HomeMy WebLinkAboutTract 7222 Drainage Study Background The approved Drainage Study for Tract 6478, McMillin Homes was prepared by Porter- Robertson Engineering & Surveying, Inc. in January 2006. This original study was done to size the main storm drain lines and the retention basin within the overall project boundary. The project site is currently partially graded with the mainlines of the sewer and storm drain in place. It is bound to the west by Tract 6553, to the north by Panama Lane, to the east by Farmers Canal, and to the south by Berkshire Road. The project site is very flat with a surface soil of silty sand and sand. This study will focus on the watershed contributing to the retention basin as named in the original study. Several revisions have been made to the initial study but the watershed boundaries will primarily stay the same. The northerly watershed (Area A) was revised to originally capture approximately 92% of the area and was reduced to about 60%. The reduced discharge will drain into inlets, where it is captured in the storm drain system and conveyed to a retention basin at the west end of Pomerado Way. The remaining southerly watershed (Area B) was increased in size and will collected in the storm drain system on Bellando Street which discharges into the retention basin. This retention basin is located in the center westerly portion of the site. The current site conditions include an expanded the retention basin into the adjacent westerly tract which will accommodate the neighboring runoff. The storm drain system has been constructed based on the previous study. Several changes have been incorporated in this study to reflect the new proposed conditions. The basin’s required sump volume was verified due to the site’s zoning alteration from an R-1 to R-2. Purpose As areas deviate from the original drainage report, subsequent studies are required to verify (1) the existing main storm drain pipe sizes can handle to proposed runoff and (2) the minimum required retention basin size for the watershed. This study will present the findings pertaining to the anticipated storm water runoff for the drainage areas tributary to and generated by the contributing areas to the retention basin. Approach The procedure used to determine the design flows are outlined in the City of Bakersfield Subdivision & Engineering Design Manual (hereafter referred to as the Manual). The pertinent steps are as follows: 1. Using a topographical map, the design grades, and the proposed development layout, determine the sub-basin boundaries within the watershed. Record the sub-basin characteristics in a tabular format similar to the one provided in the Manual. 2. Determine the initial time of concentration, (Tc), based on Section 2.3.2.1 of the Manual by using the roof gutter time and average velocity. 3. Establish the intensity based on the Intensity-Duration curves for a given event using Sheet D-1 in the Manual. 4. Determine the flow to the concentration point. 5. Route the flow to the downstream concentration points and divide the study area into defined subareas that incrementalized all flow contributions to the proposed drainage inlets. 6. Estimate flows utilizing the City’s Rational Method in accordance with the Subdivision Standards 7. Determine the rainfall depth for a 10-year, 5-day event to determine the sump size requirements. Assumptions The following information was assumed to apply: 1. SCS Soil Group B applies to the entire watershed. 2. The runoff coefficient of 0.55 is consistent over the residential zones and a runoff coefficient of 0.95 is applied to offsite roadways. Summary of Results Analysis was done verifying the viability of the existing condition but was inadequate due to the zoning adjustment to an R-2. Several changes were made to accommodate the increased runoff generated. The bottom elevation of the retention basin will be lowered two feet from 343 to 341 for additional capacity. The configuration of the storm drain system was changed to handle the upstream HGLs. Most of the storm drain system for Drainage Area A has been constructed and requires modification. An additional 24” storm drain line will be added parallel to the existing 18" RCP on Heibra Way which will extend north Callando Lane into the vacant lot and tie into a proposed manhole on Pomerado Way. For Drainage Area B, a proposed 24" RCP will run westerly on Bellando Street and tie into the basin adjacent to the access ramp. Thus existing 18" RCP on Heibra Way between Bellando Street and Pomerado Way will be abandoned. A short segment connecting the two manholes was made at the intersection of Bellando Street and Heibra Way. This storm drain system will extend along Perla Way and end at Phisto Place. Based on these proposed changes to the project and the sump requirements outlined in Section 2.82 of the Manual, the retention basin requires a minimum storage volume of 4.98 ac.ft. to accommodate the discharge 16.87 cfs from Area A and 13.06 cfs from Area B. The area of the retention basin was omitted in the study. Per Tract No. 6553 Retention Basin Design Calculations by Quad Knopf, the storage volume required for Tract 6553 is 3.74 ac-ft thus 8.72 ac.ft is required for both tracts. The provided volume for the lowered basin is 9.79 ac.ft. The HGL was calculated for the existing and proposed storm drain pipes (see appendix) using Hydraflow software. The new pipes parallel to the existing mainline were sized to keep the HGL’s below the proposed surface. The new proposed pipe sizes can be viewed in the Hydraulic Calculation section of the appendix or on the exhibit map. This study addresses only the flow to the retention basin as part of the development of Phase 2 to 5 –VTT 7222. Areas A4 & A5 will be developed at a later date. Additional studies will be required as part of future onsite development for Phase 1. ATTACHMENTS · RETENTION BASIN DESIGN CALCULATIONS · HYDROLOGY CALCULATIONS · HYDRAULIC CALCULATIONS & PROFILES · INLET SIZING CALCULATIONS · HYDROLOGY EXHIBIT BASIN EXHIBIT 08/29/13 HYDROLOGY CALCULATIONS CITY OF BAKERSFIELD RATIONAL METHOD (In accordance with City of Bakersfield Standards) TABLE OF RUNOFF COEFFICIENTS R-1, 6000 SF0.42 JOB TITLE:VTT 7222 - Onsite Improvements R-1, 7500 SF0.38 DATE:R-1, 10000 SF0.34 REVISION DATE:R-1, 15000 SF0.27 Rational Values:R-20.55 Event:10YEAR Values: 5, 10, 50R-3, R-4, M-H0.8 M.A.P.6in./yr. Values: 6, 10, 15, 20, 25, 30Commercial0.9 Industrial0.8 Curve ValuesParks0.15 a:2.38I=a+bTc (Tc<20min.)Grasslands, Type A Soil0.15 b:-0.058Grasslands, Type B Soil0.25 P60:0.550I=K1*(6.02*Tc)^(0.17*LN(p60/K1)Grasslands, Type C Soil0.35 K1:40.00 (Tc>=20min.)Grasslands, Type D Soil0.45 Pavement, drives & roofs0.95 Backyards0.05 Lawn-landscape 2% slope0.100.17 Lawn-landscape 2-7% slope0.150.22 Lawn-landscape 7% slope0.200.35 SUBAREACIARslt TcLdHQVTrial TcRoof toTmD NAMERunoff IntensityTotalTimeLengthElev.FlowVel.MIN.GutterTravelPipe Coef.(in./hr.)AreaConc.FeetDiff.SlopeCFSFPSTimeTimeDia. AC.MIN.Feet%MIN.MIN.In. PIPE SIZING CALCULATIONS 1 to 2 - Area A1 0.950.311671.741.04% 2 to 3 - Area A2 0.555.9212503.000.24% Combined A1 & A2 0.571.006.2326.1414174.740.33%3.562.1226.1415 11.14 3 to 6 252.01 0.2118 26.35 4 to 5 - Area A3 0.951.572.5614.0218086.220.34%3.812.1514.020 14.02 5 to 6 152.16 0.1218 14.14 6 to 9 0.681.008.792115.963.3726.35 1.0418 27.39 7a - Area A4 0.551.217.3020.256303.500.56%4.852.0020.2515 5.25 7a to 8 3252.74 1.9718 22.22 8 to 9 0.551.137.302474.532.5622.22 1.6118 23.83 9 to 10 0.620.9716.091999.694.0327.39 0.8221 28.21 10 to 12 0.620.9516.092579.483.9428.21 1.0921 29.30 11 - Area A6 0.551.222.4219.944951.260.25%1.631.6719.9415 4.94 11 to 12 170.92 0.3118 20.25 12 to 13 0.610.9218.515310.454.3429.30 0.2021 29.50 7b - Area A5 0.551.0911.0423.3310003.000.30%6.612.0023.3315 8.33 7b to 13 3602.11 2.8524 26.18 13 to 14 0.590.9229.5526415.973.2529.50 1.3530 30.86 14 to 15 0.590.8929.5526615.463.1530.86 1.4130 32.26 17 - Area A7 0.551.232.4019.784300.860.20%1.621.5019.7815 4.78 17 to 15 250.92 0.4518 20.23 15 to 16 0.590.8631.951716.103.2832.26 0.0930 32.35 13 to 16 - Area A8 0.551.231.7019.784300.860.20%1.151.5019.7815 4.78 16 to SUMP 0.580.8633.654816.873.4432.35 0.2330 June 21, 2013 P:\PROJECTS\12033.00-Panama\Studies\Master Drainage Study\12033_Hydrology_10yr.xls Page 1 SUBAREACIARslt TcLdHQVTrial TcRoof toTmD NAMERunoff IntensityTotalTimeLengthElev.FlowVel.MIN.GutterTravelPipe Coef.(in./hr.)AreaConc.FeetDiff.SlopeCFSFPSTimeTimeDia. AC.MIN.Feet%MIN.MIN.In. 1 to 2 - Area B1 0.951.800.5210.006251.500.24%0.891.5510.000 6.72 2 - Area B3 0.551.321.6518.333200.700.22%1.191.6018.3315 3.33 Combined B1 & B3 0.651.602.1718.332.24 2 to 3 421.18 0.5918 18.92 3 - Area B5 0.551.183.4020.826351.800.28%2.211.8220.8215 5.82 3 to 7 0.591.185.57533.872.1920.82 0.4018 21.22 4 to 5 - Area B2 0.951.800.5810.006911.730.25%0.991.5510.000 7.43 5 - Area B4 0.551.381.8617.143854.231.10%1.423.0017.1415 2.14 Combined B2 & B4 0.651.602.4417.142.52 5 to 6 421.36 0.5118 17.65 6 - Area B6 0.551.253.5319.406604.000.61%2.432.5019.4015 4.40 6 to 7 0.591.255.97434.402.4919.40 0.2918 19.69 7 to 9 0.591.1711.542737.924.4821.22 1.0218 22.24 8 - Area B7 0.551.332.2118.133100.620.20%1.611.6518.1315 3.13 8 to 9 750.91 1.3718 19.50 9 to 10 0.581.1313.751499.032.8722.24 0.8624 23.10 10 to 14 0.581.1013.753278.782.7923.10 1.9524 25.05 11- Area B8 0.551.203.1220.495601.190.21%2.051.7020.4915 5.49 11 to 12 421.16 0.6018 21.09 12 - Area B9 0.551.202.7220.325431.190.22%1.801.7020.3215 5.32 12 to 13 0.551.175.84423.771.0221.09 0.6818 21.00 13 to 14 0.551.185.84173.781.2021.00 0.2424 21.24 14 to 15 0.571.0319.5926411.603.6925.05 1.1924 26.24 15 to 16 0.571.0019.5924311.213.5726.24 1.1324 27.38 16 to 17 0.570.9719.592810.873.4627.38 0.1424 27.52 17 - Area B10 0.551.344.2017.944503.020.67%3.092.5517.9415 2.94 17 to SUMP 0.570.9723.794813.062.6627.52 0.3030 Required Sump Capacity = 0.15 x C x A = 4.98ac-ft C =0.58A =57.44ac P:\PROJECTS\12033.00-Panama\Studies\Master Drainage Study\12033_Hydrology_10yr.xls Page 2 HYDRAULIC CALCULATIONS AND PIPE PROFILES Drainage Study - Area A LineLine ID Line Length LineSizeFlowRateVelAveCapacityFullInvertDnHGLDnVelDnVelHd DnEGLDnSfDnInvertUp No. (ft) (in) (cfs) (ft/s) (cfs) (ft) (ft) (ft/s) (ft) (ft) (%) (ft) 116 to SUMP48.153016.873.759.13433463.440.18346.180.169344215 to 16173016.13.2814.06344346.53.280.17346.670.154344.02317 to1525181.620.923.64344.02346.690.920.01346.70.024344.05414 to 15265.563015.463.1511.53344.02346.693.150.15346.840.142344.23513 to 14264.253015.973.2511.56344.23347.093.250.16347.250.152344.44612 to 1352.752110.454.3512.34344.44347.654.350.29347.950.435344.76711 to 1217.19181.631.983.58353.12353.831.980.06353.890.116353.14810 to 12257.25219.483.9412.26344.76348.183.940.24348.420.358346.397b to 13360246.613.4332.78344.44347.652.10.07347.720.085352109 to 10198.6216.692.7810.05346.3349.342.780.12349.460.178347.1118 to 9247.25184.532.565.22347.1349.812.560.1349.920.186347.71127a to 8325.75184.852.746.21347.71350.292.750.12350.410.213348.85136 to 9211.2185.963.375.26347.1349.813.370.18349.990.322347.63145 to 615183.812.473.83352.42353.642.470.1353.740.133352.4415 3 to 6 25 18 3.56 2.01 3.64 347.63 350.67 2.01 0.06 350.73 0.115 347.66 LineLine IDHGLUp Grnd/RimElev Up CoverUpVelUpVelHd UpEGLUpSfUpSfAve EnergyLoss J-LossMinor Loss No. (ft) (ft) (ft) (ft/s) (ft) (ft) (%) (%) (ft) Coeff (ft) 116 to SUMP346.02355.729.223.970.24346.270.1730.1710.0830.560.14215 to 16346.52356.379.853.280.17346.690.1540.1540.02610.17317 to15346.69355.7210.170.920.01346.710.0240.0240.00610.01414 to 15347.06356.910.173.150.15347.220.1420.1420.3770.150.02513 to 14347.4935710.063.250.16347.650.1520.1520.40110.16612 to 13347.88357.510.994.340.29348.180.4350.4350.2310.29711 to 12353.85356.852.211.980.06353.910.1170.1170.0210.06810 to 12349.1357.869.813.940.24349.340.3580.3580.92210.2497b to 13352.91 j357.23.24.750.35353.260.4730.2791.0051n/a 109 to 10349.69357.358.52.780.12349.810.1780.1780.35410.12118 to 9350.27356.97.692.560.1350.380.1860.1860.460.150.02127a to 8350.98357.57.152.740.12351.10.2130.2130.69510.12136 to 9350.49356.87.673.370.18350.670.3220.3220.6810.18145 to 6353.66356.152.212.470.1353.760.1330.1330.0210.115 3 to 6 350.7 356.15 6.99 2.01 0.06 350.76 0.115 0.115 0.029 1 0.06 SUMP 16 - CB# 5 15 17 - CB# 4 Line No. 1 Line No. 2 Line No. 3 15 14 13 Line No. 4 Line No. 5 13 12 11 - CB# 3 Line No. 6 Line No. 7 10 13 12 Line No. 6 Line No. 8 13 7b Line No. 9 10 9 6 Line No. 10 Line No. 13 9 8 7a Line No. 11 Line No. 12 9 6 5 - CB# 1 Line No. 13 Line No. 14 6 3 - CB# 2 Line No. 15 Drainage Study - Area B LineLineIDLineLengthLineSizeFlowRateVelAveCapacityFullInvertDnHGLDnVelDnVelHd DnEGLDnSfDnInvertUpNo. (ft) (in) (cfs) (ft/s) (cfs) (ft) (ft) (ft/s) (ft) (ft) (%) (ft) 117 to SUMP44.2012413.064.1624.063433464.160.27346.270.334343.5216 to 1728.2812410.873.4630.07343.5346.33.460.19346.480.231344315 to 16243.3792411.213.578.58344346.433.570.2346.630.246344.35414 to 15264.2172411.63.697.49344.35347.063.690.21347.270.263344.64510 to 14310248.784.0124.44344.64347.962.80.12348.090.151348.2669 to 10141.781249.032.876.85348.26350.262.870.13350.390.159348.3977 to 9273187.924.483.48348.39350.614.480.31350.930.569348.6983 to 752.75183.872.193.54348.69352.482.190.07352.550.136348.7592 to 344182.241.273.54348.75352.631.270.02352.650.046348.8 108 to 975.2181.612.1318.52348.39350.610.910.01350.630.024350.731113 to 1417183.782.143.6344.64347.962.140.07348.040.13344.661212 to 1343.031183.772.1312.19344.66348.062.130.07348.130.129345.241311 to 1250182.051.163.32345.24348.181.160.02348.20.038345.29146 to 742.75184.42.493.59348.69352.482.490.1352.580.176348.7415 5 to 6 44 18 2.52 1.43 3.54 348.74 352.65 1.43 0.03 352.68 0.058 348.79 LineLineIDHGLUp Grnd/RimElev Up CoverUpVelUpVelHd UpEGLUpSfUpSfAve EnergyLoss J-LossMinorLoss No. (ft) (ft) (ft) (ft/s) (ft) (ft) (%) (%) (ft) Coeff (ft) 117 to SUMP346.15353.47.94.160.27346.420.3330.3330.1470.550.15216 to 17346.36354.88.83.460.19346.550.2310.2310.0650.370.07315 to 16347.03356.410.053.570.2347.230.2460.2460.5980.150.03414 to 15347.75357.3310.693.690.21347.960.2630.2630.69510.21510 to 14349.32 j357.57.245.220.42349.740.5020.3261.0121n/a69 to 10350.49355.855.462.870.13350.610.1590.1590.22610.1377 to 9352.17353.83.614.480.31352.480.5690.5691.55310.3183 to 7352.55353.43.152.190.07352.630.1360.1360.07210.0792 to 3352.65353.43.11.270.02352.670.0460.0460.0210.02108 to 9351.21 j354.612.383.340.17351.380.4930.2580.1941n/a1113 to 14347.99357.3311.172.140.07348.060.130.130.02210.071212 to 13348.11356.59.762.130.07348.180.1290.1290.05510.071311 to 12348.2356.59.711.160.02348.220.0380.0380.01910.02146 to 7352.56353.43.162.490.1352.650.1760.1760.07510.115 5 to 6 352.68 353.4 3.11 1.43 0.03 352.71 0.058 0.058 0.025 1 0.03 SUMP 17 - CB# 6 16 Line No. 1 Line No. 2 16 15 14 Line No. 3 Line No. 4 Line No. 5 14 10 10 9 Line No. 6 9 7 Line No. 7 7 3 - CB# 10 2 - CB# 12 Line No. 8 Line No. 9 9 8 - CB# 9 Line No. 10 14 13 12 - CB# 7 11 - CB# 8 Line No. 11 Line No. 12 Line No. 13 7 6 - CB# 11 5 - CB# 13 Line No. 14 Line No. 15 INLET SIZING CALCULATIONS Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Thursday, Jul 25 2013 Catch Basin 1 - Drainage Study Areas A3 Curb Inlet Location= Sag Curb Length (ft)= 7.00 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 3.81 Highlighted Q Total (cfs)= 3.81 Q Capt (cfs)= 3.81 Q Bypass (cfs)= -0- Depth at Inlet (in)= 5.48 Efficiency (%)= 100 Gutter Spread (ft)= 8.20 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Thursday, Jul 25 2013 Catch Basin 2 - Drainage Study Areas A1 & A2 Curb Inlet Location= Sag Curb Length (ft)= 7.00 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 3.56 Highlighted Q Total (cfs)= 3.56 Q Capt (cfs)= 3.56 Q Bypass (cfs)= -0- Depth at Inlet (in)= 5.33 Efficiency (%)= 100 Gutter Spread (ft)= 7.56 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Wednesday, Jun 19 2013 Catch Basin 3 - Drainage Study Areas A6 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 1.63 Highlighted Q Total (cfs)= 1.63 Q Capt (cfs)= 1.63 Q Bypass (cfs)= -0- Depth at Inlet (in)= 4.58 Efficiency (%)= 100 Gutter Spread (ft)= 4.45 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Wednesday, Jun 19 2013 Catch Basin 4 - Drainage Study Areas A7 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 1.62 Highlighted Q Total (cfs)= 1.62 Q Capt (cfs)= 1.62 Q Bypass (cfs)= -0- Depth at Inlet (in)= 4.57 Efficiency (%)= 100 Gutter Spread (ft)= 4.41 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Wednesday, Jun 19 2013 Catch Basin 5 - Drainage Study Areas A8 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 1.15 Highlighted Q Total (cfs)= 1.15 Q Capt (cfs)= 1.15 Q Bypass (cfs)= -0- Depth at Inlet (in)= 4.04 Efficiency (%)= 100 Gutter Spread (ft)= 2.22 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Wednesday, Jun 19 2013 Catch Basin 6 - Drainage Study Areas B10 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 3.09 Highlighted Q Total (cfs)= 3.09 Q Capt (cfs)= 3.09 Q Bypass (cfs)= -0- Depth at Inlet (in)= 5.95 Efficiency (%)= 100 Gutter Spread (ft)= 10.17 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Catch Basin 7 - Drainage Study Areas B9 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 1.80 Highlighted Q Total (cfs)= 1.80 Q Capt (cfs)= 1.80 Q Bypass (cfs)= -0- Depth at Inlet (in)= 4.77 Efficiency (%)= 100 Gutter Spread (ft)= 5.23 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Thursday, Jul 25 2013 Catch Basin 8 - Drainage Study Areas B8 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 2.05 Highlighted Q Total (cfs)= 2.05 Q Capt (cfs)= 2.05 Q Bypass (cfs)= -0- Depth at Inlet (in)= 5.03 Efficiency (%)= 100 Gutter Spread (ft)= 6.31 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Thursday, Jul 25 2013 Catch Basin 9 - Drainage Study Areas B7 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 1.61 Highlighted Q Total (cfs)= 1.61 Q Capt (cfs)= 1.61 Q Bypass (cfs)= -0- Depth at Inlet (in)= 4.57 Efficiency (%)= 100 Gutter Spread (ft)= 4.41 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Thursday, Jul 25 2013 Catch Basin 10 - Drainage Study Areas B5 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 2.21 Highlighted Q Total (cfs)= 2.21 Q Capt (cfs)= 2.21 Q Bypass (cfs)= -0- Depth at Inlet (in)= 5.15 Efficiency (%)= 100 Gutter Spread (ft)= 6.83 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Wednesday, Jun 19 2013 Catch Basin 11 - Drainage Study Areas B6 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 2.43 Highlighted Q Total (cfs)= 2.43 Q Capt (cfs)= 2.43 Q Bypass (cfs)= -0- Depth at Inlet (in)= 5.37 Efficiency (%)= 100 Gutter Spread (ft)= 7.73 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Wednesday, Jun 19 2013 Catch Basin 12 - Drainage Study Areas B1 & B3 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 2.08 Highlighted Q Total (cfs)= 2.08 Q Capt (cfs)= 2.08 Q Bypass (cfs)= -0- Depth at Inlet (in)= 5.04 Efficiency (%)= 100 Gutter Spread (ft)= 6.35 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc.Wednesday, Jun 19 2013 Catch Basin 13 - Drainage Study Areas B2 & B4 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 2.34 Highlighted Q Total (cfs)= 2.34 Q Capt (cfs)= 2.34 Q Bypass (cfs)= -0- Depth at Inlet (in)= 5.28 Efficiency (%)= 100 Gutter Spread (ft)= 7.38 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- DRAINAGE EXHIBIT VOLUME REQ'D: 8.72 AC.FT. VOLUME PROVIDED: 9.80 AC.FT.D.W.S.: 351.0BOTTOM ELEV.: 341.0 8/29/13