Loading...
HomeMy WebLinkAboutSB989 2013 FAILSWRCB, January 2002 Page_of_ Secondary Containment Testing Report Form This fonn is intended for use by contractors pe1jorming periodic testing of UST secondaiJI containment systems. Use the appropriate pages of this fonn to report results for all components tested. The completedform, wrillen test procedures, and primoutsfrom tests (if applicable), should be provided to the facility ownerloperatorfor submillal to the local regulat01y agency. 1. FACILITY INFORMATION Facility Name: #3367 Fastrip #640 I Date ofTesting: 1117/2013 Facility Address: 8001 White Lane, Bakersfield, CA 93309 Facility Contact: Omero Garica/Craig Lincoln I Phone: 661-393-7000 Date Local Agency Was Notified of Testing : 11/4/2013 Name of Local Agency Inspector (if present during testing): Ernie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Technician Conducting Test: Frank Landa Credentials: x CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: CSLB I License Number:804904 TCC# 8180171/8018524 ------. ·- Manufacturer Training Manufacturer Component(s) Date Training Expires UST 11/22/2013 I nstallaton/Retro tit UST Service ICC 1-28-2015 technician Star. Smith. Fibercast Fiber Glass Systems N.A. 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made DSL Annular X 0 n 0 91 STP J X l 87 Annular X ll u 0 UDC 13-14 X 0 u r-• " 91 Annular 0 X u 0 UDC 15-16 X u u [] DSL Secondary X _] 0 0 UDC17-l8 X L c [] DSL Vent Secondary X u 0 0 UDC 19-20 X n J ~ 87 Secondary ::::J lJ X u UDC 21-22 X u 0 J 87 Vent Secondary X [] 0 0 UDC 23-24 X c n [] 91 Secondary ::::J X 0 0 DSL Fill Sump X u l r l 91 Vent Secondary X 'J 0 [ J 87 Fill Sump X 0 0 .I Vapor Return Secondary X 0 0 0 91 Fill Sump X n n u DSL STP l X 0 0 DSL Fill Spill Bucket X u 0 .-.. . 87 STP J 0 X u 87-1 Fill Spill Bucket X Q_ u fl If hydrostatic testing was performed, describe what was done with the water after completion of tests: Water was gut back into test trailer and waste drum ONSffiLE FOR CONDUCTING THIS TESTING To the best of my kuowledo umeut are accurate and in full compliance with legal requiremellfs Technician's Signature: Date: 1117/2013 • I I I SWRCB, January 2002 Page __ of __ Secondary Containment Testing Report Form This fonn is intended for use by contractors pelfOJming periodic testing of UST secondcuy containment systems. Use the appropriate pages ofthisform to report results for all components tested. The completed form, written test procedures, and printoutsji·om tests (if applicable), should be provided to the .facility ownedoperator.for submittal to the local regulat01y agency. 1. FACILITY INFORMATION Facility Name: #3367 Fastrip #640 I Date ofTesting: 1117/2013 Facility Address: 800 I White Lane, Bakersfield, CA 93309 Facility Contact: Omero Garica/Craig Lincoln I Phone: 661-393-7000 Date Local Agency Was Notified of Testing : 11/4/2013 Name of Local Agency Inspector (!{present during testing): Ernie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Technician Conducting Test: Frank Landa Credentials: x CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: CSLB I License Number:804904 ICC# 8180171/8018524 -. .. . -·----. Manufacturer Training Manufacturer Component(s) Date Training Expires UST 11122/2013 Installaton/Retro fit UST Service ICC 1-28-2015 technician Star. Smith. Fibercast Fiber Glass Systems N.A. 3. SUMMARY OF TEST RESULTS Component Fail Not Repairs Component Pass Fail Not Repairs Pass Tested Made Tested Made 87-1 Vapor Spill Bucket X 0 0 n 0 u lJ ll 87-2 Fill Spill Bucket X 0 0 0 0 CJ D 0 87-2 Vapor Spill Bucket u X 0 lJ 0 0 CJ 0 91 Fill Spill Bucket X 0 0 0 0 0 0 l 91 Vapor Spill Bucket 0 X 0 0 0 n n '] Vent Box 0 X 0 0 0 u u 0 0 0 0 0 0 0 0 0 u 0 0 0 0 0 [J u 0 0 0 0 0 0 0 0 0 0 u 0 0 0 0 C") J 0 n 0 0 u [J [J J 0 0 0 0 0 0 n n If hydrostatic testing was performed, describe what was done with the water after completion of tests: Water was £_Ut back into test trailer and waste drum SWRCB, January 2002 Page __ of __ 4. TANK ANNULAR TESTING Test Method Developed By: D Tank Manufacturer x Industry Standard D Professional Engineer 0 Other (Spec[fy) Test Method Used: DPressure x Vacuum ll Hydrostatic D Other (Specify) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Tank# DSL Tank# 87 Tank #91 Tank# Is Tank Exempt From Testing?' DYes X No UYcs X No :::J Yes X No llYes X No Tank Capacity: Unknown Unknown Unknown Tank Material: Steel Steel Steel Tank Manufacturer: Unknown Unknown Unknown Product Stored: DSL Regular Premium Wait time between applying pressure/vacuum/water and 5min. 5 min. 5 min. starting test: Test Start Time: !O:OOam I O:OOam I O:OOam Initial Reading (R1): 10 Hg 10 Hg 10 Hg Test End Time: !1:00am !1:00am II :OOam Final Reading(~): IOHg 10 Hg 0 Hg Test Duration: 1 hour I hour 15 min. Change in Reading (~-R1): 0.00" 0.00" 10 Hg Pass/Fail Threshold or Criteria: 0.00" 0.00" 0.00" Test Result: X Pass D Fail X Pass 0 Fail D Pass X Fail 0 Pass X Fail Was sensor removed for testing? X Yes DNo DNA X Yes DNo DNA X Yes DNo DNA X Yes DNo NA Was sensor properly replaced and X Yes DNo DNA X Yes DNo DNA X Yes UNo DNA X Yes ONo ~NA verified functional after testing? Comments -(include if!formation on repairs made prior to testing, and rec_ommendedfollow-upforfailed tests) 91 Annular failed. Needs to break concrete and redo Riser. 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt fi·om periodic contairunent testing. {California Code of Regulations, Title 23, Section 2637(a)(6)} SWRCB, January 2002 Page_ of_ 5. SECONDARY PIPE TESTING Test Method Developed By: 0 Piping Manufacturer x Industry Standard II Professional Engineer 0 Other (Specify) Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic D Other (Specify) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" ·r. Piping Run # DSL Piping Rtm # DSL Vent Piping Rm1 # 87 Piping Run# 87 Vent Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass Piping Manufacturer: Smith Smith Smith Smith Piping Diameter: 3.00" 3.00" 3.00" 3.00" Length of Piping Run: 50.00' 80.00' 100.00' 50.00' Product Stored: DSL Vent Regular Vent Method and location of Boot in STP Boot in STP Boot in STP Boot in STP piping-run isolation: Wait time between applying pressure/vacuum/water and 5 min. 5 min. 5 min. starting test: Test Start Time: 9:00am 9:00am 9:00am Initial Reading (R1): 5 psi 5 psi 5 psi Test End Time: !O:OOam !O:OOam l O:OOam Final Reading (RF): 5 psi 5 psi 5 psi Test Duration: I hour 1 hour I hour Change in Reading (~-R1): 0.00" 0.00" 0.00" Pass/Fail1l1reshold or 0.00" 0.00" 0.00" Criteria: Test Result: X Pass 0 Fail X Pass OFail NOT TESTED X Pass 0 Fail Comments-(include if!formation on repairs made prior to lesting, and_recommendedfol!ow-upfor.failed tes1s) Had to install shear shrader valves in all boots in UQC_'_s. 87 Seconadrv unable to test, need to install boot. SWRCB, January 2002 Page __ of __ 5.SECONDARY PIPE TESTING Test Method Developed By: 0 Piping Manufacturer x Industry Standard 0 Professional Engineer L Other (Specify) Test Method Used: x Pressure n Vacuum U Hydrostatic 0 Other (Specify) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" . - Piping Run# 91 Piping Run# 91 Vent Piping Run# Vapor Piping Run # Extra Return Vent Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass Piping Manufacturer: Smith Smith Smith Smith Piping Diameter: 3.00" 3.00" 4.00" 3.00" Length of Piping Run: 100.00' 50.00' 100.00' 50.00' Product Stored: Premium Vent Vapor Retum Vent Method and location of Boot in STP Boot in STP Boot in STP Boot in STP piping-run isolation: Wait time between applying pressure/vacuum/water and 5 min. 5 min. 5 min. 5 min. starting test: Test Start Time: 9:00am 9:00am 9:00am !1:00am Initial Reading (R1): 5 psi 5 psi 5 psi 5 psi Test End Time: 9:30am I O:OOam I O:OOam !2:00pm Final Reading(~): 3 psi 5 psi 5 psi 5 psi Test Duration: 30 min. 1 hour I hour I hour Change in Reading (RF-R1): 2 psi 0.00" 0.00" 0.00" Pass/Fail Threshold or 0.00" 0.00" 0.00" 0.00" Criteria: Test Result: 0 Pass X Fail X Pass OFail X Pass OFail X Pass 0 Fail Comments -(include i'!formation__()_n repairs made prior to testing, and recommendedfol/ow-upforfai/ed tes/5) Vapor Return Line in DSL STP has no communication to dispensers, but has Communication to 91 STP and 87 STP. Need to remove line fr01n system, Per Ins~_e_tn_r_EmieMedina. SWRCB, January 2002 Page __ of __ 6. PIPING SUMP TESTING Test Method Developed By: D Sump Manufacturer x Industry Standard D Professional Engineer n Other (Specify) Test Method Used: DPressure U Vacuum x Hydrostatic U Other (Spec[fy) Test Equipment Used: Ts-sts Equipment Resolution: Sump #DSL Sump# 87 Sump# 91 Sump# Sump Diameter: 38.00" 38.00" 38.00" Sump Depth: 55.00" 57.00" 55.00" Sump Material: Fiberglass Fiberglass Fiberglass Height from Tank Top to Top of 16.00" 36.00" 18.00" Highest Piping Penetration: Height from Tank Top to Lowest 14.00" 14.00" 13.00" Electrical Penetration: Condition of sump prior to testing: Clean Clean Clean Portion of Sump Tested1 18.00" 18.00" 20.00" Does turbine shut down when sump sensor detects liquid (both product and water)?• DYes DNo XNA DYes flNo XNA DYes DNo XNA DYes DNo XNA Turbine shutdown response time NA NA NA Is system programmed for fail-safe shutdown?' DYes DNo XNA DYes DNo XNA DYes DNo XNA []Yes rJNo X NA Was fail-safe verified to be DYes DNo XNA DYes DNo XNA DYes DNo XNA DYes ~No X NA operational?' Wait time between applying pressure/vacuum/water and starting 5 min. 5min. 5min. test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading(~,): Test Duration: Change in Reading (~-R1): Pass/Fail Threshold or Criteria: Test Result: 0 Pass X Fail NOT TESTED 0 Pass X Fail X Pass D Fail Was sensor removed for testing? XYes nNo DNA X Yes ONo DNA X Yes []No 'l NA X Yes DNo UNA Was sensor properly replaced and X Yes DNo DNA X Yes UNo DNA X Yes DNo DNA X Yes UNo LINA verified functional after testing? Comments -(include in(onnation on repairs made prior to testing, and recommended(ollow-upforfailed tests) 87 STP not tested, unable to get boot on. Will need to dismantle filter s_y_s_t_etn_to Get boot on. DSL/91 STP possible problem with piping/electrical penetrations. 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to ill:!Y of the questions indicated with an asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-I 60) SWRCB, January 2002 Page __ of __ .. -·· -----. ·--------' . -.. -. , - Test Method Developed By: 0 UDC Manufacturer x Industry Standard ::J Professional Engineer 0 Other (Specify) Test Method Used: 0 Pressure ll Vacuum x Hydrostatic 0 Other (Specify) Test Equipment Used: Ts-sts Equipment Resolution: UDC # 13-14 UDC # 15-16 UDC # 17-18 UDC # 19-20 UDC Manufacturer: Unknown Unknown Unknown Unknown UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass UDC Depth: 32.00" 32.00" 32.00" 32.00" Height from UDC Bottom to Top 10.00" 10.00" 10.00" 10.00" of Highest Piping Penetration: Height from UDC Bottom to 7.00" 7.00" 7.00" 7.00" Lowest Electrical Penetration: Condition ofUDC prior to Clean Clean Clean Clean testing: Portion ofUDC Tested 12.00" 12.00" 12.00" 12.00" Does turbine shut down when UDC sensor detects liquid (both product and water)?" DYes ONo XNA DYes DNo XNA DYes DNo XNA LJ Yes DNo X NA Turbine shutdown response time NA NA NA NA Is system programmed for fail- safe shutdown?' DYes nNo XNA lJYes DNo XNA DYes flNo X NA DYes DNo XNA Was fail-safe verified to be DYes DNo XNA lJYes UNo XNA DYes DNo XNA DYes IJNo X NA operational?' Wait time between applying 5 min. 5 min. 5 min. 5 min. pressure/vacuum/water and starting test Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass D Fail X Pass D Fail X Pass D Fail X Pass D Fail Was sensor removed for testing? XYes DNo DNA X Yes DNo DNA X Yes DNo DNA X Yes DNo tNA Was sensor properly replaced and X Yes ONo DNA X Yes DNo DNA XYes DNo DNA X Yes D No DNA verified fi.mctional after testing? Comments -(include information on repairs made prior to testing, and recommended.follow-up.for.failed tests) All UDC's Passed. No reQairs needed at this time. 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to illlY of the questions indicated with an asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160) I ! SWRCB, January 2002 Page_ of_ 7. UNDER-DISPENSER CONTAINMENT (lJDC) TESTING Test Method Developed By: D UDC Manufacturer x Industry Standard n Professional Engineer [l Other (Specify) Test Method Used: DPressure [l Vacuum x Hydrostatic [)Other (Spec[fy) Test Equipment Used: Ts-sts Equipment Resolution: UDC # 21-22 UDC # 23-24 UDC# UDC# UDC Manufacturer: Unknown Unknown UDC Material: Fiberglass Fiberglass UDC Depth: 32.00" 32.00" Height from UDC Bottom to Top 10.00" 10.00" of Highest Piping Penetration: Height from UDC Bottom to 7.00" 7.00" Lowest Electrical Penetration: Condition of UDC prior to Clean Clean testing: Portion ofUDC Tested 12.00" 12.00" Does turbine shut down when UDC sensor detects liquid (both product and water)?* DYes DNo XNA DYes DNo XNA DYes DNo DNA (J Yes DNo DNA Turbine shutdown response tin1e NA NA Is system programmed for fail- safe shutdown?· UYes DNo XNA DYes DNo XNA DYes ONo DNA ll Yes ONo UNA Was fail-safe verified to be DYes DNo XNA 0 Yes flNo XNA UYes DNo DNA n Yes IJNo UNA operational?• Wait time between applying 5 min. 5 min. pressure/vacuum/water and starting test Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass OFail X Pass D Fail 0 Pass OFail 0 Pass OFaiJ Was sensor removed for testing? X Yes DNo DNA XYes ONo DNA UYes ONo LNA DYes D No ~NA Was sensor properly replaced and X Yes DNo llNA XYes DNo DNA DYes DNo UNA LJ Yes No flNA verified functional after testing? Comments-(include if!formation on repairs made prior to testing, and recommencledfollow-upforfailecltests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to i!!!.Y of the questions indicated with an asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page_ of_ 8. FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sumps [l Fill Riser Containment Sumps are Present, but were Not Tested u Test Method Developed By: [J Sump Manufacturer x Industry Standard U Professional Engineer 0 Other (Specify) Test Method Used: D Pressure D Vacuum x Hydrostatic [..:; Other (Spec{(y) Test Equipment Used: Equipment Resolution: ~ -----·· -~ . ---·· --·- Fill Smnp # DSL Fill Sump # 87 Fill Sump # 91 Fill Sump# Sump Diameter: 46.00" 46.00" 46.00" Sump Depth: 63.00" 60.00" 48.00" Height from Tank Top to Top of 16.00" 18.00" 16.00" Highest Piping Penetration: Height from Tank Top to Lowest 11.00" 16.00" 10.00" Electrical Penetration: Condition of sump prior to Clean Clean Clean testing: Portion of Sump Tested 18.00" 20.00" 18.00" Sump Material: Fiberglass Fiberglass Fiberglass Wait time between applying 5 min. 5 min. 5 min. pressure/vacuum/water and starting test: Test Start Time: Initial Reading (R1): Test End Time: i Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail TI1reshold or Criteria: Test Result: X Pass DFail X Pass D Fail X Pass D Fail D Pass DFaiJ Ts there a sensor in the sump? X Yes DNo X Yes IJ No X Yes LJ No L Yes DNo Does the sensor alam1 when either product or water is DYes DNo XNA DYes DNo XNA DYes DNo XNA DYes DNo DNA detected? Was sensor removed for testing? X Yes flNo DNA XYes DNo DNA X Yes CNo DNA DYes ['No DNA Was sensor properly replaced and X Yes DNo DNA X Yes DNo DNA X Yes DNo JNA D Yes [J No [ NA verified functional after testing? Comments-(include information on repairs made prior to tes1ing, and recommendedfollow-up.forfailed tests) SWRCB, January 2002 Page __ of __ 9. SPILL/OVERFILL CONTAINMENT BOXES 1'-Facility is Not Equipped With Spill/Overfill Containment Boxes f l Spill/Overfill Containment Boxes arc Present, but were Not Tested . Test Method Developed By: Spill Bucket Manufacturer x industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum x llydrostatic Other (Spec[fj) Test Equipment Used: Ts-sts Equipment Resolution: ~ - ' ---Spill Box # DSL Fill Spill Box# 87-1 Fill Spill Box# 87-1 Spill Box #87-2 Fill ! Vae£_r -1 Bucket Diameter: 12.00" 12.00" 12.00" 12.00" -Bucket Depth: 14.00'' 14.00" 14.00" 14.00" t-w31t time between applying--- pressure/vacuum/water and 5 min. 5 min. 5 min. 5 min. starting test: 1-Test Start Time: '---- Initial Reading (RJ): Test End Time: Final Reading(~): Test Duration: Change in Reading (~-R1): Pass/Fail TI1rcshold or Criteria: Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail Comments-(include i'!formation 011 repairs made prior to testing, and recommendedfollow-upfor(ailed test.\) ~~~~--~------------ SWRCB. January 2002 Page __ or 9.SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present. but were Not Tested ,_ ~. Test Method Developed By: c Spill Bucket Manufacturer x Industry Standard Professional Engineer 1- 'l Other (Spec[(l') Test Method Used: nPressure [J Vacuum x Hydrostatic 0 Other (Spec[(y) Test Equipment Used: Ts-sts I Equi?!~ent Resolution: -----------------. ~ Spill Box# 87-2 Vapor Spill Box # 91 Fill Spill Box# 91 Vapor Spill Box# ... Bucket Diameter: 12.00" 12.00" 12.00" Buckel Depth: 14.00" 14.00" 14.00" Wait time between applying pressure/vacuum/water and 5 min. 5 min. 5 min. starting test: Test Start Time: -Initial Reading (R1): Test End Time: Final Reading (Rt:): 1-Test Duration: Change in Reading (~-R1): Pass/Faillllreshold or Criteria: Test Result: 0 Pass X Fail X Pass 0 Fail 0 Pass X Fail 0 Pass 0 Fail - Comments-(include information on repair.\ made prior 10 testin_¥,. and recommendedfollow-up forfai/ed tests) 87-2 Vapor Bucket Failed. Needs to be repla_,.,_ce""'d~·------------ 91 Vapor Bucket Failed. Needs to be replace~d:.:..... ____________ _ Name: Street: ~fiDE'+. CJo C'f\ \us~~ "~uc1\0 "1!UILD WITH CONFIDENCE" Lic.970703 ~fiDE'+. CJo ~ ~UST(J. -.,,CES•~ "COMPLIANCE WITH CONFIDENCE" Lic.804904 Toll Free #: 1-800-339-9930 Confidence UST 16250 Meacham Road City: Bakersfield, CA 93314 Terms: ~ Description of ~ormed: ~ __ _____?____L2 /1 ~ /} 317:?() Job Order /Invoice #: I ToWhom I1~E71? Time Date Called Site Name: "3 :?/o 7 Street: ~~ (jJ1\. I~ Z--A J City: £K/~9('~~ State: Zip: Store No: 3 86 ~ / ~ /~ 1 ~ r--t::::>/7 J>y_ ~~ L_ _007/77 fi. ·-~. v ~~ I ~ \ _rL zi : , 1 7//1 I ==:?': l ( J H ( ~fl fi1 l ) -:-( C)rl1 JJI.JJ.JJ'lY"~()y] -VII v lr I~ , \l --Q'bfr2i . =iiXi ~-. lil/d/: ~ ~ /" ---- TRAVEL and LABOR (0.5 Hour Minimum Labor Charge) OVERTIME (5:00 PM -7:00AM) Date Technician(s) Name Start End Total OTStart OTEnd OTTotal lJJ.-J2-(i ::Y\e -PU f J.l.. {-ftJ! ~ Travel ~2b 1/30 ~/G~-,YJI'kraJv Labor Travel Date Technician{s) Name Start End Total OT Start OTEnd OTTotal Travel Labor Travel Date Technician(s) Name Start End Total OT Start OTEnd OTTotal Travel Labor Travel SUPPLIES-MATERIALS-RENTALS Check One Qty. r.. UST Parts I _Ye Parts _l _{..i._)Y._J~ J) ~ll/t L.........-\. 'Uo' COMMENTS Store Employee Print Name: Technician Print Name: .~k-~ _ _., c..,rc..--L Store E~ature: I Date Technician Signature: I Date ----- INVOICE • WHITE SITE -CANAA" 3357 FASTRIP 8001 IIHITE Ul I!AKERSFI ELD 11/12/2013 12:24 Pll . StR1P LEA'< TEST REPORT UllC1516 TEST STAATEO 12:09 Pll TEST STAATEO 11/12/2013 BEG Ill LEVEL 2. 6153 Ill 810 TillE 12:24 Pll EIIO DATE 11/12/2013 am LEVEL 2. 6158 111 lE'AK THRESHOLD 0, 002 Ill TEST REStJLT PASSED 3367 FASTRIP 8001 IIHITE Ul BAKER SFI ElO 11/12/2013 12:110 Pll SUI1P LEAl( TEST REI'(RT lllC1516 TEST STARTED 12:25 P/1 TEST STARTED 11/12/2013 BEGIII LEVEL 2,6156 Ill E/0 TIHE 12:110 P/1 EIIJ DATE 11/12/2013 E/0 LEVEL 2, 6156 Ill LE'AK THRESOOLD 0. 002 Ill TEST RESULT PASSEO ~ I I I I I I 3357 FASTr<iP 8001 Vl11 IE Ul BACXERSF JElD 11/12/2013 12:50 Pll SIJI\P LEAA TEST REPORT lllC1920 UOC2122 TEST STAATEO 12:35 Pll TEST STAATEO 11/12/2013 BEGIII LEVEL 2.8264 Ill Elll TilE 12:50 PH BID DATE 11/12/2013 am LEVEL 2.8265 Ill lEAK TlfiE510.0 0, 002 Ill TEST PESlA..T PASSED lllC2324 TEST STARTED 12:35 Pll TEST STAATED 11/12/2013 BEGIII LEVa o. 5306 Ill EIO TIME 12:50 Pll EIIO DATE 11/12/2013 EIO LEVEL o. 5301 Ill LEA'< TlflEml.O 0, 002 lll TEST REstll.T PASSED UOC1314 3367 FASTRIP 8001 IIHJTE Ul eAO<ERSFIELD 11/12/2013 1:20 Pll SUIIP LEAK TEST REPORT lllC1920 UOC2122 TEST STARTED 1:04 Pll TEST STAATEO 11/12/2013 BEGIIILEVa 2,8268 Ill Elltl TillE 1:20 Pll E/10 OATE 11/12/2013 Elll LEVEL 2, 8280 Ill LEAK Tlt=!ESIII.O 0, 002 Ill TEST RESU. T PASSI'..O UOC23211 TEST STARTED 1:04 Pll TEST STARTED 11/12/2013 BEG Ill LEVEL 0, 5300 Ill EIO TilE 1:20 P/1 EIO DATE 11/12/2013 EIO l.E\R 0, 5291 Ill LEAK TlflESHilO 0, 002 Ill TEST RESULT PASSED IJJC131Q ~- -....... 3367 FASTRIP 8001 1/HITE Ul BACKER SF lElD 11/12/2013 1:56 PH SIJi1> LEVEL REPORT SUMP UOC1920 Slll1P OS STP Slll1P uoc 1718 SUNP UOC1314 1. 161 Ill 6, 115 Ill 2, 105 Ill 3. 763 Ill 3367 FASTRIP 8001 1/HITE Ul BACKERSF I E1.D 11/12/2013 2:18 PH Slt\P LEAK TEST REPOOT UOC1920 TEST STARTED 2:03 PH TEST STARTED 11/12/2013 BEGIII LEVEL 1, 1614 Ill El/0 TillE 2:18 PH EliO DATE 11/12/2013 EliO LEVEL 1, 1620 Ill LEAK THRESiltlO 0, 002 Ill TEST RESULT PASSED OS STP TEST STARTED 2:03 PH TEST STARTED 11/12/2013 ' BEGIU LEVEL 6, 1103 Ill BID TillE 2:18 PH BlD DATE 11/12/2013 EIID LEVEL 6, 0911 Ill • LEAK THRESHll.D 0, 002 Ill TEST REStn.T FAILED UllC1118 TEST ST(IRTED TEST STll!tJED BEG Ill EJ() TIHE El() DATE Elll LEVEL LEAK TmESI TEST RESI.l. UlC1314 TEST START ED 2: 03 PH TEST STARTED 11/12/2013 BEG Ill LEVEL 3, 7641 Ill BID TillE 2:18 PH BID DATE 11/12/2013 BID LEVEL 3. 7636 Ill LEAK THRESHOLD 0, 002 Ill TEST RES\Jt. T PASSED 3367 FASTRIP 8001 1/H!TE Ul BACKERSFIELO 11/12/2013 2:45 PH SllHP LEAK TEST REPORT lllC1920 TEST STARTED 2:2~PH TEST STFI TED 11/12/201 BEGJIILEV 1, 1~ Ill EliD TillE ./'f:44 PH BID DATE 12/2013 BID LEVEL 1, Ill LEA'< lllRESI«:lLO 0. 002 Ill TEST RES\Jt.T ltlCREASEO OS STP TEST STARTED 2:29 PH TEST STARTED 11/12/2013 BEG Ill lEVEl. 6, 0875 Ill EliO TillE 2:44 PH EIID DATE 11/12/2013 EJID LEVEL 6, 0717 Ill LEM THRESH!X.D 0, 002 Ill TEST REStn.T FAILED lllC1718 UOC1314 TEST STARTED 2:29 PH TEST STARTED 11/12/2013 BEGJII LEVEL 3, 7345 Ill EJIO TillE 2:44 Pll EJIO DATE 11/12/2013 EJD LEVEL 3, 7342 Ill LEAK THRESH!X.D 0, 002 Ill TEST RESULT PASSED J 3367 FASTRIP 3367 FASTRIP 8001 1/HITE Ul 8001 1/HITE Ul 3367 FASTRIP BACKERSFIEI.D BACXERSFIELD 8001 IIHITE Ul BACKERSFIRO 11/12/2013 3:44 PH 11/12/2013 4:00 PH 11/12/2013 4:17 Pt1 SUP l£AK TEST REPORT StJf l£AX TEST 1\EPmT SlW LEAK TEST REPORT UOCI920 OOC1920 TEST STARTED TEST STARTED 3:45 PH TESTS TEO TEST STARTED 11/12/2013 TEST STARTED 4:01 PH BEG Ill BEGIII LEVEL 1. 1387 Ill TEST STARTED 11/12/2013 Elll TIHE Elll TillE 4:00 PH BEiilll LEVEL 1, 1390 Ill Elll DATE Elll DATE 11/12/2013 Elll TillE 4:17 PH EJO LEVEL 1, 1394 Ill Elll DATE 11/12/2013 LEAK THRESHOLD 0, 002 Ill Ell! LEVEL 1, 1368 Ill TEST RESULT PASSED lEA.'< THRESaJLO 0, 002 Ill TEST REStlT PASSED 91 STP 91 STP 91 STP TEST STARTED 3:29 Pll TEST STARTED 3:45 PH TEST STARTED 1 t/12/2013 TEST STARTED 11/12/2013 TEST STARTED 11:01 Pll BEGIII lEVEl 4.6958 Ill BEGIII lEVEl 4.4113 Jtl TEST STARTED 11/12/2013 Elll TIHE 3:114 PH Elll TIHE 11:00 PH BEG Ill LEVEl 4,2268 Ill EJID DATE 11/12/2013 EJll DATE 11/12/2013 Elll TIHE 4:17 PH EIIO lEVEl 11,114115 Jtl EIID LEVEL 4. 2573 Ill BID DAlE 11/12/2013 LEAK TI!RESHllD 0, 002 Ill LEAK TlflESOOLO o. 002 Ill El/0 LEVEL 4, 0935 Til TEST RESULT FAILED TEST REStLT FA !lED lEA.'< TltllESHOLD 0.002 Ill TEST RESIJL T FAILED UOC1718 LOC1718 UOCl718 TEST STARTED 3:29 PH TEST STARTED 3:45 PH TEST STARTED 11/12/2013 TEST STARTED 11/12/2013 TEST STARTED 11:01 PH BEGIII LEVEL 2. 1032 Ill BEGIII LEVEL 2. 1023 Ill TEST STARTED 11/12/2013 ElfJ TIHE 3:44 PH EJID TltE 4:00 PH BEG Ill lEVEl 2. 1021 Ill EJ[) DATE 11/12/2013 EliD DATE 11/12/2013 El:O TIHE 4:17 PH ElllLEVEl. 2. 1023 Ill EIID lEVEl 2. 1022 Ill EIID DATE 11/12/2013 LEAK TlflESOOLO 0, 002 Til LEAK TlflES!IllD 0, 002 ltl EIIO lEVEl 2. 1018 Ill TEST RESULT PASSED TEST RESll. T PASSED LEAK THlESH!l.O 0,002 Ill TEST RESULT PASSED 3361 FASTRIP 8001 III!ITE Ul BAKERSF !El.D 11/1212013 2:26 PH ALARH REPORT 11/12/2013 12:49 PH PROBE FLOAT HISSIIXJ SIJ1P llO, 1 3367 FASTRIP 8001 VHITE Ul BAXERSF I El.D 11/12/2013 4:28 PH StJHP LEA'< TEST REPORT 87FLSB TEST STAATED 4:13 PH TEST STARTED 11/12/2013 BEG Ill lEVEL 7, 6012 Ill 00 TillE LJ: 28 PH Elll DATE 11/12/2013 Elll LEVEL 7, 6003 1!1 LEAl< TlflESIIllD o. 002 Ill TEST REStl.T PASSED 91FlS8 TEST STARTED 4:13 PH TEST STARTED 11/12/2013 BEGIII lEVEl s. 1454 Ill Elll TillE 4:28 PH 910 DATE 11/12/2013 910 LEVEL s. 1055 ltl lEAl< THRESHOLD o. 002 Ill TEST RESIA. T PASSED 3357 FASTRIP 8001 VHITE Ul BAAERSF I ELD 11/12/2013 4:114 PI! StJ!'i' LEA'< TEST REPalT 87FLS6 TEST STAATED 4:29 Pll TEST STARTED 11/12/2013 BEG Ttl LEVEl 7, 5998 Ill EIID TillE 4:44 P11 81> DATE 11/12/2013 Elll LEVEL 7,5993 Ill LEAK TlfiES!fJLO 0, 002 111 TEST REru.T PASSED 91FLSB TEST STARTED 4:29 PH TEST STARTED 11/12/2013 BEG Ill LEVEl 5. 1453 Ill 910 TillE 4:44 PH 90 DATE 11/12/2013 EIIO LEVEL 5. 1454 Ill LEAl< Tl!RESHOC.D o. 002 Ill TEST RESULT PASSED 3367 FASTRIP 8001 III!JTE Lll BACKERSF I El.D 11/12/2013 5:24 Pll SU!'.P LEA!< TEST REPORT ost.SB TEST STARTED 5:09 PH TEST STARTED 11/12/2013 BEGIII LEVEL 4, 7920 1U am TII1E 5:24 PH Ellll OATE 11/12/2013 EIIO LEVEL 4, 7932 Ill LEAK THRESHOLD 0, 002 Ill TEST RESil.T PASSED 81FILl TEST STAATED 5:09 P/1 TEST STAATED 11/12/2013 BEG !II ma 4, 0506 Ill EIID liKE 5:24 PH EllD DATE 11/12/2013 EJIO LEVEL 4, 0499 Ill LEAl( ~D 0, 002 Ill TEST RESU.T PASSED 91Fill ostflll TEST STARTED 5:09 PI! TEST STARTED 11/12/2013 BEG Ill LEVEL a. 5876 111 911 TIHE 5:24 PH EIIO DATE 11/12/2013 EllO LEVEL 11,5879 IU LEAK TK{ES!IlLO o. 002 Ttl TEST RESil. T PASSED 3357 FASTRIP 8001 \'I!ITE Ul BACXERSF IB.O 11/12/2013 5:42 PH S!.IIP LEAl< TEST REPIRT DSLSB TEST STARTED 5:26 PH TEST STARTED 11/12/2013 BEG Ill LEVa 4, 7931 Ill E!O TlltE 5:42 PH Elll DATE ll/12/2013 EID LEVEL 4, 7929 Ill LEAK TlfiESH!l.D 0, 002 Ill TEST RESIJL T PASSED 87Fill TEST STARTED 5:26 PH TEST STARTED ll/12/2013 BEG Ill LEVa 4, 0500 Ill em TJHE 5:42 PH em DATE 1T/12/2013 BID LEVEL G, 0496 Ill lEAK THRESOOLO 0. 002 Ill TEST RESULT PASSED 91Fill TEST STARTED 5:26 PI! TEST STARTED 11/12/2013 BEGIIILEVB. VOLUHE ERR Elll TIHE 5:30 PH E/10 DATE 11/12/2013 E!ID LEVEL 0.0000 Ill LEM TlfiE5n'OI.O 0.004 Ill TEST RESULT ERROR OSLFILL TEST STARTED 5:26 PH TEST STARTED 11/12/2013 BEG Ill LEVEL 4, 5877 Ill Ell> TitlE 5:42 PH Elll DATE 11/12/2013 Elll lEVEl 4, 5875 Ill LEN< THRES!nD 0, 002 Ill TEST RESllT PASSED --~---·················- 3367 FASTRIP 8001 Vl!lTE U I BAKER SF 18.0 11/12/2013 6:40 PH SlJf' LEAl< TEST REPORT 872FLSB TEST STARTED 6:25 PI\ TEST STARTED ll/12/2013 BEGIII LEVEL 3. 9143 Ill EJIO TillE s:ao PH E/10 DATE 11/12/2013 El/0 LEVEL 3. 9151 Ill LEAK THRESH!l.D 0, 002 Ill TEST RESULT PASSED VEl IT BOX TEST STARTED 6:25 PI! TEST STARTED 11/12/2013 BEG Ill LEVa 3, 7849 Ill ElD Til£ 6:40 PI! ell DATE 11/12/2013 Elal LEVEL 3, 4988 Ill lEAK THRESHOLD 0. 002 Ill TEST RESULT FAILED 91Fill TEST STARTED 6:25 PH TEST STARTED 11/12/2013 ·.iEGIII LEVEl. G. 0775 Ill .-10 T111E 6:110 PH · «l DATE 11/12/2013 1J LEVEL 4.0775 Ill ' EAK TlfiES!O.D 0, 002 Ill EST RESIJL T PASSED ' •: 3367 FASTRIP 8001 \IlliTE Ul BAKERSFIELD 1/12/2013 6:56 Pl1 : StiiP LEAl< TEST REPCRT ~: 872FLSB ., '. EST STARTED 6:41 PH • · EST STARTED 11/12/2013 :'."1 EGIIILEVEL 3. 9153 Ill D TIME 6:56 PH aJ DATE 11/12/2013 .~ mLEVEL 3, 9156 Ill n,!ESHOLD 0, 002 Ill STIRESllT PASSED .. , ;~~ES~ STARTED 6:41 Pl1 . EST STARTED 11/12/2013 Gill lEVEL 3, 5114 Ill 10 TII1E 6:56 Pl1 · 10 DATE 11/12/2013 10 LEVEL 3.5112 HI , K Tl\llESH!l.O 0, 002 HI EST REStl.T FAILED 91FILL ~· EST STARTED 6:111 P11 EST STARTED 11/12/2013 Gill LEVEL ll, 0776 Ill !iJ TillE 6:56 PH l!l DATE 11/12/2013 I!! LEVEL 4.0776 Ill EAK THRESH!l.D 0. 002 Ill EST REStl. T PASSED