Loading...
HomeMy WebLinkAboutSB989 2014SWRCB, January 2002 Page __ of __ Secondary Containment Testing Report Form This form is intended for use by contractors peiforming periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, writ/en test procedures, and printouts from tests (if applicable}, should be provided to the facility owner/operator for submit/alto the local regulatory agency. 1. FACILITY INFORMATION Facility Name: #3362 Fastrip #633 T Date of Testing: 3/13/2014 Facility Address: 6401 South H St Bakersfield, CA 93304 Facility Contact: Omero Garcia I Phone: (661 )393-7000 Date Local Agency Was Notified of Testing: 3/12/2014 Name of Local Agency inspector (if present during testing): Ernie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Technician Conducting Test: Bryan A Self Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester License Type: CSLB I License Number:804904 ICC# 8022804-UT TT#11-1756 ~·~·.·.··~-··- Manufacturer Training Manufacturer Component( s) Date Training Expires UST 10/2112015 Installaton/Retrofit UST Service ICC 1-28-2015 technician Star. Smith. Fibercast Fiber Glass Systems N.A. 3. SUMMARY OF TEST RESULTS Not Repairs Component Pass Fail Not Repairs Component Pass Fail Tested Made Tested Made 87 Product Secondary X 0 0 0 UDC 5-6 X 0 0 0 91 Product Secondary X 0 0 0 UDC 7-8 X 0 0 0 Diesel Product Secondary X 0 0 0 87 Fill Sump X 0 0 0 Vapor Return Secondary 0 X 0 0 91 Fill Sump X 0 0 0 87 Vent Secondary 0 X 0 0 Diesel Fill Sump X 0 0 0 91 Vent Secondary X 0 0 0 87 Fill Spill Bucket X 0 0 0 Diesel Vent Secondary X 0 0 0 87 Vapor Spill Bucket X 0 0 0 87 STP Sump 0 X 0 0 91 Fill Spill Bucket X 0 0 0 91 STP Sump X 0 0 0 91 Vapor Spill Bucket X 0 0 0 Diesel STP Sump X 0 0 0 Diesel Fill Spill Bucket 0 X 0 0 UDC 1-2 X 0 0 0 Diesel Vapor Spill Bucket X 0 0 0 UDC 3-4 X 0 0 X 0~ 0 0 1fhydrostatic testing was performed, describe what was done with the water after completion of tests: Water was _EUt back into test trailer and waste drum During Testing we replaced a test boot on the Diesel line inside UDC 3-4. To the best of my knowledge curate am/ in full compliance with legal requirements Technician's Signature: Date: 03/13/2014 . SWRCB, January 2002 Page __ of __ 4. TANK ANNULAR TESTING Test Method Developed By: D Tank Manufacturer x industry Standard D Professional Engineer D Other (SpecifY) Test Method Used: D Pressure x Vacuum D Hydrostatic D Other (SpecifY) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Tank # Regular Tank# Super Tank# Diesel Tank# Is Tank Exempt From Testing?1 X Yes DNo X Yes DNo X Yes DNo DYes DNo Tank Capacity: Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (Rr): Test Duration: Change in Reading (Rr-R1): Pass/Fail Threshold or Criteria: Test Result: D Pass 0 Fail D Pass 0 Fail D Pass DFail D Pass D Fail Was sensor removed for testing? DYes DNo DNA DYes DNo DNA DYes DNo DNA DYes DNo DNA Was sensor properly replaced and DYes DNo DNA DYes DNo DNA DYes DNo DNA DYes DNo DNA verified functional after testing? Comments -(include information on repairs made prior to testing, anc/_rl!C()mrnen(i_ecl[ol~'rV--1-IPfor failed tests) 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)} I I SWRCB, January 2002 Page __ of __ 5. SECONDARY PJPE TESTING Test Method Developed By: 0 Piping Manufacturer x Industry Standard 0 Professional Engineer I 0 Other (Specify) Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic I 0 Other (Specify) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" ! Piping Run # Piping Run# Piping Run# Piping Run# 87 Product 91 Product Diesel Product 91 Vent Piping Material: FRP FRP FRP FRP Piping Manufacturer: Smith Smith Smith Smith Piping Diameter: 3.00" 3.00" 3.00" 3.00" Length of Piping Run: 150' 160' 170' 120' Product Stored: Regular Super Diesel 91 vent Method and location of Test Boot Test Boot Test Boot Test Boot piping-run isolation: Wait time between applying pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min staJti n g test: Test Start Time: 12:00 PM 12:00 PM 12:00 PM 12:00 PM Initial Reading (R1): 5.00" PSI 5.00" PSI 5.00" PSI 5.00" PST Test End Time: 1:00PM 1:00PM 1:00PM 1:00PM Final Reading (RF): 5.00" PSI 5.00" PSI 5.00" PSI 5.00" PSI Test Duration: 1 Hour 1 Hour I Hour I Hour Change in Reading (RF-R1): 0.00" 0.00" 0.00" 0.00" Pass/Fail Threshold or 0.00" 0.00" 0.00" Criteria: 0.00" Test Result: X Pass 0 Fail X Pass 0 Fail X Pass OFail X Pass 0 Fail Comments-(include information on repairs made prior to testing, and recommended.foilow-up.for.failed tests) SWRCB, January 2002 Page_ of_ 5. SECONDARY PIPE TESTING Test Method Developed By: 0 Piping Manufacturer x Industry Standard 0 Professional Engineer 0 Other (SpecifY) Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic 0 Other (SpecifY) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Piping Run# Piping Run# Piping Run# Piping Run# Diesel Vent 87 Vent Vapor Return Piping Material: FRP FRP FRP Piping Manufacturer: Smith Smith Smith Piping Diameter: 3.00" 3.00" 4.00" Length ofPiping Run: 170' !50' 170' Product Stored: Diesel Vent Secondary 87 Vent Secondary Vapor Return Secondary Method and location of Test Boot piping-run isolation: Wait time between applying pressure/vacuum/water and 5 Min starting test: Test Start Time: 1:00PM Initial Reading (R1): 5.00" PSI Test End Time: 2:00PM Final Reading (RF): 5.00" PSI Test Duration: I Hour Change in Reading (RF-R1): 0.00" Pass/Fail Threshold or 0.00" Criteria: Test Result: X Pass OFail 0 Pass X Fail 0 Pass X Fail 0 Pass 0 Fail Comments-(include information on repairs made prior to lesting, and recommendedfollow-upfor failed tesls} 87 Vent Secondary and Vapor Return Secondary Failed. No Test Boots. SWRCB, January 2002 Page __ of __ 6. PIPING SUMP TESTING Test Method Developed By: D Sump Manufacturer x Industry Standard D Professional Engineer D Other (Specify) Test Method Used: D Pressure D Vacuum x Hydrostatic D Other (Specify) Test Equipment Used: Ts-sts Equipment Resolution: Sump# 87 Sump# 91 Sump# Diesel Sump# Sump Diameter: 36.00" 36.00" 36.00" Sump Depth: 50.00" 50.00" 50.00" Sump Material: FRP FRP FRP Height from Tank Top to Top of 28.00" 28.00" 28.00" Highest Piping Penetration: Height from Tank Top to Lowest 15.00" 15.00" 15.00" Electrical Penetration: Condition of sump prior to testing: Clean & Dry Clean & Dry Clean & Dry Portion of Sump Tested 1 NA Pipe Penetration Pipe Penetration Does turbine shut down when sump sensor detects liquid (both product and water)?* DYes DNo XNA DYes DNoXNA DYes DNoXNA DYes DNo DNA Turbine shutdown response time NA NA NA Is system programmed for fail-safe shutdown?· DYes DNo XNA DYes DNoX NA DYes DNoXNA DYes DNo DNA Was fail-safe verified to be DYes DNo XNA DYes DNoXNA DYes DNoXNA DYes DNo DNA operational?• Wait time between applying pressure/vacuum/water and starting NA SMin SMin test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: D Pass X Fail X Pass DFail X Pass DFail D Pass D Fail Was sensor removed for testing? DYes DNo XNA DYes DNo X NA DYes DNo XNA DYes DNo DNA Was sensor properly replaced and DYes DNo XNA DYes DNo XNA DYes D No X NA DYes DNo DNA verified functional after testing? Comments -(include information on repairs made prior to testing, and recommended.follow-up.forfailed test!>) Need 2 New Test Boots in the 87 STP Sumn. 1 If the entire depth of the sump is not tested, specifY how much was tested. If the answer to ill:!Y of the questions indicated with an asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page __ of __ '0 """""...., ......... ..._ .... _ ..... ._, ..... _,. .. _....., ..... ___ ... __ .._ ... • 0----- Test Method Developed By: D UDC Manufacturer x Industry Standard D Professional Engineer D Other (Specify) Test Method Used: D Pressure D Vacuum x Hydrostatic D Other (Specify) Test Equipment Used: Ts-sts Equipment Resolution: UDC # 1-2 UDC # 3-4 UDC # S-6 UDC#7-8 UDC Manufacturer: Western Western Western Western UDC Material: FRP FRP FRP FRP UDC Depth: 31.00" 31.00" 31.00" 31.00" Height from UDC Bottom to Top 9.50" 9.50" 9.50" 9.50" of Highest Piping Penetration: Height from UDC Bottom to 3.00" 3.00" 3.00" 3.00" Lowest Electrical Penetration: Condition of UDC prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry testing: Portion ofUDC Tested1 Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration Does turbine shut down when UDC sensor detects liquid (both product and water)?• DYes DNo X NA DYes DNoXNA DYes DNo XNA DYes DNo XNA Turbine shutdown response time NA NA NA NA Is system programmed for fail- safe shutdownf DYes DNo XNA DYes DNoXNA DYes DNo XNA DYes DNo XNA Was fail-safe verified to be DYes DNo XNA DYes DNoXNA DYes DNo XNA DYes DNo XNA operationalf Wait time between applying 5 Min 5 Min 5 Min 5 Min pressure/vacuum/water and starting test Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (Rp-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass D Fail X Pass DFail X Pass DFail X Pass D Fail Was sensor removed for testing? DYes DNo XNA DYes DNo XNA DYes DNo XNA DYes DNo XNA Was sensor properly replaced and DYes DNo XNA DYes DNo X NA DYes DNo XNA DYes DNo XNA verified functional after testing? Comments -(include information on repairs made prior to testing, .. a. nd recommended.follow-up.forfailed tests) --··-··· -· ..... Installed a new test boot on the diesel line in UDC 3-4 1 lfthe entire depth of the UDC is not tested, specify how much was tested. If the answer to ill1Y of the questions indicated with an asterisk(*) is "NO" or ''NA", the entire UDC must be tested. (See SWRCB LG-160) . . I I SWRCB, January 2002 Page __ of __ 9 SPILUOVERFILL CONTAINMENT BOXES Facility is Not Equipped With SpilVOverfill Containment Boxes 0 Spill/Overfill Containment Boxes are Present, but were Not Tested 0 Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic 0 Other (SpecifY) Test Equipment Used: Ts-sts Equipment Resolution: Spill Box# 87 Fill Spill Box# 87 Vapor Spill Box # 91 Fill Spill Box# 91 Vapor Bucket Diameter: 12.00" 12.00" 12.00" 12.00" Bucket Depth: 12.00" 12.00" 12.00" 12.00" Wait time between applying pressure/vacuum/water and 5 Min. 5 Min. 5Min. 5Min. starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RJ): Pass/Fail Threshold or Criteria: Test Result: X Pass OFail X Pass 0 Fail X Pass 0 Fail X Pass O Fail Comments -(include information on repairs made prior to testing, and recommendedfollow-upfor failed tests) SWRCB, January 2002 Page __ of __ 9 SPILL/OVERFILL CONTAINMENT BOXES Faci lity is Not Equipped With Spill/Overfill Containment Boxes 0 Spill/Overfill Containment Boxes are Present, but were Not Tested 0 Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer 0 Other (SpecifY) Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic 0 Other (SpecifY) Test Equipment Used: Ts-sts I Equipment Resolution: Spill Box # Diesel F ill Spill Box# Diesel Vapor Spill Box # Spill Box# Bucket Diameter: 12.00" 12.00" Bucket Depth: 12.00" 12.00" Wait time between applying pressure/vacuum/water and 5 Min. 5 Min. starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (Rr-R1): Pass/Fail Threshold or Criteria: Test Result: 0 Pass X Fail X Pass OFail 0 Pass 0 Fail 0 Pass OFail Comments-(include information on repairs made prior to testing, and recommended.fol/ow-up[or failed tests) Diesel Fill Failed. Due to Liauid Draining Right Through the Drain Valve. 3352 FASTRIP 6001 SOUTH H ST BAKERSFIElD 03/13/201/J 4:08 Pll SliP lEA'< TEST REPmT uoc 1-2 TEST STARTED 3:52 Pll TEST STARTED-03/13/2014 BEG HI lEVa 2. 0010 Ill EIIO TitlE 4:08 PH EIIO DATE 03/13/2014 EIIO LEVEL 2.0003 Ill .,.lEAK THRESHIX.D 0.002 Ill ~TEST RESULT PASSEO uoc 3-IJ TEST STARTED 3:52 PH TEST STARTED 03/13/2014 BEGilllEVEl 4,9428 Ill EllO TitlE -4:08 PH EIXJ DATE 03/13/201/J EIIIJ LEVEL IJ, 9423 Ill lEAK TlflESfll!..O 0, 002 Ill TEST RESllT PASSED uoc 7·8 TEST STARTED 3:52 PH TEST STARTED 03/13/201Q BEGIII LEVa 3,4460 Ill EIIIJ TitlE IJ:OB PH Elll DATE 03/13/201/J EJ«l LEVEL 3,4451 Ill LEA'< nnlESlD.O 0, 002 Ill TEST RESllT PASSED 3362 FASTRIP 6401 SOUTH H ST BAKERSFIElD 03/13/2014 4:24 PH SUI'J> LEAK TEST REPORT lKlC 1-2 TEST STARTED 4:09 Pll TEST STARTED 03/13/2014 BEG Ill LEVa 2. 000/J Ill Elll TillE 4:24 Pll 00 DATE 03/13/201/J Elll lEVEL "1.9996 "lll LEAK THRESHOLD 0, 002 Ill TEST RESlLT PASSED lllC 3·/J TEST STARTED 4:09 PH TEST STARTED 03/13/2014 BEG Ill LEVEL 4, 9020 Ill EIID TillE 4:24 PH EliD DATE 03/13/2014 EIID LEVEL 4, 9417 Ill LEAK THREStnO 0, 002 Ill TEST RESU\. T PASSED I!JC 5-6 TEST STARTED 4:09 PH TEST STARTED 03/13/2014 BEG Ill lEVEL 2. 2882 Ill Elll TillE 4:24 PH Elll DATE 03/13/201/J EllllEVEL 2.2886 Ill l EAK THRESH!lD 0. 002 Ill TEST RESlL T PASSED lllC 7-8 TEST START ED 4:09 PH TEST STARTED 03/13/201/J BEG Ill LEVEL 3, 4444 Ill Elll TINE 4:24 PH Elll DATE 03/13/201/J Elll lEVa 3, 4Q26 Ill lEAl< TmESHrul 0, 002 Ill TEST REStl'-l PASSED ..... 3362 FASTRIP 6401 SOOTH H ST BAKERSFJEl.O 03/13/2014 4:40 PH sti1P LEAK TEST REP0:1T liOC 1-2 TEST STARTED 4:25 PH TEST STARTED 03/13/2014 BEGHilEVR 1,9990 Ill EliO TillE 4:40 PH EIIO DATE 03/13/201/J EllO LEVEL 1, 9986 Ill lEAK THRESHOLD 0, 002 Ill TEST RESULT PASSED uoc 3-Q TEST STARTED 4:25 PH TEST STARTED 03/13/201/J BEGIIILEVEL 4.9417 Ill EllO TillE 4:40 PH EllO DATE 03/13/2014 Ell() lEVEl. 4. 9413 Ill LEAK THRESIRO 0, 002 Ill TEST RESLU PASSED uoc 5-6 TEST STARTED 11:25 PH TEST STARTED 03/13/2014 BE Gill LEVEL 2. 2892 Ill EIIO TillE 11:40 PH EJIO DATE 03/13/20111 EJIO LEVEL 2. 2888 Ill LEAK T~ESHllD 0, 002 Ill TEST RESlL T PASSED 3362 FASTRIP 6401 SOUTH H ST BN<ERSFIELO 03/13/2014 3:03 PH StJ."J> lEAK TEST REPORT 91 SIP TEST STARTED 2:47 PH TEST STARTED 03/13/2014 BEGIU LEVEL 6,6736 Ill EIIJ TIHE 3:03 Pli EIIJ OATE 03/13/2014 Elll lEVEl 6.6737 Ill lEAK TIICESHJUI 0. 002 Ill TEST REStl. T PASSED 91 FSB TEST STARTED 2:47 PH TEST STARTED 03/13/2014 BEGIIILEVa 6,4691 Ill EJIO TillE 3:03 Pl1 EIID DATE 03/13/2014 EI,'O lEVEL 6. 4689 Ill lEAK TlflESIJJLO 0, 002 Ill TEST RESULT PASSED OS SIP TEST STARTED 2:117 PH TEST STARTED 03/13/2014 BEG !II LEVEL 6. 4426 Ill E!ID TIHE 3:03 PH EIID DATE 03/13/2014 Ell() lEVEL 6. 4420 Ill lEAl( TlflESfru) o. 002 Ill TEST RESll.T PASSED 3362 FASTRIP 6401 SOUTH H ST BN<ERSF I ElO 03/13/2014 3:18 PH SUI'!? LEAK TEST REPORT 91 STP TEST STARTED 3:03 Pli TEST STARTED 03/13/2014 BEG Ill LEva 6, 6735 Ill Elll TitlE 3!18 PH Elll DATE 03/13/2014 EllllEVEl 6. 6729 Ill lEAK TlmESIIlll 0, 002 Ill TEST RESI.U PASSED 91 FSB TEST STARTED 3:03 Pli TEST STARTED 03/13/2014 BEG Ill I.EVE1. 6, Cti90 Ill E/10 TIHE 3:18 Pl1 El.tl DATE 03/13/2014 EJJO lEVEl 6. 4686 Ill l EAK TlilESIJJLO 0, 002 Ill TEST RESUlT PASSED OS STP TEST STARTED 3:03 PH TEST STARTED 03/13/2014 BEGJIILEVEL 6, 4421 HI EJIO TillE 3:18 PH E!IO DATE 03/13/20111 EIIO LEVa 6.4418 Ill LEAl( TWlESHOLD 0, 002 Ill TEST REStl. T PASSED 3362 FASTRIP 6401 SOOTH H ST BAKERSFIElD 03/13/2014 1:40 PH stW LfA'< TEST REP!IlT 91 VSB TEST STARTED 1:24 Ptt TEST STARTED 03/13/2014 BEG HI LEVEL 7, 5367 Ill EJD liKE 1:39 Ptl EID DATE 03/13/2014 EID LEVEL 7,5371 Ill LEAK THRESHllD 0, 002 Ill TEST REstl.T PASSED OS VSB TEST STARTED 1:24 PH TEST STARTED 03/13/2014 BEG I II LEVEl 6. 2613 Ill EIIO lii1E 1:39 Ptt EllO DATE 03/13/2014 ao LEVEL e. 2615 m LEAK THRESHllD 0, 002 Ill lEST REStlT PASSED 87 FSB TEST STARTED 1:24 PH TEST STARTED 03/13/2014 BEGIIII.EVB. 6, 0785 Ill EJIO liHE 1:39 PH EIIO DATE 03/13/2010 EIIO LEVEL 6, 0179 Ill lEAl( TIV!ESHOLD 0, 002 Ill TEST RESULT PASSED 3362 FASTRIP 6401 SOUTH II ST BAKERSFIElD 03/13/2014 1:59 PH Slllf' LEAK lEST REPORT 91 vsa TEST STARTED 1:43 PH TEST STARTED 03/13/2014 BEG III LEVEL 7, 5370 Ill EllD liKE 1:58 PH EIIO DATE 03/13/2010 EIIO LEVEL 7, 5375 Ill LfA'< THRESHOLD 0, 002 Ill TEST REStlT PASSED OS VSB TEST STARTED 1:43 Pll TEST STAATEO 03/13/2014 BE!illllEVEL 6, 2616 Ill 00 liKE 1:58 P/1 EIIO DATE 03/13/2014 EIIO LEVEL 6. 2618 Ill LEAK lliRESHOLD 0. 002 Ill TEST RESlll.T PASSED 87 FSB TEST STARTED 1:43 PH TEST STARTED 03/13/2014 BEG !II LEVEL 6, 0717 Ill EllD liKE 1:58 Pll EIIO DATE 03/13/2014 El/0 LEVEL 6. 0776 Ill LfAl< THRESHr10 0, 002 Ill TEST RESULT PASSED 3352 FASTRIP 6401 SOOTH H ST BAXERSF I ElD 03/13/2014 12:55 PH S!RiP lEAK TEST REPORT 87 vsa TEST STARTED 12:41 PH TEST STARTED 03/13/20111 IIEGitllEVEt 7. 1115 Ill EllD TillE 12:55 PH EllD DATE 03/13/20111 El«l lEVEL 7, 1116 Ill LEAK THRES!f!l.O 0, 002 Ill TEST RESULT PASSED 91 FILL TEST STARTED 12:41 PH TEST STARTED 03/13/2014 BEGIIILEVEL ll, 1274 Ill EID TIHC 12:56 PH EID DATE 03/13/2014 EID LEVEl 4, 1212 Ill lEAK THRESHttO 0. 002 Ill TEST RESll. T PASSED OS FILL TEST STARTED 12:41 PH TEST STARTED 03/13/2014 BEG Ill lEVEL 2. 5542 Ill EJO TillE 12:56 PH EJIO DATE 03/13/2014 EJID lEVEl 2, 55GO Ill LEA'< TliESI!!X.D 0, 002 Ill TEST REStA. T PASSED 87 FILL TEST STARTED 12:41 PH TEST STARTED 03/13/2014 BEG Ill lEVEL 2. 3500 Ill EJlD Tllf 12:56 PH EJIO OATE 03/13/2014 Ell!l LEVEL 2, 3495 Ill LEAK lllRESHOLD 0, 002 Ill TEST RESULT PASSED 3362 FASTRIP 6401 SOOTH H ST BAKERSFIELD 03/13/2014 1:16 Ptl SUHP LEAK TEST REPORT 87 vsa TEST STARTED 1:01 PI! TEST STAATED 03/13/20111 BEGIIILEVEL 7. 1119 Ill E/10 TillE 1:16 PH El/0 DATE 03/13/2014 810 lEVEl 7.1116 Ill lEAK THRESH(ll) 0. 002 Ill TEST RESll T PASSED 91 FILL TEST STARTED 1:01 PH TEST STARTED 03/13/2014 BEGIIIlEVEt a. 1272 Ill EJID TitlE 1:15 Ptl EJD DATE 03/13/2014 EID LEVEL 4, 1271 Ill lEAK THRESHOLD 0, 002 Ill TEST Rf..qJ_T PASS8l OS FILL TEST STARTED 1:01 P/1 TEST STARTED 03/13/2014 BEGitl LEVEL 2. 5540 Ill El.U TillE 1:16 PH EJIO DATE 03/13/2014 EJlO LEVEL 2.5537 Ill LEAK TlflESllllO 0, 002 Ill TEST RESULT PASSED 87 FILL TEST STARTED 1:01 PH TEST STARTED 03/13/2014 BEGIIILEVEL 2.3495 Ill EJlD Tli1E 1:16 PH El«l DATE 03/13/20111 EIIO LEVEL 2. 3G94 Ill LEAA T~ESiJJLO 0, 002 Ill TEST RESULT PASSED