HomeMy WebLinkAboutHP GO GO 3301 Wible Rd. SB-989SWRCB. January 2002 Pagc __ of
Secondary Containment Testing Report Form
Thi:; form is intendedfor use by contractors performing periodic testing(~( UST second(II:J> containment systems. u,·e the
appropriate pages of this(omr to report results for all components tested. The completed(onn, written test procedures, and
printoutsfrom tests ([(applicable), should be prcwided to thefacility ownerloperatorfor submittal to the local regrtlato1~' agency.
I. FACILITY INFORMATION
Facility Name: liP Go Go I Date ofTesting: 10/28/2013
Facility Address: 330 I Wible Road, Bakersfield. CA 93304
Facility Contact: Alondra Hernandez I Phone: 66_1-_8_3_5-_8_0_04 __________ -4
Date Local Agency Was Notified ofTesting: 10/21/2013
Name of Local Agency Inspector ([(present during testing): Ernie Media ~--~~----------------------------------------------~
2. TESTING CONTRACTOR INFORMATION r---··-Company Name: Confidence UST Services
Technician Conducting Test: Frank Landa
Credentials: x CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: CSLB I License Number:804904 ICC# 818524/8180171
-··
Manufacturer Training
Manufacturer Corn2onent(s) Date Training Expires
UST 11/22/2013
I nsta !laton/Retrofit
UST Service ICC 1-28-2015
technician
Star. Smith. Fibercast Fiber Glass Systems N.A.
3. SUMMARY OF TEST RESULTS
Component Pass Fnil Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
87 #I Secondary [] X 0 II 87 #2 Vapor SB X f I u
87 #2 Secondary r 1 X r [l 91 Vapor SB X J c [ J
91 Secondary X r• ~ ( J .. J d
87 #I STP X . ' I ' -87 #2 STp X 0 l I ~ I -
91 STP X [] u ~) [ I J n l
UDC 1-2 [I X l J n -f I [ J I' [
UDC 3-4 X [ r I [I r .,
·' 87 #I Fill Sump X [ :I [I l' .,
'
87 #2 Fill Sump X :I (] '
91 Fill Sump u X D f I r 1 I 0 I 1-87 #I Vapor SB X r 1 [l LJ ll I r
If hydrostatic testing was perforn1cd, describe what was done with the water after completion of tests:
Water was put back into test trailer and waste drum
RESPONSIBLE FOR CONDUCTING THIS TESTING
To tlte be.\1 of my k11rmjft. •e l is docume11t are accurate ami;, full complia11ce witlt legal requirements
Technician's Signature(-Date: I 0/28/2013
SWRCB, January 2002 Page __ of __
4. TANK ANNULAR TESTING
Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer
Other (Spec[(y)
Test Method Used: II Pressure [I Vacuum U Hydrostatic
Other (Spec[(y)
Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625"
-·-
Tank# 87-1 Tank# 87-2 Tank# 91 Tank#
Is Tank Exempt From Testing?1 I l Yes X No UYes X No Yes X No Yes
Tank Capacity:
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (R1-R1):
Pass/Fail Threshold or Criteria:
Test Result: 0 Pass 0 Fail 0 Pass OFail 0 Pass 0 Fail 0 Pass
Was sensor removed for testing? r Yes '~No NA CYcs liNo DNA IIYes ONo NA I Yes
Was sensor properly replaced and Yes No l NA CYcs No NA Yes ~No NA Yes verified functional aftcrl<.!~ingl__ '-
Comments -(include information 011 repairs made prior to testing, and recommellded.fo/low-up fbr (ailed tests)
SINGLE WALL TANKS
I No
OFail
No . NA
No -NA
1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that arc hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations. Title 23. Section 2637(a)(6)l
-
SWRCB. January 2002 Page __ of __
5. SECONDARY PIPE TESTING -Test Method Developed By: ' Piping Manufacturer x Industry Standard fl Professional Engineer
Other (Spec[M -
Test Method Used: x Pressure Vacuum llydrostatic
Other (Specify)
Test Equipment Used: Calibrated Gages I Equipment Resolution:0.0625"
~ ~---·----~
Piping Run# 87-1 Piping Run# 87-2 Piping Run # 91 Piping Run #
~
Piping Material:
1-
Plastic Plastic Plastic
Piping Manufacturer: Franklin APT Franklin APT franklin APT
~ Piping Diameter: 1.50" 1.50" 1.50" -Length of Piping Run: 50.00' 50.00' 50.00'
Product Stored: Regular Regular Premium
Method and location of Boot in STP Boot in STP Boot in STP piping-run isolation:
Wait time between applying
pressure/vacuum/water and 5 min. 5 min. 5 min.
starting test:
Test Start Time: I 0:30am I 0:30am I 0:30am
Initial Reading (R1): 5 psi 5 psi 5 psi
Test End Time: I 0:35am !1:30am I 0:35am
Final Reading (!4): 0 psi 5 psi 0 psi --Test Duration: 5 min. I hour 5 min.
Change in Reading(~-~): 5 psi 0.00" 5 psi
Pass/Failll1reshold or -
Criteria: 0.00" 0.00" 0.00"
Test Result: 0 Pass X Fail X Pass 0 Fail 0 Pass X Fail 0 Pass 0 Fail -
Comments -(include i'!formation on repairs made prior to testing. and recommended.fol!oll'-llflfor.failed tests)
87-1. 87-2 bad jumpers in UDC #1-2. Need to replace jumpers.
SWRCB, January 2002 Page_ of_
6. PIPING SUMP TESTING
Test Method Developed By: Sump Manufacturer x Industry Standard Professional Engineer
Other (SpectM
Test Method Used: I l Pressure 1 Vacuum x Jlydrostatic
I J Other (Spec[[y)
Test Equipment Used: Ts-sts I Equipment Resol~tion:
-~-Sump# 87-1 Sump# 87-2 Sump# 91 Sump#
Sump Diameter: 36.00" 36.00" 36.00"
Sump Depth: 46.00" 46.00" 46.00"
Sump Material: Fiberglass Fiberglass Fiberglass
Height from Tank Top to Top of 15.00' 16.00' 17.00' Highest Piping Penetration:
Height from Tank Top to Lowest 21.00" 23.00" 23.00" Electrical Penetration:
Condition of sump prior to testing: Clean Clean Clean
Portion of Sump Tested1 19.00" 20.00" 21.00"
Docs turbine shut down when
sump sensor detects liquid (both
product and water)'?'
l I Yes nNo X NA J Yes llNoXNA l I Yes CNoX NA UYes II No rNA
Turbine shutdown response time NA NA ~A
Is system programmed for fail-safe
shutdown?' Yes ONo X NA DYes flNoXNA Yes ~No X NA ::::; Yes No NA
Was fail-safe verified to be II Yes r No X NA ll Yes ' NoXNA II Yes nNoX NA 0 Yes l No lNA O_l)erational?'
Wait time between applying
pressure/vacuum/water and starting SMin 5Min SMin
test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (Rf-R1):
Pass/Fail TI1reshold or Criteria:
Test Result: 0 Pass X Fail X Pass 0 Fail X Pass 0 Fail 0 Pass 0 Fail
Was sensor removed for testing? X Yes fJNo [INA X Yes liNo nNA X Yes n No r NA n Yes l l No NA
Was sensor properly replaced and X Yes r·No [INA X Yes No-NA X Yes r No NA ~Yes No "NA verified functional after testing?
Comments -(include information on repairs made prior to testing, and recommendedfol/ow-upforfai/ed tests)
87-1 STP fail, possible problem with piping penetration need to replace and retest.
1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to !!..!!Y of the questions indicated with an
asterisk(*) is "NO" or "NA". the entire sump must be tested. (See SWRCB LG-160)
I
I
i
I
I
I
i
i
SWRCB. January 2002 Page_ of_
7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: r UDC Manufacturer x Industry Standard ~Professional Engineer
L Other (Specf(y)
Test Method Used: Pressure Vacuum x I Iydrostatic
~ Other (Spec{(y)
Test Equipment Used: Ts-sts Equipment Resolution:
---------· -
UDC # 1-2 UDC #3-4 UDC# UDC#
UDC Manufacturer: Total Con. Total Con.
7Dt Material: Fiberglass Fiberglass
UDC Depth: 36.00" 36.00"
Height from UDC Bottom to Top 16.00" 16.00"
of Highest Piping Penetration:
Height from UDC Bottom to 12.00" 12.00"
Lowest Electrical Penetration:
t-cO'ndition ofUDC prior to Clean Clean
testing:
Portion ofUDC Tested 20.00" 20.00"
Docs turbine shut down when
UDC sensor detects liquid (both . Yes fiNo X NA UYes fJNoXNA Yes I No JNA r I Yes ClNo INA
product and water)?' -Turbine shutdown response time NA NA
Is system programmed for fail-
safe shutdown?' ~Yes No XNA ...... Yes NoXNA Yes No~ NA Yes No NA
Was fail-safe verified to be Yes No XNA Yes I NoXNA IJYes No lNA Yes No NA operational?'
Wait time between applying 5 Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1):
Test End rime:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Failll1reshold or Criteria:
Test Result: 0 Pass X Fail 0 Pass X Fail 0 Pass OFaiJ 0 Pass 0 Fail
Was sensor removed for testing? X Yes No NA X Yes No -NA Yes No ~NA Yes No NA 1----Was sensor properly replaced and X Yes 11 No tiNA X Yes lNo "NA Yes 1 No DNA I Yes No INA ~ed nmetional after testing?
Comments-(include il!fbrmation on repairs made prior to testing, and recommended.fol!oll'-up .for .failed tests)
Both UDC's faiL pQssible problem with Vapor Electrical Penetration.
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to a_llY of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire UDC must be tested. (Sec SWRCB LG-160)
SWRCB, January 2002 Page_ of
8. FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps
Fill Riser Containment Sumps are Present. but were Not Tested 1--lndus1ry Standard Professional Engineer Test Method Developed By: 1 Sump Manufacturer
I--
n Other (Specf{l)
Test Method Used: . Pressure I I Vacuum 0 Hydrostatic
0 Other (Specifj;) -
Test Equipment Used: Equipment Resolution:
~------~4t, ·• -~· . .. . . ~'~;J._ · .. _ Fill Sump# 87-1 Fill Sump# 87-2 Fill Sump # 91 Fill Sump#
Sump Diameter: 36.00" 36.00" 36.00"
Sump Depth: 46.00" 46.00" 46.00"
llcight from Tank Top to Top of 0.00"
Ilighcsl PiQing Penetration:
0.00" 0.00"
I
Height from Tank Top to Lowest 0.00" 0.00" 0.00"
Electrical Penetration:
Condition of sump prior to Clean Clean Clean
test in[ I--. 8.00" Portion of Sump Tested 8.00" 8.00''
Sump Material: Fiberglass f-iberglass Fiberglass
Wait time between applying 5 min. 5 min. 5 min.
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading {R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R!}:
Pass/Fail ·ntreshold or Criteria:
Test Result: 0 Pass X Fail X Pass OFail 0 Pass X Fail 0 Pass 0 Fail
Is there a sensor in the sump? UYcs X No Yes X No Yes X No Yes No
Docs the sensor alarm when
either product or water is 0 Yes I I No XNA I I Yes 0 No X NA fJYes I No XNA liVes ONo LINA
detected?
Was sensor removed for testing? =Yes No XNA Yes No XNA Yes No XNA Yes No NA
Was sensor properly replaced and Yes No XNA Yes No XNA Yes No XNA Yes No NA verified functional after testing? --
Comments -(include il!formcaion on repairs made priorlo testing, and recommendedj(JI!ow-up for.fai/ed tesls) ..,.2 _____ _
No_sensor tested, tank collar onl ..
Both sumps need collar fiberglassed.
No sensor/piping in sumps.
SWRCB, January 2002 Page of
9. SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes
Spill/Overfill Containment Boxes are Present. but were Not Tested I
Test Method Developed By: Spill Buckel Manufacturer x Industry Standard l Professional Engineer
Other (Specify)
Test Method Used: Pressure [ Vacuum x llydro~tatic
Oth cr (Spec i/.l ~ .
Test Equipment Used: Ts-sts Equipment Resolution:
--
-------~
Spill Box #87-1 Vapor Spill Box#87-2 Vapor Spill Box# 91 Vapor Spill Box#
Bucket Diameter: 12.00" 12.00" 12.00" -Bucket Depth: 12.00" 12.00" 12.00''
Wait time between applying
pressure/vacuum/water and 5 min. 5 min. 5 min.
starting test:
Test Start Time:
Initial Reading {R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (~-R1):
Pass/Fail Threshold or
Criteria: -Test Result: X Pass 0 Fail X Pass OFail XO Pass 0 Fail 0 Pass OFail -
Comments-(include in(onnation on repairs made prior to testing, and recommended.follow-up.for.failed tests)
V aoor Buckets Only.
HPGOGO
330\ IIIBLE
BACKERSFIELD
10/28/2013 11:08 Al1
SUNP LEAK TEST REPORT
871STP
TEST STARTED 10:53 AM
TEST S~PRTED 10/28/2013
BFG ftl LEVEL 5, a 172 W
E:;!l liME 11:08 AH
END DATE 10/28/2013 n:o lEVEL 5. 11129 It/
LEAK THRESHOLD 0.002 IN
TEST RESU~T FAilED
872STP
TEST STARTED 10:53 AM
lEST STARTED 10/28/2013
BEGIH LEVEL a. 11656 W
END mE ll :08 Al1
EMJ DATE 10/28/2013
Etl:l LE'JEL II, 115116 It;
LEAK lHRESt10LO 0.002 IN
TEST RESULT PASSEC
91STP
TEST STARTED 10:53 AM
TEST STARTED 10/28/2013
Bf.Gitl LEVEL 3, 7733 W
El.D TIME 11:08 AH
EIIO DATE 10/28/2013
WO LEVEL 3, 7729 HJ
LEAK THRESHOLD 0,002 IN
TEST RESULT PASS:O
HPGUGO
3301 I/16LE
BACKERSfiELO
10/28/2013 11:26 Al1
SUXP LEAK TEST REPORT
871STP
TEST STARTED 11:10 ~~
TEST STARTED 10/28/2013
BEG IN LEVEL 5. a 127 IU
EtlO TIM£ 11:26 AM
EIIO OATE 10/28/2013
EtlO LEVEL 5. LI082 W
LEA'< THRESHOlD 0, 002 IN
TEST RESULT FAILED
872SlP
lEST STARTED 11:10 ~~
TEST STARTED 10/28/2013
Bf.GHI LEVEL Q, 0618 Ill
END TIME 11:26 At1
EUD DATE 10/28/2013
Et!O LEVEL Q,D611l IN
LEAK THRESHC1.D 0, 002 II~
TEST RESULT PASSED
91STP
TEST ST~~TED 11:10 ~~
TEST STARTED 10/28/2013
BEGIN LEVEL 3, 7730 ltl
END TIME 11:26 AM
EtiO DATE iC/28/2013
END LEVEL 3. 7728 IN
LEAK THRESHOLD 0, 002 ill
TEST RESULT PASSED
l-PG~GO
3301 IIIBLE
BACKERSFIELU
.~ ·10/2d/2013 12:26 PH
lsUNP l:AK TEST REPCRT
j
l UOC1-2
EST STARTED 12:11 PH
tEST STARTED 10/28/2013
!EGIN LEVEl 2. 1613 ltl
NO TIME 12:26 PH
NO DATE 10/28/2013
NO LEVEL 2. 11611 Irl
(EAI( TrRESHOLO 0. 002 Ill
TEST RESJLT fAILED
UOC3-4
TEST STARTED 12:11 PH
tEST STARTED 10/28/2013
BEGJtl LEVEL 3, 9055 Ill
!NO TIME 12:26 PH
tiD DATE 10/28/2013
NO LEVEL 3, 8767 Ill
LEAK ThRESHOLD 0. 002 1t1
TEST RESuLT fAILED
871FILL
1EST s-ARlED 12:11 P~
lEST STARTED 10/28/2013
EGHI LEVEL a. 5730 IN
NO TIME 12:26 PH
~tiD on 10/28/2013
~uo mEL a. 365t: 111
4EAK THRESHOLD 0.002 IN
TEST RESULT FAILED
:.
•tPGOGJ
3301 IIIBLE
BACKERSFIELO
0/28/2013 12:02 P'1
st;l'f LEAK -EST R£PffiT
UOC1-2
EST STARTED 12:27 PH
EST STAR-EO 10/28/2013
BEGJU LEVeL 2. 1111 w
~tlD TIME 12:112 PH
END DATE 10/28/2013
Et!O LEVEL 2, 0700 Ill
tEA\ ThRESHOLD 0, 002 ltl
TEST RES~~T FPI~EO
UOCH
tEST s-ARTEO '2:27 PM
tEs-s-ARTED 10/28/2013
~EGIN LEVEL 3. 8578 iN
HlD TIME 12:112 PM
lt/0 DATE 10/28/2013
&uD LEIJ[L 3. 8385 r ~~
lEAK T'IRESHJLO 0. 002 ltl
TEST RESUL-FAILED
871FILL
TES-s-~RTEO 12:27 •M res-s-ARTEo 10/28/2013
BEG HI LEVEL ll, 33110 IN
fNO TI HE 12: D2 PI~
EtlO CATE 10/28/2013
END .. EVEL a, 131Q ·•.
~EM< T~RESHOLO 0. 002 Hl
TEST RESULT FAILED
HPGOGO
3301 WIBLE
BACI<ERSF; ELO
10/28/2013 1:13PM
ISUi~p LEAK TEST REPORT
91FiLL
TEST STARTED 12:58 PM
TEST STAR1EO 10/23/2013
~GiN LEVEl 3. 5123 ltl
EtlO TII'IE 1: 13 Pf'l
lt;D DATE 10/28/2013
NO L~VEL 3,4515 IN
EAK ·~RESHOLO 0, 002 ill
fEST RESULT FAILED
872FILL
TEST STARTED 12:58 PM
~EST STARTED 10/28/2013
. EGIN LEVEL 2. 8977 Itl r) TIME 1:13PM
flO DATE 10/28/2013
,NO LEVEL 2.8968 IN
tEAK TIIRESHOLD 0. 002 IN EST RESULT PASSED
~
iiPGOGO
3301 WIBLE
BACKERSFIELD
10/28/2013 1:31 PH
1 SUHP LEAK TESi REPORT
I 91FILL
}EST STARTCO 1:16 PH
lEST STARTED 10/28/2013
BEG ltl LEVEL 3. C533 ltl
END TIME 1:31 P"'
END DATE 10/21!,'~013
END LEVEL ::!. 2929 Ill
LEAK THRESKt.J 0, 002 W
TEST RESULT FAILED
872FILL
TEST STARTED i: 16 PH
TEST STARTED 10/28/2013
BEG ltl LEVEL 2. 8953 w
Et.D TIME 1:31PM
END DATE 10/28/2013
END LEVEL 2. 8963 1tl
LE~K THRESHOLD 0, 002 I~
TEST RESLLT PASSED
iiJ/2~/2013
0
3301 li!Bl.E
BAC~ERSt:IELD
10/2d/2013 1:55 PH
SUMP LeAK 'ESl REPORl
t-fGGG
91VAP '
iEs-·~~kTED l:G r~
10/2"72013
872VAP
TEST STARTED
TEST s-ARTED
BEG ill LEVEL
Etil li"E
EIID DATE
EI~O LEVtl
LEAK ii:RES·c··
iEST ~ESI.ll
1:40 PH
10/26/2013
B. 1323 Jt,
1:~ FM
10/28/2013
6. 1326 IN
0.002 l'!
PASSED
.r'
TEST STARTED 1:40PM
-Es ST~RT£0 '0/2&/2013
BEGHI LEVEL 6, 869n HI
EIIO TIMe 1:55 P~
Ell~ .. ATE i0/28/2013
Erm LEVEL 6, 8689 Ill
LEAK TH.~ESHOl.C 0. 002 )r;
TEST RESU...T PASS£0
91VfiP
TEST STARTEu 1:ao PH
TEST STARTFC 10/28/2013
5EG 1:1 LEIJEL 7, 1!808 ltJ
END TIHE 1:55 PM
f';D DATE 10/2o/2013
El,J LE'JEL 7, ll82a l'l
LEAK THRESHOl.u 0. 002 It/
TEsr RESULT PASSED
HPGCG~
330' ''IBLE
BM tLD
10/28/2013
91VAP
~: 11 PM
i:~t, f·M
• ,/' ,/2(•13
' ,I':E Ef::il
1:56 ?11
10/28/2013
~E e•;:
872VAP
TEST STARTED 1:56 PH
ltST STARTED 10/28/2012
B£GW LEVEL 6. 1325 irl
E~D TIME 2:11 P~
Er.O DATE i0/28/2013
Et.O LEVEL 6. 1328 IU
LEAV ThREsuc:..o 0.002 ;u
TEST RESULT PASSED
871VAP
TEST STAqTED 1:56 FH
TEST STARTfO 10/2~/2013
BEGIN LEV'-6, .::6~ JrJ
Ell9 TINE 2: 11 P!1
EUD OATE i0/25/2013
EfiD LEVEL 6, 8583 IN
L(A!\ ; rl~ESHilLD 0, 002 W
TEST R£SUL T f'4SSEO
91VAP
TEST STARTED 1:56 PH
TEST STA~~EO 10/2'-/2013
fiEGHl LEVEL 7, 1!826 W
FNO TIME 2:11PM
El.ll !:ATE 10/2t/2013
EI.O LEvEl. 7. 1l~6 ltl
LEAK ThRESH" ') 1), 002 HI
TEST REStJLT F'ASStO