HomeMy WebLinkAbout2014 RESULTSSWRCB, January 2002 Page __ of __
Secondary Containment Testing Report Form
This form is intended for use by contractors pe1jorming periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulat01y agency.
1. FACILITY INFORMATION
Facility Name: #3346 Fastrip #621 I Date of Testing: 3/14/2014
Facility Address: 805 341h Street, Bakersfield, CA 93301
Facility Contact: Omero Garcia I Phone: (661 )393-7000
Date Local Agency Was Notified ofTesting: 3/12/2014
Name of Local Agency Inspector (if present during testing): Ernie Medina
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services
Technician Conducting Test: Bryan A Self
Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester
License Type: CSLB I License Number:804904 ICC# 8022804-UT TT#11-1756
Manufacturer T raining
Manufacturer Component( s) Date Training Expires
UST 10/21/2015
lnstallaton/Retrofit
UST Service ICC 1-28-2015
technician
Star. Smith. Fibercast Fiber Glass Systems N.A.
3 SUMMARY OF TEST RESULTS .
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
87 Annular X 0 0 0 UDC 1-2 0 X 0 0
87-2 Annular X 0 0 0 UDC 3-4 0 X 0 0
91 Annular X 0 0 0 UDC 5-6 0 X 0 0
Diesel Annular X 0 0 0 UDC 7-8 0 X 0 0
87 Secondary Line 0 X 0 0 Trans West 0 X 0 0
87-2 Secondary Line 0 X 0 0 Trans East 0 X 0 0
91 Secondary Line 0 X 0 0 87 Fill Sump X 0 0 0
Diesel Secondary Line 0 X 0 0 87-2 Fill Sump X 0 0 0
87 STP Sump X 0 0 0 91 Fill Sump X 0 0 0
87-2 STP Sump 0 X 0 0 Diesel Fill Sump X 0 0 0
91 STP Sump 0 X 0 0 87 Fill Spill Bucket X 0 0 0
Diesel STP Sump 0 X 0 0 87 Vapor Spill Bucket X 0 0 0
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
Water was put back into test trailer and waste drum
F TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To tile best of my knowled rate and in full compliance with legal requirements
Technician's Signature:_;j2.'l2:!'JI_:;....~;:r~~~~~~~~::::...:£..J---:;;;,.L.~~7----___)D~a~t~e:_~0~3/~1.:!4/~2~0..!.:!14
SWRCB, January 2002 Page __ of __
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, wrillen test procedures, and
printouts from tests (if applicable), should be provided to the facility owner/operator for submillalto the local regulatory agency.
1 FACILITY INFORMATION
Facility Name: #3346 Fastrip #621 I Date ofTesting: 3/14/2014
Facility Address: 805 34'" Street, Bakersfield, CA 9330 I
Facility Contact: Omero Garcia j Phone: (661)393-7000
Date Local Agency Was Notified of Testing: 3/1 2/2014
Name of Local Agency Inspector (if present during lesting): Ernie Medina
2 TESTING CONTRACTOR INFORMATION .
Company Name: Confidence UST Services
Technician Conducting Test: Bryan A Self
Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester
License Type: CSLB I License Number:804904 ICC# 8022804-UT TT#II-1756
Manufacturer Train in~:;
Manufacturer Component( s) Date Training Expires
UST 10/21 /2015
Installaton/Retrofit
UST Service ICC 1-28-2015
technician
Star. Smith. Fibercast Fiber Glass Systems N .A.
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
87-2 Fill Spill Bucket X 0 0 [.J 0 0 0 0
87-2 Vapor Spi ll Bucket X 0 0 0 0 0 0 0
91 Fill Spill Bucket X 0 ...., 0 ...., 0 0 0 ~-.....
91 Vapor Spill Bucket X 0 0 (J ~ 0 [.J 0 ......
Diesel Fill Spill Bucket X 0 ...., c ~ 0 0 0 ' L.J
Diesel Vapor Spill Bucket X 0 0 0 0 0 tJ 0
0 0 0 0 0 0 [.J 0
0 0 D 0 0 0 0 0
0 :J 0 0 0 0 0
0 0 0 0 0 0 .J 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
lfhydrostatic testing was performed, describe what was done with the water after completion of tests:
Water was put back into test trailer and waste drum
SWRCB, January 2002 Page of
4. TANK ANNULAR TESTING
Test Method Developed By: D Tank Manufacturer x Industry Standard 0 Professional Engineer
D Other (Specify)
Test Method Used: D Pressure x Vacuum D Hydrostatic
0 Other fSoecifv)
Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625"
' Tank # 87 Tank # 87-2 Tank # 91 Tank # Diesel
Is Tank Exempt From Testing?1 '-'Yes X No Yes X No ::.. Yes X No ::=Yes X No
Tank Capacity: 12,000 12,000 12,000 12,000
Tank Material: Steel Steel Steel Steel
Tank Manufacturer: Modern Welding Modern Welding Modern Welding Modern Welding
Product Stored: 87 Annular 87-2 Annular 91 Annular Diesel Annular
Wait time between applying
pressure/vacuum/water and 5 Min. 5 Min. 5 Min. 5 Min.
starting test:
Test Start Time: 9:30AM 9:30AM 10:40 AM 10:40 AM
Initial Reading (R1): -10 Hg -10 Hg -10 llg -10 Hg
Test End Time: !0:30AM 10:30 AM I 1:40AM !1:40AM
Final Reading (RF): -10 Hg -10 Hg -I 0 llg -I 0 Ilg
Test Duration: I Hour I Hour I Hour I Hour
Change in Reading (RF-R1): 0.00" 0.00" 0.00" 0.00"
Pass/Fail Threshold or Criteria: 0.00" 0.00" 0.00" 0.00"
Test Result: X Pass DFail X Pass D Fail X Pass OFail X Pass O Fail
Was sensor removed for testing? X Yes D No DNA X Yes D No DNA X Yes ..., No L NA X Yes D No ...,NA
Was sensor properly replaced and X Yes D No DNA X Yes D No DNA X Yes DNo DNA X Yes D No DNA verified functional after testing?
Comments-(include information on repairs made prior to testing, and recommended.follow-up.for.fai/ed tests)
1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that arc hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6)}
SWRCB, January 2002 Page __ of __
5. SECONDARY PIPE TESTING
Test Method Developed By: n Piping Manufacturer x Industry Standard 0 Professional Engineer
0 Other (Specify)
Test Method Used: x Pressure 0 Vacuum U Hydrostatic
0 Other (Spec[fy)
Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" -Piping Run #87 Piping Run # 87-2 Piping Run # 91 Piping Rtm # Diesel
Piping Material: FRP FRP FRP FRP
Piping Manufacturer: Smith Smith Smith Smith
Piping Diameter: 3.00" 3.00" 3.00" 3.00"
Length ofPiping Run: 150' 160' 170' 180'
Product Stored: Regular Regular Super Diesel
Method and location of Test Boot Test Boot Test Boot Test Boot piping-run isolation:
Wait time between applying
pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (Rr):
Test Duration:
Change in Readin g (~-R1):
Pass/E il Threshold or
Criteria:
Test Result: O Pass X Fail 0 Pass X Fail 0 Pass X Fail 0 Pass X Fail
Comments -(include iriformation on repairs made prior to testing, and recommendedfo/low-up.forfailed tests)
Secondarv Line were not tested. Unable to Test Boot on.
SWRCB, January 2002 Page __ of _
6. PIPING SUMP TESTING
Test Method Developed By: D Sump Manufacturer x Industry Standard D Professional Engineer
D Other (SpecifY)
Test Method Used: D Pressure D Vacuum x Hydrostatic
D Other (SpecifY)
Test Equipment Used: Ts-sts Equipment Resolution:
Sump# 87 Sump # 87-2 Sump# 91 Sump# Diesel
Sump Diameter: 36.00" 36.00" 36.00" 36.00"
Sump Depth: 57.00" 57.00" 57.00" 57.00"
Sump Material: FRP FRP FRP FRP
Height from Tank Top to Top of 22.00" 18.00" 15.00" 22.00" Highest Piping Penetration:
!Ieight from Tank Top to Lowest 15.00" 16.00" 20.00" 14.00" Electrical Penetration:
Condition of sump prior to testing: Clean & Dry Clean & Dry Clean & Dry Clean & Dry
Portion of Sump Tested1 Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
sump sensor detects liquid (both
product and water)?'
L Yes DNo XNA r Yes =:No X NA D Yes J NoXNA 0 Yes C NoXNA
Turbine shutdown response time NA NA NA NA
Is system programmed for fail-safe
shutdown?' D Yes DNo XNA D Yes DNoXNA D Yes D NoXNA D Yes DNoXNA
Was fail-safe verified to be DYes DNo XNA [1 Yes DNoXNA D Yes DNoXNA DYes DNo X NA operational?'
Wait time between applying
pressure/vacuum/water and starting NA SMin SMin SMin
test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass DFail 0 Pass X Fail 0 Pass X Fail 0 Pass X Fail
Was sensor removed for testing? D Yes DNo XNA ~Yes DNo XNA D Yes O No XNA :; Yes DNo X NA
Was sensor properly replaced and D Yes DNo XNA D Yes ONo XNA D Yes O No X NA DYes DNo X NA verified functional after testing?
Comments-(include information on repairs made prior to tesling, and recommended.follow-upfor[ailed tests)
1 If the entire depth of the sump is not tested, specifY how much was tested. If the answer to~ of the questions indicated with an
asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page __ of __
7. UN DER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: U UDC Manufacturer x Industry Standard " Professional En gineer
D Other (Spec![Y)
Test Method Used: D Pressure lJ Vacuum x Hydrostatic
D Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
UDC # 1-2 UDC #3-4 UDC #5-6 UDC # 7-8
UDC Manufacturer: Western Western Western Western
UDC Material: FRP FRP FRP FRP
UDC Depth: 31.00" 31.00" 31.00" 31.00"
Height from UDC Bottom to Top 9.50" 9.50" 9.50" 9.50"
of llighest Piping Penetration:
Height from UDC Bottom to 3.00" 3.00" 3.00" 3.00"
Lowest Electrical Penetration:
Condition ofUDC prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry
testing:
Portion ofUDC Tested 1 Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?•
[]Yes n No XNA [l Yes fl NoXNA llYes fJ No XNA n Yes ·No XNA
Turbine shutdown response time NA NA NA NA
Is system programmed for fail-
safe shutdown?· D Yes D No XNA D Yes D NoXNA DYes CJ No XNA DYes J No XNA
Was fail-safe verified to be
LJ Yes DNo XNA DYes D NoXNA J Yes D No XNA Cl Yes []No X NA operational?•
Wait time between applying 5 Min 5 Min 5 Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or Criteria:
Test Result: D Pass X Fail D Pass X Fail D Pass X Fail D Pass X Fail
Was sensor removed for testing? ;Yes D No XNA D Yes ll No XNA D Yes D No XNA L'Yes No XNA
Was sensor properly replaced and [l Yes UNo XNA D Yes n No XNA ::::; Yes D No XNA [J Yes U No XNA verified functional after testing?
Comments-(include inj01mation on repairs made prior to testing, and recommendedfo//ow-upforfailed tests)
UDC's were not tested. Unable to get Test Boot on.
1 If the entire depth of the UDC is not tested, specifY how much was tested. If the answer to~ of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160)
SWRCB. January 2002 Page __ of __
7. UNDER-DISPENSER CONTAINMENT (UDC) TEST ING
Test Method Developed By: UDC Manufacturer x Industry Standard Professional Engineer
Other (Spec[fy)
Test Method Used: Pressure Vacuum x I lydrostatic
U Other (Spec[f"y)
Test Equipment Used: Ts-sts Equipment Resolution:
-}~ UDC #Tans East UDC #Trans West UDC# UDC#
UDC Manufacturer: Western Western
UDC Material: FRP FRP
UDC Depth: 31.00" 31.00"
Height from UDC Bottom to Top 9.50" 9.50"
of Highest Piping Penetration:
I Ieight from UDC Bottom to 3.00" 3.00"
Lowest Electrical Penetration:
Condition of UDC prior to Clean & Dry Clean & Dry
testing:
Portion ofUDC Tested' Pipe Penetration . Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?"
lJ Yes D No XNA UYes NoXNA I I Yes u No NA Yes No -NA
Turbine shutdown response time NA NA
Is system programmed for fail-
safe shutdown?' Yes No XNA Yes NoXNA Yes ~No NA Yes No NA
Was fail-safe verified to be n Yes ,No XNA ll Yes r NoXNA I I Yes J No NJ\ • Yes II No [ NA operational?'
Wait time between applying 5 Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading(~):
Test Duration:
Change in Reading (Rr-R1):
Pass/Fail TI1reshold or Criteria:
Test Result: 0 Pass X Fail 0 Pass X Fail 0 Pass 0 Fail 0 Pass OFail
Was sensor removed for testing? Yes No XNA Yes No XNA Yes ,....No NA -Yes No ~NA
Was sensor properly replaced and Yes No XNA 'l Yes [l No XNA Yes No NA _ Yes No NA verified functional after testing?
Comments-(include information on repairs made prior to testing. and recommended follow-up for failed tests)
~C'sw~e n~~s~d .Un~a~h~k~t~o~g~e~t~T~e~~~B~o~o~to~n~·~~~~~~~~~~~-
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer 10 !!!!Y of the questions indicated with an
asterisk(*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page of
8 FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps 0
Fill Riser Containment Sumps are Present, but were Not Tested D
Test Method Developed By: D Sump Manufacturer 2 Industry Standard 0 Professional Engineer
0 Other (Specify)
Test Method Used: [J Pressure D Vacuum D Hydrostatic
D Other (Specify)
Test Equipment Used: Equipment Resolution:
Fill Sump # 87 Fill Sump # 87-2 Fill Sump # 91 Fill Sump # Diesel
Sump Diameter: 36.00" 36.00" 36.00" 36.00"
Sump Depth: 57.00" 57.00" 57.00" 57.00"
Height from Tank Top to Top of NA NA NA NA
Highest Piping Penetration:
Height from Tank Top to Lowest 14.00" 14.00" 14.00" 14.00"
Electrical Penetration:
Condition of sump prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry
testing:
Portion of Sump Tested Collar Collar Collar Collar
Sump Material: FRP FRP FRP FRP
Wait time between applying 5 Min. 5 Min. 5 Min. 5 Min.
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass D Fail X Pass DFail X Pass D Fail X Pass OFail
Is there a sensor in the sump? X Yes DNo X Yes .J No X Yes .... No X Yes "No
Does the sensor alarm when
either product or water is 0 Yes D No XNA ;] Yes DNo X NA DYes D No XNA D Yes ONo XNA
detected?
Was sensor removed for testing? 0 Yes DNo XNA DYes DNo X NA 0 Yes DNo XNA DYes ONo XNA
Was sensor properly replaced and Yes ;J No XNA D Yes ,..,No X NA DYes D No XNA DYes 'l No X NA verified functional after testing?
Comments-(include information on repairs made prior to testing, and recommendedfol/ow-up.for failed tests)
SWRCB, January 2002 Page __ of __
9 SPILIJOVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes 0
SpilVOverfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer
Other (Specify)
Test Method Used: Pressure 0 Vacuum x Hydrostatic
0 Other {Specify)
Test Equipment Used: Ts-sts I Equipment Resolution:
Spill Box # 87 Fill Spill Box# 87 Vapor Spill Box# 87-2 Fill Spill Box# 87-2 Vapor
Bucket Diameter: 12.00" 12.00" 12.00" 12.00"
Bucket Depth: 12.00" 12.00" 12.00" 12.00"
Wait time between applying
pressure/vacuum/water and 5 Min. 5Min. 5 Min. 5 Min.
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (R1:):
Test Duration:
Change in Reading (Rr-R1):
Pass/Fail Threshold or
Criteria:
Test Result: X Pass O Fail X Pass 0 Fail X Pass O Fail X Pass 0 Fail
Comments-(include information on repairs made prior to testing, and recommendedfollow-up[orf ailed tests)
SWRCB, January 2002 Page __ of __
9 SPILL/OVERFILL CONTAINMENT BOXES .
Facility is Not Equipped With Spill/Overfill Containment Boxes 0
Spill/Overfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer
0 Other (SpecifY)
Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic
0 Other (SpecifY)
Test Equipment Used: Ts-sts I Equipment Resolution:
Spill Box # 91 Fill Spill Box# 91 Vapor Spill Box # Diesel Fill Spill Box# Diesel Vapor
Bucket Diameter: 12.00" 12.00" 12.00" 12.00"
Bucket Depth: 12.00" 12.00" 12.00" 12.00"
Wait time between applying
pressure/vacuum/water and 5Min. 5Min. 5 Min. 5 Min.
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or
Criteria:
Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail X Pass OFail
Comments -(include information on repairs made prior to testing, and recommended follow-up for failed tests)
3364 FASTRIP
805 34.TJi .ST
BAXERSF I El.D CA · i!33ot I • • , ...
/ TEST STARTED 1:27 PH
TEST STARTED 03/14/201/l
BEG Ill lEVEl 5. 9470 Ill
EID TIHE 1 :113 PI!
EID DATE 03/lll/201/l
EID LEVEL 5, 9464 Ill
LEAK TliRESHOLD ·o~ 002 Ill
TEST RESll..T PASSED
•. . "1·: . .. ;~?. .• DSfSB;"·· ••. , 'iS .• /
TEST STARTED 1:27 fH
TEST STARTED 03/10/2014
BEG Ill LEVEL 7. 5757 Ill
EID TillE t:43 PI!
EID DATE 03/10/2010
El!l LEVEl 7. 5751 Ill
LEAK TI!RESHtl.D O. 002 Ill
TEST RESULT PASSED
OSVSB
TEST STARTED t:27 PI!
TEST STARTED 03/tn/2010
BEG Ill lEVEl 6. 2909 Ill
Elll TillE 1:43 PI!
El!l DATE 03/111/2014
EID lEVEl 6, 2897 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESLtT PASSED
',.!
'. . ~ ... '··
t.
,.
y. ' . ., . ·1
·~ • i
·.
\'; ..
•I
·I ~ l
. ·.
3354 FASTW·
805 34TH ST
BAKER SF I El.D ct. 9330 I
03/ta/2014 2:05 Ptl
SCIIP LEAK TEST REPORT
91FSB
TEST STARTED t:50 Ptl
TEST STARTED 03/W2014
BEG Ill lEVEl S. 9458 Ill
EIIO TII1E 2:06 Pl1
EIIO DATE 03/lll/2014
El!l LEVEL _ ;•5. 9454 lfl
LEAK THRESHOUJ 0, 002 Ill
TEST RESil.T PASSED
DSFSB
TEST STARTED 1:50 PH
TEST STARTED 03/14/2014
BEG Ill lEVEL 7, 5750 W
EJIO TillE 2:06 P11
EIID DATE 03/lll/2014
EIIO lEVEl 7. 5753 Ill
lEAK TliRESIITLD 0, 002 Ill
TEST RESLtT PASSED
DSVSB
TEST STARTED 1:50 PH
TEST STARTED 03/1G/2014
BEG Ill LEVEL 6. 2892 Ill
EID TillE 2:06 PH
EIIO DATE 03/14/20111
EIIO lEVEL 6. 2889 Ill
LEAK THRESHOLD 0. 002 Ill
TEST RESll..T PASSED
.
. .t;.!
;:J;-·
• \1
~~ ,.;
.. ( \;
'" !:,
::.}
~~ ' ... .-3t1 .... ...
~-~~· '! •.
::· ...
; .... ~
i· . ~t;'-'
' .• r. t ' J ~·. -...:-
3364 FASTRIP
805 34TH ST
BAJ<ERSF I ElD CA 93301
03/10/2014 9:55 AH
SUII? LEAK lEST REPMT
87 FILL-'""' .. _ .....
TEST· STAATED 9:39 Al1
TEST··STAATED 03/la/2014
BEG !II LEVEl 3. 4314 Ill
Ell) TJHE 9:55 N1
EIIO DATE 03/1Q/2014 ·-
Ela:J LEVEL 3.4320 Ill
LEAK T!VlES!ICLO 0, 002 Ill
TEST RESIA. T PASSEO
872FILL
TEST STARTED 9:39 A.ll
TEST STARTED 03/14/2014
BEGIII lEVEL 1, 1982 Ill
E/10 TI t1E 9:55 At1
EllD DATE 03/14/2014
EllO lEVEL 1. 1976 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESIA..T PASSED
91 FILL
TEST STAATEO 9:39 Al1
TEST STAATEO 03/10/20111
BEG Ill LEVEL 4, 4043 Ill
EJI) TIHE 9:55 Al1
EJ«l DATE 03/lC/2014
Ellll LEVEL ll, 4035 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESII.T PASSED
OS FIL~ .
TEST STARTED 9:39 Al1
TEST STARTED '03lW2011!--· ·
BEG Ill LEVEL 3. 5899 IIi
EliD TillE · 9:55 At1
EIID DATE 03/14/2014
EJ/0 LEVEL 3. 5893 Ill
LEAK THRESHOLD 0. 002 Ill
TEST RESULT PASSED
.•
3364 FASTRII"
805 34TH ST
BAKERSFIElD CA 93501
03/11l/201Q 10:15 Al1
SUNP lEAK TEST REPORT
87 FILL
TEST STARTED 10:00 Al1
TEST STII.RTED 03/ta/2014
BEGIIIlEVEl 3,1l318 Ill
E/10 TillE 10:15 Al1
EllO DATE 03/14/2014
EIIO LEVEL 3.11318 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESll T PASSED
872FILL
TEST STARTEfJ 10:00 AH
TEST STAATED 03/10/2014
BEGJIILEVEL 1, 1978 Ill
Ell) TIHE 10:15 N1
Ell) DATE 03/14/2014
El.U LEVEL 1. 1930 Ill
LEAK THRESHCLO 0, 002 Ill
TEST RESUI. T PASSED
91 FILL
TEST STARTED 10:00 All
TEST STARTED 03/10/2014
6EGIII LEVEL· 4,1l033 Ill
EJID TillE 10:15 At!
EJlO DATE 03/14/2014
E/10 lEVEl U030 Ill
LEAK THl\ESiiJUl 0, 002 Ill
TEST RESULT PASSED
OS FILL
TEST STARTED 10:00 A.'l
TEST STARTED 03/14/20111
BEG !II LEVEL 3, 5391 Ill
EUD TillE 10:15 Al1
E)[) DATE 03/14/2014
Elll LEVa 3. 5891 111
LEAK THRESOOLO 0, 002 Ill
TEST RES\Jl.T PASSED
3364 FASTRIP
805 34TH ST
BAKERS!= IELD CA 93301
03/14/2014 2:53 P/1
SUHP LEAK TEST llEPORT
872FSB
TEST STARTED 2:38 P/1
TEST STARTED 03/11!/20ln
BEGIIILEVEL 6, 1303 Ill
BID TINE 2:53 PH
BID DATE 03/tn/2014
BID lEVEl 6. 1300 Ill
LEAK TlilESI'.OLO 0, 002 Ill
TEST RESULT PASSED
871FSB
TEST STARTED 2:38 PH
TEST STARTED 03/111/2014
BEG !II LEVEL 6. 4212 Ill
Ell!l TIHE 2:53 PH
BID DATE 03/111/2014
am LEVEL 6,4211 111
lEAK THRESIDLD 0, 002 Ill
TEST RESULT PASSED
871VSB
TEST STARTED 2:3a PH
TEST STARTED 03/ta/2014
BEG Ill lEVEl 5. 8621 Ill
BID TillE 2:53 P/1
BID DATE 03/14/2014
E/10 LEVEL 5,8617 Ill
lEAl< THRESHOLD 0, 002 Ill
TEST RESULT PASSED
91YSB .. ~-TEST STARTED 2:38 Pll
TEST STARTED-03/14/2014·
BEG!Il LEVEL 5, 6943 Ill
Elll TJHE 2:53 Pl1
Bll DATE 03/14/2014
BV lEVEl 5, 6941 Ill
lEA'< THRESIG.D 0, 002 Ill
TEST RESil. T PASSED
3364 FASTRIP
805 34TH ST
BAKERSFIELD CA 93301
03/ta/20tn 3:09 Pll
StJl1> LEAK TEST REPORT
872FS8
TEST STARTED 2:54 P/1
TEST STARTED 03/111/2014
BEGIIIlEVEl 6, 1297 Ill
Bll TillE 3:09 PH
Bll DATE 03/111/2014
Bll lEVEl 6, 1294 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESllT PASSED
871FSB
TEST STARTED 2:54 ftl
TEST STARTED 03/111/20111
BEGltl LEVEL 6.11213 Ill
El/0 TillE 3:09 P/1
am DATE 03/14/2014
BID lEVEl 6.4210 Ill
LEAK THRESOOLD 0, 002 Ill
TEST RESUI. T PASSED
811VSB
TEST STARTED 2:54 Pit
TEST STARTED 03/10/2014
BEGIIILEVEL 5,8611 Ill
EIIO TillE 3:09 Pit
E/10 DATE 03/14/20111
E/10 LEVEL 5. 8610 Ill
lEAK THRESOOLD 0. 002 Ill
TEST RESLI.T PASSED
91VSB
TEST STARTED 2:511 P/1
TEST STARTED 03/14/2014
BEG !II LEVEL 5, 6942 ltl
Elll TillE 3:09 P/1
Bll DATE 03/14/20111
BD LEVEL 5, 6940 Ill
LEA'< THRESHll.D 0, 002 IU
TEST RESil.T PASSED
3354 FASTRJP
80S 34TH ST
IJAI(ERSF I ElD CA 93301
03/14/2014 11:27 All
StmP l£A1( TEST REPORT
81 STP
TEST STAATED 11:12 All
TEST STAATED 03/14/2014
BEGUlLEVR 5,0623 Ill am TJKE 11:21 Nt
EIID DATE 03/14/2014
BID LEVEL 5. 0605 Ill
I..EAX TliRESI«lll 0, 002 Ill
TEST RESULT PASSED
872 STP
TEST STARTED 11:12 All
• t
: .
TEST STARTED 03/14/2014 • BElilln.£~ -s;:ws.·.nr ....;~ ..
Etll Tl If 11:27 All
Elll DATE 03/14/2014
E/jl) lEVEl.. 5, 7299 Ill
LEA'< TKIItSHrul 0, 002 Ill
TEST RESIJ..T FAILED
--~:'ll""rltciTiDlR P-
805 34TH ST
BAKERSFIElD CA 93301
03/14/2014
SW LEA'< TEST REPORT
87 STP
TEST STARTED 11:31 All
TEST STARTED 03/14/2014
BEG Ill LEVEl 5. 0503 Ill
EIID Tit£ 11:46 All
Ellll DATE 03/111/2014
Ell!l LEVEL S, 0598 Ill
LEAK THRESil(lO 0. 002 Ill
TEST RESllT PASSED
872 STP
TEST STARTED 11:31 All
TEST STARTED 03/14/2014
BElilll lEVEl 5. 7273 Ill
Elll TIHE 11:~6 All
Elll DATE 03/tn/2014
Elll LEVEl. S. 7179 Ill
LEAX THRESHOLD 0, 002 Ill
TEST REStl T FAILED
3364 FASlRIP
805 34TH ST
BAKERSFIElD CA 93301
03/10/2010 12:69 PH
Sl.t\P W.K TEST R£PORT ; . ..... _ . i .. ! J
91 STP
TEST STARTED 12:33 P/1
TEST STAR{ED 03/10/2010
BEG Ill LEVEL 2. 9199 Ill
DID TitlE 12:48 PH
DlO DATE 03/10/2010
£1:0 lEVEl 2. 6547 Ill
LEAK TIRE.SIIl.O 0.002 Ill
TEST REStLT FAilED
OS STP
TEST STA!UEO 12:33 P11
TEST STARTED 03/14/2014
·.&Gill LEVa 2. 5271 Ill
£1.0 TIHE 12:G8 P11
.... :.
£1.0 DATE 03/14/2014 _. :
EllllEVB. 1.8750 Ill( ..
LE/,K OOESIRO 0, 002 Ill
. 'iEST RESlU ,·FAILED~,· • -. : .. -. ,_ -,,.. : ~-~ .:· ' . • 'I''-:..· .-.r:-~':"'~·~-... -.::! .. :.
3364 FASTRif'
805 34TH ST
BAKERSFIElD CA 93301
03/10/2010 1:oo PH
Sill? lEA~ TEST REPmT
91 STP
TEST STARTED 12:51 PH
TEST STARTED 03/14/2014
BEGIIILE\U 2. 61~ Ill
DID TIHE 1:06 PH
. EllO DATE ~ 03/la/2014
• EIIO LEVEL 1 2. 3809 111
7 LEA'< TlilESI!tlD o. Q92 Ill ., ~ TEST RESULT!' •liAILED '"· \ · .. : ....
OS STP •
TEST STARTED 12:51 PH
TEST STARTED 03/10/2014
BEGJIILEVEL 1, 7475 Ill
Elll TIHE 1:06 PH
EIID DATE 03/14/2014
EIO lEVEL 1, 2037 Ill
lEAK THRESlll.D 0. 002 Ill
TEST RESilT FAILED
:
'·
. ~.
) .. ....
' .
·~· .r;
·,
3346 FASTRIP
805 34TH ST
BAAERSFIELD CA 93301
03/10/2014 2:10 P/1
SUI? LEAK TEST REPORT
UOC TSE
TEST STARTED 1:58 Pt1
TEST STARTED 03/14/2014
BEG Ill LEVa 2. 9631 Ill
Elll Ttl£ 2:13 PH
EJ(J DATE 03/lll/2014
Elll LEVa 2. 9558 Ill
LEAK TlfiESID.O 0, 002 Ill
TEST RESULT lllCREASEO
UDC TSV
TEST STARTED 1:58 Ptl
TEST STARTED 03/to/2014
BEGIII LEVa 1,4914 Ill
EJID Ttl£ 2:13 PH
Ell~ DATE 03/10/2014
EllO LEVEL 1. 2743 ltl
LEAK TlRESK:lD 0, 002 ltl
TEST RESU..T FAILED
3346 FASTRIP
805 34TH ST
BAKERSFIElD CA 93301
03/14/2010 2:31 PH
SUI1P LEAK TEST REPORT
IDC TSE
TEST STARTED 2:15 PH
TEST STARTED 03/14/2010
BEG !II LEVa 2, 9557 Ill
EIID TillE 2:31 PH
Elll DATE 03/14/2010
EIIO LEVEl. 2, 9522 Ill
LEAK THRESHOLD 0, 002 Ill
TEST REstl.T FAILED
IJOC TSV
TEST STARTED 2:15 PH
TEST STARTED 03/14/2010
BEGIIILEVEL 1, 2322 Ill
E!IO TillE 2:31 P/1
EIIO DATE 03/14/2014
Elll LEVEL 1.0204 Ill
LEAK THRESHOLD 0, 002 IU
TEST REStlT FAILED