Loading...
HomeMy WebLinkAbout2012 RESULTS RETESTS W RCB, January 2002 Page of Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST ,secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the, facility owner /operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: MIKE'S FOOD & LIQUOR Date of Testing: 4/20/12 Facility Address: 2300 PANAMA LANE, BAKERSFIELD Facility Contact: Phone: Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (rf present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Pass Technician Conducting Test: Not Tested Credentials: ❑ CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester License Type: Manufacturer License Number: Manufacturer Training Component(s) Date Training Expires INCON INCON TS -STS 5/27/12 #1 87 SECONDARY NEW ❑ 0 ❑ 0 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made #1 87 SECONDARY NEW ❑ 0 ❑ 0 ❑ ❑ ❑ 0 LINE FROM STP -DISP #1/2 X ❑ ❑ ❑ ❑ ❑ 0 0 0 0 0 ❑ 0 0 ❑ 1 0 #2 87 SECONDARY OLD ❑ 0 ❑ ❑ ❑ 0 ❑ ❑ LINE FROM DISP ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 41/2- 5/6- 7/8 -3/4 X ❑ ❑ ❑ ❑ ❑ ❑ 0 #3 91 SECONDARY OLD ❑ ❑ ❑ 0 0 ❑ ❑ ❑ LINE FROM DISP ❑ 0 ❑ 0 ❑ ❑ 0 0 41/2- 5/6- 7/8 -3/4 X ❑ ❑ ❑ ❑ 1 ❑ Cl ❑ ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ 0 0 ❑ 0 ❑ ❑ If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: Date: 4/20/12 S W RCB, January 2002 Page of 5- SECONDARY PIPE TESTING Test Method Developed By: ❑ Piping Manufacturer ❑ Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic ❑ Other (Specify) Test Equipment Used: Equipment Resolution: Piping Run #1 -87 Piping Material: PLASTIC Piping Run 92 -87 Piping Run #3 -91 Piping Run # PLASTIC PLASTIC Piping Manufacturer: APT TCI TO Piping Diameter: 1.5" 1.5" 1.5" Length of Piping Run: 52' 60' 60' Product Stored: 87 87 91 Method and location of i in -run isolation: NEW LINE STP TO DISP # 1/2 DISP # 1/2-5/6-78-3/4 DISP # 1 /2 -5 /6- 718 -3J4 Wait time between applying pressure /vacuum /water and starting test: 1 HOUR 1 HOUR I HOUR Test Start Time: 1:15 3:45 4:45 Initial Reading (R,): 6.1 5.2 5.1 Test End Time: 2:15 4:45 5:45 Final Reading (RF): 6.1 5.2 5.1 Test Duration: I HOUR i HOUR l HOUR Change in Reading (RF -R,): 0 0 0 Pass/Fail Threshold or Criteria: 0 0 0 Test Result:' X Pass p Fail X Pass <'' 13 Fail ,'` X Pass O Fait Q Pass 0 Fail Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests) 740 L f SB989 TESTING FAILURE REPORT SITE NAME: MIKE'S FOOD & LIQUOR DATE: 4/20/12 ADDRESS: 2300 PANAMA LANE TECHNICIAN: JAMES RICH CITY: BAKERSFIELD SIGNATURE: THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE TESTING. REPAIRS: Rc,0Lo -� P24�QuAl 1.I./Z 1i W- ern Ze LABOR: PARTS INSTALLED: Pte' ? ,,•t,�s NAME: TITLE: SIGNATURE: THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE. A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR CONVIENENCE. RICH ENVIRONMENTAL 5643 BROOKS CT. - BAKERSFIELD, CA 93308 OFF.(661)392 -8687 FAX(661)588 -7808 ACURITE TM PIPELINE TESTER PRECISION PRODUCT LINE TEST TEST RESULTS DATE: 4 -20 -2012 BILLING: MIKE'S FOOD & LIQUOR SITE: MIKE'S FOOD & LIQUOR 2300 PANAMA LANE 2300 PANAMA LANE BAKERSFIELD, CA BAKERSFIELD, CA PRODUCT PRODUCT MECHANICAL PRODUCTS LINE TEST LEAK DETECTORS UNL -87 FROM STP TO DISPENSER'/2 - .005 -PASS N/A COMMENTS A PRECISION TEST WAS PERFORMED ON PRODUCT LINES AT THE ABOVE LOCATION USING THE ACURITE TM PIPELINE TESTER. I HAVE REVIEWED THE DATA PRODUCED IN CONJUNCTION WITH AES PROTOCOL, AND THEREFORE SATISFIES ALL REQUIREMENTS FOR SUCH TESTING AS SET FORTH BY NFPA- 329 -92 AND USE 40 CFR PART 280. THE RESULTS OF TESTING ARE SHOWN ON THE FOLLOWING PAGE. INCLUDED WITH THE REPORT ARE REPRODUCTION OF DATA COMPLIED DURING THE TEST WHICH FORMED THE BASIS FOR THESE CONCLUSION. THIS INFORMATION IS STORED IN A PERMANENT FILE IF FUTURE VERIFICATION OF TEST RESULTS IS NEEDED. 1 DECLARE UNDER PENALTY OF PERJURY THAT I AM A LICENSED TANK TESTER IN THE STATE OF CALIFONIA AND THAT THE INFORMATION CONTAINED IN THIS REPORT IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. TES RTIFIED BY: r JAMES J. R CH MFG# LTN -2245 CERT# 90 -1072 d RICH ENVIRONMENTAL 5643 BROOKS CT. BAKERSFIELD, CA. 93308 OFFICE (661)392 -8687 FAX (661)392 -0621 ACURITE TM PIPELINE TESTER TEST RESULTS WORK SHEET DATE:. !!z /2 J /1�2- W/O #: FACILITY NAME: AA 1�9 -410 u y/1- FACILITY ADDRESS: %, 3 v J 10l,v-W PRODUCT LINE TYPE: FIBERGLASS STEEL ASTI (CIRCLE ONE) SYSTEM TYPE' RESSURE UC�TION GRAVITY (CIRCLE ONE) TURBINE MANUFACTURER: PRODUCT GRADE START TIME INITIAL READING 00:00 /GPH END TIME FINAL READING 00:00 /GPH TEST PRESSURE �' S.I. VOLUME RATE G.P.H. RESULTS PASS OR FAIL (�(IUI. -$� Al ys �b _ , o o S A55 • 0 5v . 0 Af 1 CERTIFY THAT THE ABOVE LINE TESTS WERE CONDUCTED ACCORDING TO THE EQUIPMENT MANUFACTURERS PROCEDURES. THE TEST RESULTS AS LISTED IS TRUE AND ACCURITE TO THE BEST OF MY KNOWLEDGE. THE TEST PASS /FAIL STATUS IS DETERMINED USING A THRESHOLD OF 190 ML PER HOUR, (0.05 G.P.H.), RATE AT 1 h TIMES OPERATING PRESSURE, OR 50 P.S.I. WHICH EVER IS GREATER. TECHNICIAN: 7sYLN'1�S STATE LICENSE #: "P'6 SIGNATURE: MFG. CERTIFICATION #: 4-rAJ - 2211.5