Loading...
HomeMy WebLinkAbout2014 RESULTSSWRCB, January 2002 Page __ of __ Secondary Containment Testing Report Form This form is intended for use by contractors pe1jorming periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulat01y agency. 1. FACILITY INFORMATION Facility Name: #3346 Fastrip #621 I Date of Testing: 3/14/2014 Facility Address: 805 341h Street, Bakersfield, CA 93301 Facility Contact: Omero Garcia I Phone: (661 )393-7000 Date Local Agency Was Notified ofTesting: 3/12/2014 Name of Local Agency Inspector (if present during testing): Ernie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Technician Conducting Test: Bryan A Self Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester License Type: CSLB I License Number:804904 ICC# 8022804-UT TT#11-1756 Manufacturer T raining Manufacturer Component( s) Date Training Expires UST 10/21/2015 lnstallaton/Retrofit UST Service ICC 1-28-2015 technician Star. Smith. Fibercast Fiber Glass Systems N.A. 3 SUMMARY OF TEST RESULTS . Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made 87 Annular X 0 0 0 UDC 1-2 0 X 0 0 87-2 Annular X 0 0 0 UDC 3-4 0 X 0 0 91 Annular X 0 0 0 UDC 5-6 0 X 0 0 Diesel Annular X 0 0 0 UDC 7-8 0 X 0 0 87 Secondary Line 0 X 0 0 Trans West 0 X 0 0 87-2 Secondary Line 0 X 0 0 Trans East 0 X 0 0 91 Secondary Line 0 X 0 0 87 Fill Sump X 0 0 0 Diesel Secondary Line 0 X 0 0 87-2 Fill Sump X 0 0 0 87 STP Sump X 0 0 0 91 Fill Sump X 0 0 0 87-2 STP Sump 0 X 0 0 Diesel Fill Sump X 0 0 0 91 STP Sump 0 X 0 0 87 Fill Spill Bucket X 0 0 0 Diesel STP Sump 0 X 0 0 87 Vapor Spill Bucket X 0 0 0 If hydrostatic testing was performed, describe what was done with the water after completion of tests: Water was put back into test trailer and waste drum F TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To tile best of my knowled rate and in full compliance with legal requirements Technician's Signature:_;j2.'l2:!'JI_:;....~;:r~~~~~~~~::::...:£..J---:;;;,.L.~~7----___)D~a~t~e:_~0~3/~1.:!4/~2~0..!.:!14 SWRCB, January 2002 Page __ of __ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, wrillen test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submillalto the local regulatory agency. 1 FACILITY INFORMATION Facility Name: #3346 Fastrip #621 I Date ofTesting: 3/14/2014 Facility Address: 805 34'" Street, Bakersfield, CA 9330 I Facility Contact: Omero Garcia j Phone: (661)393-7000 Date Local Agency Was Notified of Testing: 3/1 2/2014 Name of Local Agency Inspector (if present during lesting): Ernie Medina 2 TESTING CONTRACTOR INFORMATION . Company Name: Confidence UST Services Technician Conducting Test: Bryan A Self Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester License Type: CSLB I License Number:804904 ICC# 8022804-UT TT#II-1756 Manufacturer Train in~:; Manufacturer Component( s) Date Training Expires UST 10/21 /2015 Installaton/Retrofit UST Service ICC 1-28-2015 technician Star. Smith. Fibercast Fiber Glass Systems N .A. 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made 87-2 Fill Spill Bucket X 0 0 [.J 0 0 0 0 87-2 Vapor Spi ll Bucket X 0 0 0 0 0 0 0 91 Fill Spill Bucket X 0 ...., 0 ...., 0 0 0 ~-..... 91 Vapor Spill Bucket X 0 0 (J ~ 0 [.J 0 ...... Diesel Fill Spill Bucket X 0 ...., c ~ 0 0 0 ' L.J Diesel Vapor Spill Bucket X 0 0 0 0 0 tJ 0 0 0 0 0 0 0 [.J 0 0 0 D 0 0 0 0 0 0 :J 0 0 0 0 0 0 0 0 0 0 0 .J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 lfhydrostatic testing was performed, describe what was done with the water after completion of tests: Water was put back into test trailer and waste drum SWRCB, January 2002 Page of 4. TANK ANNULAR TESTING Test Method Developed By: D Tank Manufacturer x Industry Standard 0 Professional Engineer D Other (Specify) Test Method Used: D Pressure x Vacuum D Hydrostatic 0 Other fSoecifv) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" ' Tank # 87 Tank # 87-2 Tank # 91 Tank # Diesel Is Tank Exempt From Testing?1 '-'Yes X No Yes X No ::.. Yes X No ::=Yes X No Tank Capacity: 12,000 12,000 12,000 12,000 Tank Material: Steel Steel Steel Steel Tank Manufacturer: Modern Welding Modern Welding Modern Welding Modern Welding Product Stored: 87 Annular 87-2 Annular 91 Annular Diesel Annular Wait time between applying pressure/vacuum/water and 5 Min. 5 Min. 5 Min. 5 Min. starting test: Test Start Time: 9:30AM 9:30AM 10:40 AM 10:40 AM Initial Reading (R1): -10 Hg -10 Hg -10 llg -10 Hg Test End Time: !0:30AM 10:30 AM I 1:40AM !1:40AM Final Reading (RF): -10 Hg -10 Hg -I 0 llg -I 0 Ilg Test Duration: I Hour I Hour I Hour I Hour Change in Reading (RF-R1): 0.00" 0.00" 0.00" 0.00" Pass/Fail Threshold or Criteria: 0.00" 0.00" 0.00" 0.00" Test Result: X Pass DFail X Pass D Fail X Pass OFail X Pass O Fail Was sensor removed for testing? X Yes D No DNA X Yes D No DNA X Yes ..., No L NA X Yes D No ...,NA Was sensor properly replaced and X Yes D No DNA X Yes D No DNA X Yes DNo DNA X Yes D No DNA verified functional after testing? Comments-(include information on repairs made prior to testing, and recommended.follow-up.for.fai/ed tests) 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that arc hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)} SWRCB, January 2002 Page __ of __ 5. SECONDARY PIPE TESTING Test Method Developed By: n Piping Manufacturer x Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: x Pressure 0 Vacuum U Hydrostatic 0 Other (Spec[fy) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" -Piping Run #87 Piping Run # 87-2 Piping Run # 91 Piping Rtm # Diesel Piping Material: FRP FRP FRP FRP Piping Manufacturer: Smith Smith Smith Smith Piping Diameter: 3.00" 3.00" 3.00" 3.00" Length ofPiping Run: 150' 160' 170' 180' Product Stored: Regular Regular Super Diesel Method and location of Test Boot Test Boot Test Boot Test Boot piping-run isolation: Wait time between applying pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (Rr): Test Duration: Change in Readin g (~-R1): Pass/E il Threshold or Criteria: Test Result: O Pass X Fail 0 Pass X Fail 0 Pass X Fail 0 Pass X Fail Comments -(include iriformation on repairs made prior to testing, and recommendedfo/low-up.forfailed tests) Secondarv Line were not tested. Unable to Test Boot on. SWRCB, January 2002 Page __ of _ 6. PIPING SUMP TESTING Test Method Developed By: D Sump Manufacturer x Industry Standard D Professional Engineer D Other (SpecifY) Test Method Used: D Pressure D Vacuum x Hydrostatic D Other (SpecifY) Test Equipment Used: Ts-sts Equipment Resolution: Sump# 87 Sump # 87-2 Sump# 91 Sump# Diesel Sump Diameter: 36.00" 36.00" 36.00" 36.00" Sump Depth: 57.00" 57.00" 57.00" 57.00" Sump Material: FRP FRP FRP FRP Height from Tank Top to Top of 22.00" 18.00" 15.00" 22.00" Highest Piping Penetration: !Ieight from Tank Top to Lowest 15.00" 16.00" 20.00" 14.00" Electrical Penetration: Condition of sump prior to testing: Clean & Dry Clean & Dry Clean & Dry Clean & Dry Portion of Sump Tested1 Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration Does turbine shut down when sump sensor detects liquid (both product and water)?' L Yes DNo XNA r Yes =:No X NA D Yes J NoXNA 0 Yes C NoXNA Turbine shutdown response time NA NA NA NA Is system programmed for fail-safe shutdown?' D Yes DNo XNA D Yes DNoXNA D Yes D NoXNA D Yes DNoXNA Was fail-safe verified to be DYes DNo XNA [1 Yes DNoXNA D Yes DNoXNA DYes DNo X NA operational?' Wait time between applying pressure/vacuum/water and starting NA SMin SMin SMin test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass DFail 0 Pass X Fail 0 Pass X Fail 0 Pass X Fail Was sensor removed for testing? D Yes DNo XNA ~Yes DNo XNA D Yes O No XNA :; Yes DNo X NA Was sensor properly replaced and D Yes DNo XNA D Yes ONo XNA D Yes O No X NA DYes DNo X NA verified functional after testing? Comments-(include information on repairs made prior to tesling, and recommended.follow-upfor[ailed tests) 1 If the entire depth of the sump is not tested, specifY how much was tested. If the answer to~ of the questions indicated with an asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page __ of __ 7. UN DER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: U UDC Manufacturer x Industry Standard " Professional En gineer D Other (Spec![Y) Test Method Used: D Pressure lJ Vacuum x Hydrostatic D Other (Specify) Test Equipment Used: Ts-sts Equipment Resolution: UDC # 1-2 UDC #3-4 UDC #5-6 UDC # 7-8 UDC Manufacturer: Western Western Western Western UDC Material: FRP FRP FRP FRP UDC Depth: 31.00" 31.00" 31.00" 31.00" Height from UDC Bottom to Top 9.50" 9.50" 9.50" 9.50" of llighest Piping Penetration: Height from UDC Bottom to 3.00" 3.00" 3.00" 3.00" Lowest Electrical Penetration: Condition ofUDC prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry testing: Portion ofUDC Tested 1 Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration Does turbine shut down when UDC sensor detects liquid (both product and water)?• []Yes n No XNA [l Yes fl NoXNA llYes fJ No XNA n Yes ·No XNA Turbine shutdown response time NA NA NA NA Is system programmed for fail- safe shutdown?· D Yes D No XNA D Yes D NoXNA DYes CJ No XNA DYes J No XNA Was fail-safe verified to be LJ Yes DNo XNA DYes D NoXNA J Yes D No XNA Cl Yes []No X NA operational?• Wait time between applying 5 Min 5 Min 5 Min 5 Min pressure/vacuum/water and starting test Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: D Pass X Fail D Pass X Fail D Pass X Fail D Pass X Fail Was sensor removed for testing? ;Yes D No XNA D Yes ll No XNA D Yes D No XNA L'Yes No XNA Was sensor properly replaced and [l Yes UNo XNA D Yes n No XNA ::::; Yes D No XNA [J Yes U No XNA verified functional after testing? Comments-(include inj01mation on repairs made prior to testing, and recommendedfo//ow-upforfailed tests) UDC's were not tested. Unable to get Test Boot on. 1 If the entire depth of the UDC is not tested, specifY how much was tested. If the answer to~ of the questions indicated with an asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160) SWRCB. January 2002 Page __ of __ 7. UNDER-DISPENSER CONTAINMENT (UDC) TEST ING Test Method Developed By: UDC Manufacturer x Industry Standard Professional Engineer Other (Spec[fy) Test Method Used: Pressure Vacuum x I lydrostatic U Other (Spec[f"y) Test Equipment Used: Ts-sts Equipment Resolution: -}~ UDC #Tans East UDC #Trans West UDC# UDC# UDC Manufacturer: Western Western UDC Material: FRP FRP UDC Depth: 31.00" 31.00" Height from UDC Bottom to Top 9.50" 9.50" of Highest Piping Penetration: I Ieight from UDC Bottom to 3.00" 3.00" Lowest Electrical Penetration: Condition of UDC prior to Clean & Dry Clean & Dry testing: Portion ofUDC Tested' Pipe Penetration . Pipe Penetration Does turbine shut down when UDC sensor detects liquid (both product and water)?" lJ Yes D No XNA UYes NoXNA I I Yes u No NA Yes No -NA Turbine shutdown response time NA NA Is system programmed for fail- safe shutdown?' Yes No XNA Yes NoXNA Yes ~No NA Yes No NA Was fail-safe verified to be n Yes ,No XNA ll Yes r NoXNA I I Yes J No NJ\ • Yes II No [ NA operational?' Wait time between applying 5 Min 5 Min pressure/vacuum/water and starting test Test Start Time: Initial Reading (R1): Test End Time: Final Reading(~): Test Duration: Change in Reading (Rr-R1): Pass/Fail TI1reshold or Criteria: Test Result: 0 Pass X Fail 0 Pass X Fail 0 Pass 0 Fail 0 Pass OFail Was sensor removed for testing? Yes No XNA Yes No XNA Yes ,....No NA -Yes No ~NA Was sensor properly replaced and Yes No XNA 'l Yes [l No XNA Yes No NA _ Yes No NA verified functional after testing? Comments-(include information on repairs made prior to testing. and recommended follow-up for failed tests) ~C'sw~e n~~s~d .Un~a~h~k~t~o~g~e~t~T~e~~~B~o~o~to~n~·~~~~~~~~~~~- 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer 10 !!!!Y of the questions indicated with an asterisk(*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page of 8 FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sumps 0 Fill Riser Containment Sumps are Present, but were Not Tested D Test Method Developed By: D Sump Manufacturer 2 Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: [J Pressure D Vacuum D Hydrostatic D Other (Specify) Test Equipment Used: Equipment Resolution: Fill Sump # 87 Fill Sump # 87-2 Fill Sump # 91 Fill Sump # Diesel Sump Diameter: 36.00" 36.00" 36.00" 36.00" Sump Depth: 57.00" 57.00" 57.00" 57.00" Height from Tank Top to Top of NA NA NA NA Highest Piping Penetration: Height from Tank Top to Lowest 14.00" 14.00" 14.00" 14.00" Electrical Penetration: Condition of sump prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry testing: Portion of Sump Tested Collar Collar Collar Collar Sump Material: FRP FRP FRP FRP Wait time between applying 5 Min. 5 Min. 5 Min. 5 Min. pressure/vacuum/water and starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass D Fail X Pass DFail X Pass D Fail X Pass OFail Is there a sensor in the sump? X Yes DNo X Yes .J No X Yes .... No X Yes "No Does the sensor alarm when either product or water is 0 Yes D No XNA ;] Yes DNo X NA DYes D No XNA D Yes ONo XNA detected? Was sensor removed for testing? 0 Yes DNo XNA DYes DNo X NA 0 Yes DNo XNA DYes ONo XNA Was sensor properly replaced and Yes ;J No XNA D Yes ,..,No X NA DYes D No XNA DYes 'l No X NA verified functional after testing? Comments-(include information on repairs made prior to testing, and recommendedfol/ow-up.for failed tests) SWRCB, January 2002 Page __ of __ 9 SPILIJOVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes 0 SpilVOverfill Containment Boxes are Present, but were Not Tested 0 Test Method Developed By: Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer Other (Specify) Test Method Used: Pressure 0 Vacuum x Hydrostatic 0 Other {Specify) Test Equipment Used: Ts-sts I Equipment Resolution: Spill Box # 87 Fill Spill Box# 87 Vapor Spill Box# 87-2 Fill Spill Box# 87-2 Vapor Bucket Diameter: 12.00" 12.00" 12.00" 12.00" Bucket Depth: 12.00" 12.00" 12.00" 12.00" Wait time between applying pressure/vacuum/water and 5 Min. 5Min. 5 Min. 5 Min. starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (R1:): Test Duration: Change in Reading (Rr-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass O Fail X Pass 0 Fail X Pass O Fail X Pass 0 Fail Comments-(include information on repairs made prior to testing, and recommendedfollow-up[orf ailed tests) SWRCB, January 2002 Page __ of __ 9 SPILL/OVERFILL CONTAINMENT BOXES . Facility is Not Equipped With Spill/Overfill Containment Boxes 0 Spill/Overfill Containment Boxes are Present, but were Not Tested 0 Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer 0 Other (SpecifY) Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic 0 Other (SpecifY) Test Equipment Used: Ts-sts I Equipment Resolution: Spill Box # 91 Fill Spill Box# 91 Vapor Spill Box # Diesel Fill Spill Box# Diesel Vapor Bucket Diameter: 12.00" 12.00" 12.00" 12.00" Bucket Depth: 12.00" 12.00" 12.00" 12.00" Wait time between applying pressure/vacuum/water and 5Min. 5Min. 5 Min. 5 Min. starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail X Pass OFail Comments -(include information on repairs made prior to testing, and recommended follow-up for failed tests) 3364 FASTRIP 805 34.TJi .ST BAXERSF I El.D CA · i!33ot I • • , ... / TEST STARTED 1:27 PH TEST STARTED 03/14/201/l BEG Ill lEVEl 5. 9470 Ill EID TIHE 1 :113 PI! EID DATE 03/lll/201/l EID LEVEL 5, 9464 Ill LEAK TliRESHOLD ·o~ 002 Ill TEST RESll..T PASSED •. . "1·: . .. ;~?. .• DSfSB;"·· ••. , 'iS .• / TEST STARTED 1:27 fH TEST STARTED 03/10/2014 BEG Ill LEVEL 7. 5757 Ill EID TillE t:43 PI! EID DATE 03/10/2010 El!l LEVEl 7. 5751 Ill LEAK TI!RESHtl.D O. 002 Ill TEST RESULT PASSED OSVSB TEST STARTED t:27 PI! TEST STARTED 03/tn/2010 BEG Ill lEVEl 6. 2909 Ill Elll TillE 1:43 PI! El!l DATE 03/111/2014 EID lEVEl 6, 2897 Ill LEAK THRESHOLD 0, 002 Ill TEST RESLtT PASSED ',.! '. . ~ ... '·· t. ,. y. ' . ., . ·1 ·~ • i ·. \'; .. •I ·I ~ l . ·. 3354 FASTW· 805 34TH ST BAKER SF I El.D ct. 9330 I 03/ta/2014 2:05 Ptl SCIIP LEAK TEST REPORT 91FSB TEST STARTED t:50 Ptl TEST STARTED 03/W2014 BEG Ill lEVEl S. 9458 Ill EIIO TII1E 2:06 Pl1 EIIO DATE 03/lll/2014 El!l LEVEL _ ;•5. 9454 lfl LEAK THRESHOUJ 0, 002 Ill TEST RESil.T PASSED DSFSB TEST STARTED 1:50 PH TEST STARTED 03/14/2014 BEG Ill lEVEL 7, 5750 W EJIO TillE 2:06 P11 EIID DATE 03/lll/2014 EIIO lEVEl 7. 5753 Ill lEAK TliRESIITLD 0, 002 Ill TEST RESLtT PASSED DSVSB TEST STARTED 1:50 PH TEST STARTED 03/1G/2014 BEG Ill LEVEL 6. 2892 Ill EID TillE 2:06 PH EIIO DATE 03/14/20111 EIIO lEVEL 6. 2889 Ill LEAK THRESHOLD 0. 002 Ill TEST RESll..T PASSED . . .t;.! ;:J;-· • \1 ~~ ,.; .. ( \; '" !:, ::.} ~~ ' ... .-3t1 .... ... ~-~~· '! •. ::· ... ; .... ~ i· . ~t;'-' ' .• r. t ' J ~·. -...:- 3364 FASTRIP 805 34TH ST BAJ<ERSF I ElD CA 93301 03/10/2014 9:55 AH SUII? LEAK lEST REPMT 87 FILL-'""' .. _ ..... TEST· STAATED 9:39 Al1 TEST··STAATED 03/la/2014 BEG !II LEVEl 3. 4314 Ill Ell) TJHE 9:55 N1 EIIO DATE 03/1Q/2014 ·- Ela:J LEVEL 3.4320 Ill LEAK T!VlES!ICLO 0, 002 Ill TEST RESIA. T PASSEO 872FILL TEST STARTED 9:39 A.ll TEST STARTED 03/14/2014 BEGIII lEVEL 1, 1982 Ill E/10 TI t1E 9:55 At1 EllD DATE 03/14/2014 EllO lEVEL 1. 1976 Ill LEAK THRESHOLD 0, 002 Ill TEST RESIA..T PASSED 91 FILL TEST STAATEO 9:39 Al1 TEST STAATEO 03/10/20111 BEG Ill LEVEL 4, 4043 Ill EJI) TIHE 9:55 Al1 EJ«l DATE 03/lC/2014 Ellll LEVEL ll, 4035 Ill LEAK THRESHOLD 0, 002 Ill TEST RESII.T PASSED OS FIL~ . TEST STARTED 9:39 Al1 TEST STARTED '03lW2011!--· · BEG Ill LEVEL 3. 5899 IIi EliD TillE · 9:55 At1 EIID DATE 03/14/2014 EJ/0 LEVEL 3. 5893 Ill LEAK THRESHOLD 0. 002 Ill TEST RESULT PASSED .• 3364 FASTRII" 805 34TH ST BAKERSFIElD CA 93501 03/11l/201Q 10:15 Al1 SUNP lEAK TEST REPORT 87 FILL TEST STARTED 10:00 Al1 TEST STII.RTED 03/ta/2014 BEGIIIlEVEl 3,1l318 Ill E/10 TillE 10:15 Al1 EllO DATE 03/14/2014 EIIO LEVEL 3.11318 Ill LEAK THRESHOLD 0, 002 Ill TEST RESll T PASSED 872FILL TEST STARTEfJ 10:00 AH TEST STAATED 03/10/2014 BEGJIILEVEL 1, 1978 Ill Ell) TIHE 10:15 N1 Ell) DATE 03/14/2014 El.U LEVEL 1. 1930 Ill LEAK THRESHCLO 0, 002 Ill TEST RESUI. T PASSED 91 FILL TEST STARTED 10:00 All TEST STARTED 03/10/2014 6EGIII LEVEL· 4,1l033 Ill EJID TillE 10:15 At! EJlO DATE 03/14/2014 E/10 lEVEl U030 Ill LEAK THl\ESiiJUl 0, 002 Ill TEST RESULT PASSED OS FILL TEST STARTED 10:00 A.'l TEST STARTED 03/14/20111 BEG !II LEVEL 3, 5391 Ill EUD TillE 10:15 Al1 E)[) DATE 03/14/2014 Elll LEVa 3. 5891 111 LEAK THRESOOLO 0, 002 Ill TEST RES\Jl.T PASSED 3364 FASTRIP 805 34TH ST BAKERS!= IELD CA 93301 03/14/2014 2:53 P/1 SUHP LEAK TEST llEPORT 872FSB TEST STARTED 2:38 P/1 TEST STARTED 03/11!/20ln BEGIIILEVEL 6, 1303 Ill BID TINE 2:53 PH BID DATE 03/tn/2014 BID lEVEl 6. 1300 Ill LEAK TlilESI'.OLO 0, 002 Ill TEST RESULT PASSED 871FSB TEST STARTED 2:38 PH TEST STARTED 03/111/2014 BEG !II LEVEL 6. 4212 Ill Ell!l TIHE 2:53 PH BID DATE 03/111/2014 am LEVEL 6,4211 111 lEAK THRESIDLD 0, 002 Ill TEST RESULT PASSED 871VSB TEST STARTED 2:3a PH TEST STARTED 03/ta/2014 BEG Ill lEVEl 5. 8621 Ill BID TillE 2:53 P/1 BID DATE 03/14/2014 E/10 LEVEL 5,8617 Ill lEAl< THRESHOLD 0, 002 Ill TEST RESULT PASSED 91YSB .. ~-TEST STARTED 2:38 Pll TEST STARTED-03/14/2014· BEG!Il LEVEL 5, 6943 Ill Elll TJHE 2:53 Pl1 Bll DATE 03/14/2014 BV lEVEl 5, 6941 Ill lEA'< THRESIG.D 0, 002 Ill TEST RESil. T PASSED 3364 FASTRIP 805 34TH ST BAKERSFIELD CA 93301 03/ta/20tn 3:09 Pll StJl1> LEAK TEST REPORT 872FS8 TEST STARTED 2:54 P/1 TEST STARTED 03/111/2014 BEGIIIlEVEl 6, 1297 Ill Bll TillE 3:09 PH Bll DATE 03/111/2014 Bll lEVEl 6, 1294 Ill LEAK THRESHOLD 0, 002 Ill TEST RESllT PASSED 871FSB TEST STARTED 2:54 ftl TEST STARTED 03/111/20111 BEGltl LEVEL 6.11213 Ill El/0 TillE 3:09 P/1 am DATE 03/14/2014 BID lEVEl 6.4210 Ill LEAK THRESOOLD 0, 002 Ill TEST RESUI. T PASSED 811VSB TEST STARTED 2:54 Pit TEST STARTED 03/10/2014 BEGIIILEVEL 5,8611 Ill EIIO TillE 3:09 Pit E/10 DATE 03/14/20111 E/10 LEVEL 5. 8610 Ill lEAK THRESOOLD 0. 002 Ill TEST RESLI.T PASSED 91VSB TEST STARTED 2:511 P/1 TEST STARTED 03/14/2014 BEG !II LEVEL 5, 6942 ltl Elll TillE 3:09 P/1 Bll DATE 03/14/20111 BD LEVEL 5, 6940 Ill LEA'< THRESHll.D 0, 002 IU TEST RESil.T PASSED 3354 FASTRJP 80S 34TH ST IJAI(ERSF I ElD CA 93301 03/14/2014 11:27 All StmP l£A1( TEST REPORT 81 STP TEST STAATED 11:12 All TEST STAATED 03/14/2014 BEGUlLEVR 5,0623 Ill am TJKE 11:21 Nt EIID DATE 03/14/2014 BID LEVEL 5. 0605 Ill I..EAX TliRESI«lll 0, 002 Ill TEST RESULT PASSED 872 STP TEST STARTED 11:12 All • t : . TEST STARTED 03/14/2014 • BElilln.£~ -s;:ws.·.nr ....;~ .. Etll Tl If 11:27 All Elll DATE 03/14/2014 E/jl) lEVEl.. 5, 7299 Ill LEA'< TKIItSHrul 0, 002 Ill TEST RESIJ..T FAILED --~:'ll""rltciTiDlR P- 805 34TH ST BAKERSFIElD CA 93301 03/14/2014 SW LEA'< TEST REPORT 87 STP TEST STARTED 11:31 All TEST STARTED 03/14/2014 BEG Ill LEVEl 5. 0503 Ill EIID Tit£ 11:46 All Ellll DATE 03/111/2014 Ell!l LEVEL S, 0598 Ill LEAK THRESil(lO 0. 002 Ill TEST RESllT PASSED 872 STP TEST STARTED 11:31 All TEST STARTED 03/14/2014 BElilll lEVEl 5. 7273 Ill Elll TIHE 11:~6 All Elll DATE 03/tn/2014 Elll LEVEl. S. 7179 Ill LEAX THRESHOLD 0, 002 Ill TEST REStl T FAILED 3364 FASlRIP 805 34TH ST BAKERSFIElD CA 93301 03/10/2010 12:69 PH Sl.t\P W.K TEST R£PORT ; . ..... _ . i .. ! J 91 STP TEST STARTED 12:33 P/1 TEST STAR{ED 03/10/2010 BEG Ill LEVEL 2. 9199 Ill DID TitlE 12:48 PH DlO DATE 03/10/2010 £1:0 lEVEl 2. 6547 Ill LEAK TIRE.SIIl.O 0.002 Ill TEST REStLT FAilED OS STP TEST STA!UEO 12:33 P11 TEST STARTED 03/14/2014 ·.&Gill LEVa 2. 5271 Ill £1.0 TIHE 12:G8 P11 .... :. £1.0 DATE 03/14/2014 _. : EllllEVB. 1.8750 Ill( .. LE/,K OOESIRO 0, 002 Ill . 'iEST RESlU ,·FAILED~,· • -. : .. -. ,_ -,,.. : ~-~ .:· ' . • 'I''-:..· .-.r:-~':"'~·~-... -.::! .. :. 3364 FASTRif' 805 34TH ST BAKERSFIElD CA 93301 03/10/2010 1:oo PH Sill? lEA~ TEST REPmT 91 STP TEST STARTED 12:51 PH TEST STARTED 03/14/2014 BEGIIILE\U 2. 61~ Ill DID TIHE 1:06 PH . EllO DATE ~ 03/la/2014 • EIIO LEVEL 1 2. 3809 111 7 LEA'< TlilESI!tlD o. Q92 Ill ., ~ TEST RESULT!' •liAILED '"· \ · .. : .... OS STP • TEST STARTED 12:51 PH TEST STARTED 03/10/2014 BEGJIILEVEL 1, 7475 Ill Elll TIHE 1:06 PH EIID DATE 03/14/2014 EIO lEVEL 1, 2037 Ill lEAK THRESlll.D 0. 002 Ill TEST RESilT FAILED : '· . ~. ) .. .... ' . ·~· .r; ·, 3346 FASTRIP 805 34TH ST BAAERSFIELD CA 93301 03/10/2014 2:10 P/1 SUI? LEAK TEST REPORT UOC TSE TEST STARTED 1:58 Pt1 TEST STARTED 03/14/2014 BEG Ill LEVa 2. 9631 Ill Elll Ttl£ 2:13 PH EJ(J DATE 03/lll/2014 Elll LEVa 2. 9558 Ill LEAK TlfiESID.O 0, 002 Ill TEST RESULT lllCREASEO UDC TSV TEST STARTED 1:58 Ptl TEST STARTED 03/to/2014 BEGIII LEVa 1,4914 Ill EJID Ttl£ 2:13 PH Ell~ DATE 03/10/2014 EllO LEVEL 1. 2743 ltl LEAK TlRESK:lD 0, 002 ltl TEST RESU..T FAILED 3346 FASTRIP 805 34TH ST BAKERSFIElD CA 93301 03/14/2010 2:31 PH SUI1P LEAK TEST REPORT IDC TSE TEST STARTED 2:15 PH TEST STARTED 03/14/2010 BEG !II LEVa 2, 9557 Ill EIID TillE 2:31 PH Elll DATE 03/14/2010 EIIO LEVEl. 2, 9522 Ill LEAK THRESHOLD 0, 002 Ill TEST REstl.T FAILED IJOC TSV TEST STARTED 2:15 PH TEST STARTED 03/14/2010 BEGIIILEVEL 1, 2322 Ill E!IO TillE 2:31 P/1 EIIO DATE 03/14/2014 Elll LEVEL 1.0204 Ill LEAK THRESHOLD 0, 002 IU TEST REStlT FAILED