Loading...
HomeMy WebLinkAbout2012 RESULTSSWRCB, January 2002 Page of Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner /operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Mesa Marin Chevron & Food Mart Date of Testing: 07/16/12 Facility Address: 1 1 101 Highway 178 Bakersfield, C.A. 93306 Facility Contact: Moe Phone: 661- 366 -4886 Date Local Agency Was Notified of Testing: 4/13/12 Name of Local Agency Inspector (ifpresent during testing): Ester 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Pass Technician Conducting Test: Frank Landa Not Tested Credentials: x CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester License Type: CSLB Fail License Number:804904 Manufacturer Manufacturer Training Component(s) ) Date Training Expires Franklin Fueling Incon 9/20/12 ❑ ❑ ❑ ❑ ❑ 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made U.D.C. 1 -2 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ U.D.C. 3-4 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ If hydrostatic testing was performed, describe what was done with the water after completion of tests: Water was put back into testing trailer CERTIFICATION OF TECHNICIAJ5LAESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the fa is stated t ti do ument are accurate and in full compliance with legal requirements Technician's Signature Date: 07/16/12 SWRCB, January 2002 7. UNDER- DISPENSER CONTAINMENT DC TESTING Page of Test Method Developed By: ❑ UDC Manufacturer x Industry Standard ❑ Professional Engineer ❑ Other (Specify) Test Method Used: ❑ Pressure ❑ Vacuum x Hydrostatic ❑ Other (Spec) Test Equipment Used: Ts -sts Equipment Resolution: gg UDC #1 -2 UDC #34 UDC # UDC # UDC Manufacturer: Environ Environ UDC Material: Com sit Compsit UDC Depth: 12" 12" Height from UDC Bottom to Top of Highest Piping Penetration: 0" 0" Height from UDC Bottom to Lowest Electrical Penetration: 0" 0" Condition of UDC prior to testing: Clean & Dry Clean & Dry Portion of UDC Tested 8" 8" Does turbine shut down when UDC sensor detects liquid (both product and water) ?* ❑ Yes ❑ No xNA ❑ Yes ❑ No xNA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA Turbine shutdown response time N.A. N.A. Is system programmed for fail- safe shutdown ?* ❑ Yes ❑ No xNA ❑ Yes ❑ No xNA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA Was fail -safe verified to be operational?* ❑ Yes ❑ No xNA ❑ Yes ❑ No xNA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA Wait time between applying pressure /vacuum /water and starting test 5 min 5 min Test Start Time: Initial Reading (RI): bee 11 CON Test End Time: Ran 11ta Final Reading (RF): Test Duration: Change in Reading (RF -R,): Pass /Fail Threshold or Criteria: Test Result: X Pass ❑ Fail X Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail Was sensor removed for testing? ❑Yes ❑ No X NA ❑Yes ❑ No X NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA Was sensor properly replaced and verified functional after testing? ❑Yes ❑ No X NA ❑Yes ❑ No X NA []Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests) Replaced (9) piains- penetrations all tested ok ' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to a� of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) i�KmxCSi�.�ati��hs:. wz:_�.•:.a:.V:�:.a. �.n. �rw.�;n:w•.i. !� ����.� r . PL? �f67LX`1n+G(99CY..+.:- ;•.�a�n.. .c.r.�.. u MESA FJAKf- k" F 1 [ LD l2 L i: ;r' 'Ii :Ili 1110 1-2 [I'D i I'T v:16 PH VL SS; I Ifit' 3 u0c 37�41 It: Z : "i V Hl 04D TIMF 1:0 1 I'M Epl', DAiF 1c /2')12 RiF.' LEVEL 2.3696 III TES( k'�SUI.:' PASSED J S; UD", )-el m": 12:@f; PIl Ihl L I IU I ME I :o I pl'i END D A IF. 10/ e L 1 L L*A., E%, kES& u0c 37�41 It: Z : "i V Hl 04D TIMF 1:0 1 I'M Epl', DAiF 1c /2')12 RiF.' LEVEL 2.3696 III TES( k'�SUI.:' PASSED J S; UD", )-el Ihl L I IU I ME I :o I pl'i END D A IF. 10/ e L 1 L L*A., E%, kES& u0c 37�41 It: Z : "i V Hl 04D TIMF 1:0 1 I'M Epl', DAiF 1c /2')12 RiF.' LEVEL 2.3696 III TES( k'�SUI.:' PASSED