HomeMy WebLinkAbout9855 Compagnoni St.I � Jill 11 1
to 110 PIZA-ugels to im ails N 11 imm
Building Division
Phone: (661) 326-3720
FAX: (661) 3i25-0266,1
August 16, 2013
Ken Dye
Dyco Development, Inc.
3321 Ellenmere Drive
Sacramento, CA 95821
RE: Notice of Decision -Site Plan Review (Project No. 13-0266)
ASE��
Jim Eggert, Planning Director
Planning Division
Phone: (66,1) 326-3733
FAX., (661) 852-21' 6
At the recommendation of the Site Plan Review Committee, your plains for a 41,736
square foot California Highway Patrol facility in an M-1 (Light Manufacturing Zone) district
at 9855 Compagnoni Street are approved.
Your proposal, with corrections as noted, meets the minimum required codes,
policies and standards for development as adopted by the Bakersfield City Council,
Specific items have been identified (see attached Site Plan Compliance List) that you
need to resolve before you can obtain a building permit or be allowed occupancy.
These items may include changes or additions that need to be shown on the final building
plans, alert you to specific fees, and/or are comments that will help you in complying with
the city's development standards. Each item will note when it is to be completed and
they have been grouped by department so that you know who to contact if you have
questions.
Your next step is to either apply for necessary building permits to construct your
project, or begin your business activities depending on the request submitted. You must
submit final building plans to the Building Division. The Site Plan Review Committee will
review these final plans while building plan check occurs to ensure that you satisfy the
items in the Site Plan Compliance List, Please read them carefully. Failure to satisfy an
item may delay your obtaining a building permit or commencing your project.
After construction of your project but before the City can allow occupancy, the
Building Division must inspect the development to find if it complies with the approved
plans, and any other relevant permits and codes. If you have satisfied all of the
requirements, the Building Director will issue a certificate of occupancy; of not, the area
inspector will give you a correction notice. Once you have made all of the corrections,
the Building Director can issue a certificate of occupancy. You may not occupy a
development until the Building Director has issued a certificate of occupancy.
City cif 'Bakersfield * 1715 Chester Avenue * Bakersfield, Ca1ifomia 9 9 3301
SM 13-0266 Page 2 q I I
In consideration by the City of Bakersfield for land use entitlements, including but
not limited to related environmental approvals related to or arising from this project, the
applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to
indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents,
employees, departments, commissioners and boards ("City " herein) against any and all
liability, claims, actions, causes of actions or demands whatsoever against them, or any of
them, before administrative or judicial tribunals of any kind whatsoever, in any way arising
from, the terms and provisions of this application, including without limitation any CEQA
approval or any related development approvals or conditions whether imposed by the
City, or not, except for City's sole active negligence or willful misconduct.
This indemnification condition does not prevent the Applicant from challenging any
decision by the City related to this project and the obligations of this condition apply
regardless of whether any other permits or entitlements are issued.
The City will promptly notify Applicant of any such claim, action, or proceeding,
failing under this condition within thirty (30) days of actually receiving such claim. The City,
in its sole discretion, shall be allowed to choose the attorney or outside law firm to defend
the City at the sole cost and expense of the Applicant and the City is not obligated to use
any law firm or attorney chosen by another entity or party.
[MM [4119 ii 0 .1 -, 7 •
Any time offer site plan approval but before the approval expires you may submit
revisions to the plan. We will treat these revisions as a new site plan application subject to
a new review and required fees. The Planning Director can only approve minor changes
to the original plan without a new application if they are necessary to meet a condition,
mitigation, or result from physical obstacles or other comparable constraints.
Approval of this site plan expires on August 15, 2015 (2 years from the decision
date), unless building permits have been issued, or on projects not requiring a building
permit, the use has commenced. The project must be completed within 5 years from the
decision date. If the property is rezoned, site plan approval will expire upon the effective
date for the rezoning unless the use is permitted itted in the new zone,
The Planning Director may extend the expiration date up to one (1) year if you
resubmit new plans for check against the code requirements in effect at that time and
include a written request for the extension. We must receive this request before expiration
of the project approval. We will not require a fee for this extension request; however,
changes to the plans originally approved for purposes other than code requirements shall
be subject to a new site plan review, including payment of all required fees.
SPR9, 13-0266 Page 3 qf'] I
A 2 ITA Mel 11 �-*V
This site plan review has been found to be exempt from the provisions of the
CaNfornia Environmental Quality Act (CEQA) according to Section 15332. This project is
exempt because it is an infill development that is consistent with the general plan and
zoning regulations, is within an area predominantly developed with urban uses, is not
identified as crifical habitat for endangered or threatened species, will not significantly,
affect traffic noise, air or wafer quality, and will be adequately served by appropriate
utilities and public services. A Notice of Exemption has been prepared and is available for
review at the Planning Division (see cover sheet for address) .
APPEAL
Any person may appeal this decision, An appeal is limited to whether or not an
adopted development standard, zoning regulation, mitigation, or policy applied • not
applied to the project, was done consistent with the authority granted by city ordinances
or the California Environmental Quality Act (CEQA). The appeal must be in writing; stating
the precise basis or issue as noted, include a $700 filing fee, and must be filed within 10
4W of the decision date to the City of Bakersfield Planning Commission (c/o Bakersfield
Planning Director, 1715 Chester Avenue, Bakersfield, CA, 93301). The Planning Commission!
will hold a public hearing on the appeal and their decision will be final unless their decision
is appealed to the City Council.
Site plan approval is based on the statements made in the application and the
plans you submitted'. Any errors or omissions on these plans could alter the compliance list
and/or void this decision. If you have questions about any of the items noted in the Site
Plan Compliance List, you must speak to the contact person representing the department
requiring that item. If you have other questions regarding general information about the
site plan review process, please contact the Planning Division at (661) 326-3733.
DECISION DATE: August 1' 6, 2013
erely,
cc: All Interested Agencies — For your records.
rma
S:\BZA-SPR\Forms\spr-data!\2013 spr\ I 3-0266,spr,1tr,docx
SPR# 13-0266 Page 4 of I I
Prior to review of improvement plans by the City, the developer shall submit
a grading plan for the proposed site to be reviewed and approved by the
City Engineer and Building Official (Bakersfield Municipal Code Section
16.44.010), With the grading plan, if the project is subject to the provisions of
the National Pollutant Discharge Elimination System (NPDES), a Notice of
Intent (NOI) to comply with the terms of the General Permit to Discharge
Storm Water Associated with Construction Activity (WQ Order No. 99-08-
DWQ) must be filed with the State Water Resources Control Board in
Sacramento before the beginning of any construction activity. Compliance
with the general permit requires that a Storm Water Pollution Prevention Plan
(SWPPP) be prepared, continuously carried out, and always be available for
public inspection during normal construction hours.
V A grading permit is required prior to final plan approval. The developer sha-V
submit 4 copies of grading plans and 2 copies of the preliminary soils report
to the Building Division. A final soils report shall also be submitted to the
Building Division before they can issue a building permit. Please note that
grading plans must be consistent with the final building site plans and
landscaping plans. Building permits will not be issued until the grad:ing
permit is approved by the Building Division, Planning Division (HCP), and
Public Works Department.
3. An approved site utilities plan is required prior to final plan approval.
4. Show on the final building plan pedestrian access from the public way and
handicap parking. Private streets are not the public way.
5. Include with or show on the final building plans information necessary to
verify that the project complies with all disability requirements of Title 24 of
the California Building Code.
6. Buildings or structures shall require installation of an automatic fire sprinkler
system where required' by current California Building Code and City
ordinance.
7. The Building Division will calculate and collect the approp(iafe school district
impact fee at the time they issue a building permit.
SP R# 13-0266
Page 5 of I I
8. Final Building plans shall show pedestrian access pathways or easements for
persons with disabilities from public rights-of-ways that connect to all
accessible buildings, facilities, elements, and spaces in accordance with the
California Building Code. These pedestrian access ways shall not be parallel
to vehicular lanes unless separated) by curbs or railings.
9. Prior to granting occupancy, the Building Division will verify that a waiter
meter serving the development is in place. Therefore, it is recommended
that the developer contact the applicable water purveyor to inquire about
their process for obfalining water service for the development as soon as
possible. To determine who the water purveyor for the development is, you
may contact the City of Bakersfield Water Resources Department (1000
Buena Vista Road, Bakersfield, CA, phone: 661-326-3715).
The minimum parking required for this project has been computed based on
use and shall be as follows,
Square
Use Footage
General Office 34,749 sf
Automobi[e Service 6,172 sf
Stara e 815 sf
Parking
Ratio
I space/250 sf
1 space/500 sf
—!�Pa000 SI
Required
Parkina
(No te: 157 s tandardparking spaces and 15 mo torcycle parkin g spaces are
,ii on the proposed site plan. By ordinance, compact and tandem
spaces cannot be counted toward meeting minimum parking
requirementsj
2. Minimum parking stall dimensions shall be 9-feet wide by 18-feet long.
Vehicles may hang over landscape areas no more than 2-1/2 feet provided
required setbacks along street frontages are maintained, and trees and
shrubs are protected from vehicles.
3. All parking lots, driveways, drive aisles, loading areas, and other vehicular
access ways, shall be paved with concrete, asphaltic concrete (A. C.), or
other paved street surfacing material in accordance with the Bakersfield
Municipal Code (Sections 15.76.020 and 17.58.060, A.).
4. Lighting is required for all parking lots, except residential lots with four units or
less (Section 17. 8.060 A.). Illumination shall be evenly distributed across the
parking area with light fixtures designed and arranged so that light is
directed downward and is reflected away from adjacent properties and
streets. Use of glare shields, or baffles may be required for glare reduction or
control of back light. No light poles, standards and fixtures, including bases
or pedestals, shall exceed a height of 40 feet above grade. However, light
standards placed less than 50 feet from residentially zoned or designated
property, or from existing residential development, shall not exceed a height
of 15 feet, The final building plans shall include a picture or diagram of the
light fixtures being used and show how light will be directed onto the parking
SM 13-0266 Page 6 of II
area. Please note that staff can require additional adjustments to installed
lighting after occupancy to resolve glare or other lighting problems if they
negatively affect adjacent properties.
5. The developer shall include a copy of a final landscape plan with each set
of the final building plans submitted to the Building Division, Building permits
will not be issued until the Planning Division has approved the final
landscape plan for consistency with approved site plans and minimum
ordinance standards (please refer to the landscaping requirements in
Chapter 17.61).
11
6. Our records show that the project is contained on more than one parcel.
These parcels shall be merged into one parcel because parking must be on
the same site as the project (Section 17.58.01 OB of the B.M.C.), building
setbacks cannot be met based on the design layout® and/or a parcel line
bisects a building. A parcel merger or lot line adjustment application
removing or relocating property lines shall be submitted to the Planning
Division before bu!il'ding permits can be issued. Recordation of the map shall
occur before final building or site occupancy can be granted. If our records
are in error and these parcels have been merged, please provide a copy of
the parcel map, subdivision map, or certificate of compliance showing the
property as one parcel. (Note: An Assessor's map is not acceptable since it
is only for tax purposes and does not verify legal parcel status.)
7. Business identification signs are neither considered nor approved under this
review. A separate sign permit reviewed by the Planning and Building
Divisions and issued by the Building Division, is required for all new signs,
including future use and construction signs. Signs must comply with the Sign
Ordinance (Chapter 17.60 of the Bakersfield Municipal Code.)
8. Habitat Conservation fees shall be required for this project and will be
calculated based on the fee in effect at the time we issue an urban
development permit (includes grading plan approvals) as defined in the
Implementation/Management Agreement (Section 2.21) for the
Metropolitan Bakersfield Habitat Conservation Plan. i Upon payment of the
fee, the applicant will receive acknowledgment of compliance with
Metropolitan Bakersfield Habitat Conservation Plan
(Implementation/Management Agreement Section 3.1.4). This fee is
currently $2,145 per gross acres, payable to the City of Bakersfield (submit to
the Planning Division), This fee must be paid before any grading or other site
disturbance occurs.
Forms and instructions are available at the Planning Division or on the city's
web site at w'ww,b,akersfieldcitY,gS, (go to Development Services
Department).
SPR9 13-0266 Page 7 of 11
The current Metropolitan Bakersfield Habitat Conservation Plan (MBHCP)
expires in year 2014. Projects may be issued an urban development permit,
grading plan approval, or building permit and pay fees prior to the 2014
expiration date under the current MBHCP,, As determined by the City of
Bakersfield, only projects ready to be issued an urban development permit,
grading plan approval or building permit before the 2014 expiration date will
be eligible to pay fees under the current MBHCP. Early payment or pre-
payment of MBHCP fees shall not be allowed. The ability of the City to issue
urban development permits is governed by the terms of the MBHCP. Urban
development permits issued after the 2014 expiration date may be subject
to a new or revised Habitat Conservation Plan, if approved, or be required to
comply directly with requests of the U.S. Fish and Wildlife Agency and the
California Fish and Game Department.
9. Burrowing Owl Notification: The burrowing owl is a migratory bird species
protected by international treaty under the Migratory Bird! Treaty Act (MBTA),
of 1918 (16 U.S,C. 703-711). The MBTA makes it unlawful to take, possess, buy,
sell, purchase, or barter any migratory bird listed in 50 C.F.R. Part 10 including
feathers or other parts, nests, eggs, or products. except as allowed by
implementing regulations (50 C.F.R. 21). Sections 3503, 35,03.5, and 3800 of
the California Deocirtment of Fish and Game Code prohibit the taking,
possession, or destruction of birds, their nests or eggs. To avoid violation of
the provisions of these laws generally requires that project related
disturbance at active nesting territories be reduced or eliminated during
critical phases of the nesting cycle (March I- August 15, annually),
Disturbance that causes nest abandonment and/or loss of reproductive
effort (e.g., killing or abandonment of eggs or young) may be considered
"taking" and is potentially punishable by fines, and/or imprisonment.
10. Prior to ground disturbance, the developer shall have a qualified consultant
survey the location for kit fox, and comply with the provisions of the
Metropolitan Bakersfield Habitat Conservation Plan. Survey protocol shall be
recommended by the State Department of Fish and Game. Developer shall
be subject to the mitigation measures recommended by the consultant. A
copy of the survey shall be provided to the Planning Department prior to
ground disturbance.
11. Rooftop areas of commercial buildings (e.g., office, retail, restaurant,
assembly, hotel, hospital, church, school), and industrial buildings adjacent
to residentially zoned properties, shall be completely screened by parapets
or other finished architectural features constructed to a height of the highest
equipment, unfinished structural element or unfinished architectural feature
of the building.
12. Open storage of materials and equipment shall be surrounded and
screened' with a solid wall or fence (screening also applies to gates). This
fence shall be at least 6 feet in height and materials shall not be stacked
above the height of the fence. (Note,: Fences taller than 6 feet are allowed
in commercial and industrial zones but they will require a building permit).
SPR4 13-0266
]'age 8 of I I
13. Areas, used for outside storage shall be treated with a permanent dust
binder or other permanent dust control measure consistent with the
regulations of the San Joaquin Valley Air Pollution Control District. (Note- All
passenger vehicle-parking areas must be paved.)
14. Refuse collection bin enclosures and container areas are subject to all
required structural setback from street frontages, and shall not reduce any
parking, loading or landscaping areas as required by the Zoning Ordinance.
15. In the event a previously undocumented oil /gas well is uncovered or
discovered on the project, the developer is responsible to contact the
Department of Conservation's Division of Oil, Gas, and Geothermal
Resources (DOGGR) , The developer is responsible for any remedial
operations on the well required by DOGGR. The developer shall also be
subject to provisions of BMC Section 15.66.080 (B).
16. The developer shall meet all regulations of the Son Joaquin Valley Air
Pollution Control District (Regulation VIII) concerning dust suppression during
construction of the project. Methods include, but are not limited to; use of
water or chemical stabilizer/suppressants to control dust emission from
disturbed area, stock piles, and access ways; covering or wetting materials
that are transported off-site; limit construction-related speed to 15 mph on all
unpaved areas/washing of construction vehicles before they enter public
streets to minimize carryout/track out; and cease grading and earth moving
during periods of high winds (20 mph or more).
17. Prior to receiving final building or site occupancy, you must contact the
Planning Division (staff contact noted above) fcr final inspection and
approval of the landscaping, parking lot, lighting and other related site
improvements. Inspections will not be conducted until all required items
have been installed. Any deviations from the approved plans, without prior
approval from the Planning Division may result in reconstruction and delays
in obtaining a building or site occupancy.
';:qIr1IIIIIIIr!,11 Fill 11111111111 IrIIIIIIIII 111111 1� III iiiiii 1 11
; 10 � : i I
RENEM A!14 AMM -'' L ka" mm
E= �
0. All fire hydrants, both offsite (nearest to site and on-site. Include flow
data on all hydrants. Hydrants shall be in good working condition
and are subject to testing for verification. Fire flow requirements must
be met prior to construction commencing on the project site. Please
provide 2 sets of the engineered water plains to Dave Weirather.
b All fire sprinkler and/orstand pipe systems, fire alarms and commercial
hoods stems. These suppression systems require review and permits
by the Fire Department. The Fire Department will issue guidelines for
these various items as they may apply to this project,
2. The developer must request an inspection from the Water Resources
Department (1000 Buena Vista Road, Bakersfield, CA, phone: 661-326-3715)
SPR4 13-0266 Page 9' of 11
for any underground sprinkler feeds at least 24 hours before they are buried,
The Prevention Services Division (1501 Truxtun Avenue, Bakersfield CA, Ph.
661/326-3979) must complete all on-site inspections, of fire sprinkler systems
and fire alarm systems before any building is occupied.
3. All access (permanent and temporary) to and around any building under
construction must be at least 20 feet wide, contain no vehicle obstruction,
and be graded to prevent standing water. Barricades must be in place
where ditches and barriers exist in or cross roadways. Emergency vehicle
access must always be reliable.
1 The developer shall construct curbs, gutters, cross gutters, 5-foot 6-inch wide
sidewalks, and street/alley paving along Compagnoni Street according to
adopted city standards. These improvements shall be shown on the final
building plans submitted to the Building Division before any building permits
will be issued.
2. The developer shall install one streetlight along Compagnoni Street as shown
by staff on the returned site plan. The developer shall be responsible for
providing the labor and materials necessary to energize all newly installed
streetlights before occupancy of the building or site. These improvements
shall be shown on the final building plans submitted to the Building Division
before any building permits will be issued.
3. The developer shall install new connection(s) to the public sewer system. This
connection shall be shown on the final building plans submitted to the
Building Division before any building permits will be issued.
4. All on-site areas required to be paved (ie. parking lots, access drives, loading
areas, etc.) shall consist of concrete, asphaltic concrete (Type B, A. C.) or
other paved street material approved by the City Engineer. Pavement shall
be a minimum thickness of 2 inches over 3 inches of approved base material
(ie. Class 11 A. B.) if concrete is used, it shall be a minimum thickness of 4
inches per Municipal Code Section 17.58.0601, paragraph A. This paving
standard shall be noted on the final building plans submitted to the Building
Division before any building permits will be issued.
5. If a grading plan is required by the Building Division, building permits wiH not
be issued until the grading plan is approved by both the Public Works
Department and the Building Division.
6. If the project generates industrial waste, it shall be subject to the
requirements of the Industrial Waste Ordinance. An industrial waste permit
must be obtained from the Public Works Department before issuance of the
building permit. To find out what type of waste is considered industrial,
please contact the Wastewater Treatment Superintendent at 661-326-3249.
7. Before any building or site can be occupied, the developer must reconstruct
or repair substandard off -site street improvements that front the site to
SPR# 13-0266 Page 10 qf 11
adopted city standards as directed by the City Engineer. Please call the
Construction Superintendent at 661-326-3049 to schedule a site inspection to
find out. what improvements may be required.
8. A street permit from the Public Works Department shall be obtained before
any work can be done within the public right-of-way (streets, alleys,
easements). Please include a copy of this site plan review decision to the
department at the time you apply far this permit.
9. A sewer connection fee shall be paid at the time a building permit is issued.
We will base this fee at the rate in effect at the time a building permit is
issued,
10. A transportation impact fee for regional facilities shall be paid at the time a
building permit is issued, or if no building permit is required, before
occupancy of the building or site. This fee will be based at the rate in effect
at the time the building permit is issued. The Public Works Department will
calculate an estimate of the total fee when you submit construction plans
for the project.
11. The developer shall form a new Maintenance District. Undeveloped parcels
within an existing Maintenance District are required to update Maintenance
District documents. Updated documents, including Proposition 218 Ballot
and Covenant, shall be signed and notarized. If there are questions,
contact Manny Behl at 661-326-3576.
1' 2. All storm water generated on the project site, including the street frontage
shall be retained'onsite unless otherwise allowed by the Public Works
Department (please contact the Public Works Department - Subdivisions at
661-326-3576).
13. This project may be located within a Planned Sewer Area. Please contact
the Public Works Department - Subdivisions at 661-326-3576 to determine
what fees may apply.
14 This project may be located within a Planned Drainage Area. Please
contact the Public Works Department - Subdivisions at 661-326-3576 t#
determine what fees may apply.
Show on the final building plans minimum 30-foot wide (top-to,-top) drive
approach(es) as indicated by staff on the returned site plan. Drive
approaches must be centered on drive aisles. All dimensions shall be shown
on the final building plans.
2. Two-way drive aisles shall be a minimum width of 24 feet. If perpendicular
(900) parking spaces are proposed where a vehicle must back into these
aisles, the minimum aisle width shall be 25 feet. All drive aisle dimension shall
be shown on the final building plans.
SPR# 13-0266 ]>age 11 of I/
Cart service 1 cubic yard/week or less I time per week
Front loader bin services I cubic yard/week - 12 cubic yards/day,
Roll-off compactor service More than 12 cubic yards/day
2. Show on the final building plans refuse bin enclosures. Each enclosure shall
be designed according to adopted city standard (Detail #ST25 A and B), at
the size checked below 2. Before occupancy of the building or site is
allowed, four 3 cubic yard front loading type refuse bin(s) shall be placed
within the required enclosure(s).
6'deep x 8'wide (1 bin) El 8'deep x 15'wide (3 bins)
N 8'deep x I O'wide (2 bins) 0 8'deep x 20'wide (4 bins)
enclosure. If both refuse and recycling containers are to be combined in
the some enclosure area, this area must be expanded in size to
accommodate multiple containers/bins (contact the staff person above for
the appropriate enclosure size).
3. Facilities that require infectious waste services shall obtain approval for
separate infectious waste storage areas from the Kern County Health
Department. In no instances shall the refuse bin area be used for infectious
waste containment purposes.
4. Facilities that require grease containment must provide a storage location
that is separate from the refuse bin location. This shall be shown on the final
building plans.
S. Facilities that participate in recycling operations must provide a location that
is separate from the refuse containment area.
STATC 14WY.
M&I
1
m
526.7
qc
. . . . . .. . ....... .
AM