HomeMy WebLinkAbout2012 SB989 RESULTSMay 18, 2012 SB989 3 -YEAR POST REPAIR COMPLIANCE TEST
Inspector Esther Duran
Bakersfield Fire Department
2101 H Street
Bakersfield, CA 93301
SUBJECT: SB 989 COMPLIANCE TESTING AT COSTCO FUELING STATION —
3800 ROSEDALE HWY, BAKERSFIELD, CA 93308 — FACILITY NO. 688
To Whom It May Concern:
Below please find the secondary containment testing results for the above - referenced site. These results are being sent to
you per the requirement of SB 989. Initial testing was performed by Wayne Perry, Inc. on 2/16/2012 with some
components failing. Permitted secondary containment repairs were made pursuant to Permit #12- 10000180. Post Repair
testing and inspection were conducted on 5/16/2012 and witnessed by Inspector Esther Duran with passing results.
Please see attached report for further details.
CONTRACTOR: Wayne Perry, Inc.
License No: 300345
Technician: Austen Downey — ICC #8018653
If you have any questions regarding the attached results, please contact the undersigned at (714) 826 -0352.
Sincerely,
Wayne Perry, Inc.
aviary young
Mary Young
Program Manger
Attachments — SB 989 Testing Results
Cc: Dennis Bock — Costco
Costco #688
8281 Commonwealth Avenue Buena Park, California 90621 Phone (714) 826 -0352 1 Fax (714) 523 -9735
Pagel of 4
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts fi-om tests (f applicable), should be provided to the facilityowner /operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: COSTCO #688
1 Date of Testing: 5%16/2012
Facility Address: 3800 ROSEDALE HWY, BAKERSFIELD, CA 93308
Facility Contact:
Phone:
Date Local Agency Was Notified of Testing: 5/10/2012
Name of Local Agency Inspector (f present during testing): Esther Duran
2. TESTING CONTRACTOR INFORMATION
Company Name: Wayne Perry, Incorporated
Technician Conducting Test: Austen Downey ICC #8018563
Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: A, HAZ, C21, C10, B, C61, D40
License Number: 300345
Manufacturer Training
Manufacturer Component(s) Date Training Expires
Furnished on request
3. SUMMARY OF TEST RESULTS
Two (2) 55- gallon drums were left on site
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: Date:_5 /16/2012
Component
AIIx STP Sump 1
011-01
L■J
►�
WWE
M
'
►_�
w=
M0
000M
WE
M
M0
WW=M
oWoo■
MW
M
r_■
wm
0000
�000
0000
0000
°v;
�or■�■�
�oo
u
..=
-
._.._.... - --
W_w_m
_m•_
_
Two (2) 55- gallon drums were left on site
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: Date:_5 /16/2012
Page 2 of 4
1. SECONDARY PIl'E TESTING
Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer
Other (Specify)
Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic
❑ Other (Spec)
Test Equipment Used: See attached testing procedures
Equipment Resolution:
Piping Run # 91
Piping Run #
Vent/Va or
Piping Material:
Plastic
Fiberglass
Piping Manufacturer:
Environ
Smith
Piping Diameter:
2"
4" over 3"
Length of Piping Run:
Product Stored:
Premium
Vapors
Method and location of
piping-run isolation:
Test boot in sump
Test boot in sump
Wait time between applying
pressure /vacuum/water and
starting test:
30 minutes
30 minutes
Test Start Time:
11:10am
11:10am
Initial Reading (R,):
5.5 psi
5 psi
Test End Time:
12:10pm
12:10pm
Final Reading (RF):
5.5 psi
5 psi
Test Duration:
1 hour
1 hour
Change in Reading (RF -R,):
0
0
Pass/Fail Threshold or
Criteria:
0.00
0.00
0.00
0.00
Test Result:.
Z Pas S El Fait'
®::Pass. Fail,: ".
❑_i Pass :; . ❑Fail,
" •'❑ Pass. ❑ .Fail..::
Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
Repairs made pursuant to Bakersfield Fire Permit #12- 10000180 — Post repair testing witnessed by Inspector Esther
Page 3 of 4
2. PIPING SUMP TESTING
Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other (Sped&)
Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic
❑ Other (Specify)
Test Equipment Used: See attached testing procedures
Equipment Resolution:
Sump # 87 Aux
Sump # 87 Aux
Sump # 91
Sump # 91
Sump Diameter:
48"
48"
48"
48"
Sump Depth:
62"
62"
62"
62"
Sump Material & Manufacturer:
Fiberglass
Fiberglass
Fiberglass
Fiberglass
Height from Tank Top to Top of
Highest Piping Penetration:
2619
2699
22"
2219
Height from Tank Top to Lowest
Electrical Penetration:
24"
24"
20"
20"
Condition of sump prior to testing:
Fair
Fair
Fair
Fair
Portion of Sum Tested'
Sump e
Above highest -.
penetration
Above highest
penetration
Above highest
penetration
Above highest
penetration
Does turbine shut down when
sump sensor detects liquid (both
product and water)?
❑Yes El No ® NA
❑Yes [] No ®
NA
❑Yes [:j No ®
NA
❑Yes ❑ No ® NA
Turbine shutdown response time
Is system programmed for fail -safe
❑ Yes ❑ No ®NA
El Yes El No ®
NA
El Yes E] No
NA
Yes No ®NA
❑ El
Was fail -safe verified to be
operational?*
F-1 Yes ❑ No ®NA
❑ Yes ❑ No ®
NA
❑ Yes ❑ No
NA
❑Yes ❑ No ®NA
Wait time between applying
pressure /vacuum/water and starting
test:
30 minutes
30 minutes
30 minutes
30 minutes
Test Start Time:
11:16am
11:32am
11:16am
11:32am
Initial Reading (RI):
0.2481
0.2483
3.2732
3.2732
Test End Time:
11:31am
11:47am
11:31am
11:47am
Final Reading (RF):
0.24835
0.24821
3.2732
3.27317
Test Duration:
15 min
15 min
15 min
15 min
Change in Reading (RF -R,):
0.00025
0.00009
0
0.00003
Pass/Fail Threshold or Criteria:
0.002
0.002
0.002
0.002
Test Result:
Z. Pass ❑ Fail
®Pass:. ❑;Fail
N Pass.; Fa><1
` Pass: `.:Fail.:.]
Was sensor removed for testing?
® Yes ❑ No ❑ NA
®Yes ❑ No ❑ NA
®Yes [_1 No ❑ NA
® Yes ❑ No ❑ NA
Was sensor properly replaced and
verified functional after testing?
®Yes E] No El NA
®Yes El No El NA
Eyes E] No ❑ NA
®Yes E] No El NA
Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
Repairs made pursuant to Bakersfield Fire Permit #12- 10000180 — Post repair testing witnessed by Inspector Esther
Duran
i If the entire depth of the sump is not tested, specify how much was tested. If the answer to anv of the questions indicated with an
asterisk(*) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)
Page 4 of 4
7. UNDER- DISPENSER CONTAINMENT (UDQ TESTING
Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other (Specify)
Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic
❑ Other (Spec)
Test Equipment Used: See attached testing procedures.
Equipment Resolution:
Ftix .a
UDC # 7/8
UDC # 7/8
UDC Manufacturer:
Environ
Environ
UDC Material:
Plastic
Plastic
UDC Depth:
30"
30"
Height from UDC Bottom to Top
of Highest Piping Penetration:
8"
8"
Height from UDC Bottom to
Lowest Electrical Penetration:
6"
6"
Condition of UDC prior to _
testing:
Fair
Fair
Portion of UDC Tested
Above highest
penetration
Above highest
pene tration
Above highest
penetration
Above highest
penetration
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
❑ Yes ❑ No ® NA
❑Yes ❑ No ® NA
❑ Yes ❑ No ® NA
❑ Yes ❑ No ® NA
Turbine shutdown response time
Is system programmed for fail -
safe shutdown ?"
❑ Z' ❑ No ®NA
❑Yes ❑ No ®NA
❑Yes ❑ No [D NA
El Yes ❑ No ®NA
Was fail -safe verified to be
o erationalf
❑ Yes ❑ No ® NA
❑Yes ❑ No ® NA
❑ Yes ❑ No ® NA
❑ Yes ❑ No ® NA.
Wait time between applying
pressure /vacuum/water and
starting test
30 minutes
30 minutes
30 minutes
30 minutes
Test Start Time:
11:20am
11:38am
Initial Reading (R1):
2.1025
2.1026
Test End Time:
11:35am
11:53am
Final Readin (RF):
2.1025
2.1026
Test Duration:
15 min
15 min
Change in Reading (RF -R1):
0
0
Pass/Fail Threshold or Criteria:
0.002
0.002
0.002
0.002
Test Result: :.
Pass ❑Fail
®..:Pass :. Fail
❑! Pass ..; ; Fail
❑ Eass: ;Fail
Was sensor removed for testing?
®Yes ❑No ❑ NA
®Yes [—]No ❑NA
®Yes ❑No ❑ NA
®Yes ❑No ❑ NA
Was sensor properly replaced and
verified functional after testing?
®Yes ❑No ❑ NA
®Yes ❑No ❑NA
®Yes ❑No ❑ NA
®Yes [—]No ❑ NA
CommentS — (include information on repairs made prior to testing, and recommended follow -up for failed tests)
Repairs made pursuant to Bakersfield Fire Permit #12- 10000180 — Post repair testing witnessed by Inspector Esther
Duran
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an
asterisk(*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
p p�.
Al
ELDS NYAf no
ItA
t Test al
S
Ac" i,
T U
AS
Test Site
t ius'�,;
Status
r'4. e
Pas's/FaiI.j'.-,:'
Restart ° --7Ar b, 6 rl
tostco
6800 Rosedale hwy
AM f 3w.
N
Saving ...
:h ti
. . . . . . .
PASS
a
Bakersfield,
CA 93308-XXXX
C . . . . . . . .
ff! Wed, May 16, 2012 11:31 AM
. . . . . . . . . .
�0.00025
R -,Prod U: dt =
ix
. . . . . . . . . . .
M
jj
85 aux
M 'Type,
Tank Sump Turbine
AS
0 2'48'3
EM
Wed, May 16, 2012 11:16
AM f 3w.
N
Nest End Time1 T
a
t-V 0'.'2482 p
ff! Wed, May 16, 2012 11:31 AM
15
,,ITest.passed
0.0020
.0.'2479
'05/'
1,1 21�'-.-00';AM' 1'1--2'4':'00'AM -U '27--00� 11:'31
12-,'-1:; -"05116/20 -;05Aff
6� j,,,-i05116/201 06
xJ
�34
=UE
EM
M
MM
NO
M
M
ME
ME
M
IMMIMMOMM
WOMOMM
SO
ME
WMINUMIZION
MZ
MMIMMUMMUM
MMMMINOW
.
ME
ii
among
w
=1
ON
■
P.'Eoiim.-Imnp!!N
M
P-MMINUMM
MMM
on
M
M
ME
■MMMMMMMM
IM
MOM
0 ■mom
0
now
Is
Epp
mmm
mm
.mg-mgammonno
mmm
==a
ImnommmaxwoMMOMM
.........
-mon
NI■■■NOMPM
p
MUMMIMM
0
mm;
M
limmeloPE2ggm
MMM
MMMM
M
MOMM
MONSOON
I
ME
w
M
mom
MMIM
IIM
ME
=mom
M
IM■E
ME
M
M
'20
ME
ISIMMOMMOMMERM
MOM'S
rM
ME
on
M
ME
w==
■MMMMIMNMMM
ME
OWWWW
MINE
OMEN
M
ME
MEM
MMOMM
0
0
====�Mm■n
122201im.1
M
wMizzwMEMMMM
■02221MRO
■ ■
mmm�
1,1 21�'-.-00';AM' 1'1--2'4':'00'AM -U '27--00� 11:'31
12-,'-1:; -"05116/20 -;05Aff
6� j,,,-i05116/201 06
xJ
�34
Fky�' �G� ..X n's ;�: .:'.3 ..... � f..IC9e +�:e:. u.� ,.�.i..+� ....a14:
... �A..��.- .'S..T... .- ..aa... n_ i� � "i!c, '.4 -. \.L 3I -
__+4e...M ��:W.. �S. . t+•�.`.fs
� Test Site x -
- :Status
PasslFail 7Restartbort
Costco
3800 Rosedale hwy
Saving... .:
;
a
Bakersfield, CA 93308
.Change.,
Return,.
lq -XXXX
s 0.00003
j
Product
d
t �c�
.r9 r�,�
n�1r`% �e 3 '`� e' ,ri 6+K s� .' ���`a��F �
C'1
a7
� q
§ s f �' - eti 'w
q
,T e
Ell -.
s 2�aa f `5
===
�G�—=—
Tank Sump Turbine
C=
E•
�CC
EE=--
�--
°—
L■
°C—
J=
EEEC=
O==CC=
—_
-M
C
EMOMEMS
-_
-
--
-
--
MIMM
.. ......... ..... ....__.. ..._...... �. __. .. __ _. �...... __. _.. ... _... _
• 1
�_�_
-
===
�G�—=—
C=
E•
�CC
EE=--
�--
°—
L■
°C—
J=
EEEC=
O==CC=
—_
-M
C
EMOMEMS
-_
-
--
-
--
MIMM
.. ......... ..... ....__.. ..._...... �. __. .. __ _. �...... __. _.. ... _... _
• 1
�_�_
==--=
-
-
-�
_- --
-E --
MOMEM
E�
=_
---
---
-
------
S a
Saving... "I .
c.fi-S
- Change
u r, r
o 00.000
E-Nr4, ig M&N AIX",
ji�l ',-v ku-- TS I
Costco
3800 R osedale hwy
Bakersfield, CA .93308-XXXX
1 'P ro a U Ctr
4-�11 ud
, 7Y
, _
T y�e,
Dispenser 7 8
-T,
2
ME
4. 'Wed, May 16, 2012 11:38 AM
I-
Wed may 16, 2012 11:53 AM
it qq
15 0.0020 f
es es
Test passed I
6 mfnb n
-T-
�N
N
j 21026':
-4 -
- -
- -
- -
- -
H
`�
xV
I
�,
2 f625-I
-,
j 1 16 AM