HomeMy WebLinkAboutSB989 2014SWRCB, January 2002 Page __ of __
Secondary Containment Testing Report Form
This form is intended for use by contractors peiforming periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, writ/en test procedures, and
printouts from tests (if applicable}, should be provided to the facility owner/operator for submit/alto the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: #3362 Fastrip #633 T Date of Testing: 3/13/2014
Facility Address: 6401 South H St Bakersfield, CA 93304
Facility Contact: Omero Garcia I Phone: (661 )393-7000
Date Local Agency Was Notified of Testing: 3/12/2014
Name of Local Agency inspector (if present during testing): Ernie Medina
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services
Technician Conducting Test: Bryan A Self
Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester
License Type: CSLB I License Number:804904 ICC# 8022804-UT TT#11-1756
~·~·.·.··~-··-
Manufacturer Training
Manufacturer Component( s) Date Training Expires
UST 10/2112015
Installaton/Retrofit
UST Service ICC 1-28-2015
technician
Star. Smith. Fibercast Fiber Glass Systems N.A.
3. SUMMARY OF TEST RESULTS
Not Repairs Component Pass Fail Not Repairs Component Pass Fail Tested Made Tested Made
87 Product Secondary X 0 0 0 UDC 5-6 X 0 0 0
91 Product Secondary X 0 0 0 UDC 7-8 X 0 0 0
Diesel Product Secondary X 0 0 0 87 Fill Sump X 0 0 0
Vapor Return Secondary 0 X 0 0 91 Fill Sump X 0 0 0
87 Vent Secondary 0 X 0 0 Diesel Fill Sump X 0 0 0
91 Vent Secondary X 0 0 0 87 Fill Spill Bucket X 0 0 0
Diesel Vent Secondary X 0 0 0 87 Vapor Spill Bucket X 0 0 0
87 STP Sump 0 X 0 0 91 Fill Spill Bucket X 0 0 0
91 STP Sump X 0 0 0 91 Vapor Spill Bucket X 0 0 0
Diesel STP Sump X 0 0 0 Diesel Fill Spill Bucket 0 X 0 0
UDC 1-2 X 0 0 0 Diesel Vapor Spill Bucket X 0 0 0
UDC 3-4 X 0 0 X 0~ 0 0
1fhydrostatic testing was performed, describe what was done with the water after completion of tests:
Water was _EUt back into test trailer and waste drum
During Testing we replaced a test boot on the Diesel line inside UDC 3-4.
To the best of my knowledge curate am/ in full compliance with legal requirements
Technician's Signature: Date: 03/13/2014
.
SWRCB, January 2002 Page __ of __
4. TANK ANNULAR TESTING
Test Method Developed By: D Tank Manufacturer x industry Standard D Professional Engineer
D Other (SpecifY)
Test Method Used: D Pressure x Vacuum D Hydrostatic
D Other (SpecifY)
Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625"
Tank # Regular Tank# Super Tank# Diesel Tank#
Is Tank Exempt From Testing?1 X Yes DNo X Yes DNo X Yes DNo DYes DNo
Tank Capacity:
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (Rr):
Test Duration:
Change in Reading (Rr-R1):
Pass/Fail Threshold or Criteria:
Test Result: D Pass 0 Fail D Pass 0 Fail D Pass DFail D Pass D Fail
Was sensor removed for testing? DYes DNo DNA DYes DNo DNA DYes DNo DNA DYes DNo DNA
Was sensor properly replaced and DYes DNo DNA DYes DNo DNA DYes DNo DNA DYes DNo DNA verified functional after testing?
Comments -(include information on repairs made prior to testing, anc/_rl!C()mrnen(i_ecl[ol~'rV--1-IPfor failed tests)
1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6)}
I
I
SWRCB, January 2002 Page __ of __
5. SECONDARY PJPE TESTING
Test Method Developed By: 0 Piping Manufacturer x Industry Standard 0 Professional Engineer
I 0 Other (Specify)
Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic
I 0 Other (Specify)
Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625"
! Piping Run # Piping Run# Piping Run# Piping Run#
87 Product 91 Product Diesel Product 91 Vent
Piping Material: FRP FRP FRP FRP
Piping Manufacturer: Smith Smith Smith Smith
Piping Diameter: 3.00" 3.00" 3.00" 3.00"
Length of Piping Run: 150' 160' 170' 120'
Product Stored: Regular Super Diesel 91 vent
Method and location of Test Boot Test Boot Test Boot Test Boot piping-run isolation:
Wait time between applying
pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min
staJti n g test:
Test Start Time: 12:00 PM 12:00 PM 12:00 PM 12:00 PM
Initial Reading (R1): 5.00" PSI 5.00" PSI 5.00" PSI 5.00" PST
Test End Time: 1:00PM 1:00PM 1:00PM 1:00PM
Final Reading (RF): 5.00" PSI 5.00" PSI 5.00" PSI 5.00" PSI
Test Duration: 1 Hour 1 Hour I Hour I Hour
Change in Reading (RF-R1): 0.00" 0.00" 0.00" 0.00"
Pass/Fail Threshold or 0.00" 0.00" 0.00" Criteria: 0.00"
Test Result: X Pass 0 Fail X Pass 0 Fail X Pass OFail X Pass 0 Fail
Comments-(include information on repairs made prior to testing, and recommended.foilow-up.for.failed tests)
SWRCB, January 2002 Page_ of_
5. SECONDARY PIPE TESTING
Test Method Developed By: 0 Piping Manufacturer x Industry Standard 0 Professional Engineer
0 Other (SpecifY)
Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic
0 Other (SpecifY)
Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625"
Piping Run# Piping Run# Piping Run# Piping Run#
Diesel Vent 87 Vent Vapor Return
Piping Material: FRP FRP FRP
Piping Manufacturer: Smith Smith Smith
Piping Diameter: 3.00" 3.00" 4.00"
Length ofPiping Run: 170' !50' 170'
Product Stored: Diesel Vent Secondary 87 Vent Secondary Vapor Return
Secondary
Method and location of Test Boot piping-run isolation:
Wait time between applying
pressure/vacuum/water and 5 Min
starting test:
Test Start Time: 1:00PM
Initial Reading (R1): 5.00" PSI
Test End Time: 2:00PM
Final Reading (RF): 5.00" PSI
Test Duration: I Hour
Change in Reading (RF-R1): 0.00"
Pass/Fail Threshold or 0.00" Criteria:
Test Result: X Pass OFail 0 Pass X Fail 0 Pass X Fail 0 Pass 0 Fail
Comments-(include information on repairs made prior to lesting, and recommendedfollow-upfor failed tesls}
87 Vent Secondary and Vapor Return Secondary Failed. No Test Boots.
SWRCB, January 2002 Page __ of __
6. PIPING SUMP TESTING
Test Method Developed By: D Sump Manufacturer x Industry Standard D Professional Engineer
D Other (Specify)
Test Method Used: D Pressure D Vacuum x Hydrostatic
D Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
Sump# 87 Sump# 91 Sump# Diesel Sump#
Sump Diameter: 36.00" 36.00" 36.00"
Sump Depth: 50.00" 50.00" 50.00"
Sump Material: FRP FRP FRP
Height from Tank Top to Top of 28.00" 28.00" 28.00" Highest Piping Penetration:
Height from Tank Top to Lowest 15.00" 15.00" 15.00" Electrical Penetration:
Condition of sump prior to testing: Clean & Dry Clean & Dry Clean & Dry
Portion of Sump Tested 1 NA Pipe Penetration Pipe Penetration
Does turbine shut down when
sump sensor detects liquid (both
product and water)?*
DYes DNo XNA DYes DNoXNA DYes DNoXNA DYes DNo DNA
Turbine shutdown response time NA NA NA
Is system programmed for fail-safe
shutdown?· DYes DNo XNA DYes DNoX NA DYes DNoXNA DYes DNo DNA
Was fail-safe verified to be DYes DNo XNA DYes DNoXNA DYes DNoXNA DYes DNo DNA operational?•
Wait time between applying
pressure/vacuum/water and starting NA SMin SMin
test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or Criteria:
Test Result: D Pass X Fail X Pass DFail X Pass DFail D Pass D Fail
Was sensor removed for testing? DYes DNo XNA DYes DNo X NA DYes DNo XNA DYes DNo DNA
Was sensor properly replaced and DYes DNo XNA DYes DNo XNA DYes D No X NA DYes DNo DNA verified functional after testing?
Comments -(include information on repairs made prior to testing, and recommended.follow-up.forfailed test!>)
Need 2 New Test Boots in the 87 STP Sumn.
1 If the entire depth of the sump is not tested, specifY how much was tested. If the answer to ill:!Y of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page __ of __
'0 """""...., ......... ..._ .... _ ..... ._, ..... _,. .. _....., ..... ___ ... __ .._ ... • 0-----
Test Method Developed By: D UDC Manufacturer x Industry Standard D Professional Engineer
D Other (Specify)
Test Method Used: D Pressure D Vacuum x Hydrostatic
D Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
UDC # 1-2 UDC # 3-4 UDC # S-6 UDC#7-8
UDC Manufacturer: Western Western Western Western
UDC Material: FRP FRP FRP FRP
UDC Depth: 31.00" 31.00" 31.00" 31.00"
Height from UDC Bottom to Top 9.50" 9.50" 9.50" 9.50"
of Highest Piping Penetration:
Height from UDC Bottom to 3.00" 3.00" 3.00" 3.00"
Lowest Electrical Penetration:
Condition of UDC prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry
testing:
Portion ofUDC Tested1 Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?•
DYes DNo X NA DYes DNoXNA DYes DNo XNA DYes DNo XNA
Turbine shutdown response time NA NA NA NA
Is system programmed for fail-
safe shutdownf DYes DNo XNA DYes DNoXNA DYes DNo XNA DYes DNo XNA
Was fail-safe verified to be DYes DNo XNA DYes DNoXNA DYes DNo XNA DYes DNo XNA operationalf
Wait time between applying 5 Min 5 Min 5 Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (Rp-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass D Fail X Pass DFail X Pass DFail X Pass D Fail
Was sensor removed for testing? DYes DNo XNA DYes DNo XNA DYes DNo XNA DYes DNo XNA
Was sensor properly replaced and DYes DNo XNA DYes DNo X NA DYes DNo XNA DYes DNo XNA verified functional after testing?
Comments -(include information on repairs made prior to testing, .. a. nd recommended.follow-up.forfailed tests) --··-··· -· .....
Installed a new test boot on the diesel line in UDC 3-4
1 lfthe entire depth of the UDC is not tested, specify how much was tested. If the answer to ill1Y of the questions indicated with an
asterisk(*) is "NO" or ''NA", the entire UDC must be tested. (See SWRCB LG-160)
.
.
I
I
SWRCB, January 2002 Page __ of __
9 SPILUOVERFILL CONTAINMENT BOXES
Facility is Not Equipped With SpilVOverfill Containment Boxes 0
Spill/Overfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer
0 Other (Specify)
Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic
0 Other (SpecifY)
Test Equipment Used: Ts-sts Equipment Resolution:
Spill Box# 87 Fill Spill Box# 87 Vapor Spill Box # 91 Fill Spill Box# 91 Vapor
Bucket Diameter: 12.00" 12.00" 12.00" 12.00"
Bucket Depth: 12.00" 12.00" 12.00" 12.00"
Wait time between applying
pressure/vacuum/water and 5 Min. 5 Min. 5Min. 5Min.
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RJ):
Pass/Fail Threshold or
Criteria:
Test Result: X Pass OFail X Pass 0 Fail X Pass 0 Fail X Pass O Fail
Comments -(include information on repairs made prior to testing, and recommendedfollow-upfor failed tests)
SWRCB, January 2002 Page __ of __
9 SPILL/OVERFILL CONTAINMENT BOXES
Faci lity is Not Equipped With Spill/Overfill Containment Boxes 0
Spill/Overfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer
0 Other (SpecifY)
Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic
0 Other (SpecifY)
Test Equipment Used: Ts-sts I Equipment Resolution:
Spill Box # Diesel F ill Spill Box# Diesel Vapor Spill Box # Spill Box#
Bucket Diameter: 12.00" 12.00"
Bucket Depth: 12.00" 12.00"
Wait time between applying
pressure/vacuum/water and 5 Min. 5 Min.
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (Rr-R1):
Pass/Fail Threshold or
Criteria:
Test Result: 0 Pass X Fail X Pass OFail 0 Pass 0 Fail 0 Pass OFail
Comments-(include information on repairs made prior to testing, and recommended.fol/ow-up[or failed tests)
Diesel Fill Failed. Due to Liauid Draining Right Through the Drain Valve.
3352 FASTRIP
6001 SOUTH H ST
BAKERSFIElD
03/13/201/J 4:08 Pll
SliP lEA'< TEST REPmT
uoc 1-2
TEST STARTED 3:52 Pll
TEST STARTED-03/13/2014
BEG HI lEVa 2. 0010 Ill
EIIO TitlE 4:08 PH
EIIO DATE 03/13/2014
EIIO LEVEL 2.0003 Ill
.,.lEAK THRESHIX.D 0.002 Ill
~TEST RESULT PASSEO
uoc 3-IJ
TEST STARTED 3:52 PH
TEST STARTED 03/13/2014
BEGilllEVEl 4,9428 Ill
EllO TitlE -4:08 PH
EIXJ DATE 03/13/201/J
EIIIJ LEVEL IJ, 9423 Ill
lEAK TlflESfll!..O 0, 002 Ill
TEST RESllT PASSED
uoc 7·8
TEST STARTED 3:52 PH
TEST STARTED 03/13/201Q
BEGIII LEVa 3,4460 Ill
EIIIJ TitlE IJ:OB PH
Elll DATE 03/13/201/J
EJ«l LEVEL 3,4451 Ill
LEA'< nnlESlD.O 0, 002 Ill
TEST RESllT PASSED
3362 FASTRIP
6401 SOUTH H ST
BAKERSFIElD
03/13/2014 4:24 PH
SUI'J> LEAK TEST REPORT
lKlC 1-2
TEST STARTED 4:09 Pll
TEST STARTED 03/13/2014
BEG Ill LEVa 2. 000/J Ill
Elll TillE 4:24 Pll
00 DATE 03/13/201/J
Elll lEVEL "1.9996 "lll
LEAK THRESHOLD 0, 002 Ill
TEST RESlLT PASSED
lllC 3·/J
TEST STARTED 4:09 PH
TEST STARTED 03/13/2014
BEG Ill LEVEL 4, 9020 Ill
EIID TillE 4:24 PH
EliD DATE 03/13/2014
EIID LEVEL 4, 9417 Ill
LEAK THREStnO 0, 002 Ill
TEST RESU\. T PASSED
I!JC 5-6
TEST STARTED 4:09 PH
TEST STARTED 03/13/2014
BEG Ill lEVEL 2. 2882 Ill
Elll TillE 4:24 PH
Elll DATE 03/13/201/J
EllllEVEL 2.2886 Ill
l EAK THRESH!lD 0. 002 Ill
TEST RESlL T PASSED
lllC 7-8
TEST START ED 4:09 PH
TEST STARTED 03/13/201/J
BEG Ill LEVEL 3, 4444 Ill
Elll TINE 4:24 PH
Elll DATE 03/13/201/J
Elll lEVa 3, 4Q26 Ill
lEAl< TmESHrul 0, 002 Ill
TEST REStl'-l PASSED
.....
3362 FASTRIP
6401 SOOTH H ST
BAKERSFJEl.O
03/13/2014 4:40 PH
sti1P LEAK TEST REP0:1T
liOC 1-2
TEST STARTED 4:25 PH
TEST STARTED 03/13/2014
BEGHilEVR 1,9990 Ill
EliO TillE 4:40 PH
EIIO DATE 03/13/201/J
EllO LEVEL 1, 9986 Ill
lEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
uoc 3-Q
TEST STARTED 4:25 PH
TEST STARTED 03/13/201/J
BEGIIILEVEL 4.9417 Ill
EllO TillE 4:40 PH
EllO DATE 03/13/2014
Ell() lEVEl. 4. 9413 Ill
LEAK THRESIRO 0, 002 Ill
TEST RESLU PASSED
uoc 5-6
TEST STARTED 11:25 PH
TEST STARTED 03/13/2014
BE Gill LEVEL 2. 2892 Ill
EIIO TillE 11:40 PH
EJIO DATE 03/13/20111
EJIO LEVEL 2. 2888 Ill
LEAK T~ESHllD 0, 002 Ill
TEST RESlL T PASSED
3362 FASTRIP
6401 SOUTH H ST
BN<ERSFIELO
03/13/2014 3:03 PH
StJ."J> lEAK TEST REPORT
91 SIP
TEST STARTED 2:47 PH
TEST STARTED 03/13/2014
BEGIU LEVEL 6,6736 Ill
EIIJ TIHE 3:03 Pli
EIIJ OATE 03/13/2014
Elll lEVEl 6.6737 Ill
lEAK TIICESHJUI 0. 002 Ill
TEST REStl. T PASSED
91 FSB
TEST STARTED 2:47 PH
TEST STARTED 03/13/2014
BEGIIILEVa 6,4691 Ill
EJIO TillE 3:03 Pl1
EIID DATE 03/13/2014
EI,'O lEVEL 6. 4689 Ill
lEAK TlflESIJJLO 0, 002 Ill
TEST RESULT PASSED
OS SIP
TEST STARTED 2:117 PH
TEST STARTED 03/13/2014
BEG !II LEVEL 6. 4426 Ill
E!ID TIHE 3:03 PH
EIID DATE 03/13/2014
Ell() lEVEL 6. 4420 Ill
lEAl( TlflESfru) o. 002 Ill
TEST RESll.T PASSED
3362 FASTRIP
6401 SOUTH H ST
BN<ERSF I ElO
03/13/2014 3:18 PH
SUI'!? LEAK TEST REPORT
91 STP
TEST STARTED 3:03 Pli
TEST STARTED 03/13/2014
BEG Ill LEva 6, 6735 Ill
Elll TitlE 3!18 PH
Elll DATE 03/13/2014
EllllEVEl 6. 6729 Ill
lEAK TlmESIIlll 0, 002 Ill
TEST RESI.U PASSED
91 FSB
TEST STARTED 3:03 Pli
TEST STARTED 03/13/2014
BEG Ill I.EVE1. 6, Cti90 Ill
E/10 TIHE 3:18 Pl1
El.tl DATE 03/13/2014
EJJO lEVEl 6. 4686 Ill
l EAK TlilESIJJLO 0, 002 Ill
TEST RESUlT PASSED
OS STP
TEST STARTED 3:03 PH
TEST STARTED 03/13/2014
BEGJIILEVEL 6, 4421 HI
EJIO TillE 3:18 PH
E!IO DATE 03/13/20111
EIIO LEVa 6.4418 Ill
LEAl( TWlESHOLD 0, 002 Ill
TEST REStl. T PASSED
3362 FASTRIP
6401 SOOTH H ST
BAKERSFIElD
03/13/2014 1:40 PH
stW LfA'< TEST REP!IlT
91 VSB
TEST STARTED 1:24 Ptt
TEST STARTED 03/13/2014
BEG HI LEVEL 7, 5367 Ill
EJD liKE 1:39 Ptl
EID DATE 03/13/2014
EID LEVEL 7,5371 Ill
LEAK THRESHllD 0, 002 Ill
TEST REstl.T PASSED
OS VSB
TEST STARTED 1:24 PH
TEST STARTED 03/13/2014
BEG I II LEVEl 6. 2613 Ill
EIIO lii1E 1:39 Ptt
EllO DATE 03/13/2014 ao LEVEL e. 2615 m
LEAK THRESHllD 0, 002 Ill
lEST REStlT PASSED
87 FSB
TEST STARTED 1:24 PH
TEST STARTED 03/13/2014
BEGIIII.EVB. 6, 0785 Ill
EJIO liHE 1:39 PH
EIIO DATE 03/13/2010
EIIO LEVEL 6, 0179 Ill
lEAl( TIV!ESHOLD 0, 002 Ill
TEST RESULT PASSED
3362 FASTRIP
6401 SOUTH II ST
BAKERSFIElD
03/13/2014 1:59 PH
Slllf' LEAK lEST REPORT
91 vsa
TEST STARTED 1:43 PH
TEST STARTED 03/13/2014
BEG III LEVEL 7, 5370 Ill
EllD liKE 1:58 PH
EIIO DATE 03/13/2010
EIIO LEVEL 7, 5375 Ill
LfA'< THRESHOLD 0, 002 Ill
TEST REStlT PASSED
OS VSB
TEST STARTED 1:43 Pll
TEST STAATEO 03/13/2014
BE!illllEVEL 6, 2616 Ill
00 liKE 1:58 P/1
EIIO DATE 03/13/2014
EIIO LEVEL 6. 2618 Ill
LEAK lliRESHOLD 0. 002 Ill
TEST RESlll.T PASSED
87 FSB
TEST STARTED 1:43 PH
TEST STARTED 03/13/2014
BEG !II LEVEL 6, 0717 Ill
EllD liKE 1:58 Pll
EIIO DATE 03/13/2014
El/0 LEVEL 6. 0776 Ill
LfAl< THRESHr10 0, 002 Ill
TEST RESULT PASSED
3352 FASTRIP
6401 SOOTH H ST
BAXERSF I ElD
03/13/2014 12:55 PH
S!RiP lEAK TEST REPORT
87 vsa
TEST STARTED 12:41 PH
TEST STARTED 03/13/20111
IIEGitllEVEt 7. 1115 Ill
EllD TillE 12:55 PH
EllD DATE 03/13/20111
El«l lEVEL 7, 1116 Ill
LEAK THRES!f!l.O 0, 002 Ill
TEST RESULT PASSED
91 FILL
TEST STARTED 12:41 PH
TEST STARTED 03/13/2014
BEGIIILEVEL ll, 1274 Ill
EID TIHC 12:56 PH
EID DATE 03/13/2014
EID LEVEl 4, 1212 Ill
lEAK THRESHttO 0. 002 Ill
TEST RESll. T PASSED
OS FILL
TEST STARTED 12:41 PH
TEST STARTED 03/13/2014
BEG Ill lEVEL 2. 5542 Ill
EJO TillE 12:56 PH
EJIO DATE 03/13/2014
EJID lEVEl 2, 55GO Ill
LEA'< TliESI!!X.D 0, 002 Ill
TEST REStA. T PASSED
87 FILL
TEST STARTED 12:41 PH
TEST STARTED 03/13/2014
BEG Ill lEVEL 2. 3500 Ill
EJlD Tllf 12:56 PH
EJIO OATE 03/13/2014
Ell!l LEVEL 2, 3495 Ill
LEAK lllRESHOLD 0, 002 Ill
TEST RESULT PASSED
3362 FASTRIP
6401 SOOTH H ST
BAKERSFIELD
03/13/2014 1:16 Ptl
SUHP LEAK TEST REPORT
87 vsa
TEST STARTED 1:01 PI!
TEST STAATED 03/13/20111
BEGIIILEVEL 7. 1119 Ill
E/10 TillE 1:16 PH
El/0 DATE 03/13/2014
810 lEVEl 7.1116 Ill
lEAK THRESH(ll) 0. 002 Ill
TEST RESll T PASSED
91 FILL
TEST STARTED 1:01 PH
TEST STARTED 03/13/2014
BEGIIIlEVEt a. 1272 Ill
EJID TitlE 1:15 Ptl
EJD DATE 03/13/2014
EID LEVEL 4, 1271 Ill
lEAK THRESHOLD 0, 002 Ill
TEST Rf..qJ_T PASS8l
OS FILL
TEST STARTED 1:01 P/1
TEST STARTED 03/13/2014
BEGitl LEVEL 2. 5540 Ill
El.U TillE 1:16 PH
EJIO DATE 03/13/2014
EJlO LEVEL 2.5537 Ill
LEAK TlflESllllO 0, 002 Ill
TEST RESULT PASSED
87 FILL
TEST STARTED 1:01 PH
TEST STARTED 03/13/2014
BEGIIILEVEL 2.3495 Ill
EJlD Tli1E 1:16 PH
El«l DATE 03/13/20111
EIIO LEVEL 2. 3G94 Ill
LEAA T~ESiJJLO 0, 002 Ill
TEST RESULT PASSED