HomeMy WebLinkAbout2012 RESULTSF2; /
SWRCB, January 2002
t151'-r1:)
Page —�— of
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested The completed form, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner /operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
2_ TFSTTNG CONTRACTOR TNFORMATTON
Company Name: RICH ENVIRONMENTAL
OF
Technician Conducting Test: RICH PHILLIPS
RESULTS
Credentials: X CSLB Licensed Contractor
❑ SWRCB Licensed Tank Tester
License Type: C61/1340 A HAZ
Not
Tested
License Number: 809850
Manufacturer Training
Manufacturer Component(s) Date Training Expires
INCON
TS -STS 6/11/2012
Not
Tested
Repairs
Made
87REG ANNULAR
X
❑
❑
3. SUMMARY
OF
TEST
RESULTS
Component
Pass
Fail
Not
Tested
Repairs
Made
Component
Pass
Fail
Not
Tested
Repairs
Made
87REG ANNULAR
X
❑
❑
❑
UDC #3/4
❑
❑
X
❑
91PREM ANNULAR
X
❑
❑
❑
UDC #5/6
❑
❑
X
0
DIESEL ANNULAR
X
❑
❑
I ❑
UDC #7/8
❑
X
❑
❑
87 #1 REG SECONDARY
❑
❑
X
1 ❑
UDC #9/10
X
❑
❑
❑
87 #2 REG SECONDARY
❑
❑
X
❑
UDC #11/12
❑
❑
X
0
91 #1 PREM SECONDARY
❑
❑
X
❑
87REG FILL SUMP
X
❑
0
❑
91 #2 PREM SECONDARY
❑
❑
X
❑
91PREM FILL SUMP
X
❑
❑
❑
DIESEL SECONDARY
n
n
X
n
DIESEL FILL SUMP
X
n
n
n
87REG STP
X
❑
❑
❑
87REG VAPOR BKT
X
❑
❑
❑
91PREM STP
X
❑
❑
❑
91 PREM VAPOR BKT
X
❑
0
❑
DIESEL STP
X
0
❑
❑
❑
❑
❑
❑
UDC #1/2
X
❑
❑
❑
❑
❑
0
❑
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TECRN CIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts state n this document are accurate and in full compliance with legal requirements
Technician's Signature: Date: 315/12
LF5n45
SWRCB January ?2002 Page 7/ of , k
4. TANK ANNULAR TESTING
Test Method Developed By: ❑ Tank Manufacturer ❑ Industry Standard ❑ Professional Engineer
❑ Other (Spec)
Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic
❑ Other (Specify)
Test Equipment Used:
Equipment Resolution:
Tank #87
Is Tank Exempt From Testing ?' ❑ Yes X No
0
Tank #DSL
Tank #
Tank #91
❑ Yes X No
❑ Yes X No
❑ Yes ❑ No
Tank Capacity:
20K
15K
8K
Tank Material:
FIBERGLASS
FIBERGLASS
FIBERGLASS
Tank Manufacturer:
UNKNOWN
UNKNOWN
UNKNOWN
Product Stored:
87
91
DIESEL
Wait time between applying
pressure/vacuum/water and
starting test:
30MIN
30MIN
30MIN
Test Start Time:
9:30
9:30
10:45
Initial Reading (R,):
10.0
10.5
10.0
Test End Time:
10:30
10:30
11:45
Final Reading (RF):
10.0
10.5
10.0
Test Duration:
60 MIN
60 MIN
60 MIN
Change in Reading (RF -Rj):
0
0
0
Pass/Fail Threshold or Criteria:
0
0
0
Test Result:
X Pass ❑ Fail
X Pass ❑ Fail
X Pass ❑ Fail
❑ Pass ❑ Fail
Was sensor removed for testing? X Yes ❑ No ❑ NA X Yes ❑ No ❑ NA X Yes ❑ No C NA ❑ Yes ❑ No DNA
Was sensor properly replaced and X Yes ❑ No ❑ NA X Yes ❑No ❑ NA X Yes ❑ No ON A D Yes ❑ No DNA
verified functional after testis ?
Comments — (include information on repairs made prior to testis& and recommendedfollow -up for failed tests)
' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. (Califomia Code of Regulations, Title 23, Section 2637(a)(6))
SWRCB, January 2002
5. SECONDARY PIPE TESTING
—L., Ay
Page -.5 of '1
Test Method Developed By: ❑ Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer
❑ Other (Spec)
Test Method Used: ❑ Pressure ❑ Vacuum D Hydrostatic
❑ Other (Sped)
Test Equipment Used:
Equipment Resolution:
Piping Run #87 #1
Piping Run #87 #2
Piping Run 491 #1
Piping Run #91 #2
Piping Material:
PLASTIC
PLASTIC
PLASTIC
PLASTIC
Piping Manufacturer:
TCI
TCI
TCI
TCI
Piping Diameter:
2"
2"
2"
2"
Length of Piping Run:
75"
75"
75"
75"
Product Stored:
87
87
91
91
Method and location of
piping-run isolation:
BOOT IN SUMP
BOOT IN SUMP
BOOT IN SUMP
BOOT IN SUMP
Wait time between applying
pressure/vacuum /water and
starting test:
30 MIN
30 MIN
30 MIN
30 MIN
Test Start Time:
Initial Reading (Rj):
Test End Time:
Final Reading (RF):
Test Duration:
60 MIN
60 MIN
60 MIN
60 MIN
Change in Reading (RF -Rj):
Pass/Fail Threshold or
Criteria:
0 PST
0 PSI
0 PSI
0 PSI
Test Result:
❑Pass ❑Fail
❑ Pass ❑ Fail
❑ Pass ❑ Fail
❑ Pass ❑ Fail
Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
UNABLE TO TEST DUE TO DONUTS IN UDC WERE REMOVED. WE DID REINSTALL ON
DISP #1/2, #9/10. NEED TO GO BACK TO REMOVE PIPING TO GET TO DONUTS.
SWRCB, January 2002
5. SECONDARY PIPE TESTING
Ti 514,3
Page � of
Test Method Developed By: ❑ Piping Manufacturer X Industry Standard ❑ Professional Engineer
❑ Other (Spec)
Test Method Used. X Pressure ❑ Vacuum ❑ Hydrostatic
❑ Other (Specify)
Test Equipment Used: 4" DIAL GAUGE
Equipment Resolution: .5%
INPiping Run #DSL
Piping Run #
Piping Run #
Piping Run #
Piping Material:
PLASTIC
Piping Manufacturer:
TCI
Piping Diameter.
2"
Length of Piping Run:
75'
Product Stored:
DIESEL
Method and location of
piping-run isolation:
BOOT IN SUMP
Wait time between applying
pressure/vacuum/water and
starting test:
30 MIN
Test Start Time:
Initial Reading (R,):
Test End Time:
Final Reading (RF):
Test Duration:
60 MIN
Change in Reading (RF -R,):
Pass/Fail Threshold or
Criteria:
0 PSI
0 PSI
0 PSI
0 PSI
Test Result:
❑ Pass ❑ Fail
❑ Pass ❑ Fail
❑ Pass ❑ Fail
❑ Pass ❑ Fail
COmmellb — (include information on repairs made prior to testing and recommended follow- up_for failed tests)
UNABLE TO TEST DUE TO DONUTS REMOVED. NEED TO REMOVE PIPING TO GET TO
DONUTS AND REINSTALL.
SWRCB, January 2002
6. PIPING SUMP TESTING
X143
Page iie" of
Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard 0 Professional Engineer
❑ Other (Spec)
Test Method Used: 0 Pressure ❑ Vacuum 0 Hydrostatic
0 Other (Specify)
Test Equipment Used: Equipment Resolution:
MOM
Sump #87 Sump #91 Sump #DSL
Sump #
Sump Diameter.
46"
46"
46"
Sump Depth:
62"
62"
62"
Sump Material:
FIBERGLASS
FIBERGLASS
FIBERGLASS
Height from Tank Top to Top of
Highest Piping Penetration:
27"
27"
27"
Height from Tank Top to Lowest
Electrical Penetration:
17"
17"
17"
Condition of sump prior to testing:
GOOD
GOOD
GOOD
Portion of Sump Tested'
29"
29"
29"
Does turbine shut down when
sump sensor detects liquid (both
product and water) ?*
0 Yes 0 No X NA
0 Yes 0 No X NA
❑ Yes 0 No X NA
0 Yes 0 No ❑ NA
Turbine shutdown response time
Is system programmed for fail -safe
shutdown ?'
0 Yes 0 No X NA
0 Yes ❑ No X NA
❑ Yes D No X NA
0 Yes 0 No 0 NA
Was fail -safe verified to be
operational?*
0 Yes 0 No X NA
0 Yes 0 No X NA
❑ Yes ❑ No X NA
0 Yes D No 0 NA
Wait time between applying
pressure /vacuum/water and starting
test:
30 MIN
30 MIN
30 MIN
Test Start Time:
11:47 12:29
11:47
12 :29
11:47
12:29
Initial Reading (Rj):
6.447 6.442
2.084
2.084
1.768
1.768
Test End Time:
12:02 12:45
12:02
12:45
12:02
12:45
Final Reading (RF):
6.447 6.442
2.084
2.084
1.767
1.767
Test Duration:
15MIN 15MIN
15MIN
ISMIN
ISMIN
15MIN
Change in Reading (RF -R,):
-.000 -.000
-.000
-.000
-.00I
-.001
Pass/Fail Threshold or Criteria:
-.002 i 502
-.002
-.002
-.002
-.002
Test Result:
X Pass 0 Fail
X Pass 0 Fail
X Pass 0 Fail
❑ Pass 0 Fail
Was sensor removed for testing?
X Yes 0 No ❑ NA
X Yes D No DNA
X Yes D No ❑ NA
D Yes 0 No ❑ NA
Was sensor properly replaced and
verified functional after testin ?
X Yes 0 No ❑ NA
X Yes ❑ No ❑ NA
X Yes 0 No DNA
❑ Yes 0 No 0 NA
COMMWAS — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
' if the entire depth of the sump is not tested, specify how much was tested. If the answer to gny of the questions indicated with an
asterisk ( *) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160)
SWRCB, January 2002
7. UNDER- DISPENSER CONTAINMENT (UDQ TESTING
Page —to of Or
Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard ❑ Professional Engineer
❑ Other (Specify)
Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic
❑ Other (Spec)
Test Equipment Used:
Equipment Resolution:
UDC #1/2
UDC #3/4
UDC #516
UDC #7/8
UDC Manufacturer.
UNKNOWN
UNKNOWN
UNKNOWN
UNKNOWN
UDC Material:
FIBERGLASS
FIBERGLASS
FIBERGLASS
FIBERGLASS
UDC Depth:
36"
36"
36"
36"
Height from UDC Bottom to Top
of Highest Piping Penetration:
19"
19"
16"
IT,
Height from UDC Bottom to
Lowest Electrical Penetration:
20"
20"
19"
21"
Condition of UDC prior to
testing:
GOOD
GOOD
GOOD
GOOD
Portion of UDC Tested
21"
Does turbine shut down when
UDC sensor detects liquid (both
product and water) ?'
❑ Yes ❑ No X NA
❑ Yes ❑ No ❑ NA
❑ Yes ❑ No ❑ NA
❑ Yes ❑ No ❑ NA
Turbine shutdown response time
Is system programmed for fail -
safe shutdown ?*
❑ Yes ❑ No X NA
❑Yes ❑ No ❑ NA
❑Yes 0 No ❑ NA
❑Yes ❑ No ❑ NA
Was fail -safe verified to be
operational?*
❑ Yes ❑ No X NA
❑ Yes ❑ No ❑ NA
❑ Yes ❑ No ❑ NA
❑ Yes D No ❑ NA
Wait time between applying
pressure /vacuum/waterand
starting test
30MIN�
/V
/
Test Start Time:
6:17 6:45
Initial Reading j):
3.570 3.571
Test End Time:
6:32 7:00
Final Reading (RF):
3.571 3.571
Test Duration:
15MIN 15MIN
Change in Reading RF -RI).
-.002 -.002
Pass/Fail Threshold or Criteria:
.0021N .002rN
.0021N
.002IN
.0021N
.002IN
002IN
.0021N
Test Result: I
X Pass ❑ Fail
❑ Pass ❑ Fail
❑ Pass ❑ Fail
❑ Pass Fail
Was sensor removed for testing?
X Yes ❑ No ❑ NA
❑ Yes ❑ No ❑ NA
D Yes D No ❑ NA
❑ Yes ❑ o ❑ NA
Was sensor properly replaced and
verified functional after testing?.
X Yes ❑ No ❑ NA
❑ Yes ❑ No ❑ NA
❑ Yes p No ❑ NA
❑ Yes ❑ No ❑ NA
Comments — (include information on repairs made prior to testing; and recommended follow -up for failed tests)
UNABLE TO TEST DUE TO DONUTS REMOVED FROM DISP #3/4,5/6,11/12.
DISP #7/8 HAS TORN PENETRATION 91 LINE — DISP #7 SIDE
If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
7. UNDER- DISPENSER CONTAINMENT (UDC) TESTING
ria3
Page l of y
Test Method Developed By: 0 UDC Manufacturer X Industry Standard 0 Professional Engineer
0 Other (Specify)
Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic
❑ Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC #9/10
UDC Manufacturer. UNKNOWN
UDC #11/12
UDC #
UDC #
UNKNOWN
UDC Material:
FIBERGLASS
FIBERGLASS
UDC Depth:
36"
36"
Height from UDC Bottom to Top
of Highest Piping Penetration:
12"
10"
Height from UDC Bottom to
Lowest Electrical Penetration:
16"
16"
Condition of UDC prior to
testing:
GOOD
GOOD
Portion of UDC Tested
14"
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
❑ Yes ❑ No X NA
❑ Yes ❑ No ❑ NA
0 Yes 0 No 0 NA
❑ Yes ❑ No ❑ NA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown ?'
❑Yes ❑No XNA
OYes DNo DNA
❑Yes ONo DNA
0Yes 0 N 0 N
Was fail -safe verified to be
operational?*
0 Yes 0 No X NA
0 Yes 0 No ❑ NA
❑ Yes ❑ No ❑ NA
❑ Yes 0 No ❑ NA
Wait time between applying
pressure /vacuum/water and
starting test
30MIN
/
N 1 30M
4% Y✓�
Test Start Time:
4:57
5:15
Initial Reading R,):
2.071
2.072
Test End Time:
5:12
5:36
Final Reading (RF ):
2.073
2.073
Test Duration:
15MIN
15MIN
Change in Reading (RF -Rj):
+,002
+.001
Pass/Fail Threshold or Criteria:
.002
.002
Test Result:
X Pass Cl Fail
0 Pass ❑ Fail
0 Pass ❑ Fail
0 Pass 0 Fail
Was sensor removed for testing?
X Yes 0 No 0 NA
0 Yes ❑ No ❑ NA
0 Yes 0 No ❑ NA
❑ Yes 0 No ❑ NA
Was sensor properly replaced and
verified functional after testin ?
X Yes 0 No ❑ NA
❑ Yes 0 No DNA
0 Yes 0 No 0 NA
❑ Yes ❑ No ❑ NA
Comments — (include information on repairs made prior to testing, and recommendedfollow -up for failed tests)
DISP #11/12 UNABLE TO INSTALL DONUT WITHOUT REMOVING PIPE TO TEST.
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an
asterisk (*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
8. FILL RISER CONTAINMENT SUMP TESTING
L45 1
Page -,b of O� //
Facility is Not Equipped With Fill Riser Containment Sums ❑
Fill Riser Containment Sumps are Present, but were Not Tested ❑
Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard ❑ Professional Engineer
❑ Other (Specify)
Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic
❑ Other (Specify)
Test Equipment Used:
Equipment Resolution:
Sum Diameter:
MKOURNMOM
Fill Sump #87
Fill Sump #91
Fill Sump #DSL
Fill Sump #
37"
37"
3T'
Sum De the
61"
61"
61"
Height from Tank Top to Top of
Piping Penetration:
0
0
0
-Highest
Height from Tank Top to Lowest
Electrical Penetration:
0
0
0
Condition of sump prior to
testing:
GOOD
GOOD
GOOD
Portion of Sump Tested
10"
10"
10"
Sump Material:
FIBERGLASS
FIBERGLASS
FIBERGLASS
Wait time between applying
pressure/vacuum /water and
starting test:
30MIN
30MIN
30MIN
Test Start Time:
10:29
10:47
10:29
10 :47
11:47
12:04
Initial Reading (R,):
7.067
7.068
7.017
7.024
2.720
7.722
Test End Time:
10:44
11:02
10:44
11:02
12:02
12:19
Final Reading (RF :
7.067
7.068
7.017
7.027
2.722
2.722
Test Duration:
15MIN
15MIN
15MIN
15MIN
15MIN
15MIN
Chan &e in Reading (RF -Rj):
-.000
-.000
-.000
1 -.000
+.002
-.000
Pass/Fail Threshold or Criteria:
-.002
1 -.002
-.002
1 -.002
-.002
1 -.002
Test Result:
X Pass ❑ Fail
X Pass ❑ Fail
X Pass ❑ Fail
❑ Pass ❑ Fail
Is there a sensor in the sump?
❑ Yes X No
❑ Yes X No
❑ Yes X No
❑ Yes ❑ No
Does the sensor alarm when
either product or water is
detected?
❑ Yes ❑ No X NA
❑ Yes ❑No XNA
❑ Yes ❑ No XNA
❑ Yes 0 No ❑ NA
Was sensor removed for testing?
❑ Yes ❑ No X NA
❑Yes ❑No XNA
[]Yes ❑No XNA
❑ Yes ❑No DNA
Was sensor properly replaced ?
and
verified functional after testin
❑ Yes ❑ No X NA
❑ Yes ❑No XNA
❑ Yes ❑ No XNA
❑ Yes ❑ No DNA
CCOMMell S — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
SWRCB, January 2002
9. SPHAJOVERFILL CONTAINMENT BOXES
L)ISILF3 �/
Page �[__ of
Facility is Not Equipped With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: 0 Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer
0 Other (Spec)
Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic
0 Other (Spec)
Test Equipment Used:
Equipment Resolution:
Spill Box #87 VPR
Boom
Spill Box #
Spill Box 991 VPR
Spill Box #
Bucket Diameter:
12"
12"
Bucket Depth:
10"
10"
Wait time between applying
pressure/vacuum /water and
starting test:
30MIN
30MIN
Test Start Time:
10:29
10:47
10:29
10:47
Initial Reading (Rj):
1.165
1.165
1.676
1.675
Test End Time:
10:44
11:02
10:44
11:02
Final Reading (RF):
1.165
1.165
1.676
1.675
Test Duration:
15MIN
15MIN
15MIN
15MIN
Change in Reading (RF -Ri):
-.000
-.000
-.000
-.000
Pass/Fail Threshold or
Criteria:
-.002
-.002
-.002
-.002
Test Result:
X Pass ❑ Fail
X Pass 0 Fail
❑ Pass 0 Fail
0 Pass ❑ Fail
Comments — (include in on repairs made prior to testing and recommended follow -up for falled tests)
CHEVRON
1999 TAFE HWY
SAKERSFIELD CA
03/05/2012 10:45 AM
SUMP LEAK TEST REPORT
87VPR
TEST STARTED 10:29 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 1.1659 IN
END TIME 10:44 AM
END DATE 03/05/2012
END LEVELS 1.1650 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91VPR
TEST STARTED 10:29 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 1.6768 IN
END TIME 10:44 AM
END DATE 03/05/2012
END LEVEL 1.6767 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
87FILS
TEST STARTED 10:29 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 7.0675 IN
END TIME 10:44 AM
END DATE 03/05/2012
END LEVEL 7.0671 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91FILS
TEST STARTED 10:29 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 7,0175 IN
END TIME 10:44 AM
END DATE 03/05/2012
END LEVEL 7.0172 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
CHEURON
1999 TAFT HWY
BAKERSFIELD CA
03/05/2012 11:02 AM
SUMP LEAK: TEST REPORT
87VPR
TEST STARTED 10:47 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 1.1650,IN
ENE) TIME 11:02 AM
END DATE 03/05/2012
END LEVEL 1.1653 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91VPR
TEST STARTED 10:47 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 1.6759 IN
END TIME 11:02 AM
END.DATE 03/05 /2012
END LEVEL 1.6758 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
87FILS
TEST STARTED 10:47 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 7.0668 IN
END TIME 11:02 AM
END DATE 03/05/2012
END LEVEL 7.0669 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
91FILS
TEST STARTED 10:47'AM
TEST STARTED 03/05/2012
BEGIN LEVEL 7.0240 IN
END TIME 11:02 All
ENti DATE 03/05/2012
END 1_EVEL 7.0240 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
- LrDILL5
CHEVRON
1'?99 �Ai=7 bA
BAKERSFIELD CA .
03/05/2012 12:02 PM
SUMP LEAK; TEST REPORT
87STR
TEST STARTED 11 :47 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 6.4479 IN
END TIME 12:02 PM
END DATE 03/05/2012
END LEVEL 6.4478 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91 STP
TEST STARTED 11:47 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 2.0847 IN
END TIME 12:02 PM
END DATE 03/05/2012
END LEVEL 2.0844 IN
LEAK: THRESHOLD 0.002 IN
TEST RESULT PASSED
DSLFILS
TEST STARTED 11:47 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 2.7202 IN
END TIME 12:02 PM
END DATE 03/05/2012
END LEVEL 2.7228 IN
LEAK, THRESHOLD 0.002 IN
TEST RESULT INCREASED
L)SLSTP
TEST STARTED 11 :47 AM
TEST STARTED 03/05/2012
BEGIN LEVEL 1.7680 IN
END TIME 12:02 PM
END DATE 03/05/2012
END LEVEL 1.7676 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91STP
0- iEijPON •
1999 TAPT TAP
HOY'
TEST STARTED
12:04 P11
BAKERSFIELD CA
TEST STARTED
03/05/2012
BEGIN LEVEL
2.0843 IN
03/05/2012
i2:ev5 Pr-l-
END TIME
12:19 PM
END DATE
03/05/2012
SUMP i_EHK TEST REPORT
END LEVEL
2.0845 IN
LEAK THRESHOLD 0.002 Iry
87STF
TEST RESULT
PASSED
TEST STARTED
12:29 PM
TEST STARTED
03/05 /2012
DSLFILS
BEGIN LEVEL
6.4429 iN
TEST STARTED
12:04 PM
END TIME
END DATE
12:45 PM
03/05/2012
TEST STARTED
BEGIN
03/05/2012
END LEVEL
6.4423 IN
LEVEL"
2.7225 IN
LEAK THRESHOLD
0.002 IN
END TIME
12 :19 PM
TEST RESULT
PASSED
END DATE
03/05/2012
END LEVEL
2.7227 IN
LEAK THRESHOLD
0.002 IN
918TP
TEST RESULT
PASSED
TEST 8TARTED
12:29 PPS
TEST STARTED
03/05/2012
i)SLSTP
BEGIN LEVEL
2.0843 IN
TEST STARTED
12:04 PP1
END TIME
END DATE
12:45 PM
03/05/2012
TEST STARTED
03/05/2012
END LEVEL
2.0841 IN
BEGIN LEVEL
1.7678 IN
LEAK THRESHOLD 0.002 IN
END TIME
12:19 PM
TEST RESULT
PASSED
END DATE
03/05/2012
END LEVEL
1.7684 IN
LEAK THRESHOLD
0.002 IN
DSLFILS
TEST RESULT
PASSED
TEST STARTED
12:29 PM
TEST STARTED
03/05/2012
BEGIN LEVEL
2.7231 IN
END TIME
12:45 P9
END DATE
03/05/2012
END LEUEL
2.7232 IN
LEAK THRESHOLD
0.002 IN
TEST RESULT
PASSED
DSLSTP
TEST STARTED 12:29 PM
TEST STARTED 03/05/2012
BEGIN LEVEL 1.7683 IN
END TIME 12:45 PM
END DATE 03/05/2012
END LEVEL 1.7678 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
CHEVRON
1999 TAFT HWY
BAKERSFIELD CA
03/05/2012 6:32 PM
SUMP LEAK. TEST REPORT
UDC/ -2
TEST STARTED 6.17 PM
TEST STARTED 0.3/05/2012
BEGIN LEUEL 3.5700 IN
END TIME 6:32 PM
END DATE 03/05/2012
END LEVEL 3.5713 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
CHEVRON
1999 TAFT HWY
BAKERSFIELD CA,
53/05/2012• 5 :12 PM
SUMP LEAK TEST REPORT
UDC9 -10
TEST STARTED
TEST STARTED
BEGIN LEVEL
END TIME
END DATE
END LEVEL
LEAK THRESHOI
TEST RESULT
4:57 PM
03/05/2012
2.0717 IN
5:12 PM
03/05/2012
2.0730 IN
.D 0.002 IN
PASSED
CHEVRON
1999 TAFT HWY
BAKERSFIELD CA
03/05.12012 5:30 PM
:SUMP LEAK TEST REPORT
UDC9 --10
TEST STARTED 5:15 PM
TEST STARTED 03/05/2012
BEGIN LEVEL 2.0729 IN
END TIME 5:30 PM
END DATE 03/05!2012
END LEVEL 2.0730 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
CHEVRON
1999 TAFT HWY
BAKERSFIELD CA
&5/05/2012 7:00 PAt
SUMP LEAK TEST REPORT
UDC1 -2
TEST STARTED 6:45 PM
TEST STARTED 03/05/2012
BEGIN LEVEL 3.5710 IN
END TIME 7:00 PM
END DATE 03/05/2012
END LEVEL 3.5714 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
L+514�) t
SB989 TESTING FAILURE REPORT
SITE NAME: CHEVRON DATE: 3/5/12
THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE
TESTING.
REPAIRS: ALL ANNULARS PASSED, ALL VAPOR BUCKETS PASSED, ALL FILL
SUMPS PASSED, ALL STP PASSED. UDC #7 /8 TORN PENETRATION ON 91 (ON #7
SIDE). NEED TO GET PENETRATION. UDC #9/10 PASSED, UDC #1/2 PASSED.
UNABLE TO REACH DONUTS ON REST OF DISPENSERS WITHOUT MOVING
PIPING. DISP #3/4.5/6,11/12.
LABOR:
PARTS INSTALLED:
NAME • TITLE
SIGNATURE:
TAE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING
THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR
THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMENTAL FOR
ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF
ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE.
A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR
CONVIENENCE.