HomeMy WebLinkAboutSB989 2014SWRCB, January 2002 Page __ of __
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: #7785 Fastrip #32 I Date ofTesting: 3/18/2014
Facility Address: 370 I Ming A venue, Bakersfield, CA 93309
Facility Contact: Omero Garcia I Phone: ( 661 )3 93-7000
Date Local Agency Was Notified of Testing : 3/12/2014
Name of Local Agel)cy Inspector (if present during testing): Emie Medina
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services
Technician Conducting Test: Bryan A Self
Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester
License Type: CSLB I License N umber:804904 ICC# 8022804-UT TT#l l-1756
Manufacturer Training
Manufacturer Component(s) Date Training Expires
UST 10/2112015
Installaton/Retrofi t
UST Service ICC 1-28-2015
technician
Star. Smith. Fibercast Fiber Glass Systems N.A.
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
87 Product Secondary X 0 0 0 UDC 3-4 X 0 0 0
91 Product Secondary X 0 0 0 UDC 5-6 X 0 0 0
Diesel Product Secondary X 0 0 0 UDC 7-8 X 0 0 0
87 Vent Secondary X 0 0 0 Vent Box X 0 0 0
91 Vent Secondary X 0 0 0 87 Fill Sump X 0 0 0
Diesel Vent Secondary X 0 0 0 91 Fill Sump X 0 0 0
Vapor Return Secondary X 0 0 0 Diesel Fill Sump X 0 0 0
Abandon Secondary X 0 0 0 87 Fill Spill Bucket X 0 0 0
87 STP Sump X 0 0 0 87 Vapor Spill Bucket X 0 0 0
91 STP Sump X 0 0 0 91 Fill Spill Bucket X 0 0 0
Diesel STP Sump X 0 0 0 91 Vapor Spill Bucket X 0 0 0
UDC 1-2 X 0 0 0 Diesel Fill Spill Bucket X 0 0 0
lfhydrostatic testing was performed, describe what was done with the water after completion of tests:
Water was put back into test trailer and waste drum
CERTIFICATION OF TECHNICIAN RESPONSJ E FOR CONDUCTING THIS TESTING
To the best of my know/ell tefacts stated in this d ~~ accurate and in full compliance with legal requirements
Technician's Signature: Date: 03/1 8/2014
SWRCB, January 2002 Page __ of __
4 TANK ANNULAR TESTING
Test Method Developed By: D Tank Manufacturer x Industry Standard D Professional Engineer
D Other (Specify)
Test Method Used: D Pressure x Vacuum D Hydrostatic
D Other (Specify)
Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625"
Tank # 87 Tank # 91 Tank # Diesel Tank#
Is Tank Exempt From Testing?1 X Yes D No X Yes D No X Yes D No D Yes D No
Tank Capacity:
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or Criteria:
Test Result: 0 Pass 0 Fail D Pass 0 Fail 0 Pass O Fail 0 Pass D Fail
Was sensor removed for testing? 0 Yes O No D NA D Yes O No D NA 0 Yes O No D NA D Yes O No DNA
Was sensor properly replaced and D Yes O No D NA D Yes D No D NA D Yes D No D NA 0 Yes D No DNA verified functional after testing?
Comments -(include information on repairs made prior to testing, and recommended.follow-up.forfailed test~)
1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6)}
SWRCB, January 2002 Page _ of __
5.SECONDARY PIPE TESTING
Test Method Developed By: 0 Piping Manufacturer x Industry Standard 0 Professional Engineer
0 Other (Specify)
Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic
[]Other (Specify)
Test Equipment Used: Calibrated Gages I Equipment Resolution:0.0625"
Piping Run #87 Piping Run # 87 Vent Piping Run #Vapor Piping Run # 91 Vent Return
Piping Material: FRP FRP FRP FRP
Piping Manufacturer: Smith Smith Smith Smith
Piping Diameter: 3.00" 3.00" 4.00" 3.00"
Length of Piping Run: 200' 200' 200' 200'
Product Stored: Regular Regular Vapor Return Super
Method and location of Test Boot Test Boot Test Boot Test Boot piping-run isolation:
Wait time between applying
pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min
starting test:
Test Start Time: 10:45 AM 10:45 AM 10:45 AM 10:45 AM
Initial Reading (R1): 5.00"PSI 5.00"PSI 5.00"PSI 5.00"PSI
Test End Time: I 1:45AM I 1:45AM 11:45 AM I 1:45AM
Final Reading (RF): 5.00"PSI 5.00"PSI 5.00"PSI 5.00"PSI
Test Duration: I Hour I Hour I Hour I Hour
Change in Reading (RF-RI): 0.00" 0.00" 0.00" 0.00"
Pass/Fail Threshold or 0.00" 0.00" 0.00" 0.00" Criteria:
Test Result: X Pass O Fail X Pass 0 Fail X Pass O Fail X Pass 0 Fail
Comments-(include information on repairs made prior to testing. and recommendedfollow-up[orfailed tests)
SWRCB, January 2002 Page __ of __
5 SECONDARY PIPE TESTING
Test Method Developed By: J Piping Manufacturer x Industry Standard w Professional Engineer
0 Other (Specify)
Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic
0 Other (Specify)
Test Equipment Used: Calibrated Gages I Equipment Resolution:0.0625"
Piping Run #91 Piping Run # Diesel Piping Run # Diesel Vent Piping Run #
Abandon
Piping Material: FRP FRP FRP FRP
Piping Manufacturer: Smith Smith Smith Smith
Piping Diameter: 3.00" 3.00" 4.00" 3.00"
Length of Piping Run: 200' 200' 200' 200'
Product Stored: Super Diesel Diesel NA
Method and location of Test Boot Test Boot Test Boot Test Boot piping-nm isolation:
Wait time between applying
pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min
starting test:
Test Start Time: 10:45 AM 10:45 AM 10:45 AM 10:45 AM
Initial Reading (R1): 5.00"PSI 5.00"PSI 5.00"PSI 5.00"PSI
Test End Time: I 1:45AM 11:45 AM 11:45 AM 11:45 AM
Final Reading (RF): 5.00"PSI 5.00"PSI 5.00"PSI 5.00"PSI
Test Duration: I Hour I !lour I !lour I Hour
Change in Reading (RF-R1): 0.00" 0.00" 0.00" 0.00"
Pass/Fail Threshold or 0.00" 0.00" 0.00" 0.00" Criteria:
Test Result: X Pass O Fail X Pass 0 Fail X Pass O Fail X Pass OFail
Comments -(include information on repairs made prior to testing. and recommended.follow-upfor failed tests)
SWRCB, January 2002 Page __ of __
6.PIPING SUMP TESTING
Test Method Developed By: 0 Sump Manufacturer x Industry Standard 0 Professional Engineer
0 Other (SpecifY)
Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic
0 Other (SpecifY)
Test Equipment Used: Ts-sts Equipment Resolution:
Sump# 87 Sump# 91 Sump# Diesel Sump#
Sump Diameter: 36.00" 36.00" 36.00"
Sump Depth: 67.00" 67.00" 66.00"
Sump Material: FRP FRP FRP
Height from Tank Top to Top of 32.00" 30.00" 34.00" Highest Piping Penetration:
Height from Tank Top to Lowest 22.00" 20.00" 24.00" Electrical Penetration:
Condition of sump prior to testing: Clean & Dry Clean & Dry Clean & Dry
Portion of Sump Tested1 Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
sump sensor detects liquid (both
product and water)?•
D Yes O No XNA D Yes DNoXNA D Yes O NoXNA D Yes D No DNA
Turbine shutdown response time NA NA NA
Is system programmed for fail-safe
shutdown?· DYes DNo XNA D Yes D NoXNA D Yes D NoX NA D Yes D No D NA
Was fail-safe verified to be DYes DNo XNA D Yes D NoXNA D Yes D NoXNA D Yes DNo D NA operational?•
Wait time between applying
pressure/vacuum/water and starting 5 Min 5 Min 5 Min
test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (Rr-):
Test Duration:
Change in Reading (RF-RJ):
Pass/Fail Threshold or Criteria:
Test Result: X Pass D Fail X Pass D Fail X Pass D Fail 0 Pass D Fail
Was sensor removed for testing? D Yes D No XNA D Yes D No XNA D Yes O No XNA D Yes D No DNA
Was sensor properly replaced and D Yes D No XNA D Yes DNo XNA D Yes D No XNA D Yes D No D NA verified functional after testing?
Comments -(include information on repairs made prior to testing, and recommendedfo/low-up for failed tests)
1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to ill!Y of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page __ of __
7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: D UDC Manufacturer x Industry Standard D Professional Engineer
D Other (Specify)
Test Method Used: D Pressure D Vacuum x Hydrostatic
D Other (Spec[ty)
Test Equipment Used: Ts-sts Equipment Resolution:
UDC # 1-2 UDC # 3-4 UDC# 5-6 UDC # 7-8
UDC Manufacturer: Western Western Western Western
UDC Material: FRP FRP FRP FRP
UDC Depth: 31.00" 31.00" 31.00" 31.00"
Height from UDC Bottom to Top 9.50" 9.50" 9.50" 9.50"
of Highest Piping Penetration:
Height from UDC Bottom to 3.00" 3.00" 3.00" 3.00"
Lowest Electrical Penetration:
Condition of UDC prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry
testing:
Portion of UDC Tested Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?•
D Yes D No XNA DYes D NoXNA D Yes DNo XNA DYes DNo XNA
Turbine shutdown response time NA NA NA NA
Is system programmed for fail-
safe shutdown?· D Yes D No XNA D Yes D NoXNA D Yes DNo XNA DYes DNo XNA
Was fail-safe verified to be D Yes D No XNA D Yes D NoXNA D Yes DNo XNA DYes DNo XNA operational?•
Wait time between applying 5 Min 5 Min 5 Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass D Fail X Pass D Fail X Pass D Fail X Pass D Fail
Was sensor removed for testing? DYes D No XNA DYes D No XNA D Yes D No XNA D Yes D No XNA
Was sensor properly replaced and D Yes DNo XNA DYes D No verified functional after testing? XNA D Yes D No XNA D Yes D No XNA
Comments -(include information on repairs made prior to testing, and recommended follow-up for failed tests)
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to @Y of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page of
7 .UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: U UDC Manufacturer x Industry Standard ...... Professional Engineer
0 Other (Specify)
Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic
0 Other (SpecifY)
Test Equipment Used: Ts-sts Equipment Resolution:
UDC #Vent Box UDC# UDC# UDC#
UDC Manufacturer: Western
UDC Material: FRP
UDC Depth: 38.00"
Height from UDC Bottom to Top 15.00"
of Highest Piping Penetration:
Height from UDC Bottom to 18.00"
Lowest Electrical Penetration:
Condition of UDC pri?r to Clean & Dry
testing:
Portion ofUDC Tested Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?•
D Yes C No XNA Yes No D NA DYes No t..J NA D Yes No NA
Turbine shutdown response time NA
Is system programmed for fail-
safe shutdown?· D Yes DNo XNA 0 Yes ONo ONA DYes J No ONA D Yes ONo ONA
Was fail-safe verified to be D Yes DNo XNA DYes ONo DNA DYes D No ONA D Yes ONo ONA operational?•
Wait time between applying 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-Rr):
Pass/Fail Threshold or Criteria:
Test Result: X Pass DFail D Pass DFail D Pass D Fail D Pass D Fail
Was sensor removed for testing? J Yes O No XNA J Yes DNo D NA 0 Yes ONo DNA D Yes ONo DNA
Was sensor properly replaced and DYes ;J No XNA Yes ['No D NA ~Yes DNo DNA O Yes O No NA verified functional after testing?
Comments-(include information on repairs made prior to testing, and recommended[ollow-up[or f ailed tests)
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to illlY of the questions indicated with an
asteri sk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page __ of __
FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps u
Fill Riser Containment Sumps are Present, but were Not Tested 0
Test Method Developed By: 0 Sump Manufacturer [] Industry Standard 0 Professional Engineer
0 Other (Specify)
Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic
0 Other (Specify)
Test Equipment Used: Equipment Resolution:
Fill Sump # 87 Fill Sump # 91 Fill Sump # Diesel Fill Sump #
Sump Diameter: 36.00" 36.00" 36.00"
Sump Depth: 60.00" 62.00" 65.00"
Height fi·om Tank Top to Top of NA NA NA
Highest Piping Penetration:
Height from Tank Top to Lowest 18.00" 18.00" 14.00"
Electrical Penetration:
Condition of sump prior to Clean & Dry Clean & Dry Clean & Dry
testing:
Portion of Sump Tested Collar Collar Collar
Sump Material: FRP FRP FRP
Wait time between applying 5 Min. 5 Min. 5 Min.
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass O Fail X Pass 0 Fail X Pass 0 Fail 0 Pass 0 Fail
Is there a sensor in the sump? X Yes ONo X Yes O No X Yes 0 No D Yes lJ No
Does the sensor alarm when
either product or water is D Yes ONo X NA 0 Yes ONo XNA 0 Yes O No XNA D Yes O No DNA
detected?
Was sensor removed for testing? D Yes ONo XNA DYes ONo XNA 0 Yes ONo XNA 0 Yes ONo DNA
Was sensor properly replaced and r Yes J No XNA 0 Yes ;::;No XNA 0 Yes ONo XNA 0 Yes ..... No l NA verified functional after testing?
Comments-(include information on repairs made prior to testing, and recommendedfollow-up[or failed tests)
SWRCB, January 2002 Page __ of __
9.SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With SpiiVOverfill Containment Boxes 0
Spill/Overfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer
0 Other (SpecifY)
Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic
0 Other (SpecifY)
Test Equipment Used: Ts-sts I Equipment Resolution:
Spill Box # 87 Fill Spill Box# 87 Vapor Spill Box# 91 Fill Spill Box# 91 Vapor
Bucket Diameter: 12.00" 12.00" 12.00" 12.00"
Bucket Depth: 12.00" 12.00" 12.00" 12.00"
Wait time between applying
pressure/vacuum/water and 5 Min. 5 Min. 5 Min. 5 Min.
starting test
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-Rt):
Pass/Fail Threshold or
Criteria:
Test Result: X Pass 0 Fail X Pass 0 Fail X Pass D Fail X Pass 0 Fail
Comments-(include information on repairs made prior to testing, and recommendedfollow-up.for failed tests)
SWRCB, January 2002 Page __ of __
9. SPILUOVERFILL CONTAINMENT BOXES
Facility is Not Equipped With SpiiVOverfill Containment Boxes 'l
Spill/Overfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer
0 Other (Specijj~
Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic
0 Other (Specify)
Test Equipment Used: Ts-sts J Equipment Resolution:
Spill Box# Diesel Fill Spill Box# Diesel Vapor Spill Box# Spill Box#
Bucket Diameter: 12.00" 12.00"
Bucket Depth: 12.00" 12.00"
Wait time between applying
pressure/vacuum/water and 5 Min. 5 Min.
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or
Criteria:
Test Result: X Pass 0 Fail 0 Pass X Fail 0 Pass 0 Fail D Pass 0 Fail
Comments-{include information on repairs made prior to testing, and recommendedfollow-up[or f ailed tests)
7785 FASTRIP
3701 HIIIG AVE
BAXERSFIElD CA 93309
D3/18/2014 2:31 PH
Sill\? LEAK TEST REPII!T
'87 STP
TEST STARTED 2:15 PH
TEST STARTED 03/18/2014
BEGIII LEVEL 5,2225 111
aiJ Till£ 2:30 Ptt
Elll DATE 03/18/2014
EllllEVR 5.2226 111
LEAK THRESHOLD 0.002 111
TEST REStU PASSED
OS STP
TEST ST ARTEO 2:15 PH
TEST STARTED 03/18/2014
BEG Ill lEVEl 5.8821 Ill
00 Till£ 2:30 PH
Elll DATE 03/18/2014
Ell! lEVEL 5,8824 Ill
lEAK TlmESH!lO 0.002 111
TEST REstl.T PASSED
7785 FP.STRIP
3701 HIIIG AVE
BA.'<ERSFIEtD CA 93309
D3/18/2014 2:47 PH
SIJ'.P LEAK TEST REPORT
87 STP
TEST STARTED 2:31 PH
TEST STARTED D3/18/2014
BEG Ill lEVEL 5.2227 Ill
EllO TitlE 2:47 PH
EllO DATE 03/18/2014
ElK> LEVEl 5,2228 111
LEAK TlmESHOLO 0.002 111
TEST REStlT PASSED
OS STP
TEST STARTED 2:31 Ptt
TEST STARTED 03/18/2014
BEG Ill lEVEl 5,8826 Ill
E1ll TitlE 2:47 Ptt
E1ll DATE 03/18/2014
ElllLEVEL s. 8824 Ill
LEAK TlllESH(lD 0, 002 Ill
TEST REStU PASSED
7785 FASTRIP
3701 Hlll!i AVE
BAKERSFIELD CA 93309
03/18/2014 1:19 Ptt
SU'P LEAK TEST Rtro.llT
TEST STARTED 1:04 P/1
TEST STAATED 03/18/2014
BEG Ill LEVEL -s:-0234 Ill--
E1ll TillE 1:19 PH
E1ll DATE 03/18/2014
E110 LEVEL 6. 0241 It/
LEAK TlfiESHOLD 0, 002 Ill
TEST RESUI. T PASSED
7785 FASTRIP
3701 Hlll!i AVE
BAKERSFiao CA 93309
03/18/2014 1:117 PH
SUif' I.EAX TEST REPORT
91Sff.~
TEST STARTED 1:32 PH
TEST STARTED 03/18/2014 '·.·
BEG Ill lEVEl 6. 0243 Ill
EJID TltE 1:117 PH
E1/0 DATE 03/18/2014
EIIO LEVEL 6.0226 Ill
LEAK THRESHOLD 0. 002 Ill
TEST RESULT PASSED
7785 FASTRIP
3701 HlfiG AVE
BAXERSFiaO CA 93309
03/18/2014 9:59 All
SUI1P LEAK TEST REPmT
OS FILl
TEST STARTED 9:110 All
TEST STARTED 03/18/2010
BEG Ill lEVEL 1, 0760 Ill
EID TillE 9:59 All
El«l DATE 03/18/2014
El«l LEVa I. 0766 Ill
lEAK THRESHOLD 0. 002 Ill
TEST RESULT PASSED
91 Fill
TEST STARTED 9:Q4 Al1
TEST STARTED 03/18/2010
BEG !II LEVa 0. 5803 Ill
BID TIHE 9:59 All
EIID DATE 03/18/2014
EIID LEVEl 0,5815 Ill
LfAK TllRESOOLO 0. 002 Ill
TEST RESIA. T PASSED
87 FILL
TEST STARTED 9:40 All
TEST STARTED 03/18/2010
BEli Ill LEVEl 2. 7581 Ill
EJD TIHE 9:59 Al1
Elll DATE 03/18/2014
EIJO LEVEL 2. 7580 Ill
LEAK TllRESI!ll.D 0, 002 Ill
TEST RESIA. T PASSED
OS FSB .i,,~.;~:.
TEST S~TED 9:1l4 All
TESrSTrolTEIT·'03/16!@14--
BElilll LEVa 7, 3267 Ill
EJD TillE 9:59 Al1
Elll DATE 03/18/2014
BID LEVa 7, 3269 Ill
LEAK TmESH!lO 0, 002 Ill
TEST REStl T PASS£0
TI85 FASTRIP
3701 HII.G AVE
BAKERSF!aD CA 93309
03/16/2010 to: 18 All
SUtl? LEAK TEST REPMT
OS FILl
TEST STARTED 10:02 All
TEST STARTED 03/18/2010
BEG Ill lEVEl 1, 0763 Ill
EID TIHE 10:18 All
Elll DATE 03/18/2010
EID LEVB. 1, 0764 HI
LEAK TllRESHOI.O 0, 002 Ill
TEST RES!JtT PASSED
91 Fill
TEST STARTED 10:02 Al1
TEST STARTED 03/18/2014
BEGIII LEVB. 0,5810 Ill
EID TIHE 10:18 Al1
EID DATE 03/18/2014
EJD LEVa 0. 5813 Ill
lEAK mlESI!DLO 0, 002 Ill
TEST RESULT PASSED
87 FILL
TEST STARTED 10:02 All
TEST STARTED 03/18/2014
BEli Ill LEVEL 2, 7579 Ill
EJID Til£ 10:18 All
EIID DATE 03/16/2010 em LEVEL 2. 7582 111
lEAK Tlf{ESIIJLO 0, 002 Ill
TEST RESULT PASSED
OSFS8
TEST STARTED 10:02 Al1
TEST STARTED 03/18/2014
BElilll LEVEL 7, 3265 Ill
EID TillE 10:18 All
EID DATE 03/18/2014
EllO lEVEL 7. 3259 Ill
LEAK THRESHOLD O. 002 Ill
TEST REStU PASSED
l
7785 FASTRIP
3701 Hll«i AVE
BAKERSFIELD CA 93309
03/18/2014 3:50 PH
SW1P LEAK lEST REPORT
IIJC 1-2
TEST STARTED 3:35 PH
TEST STARTED 03/18/20111
BEGIIILEVEL 1!,2890 Ill
Elll TillE 3:50 PH
Elll DATE 03/18/20111
Elll LEVEL ll, 2891 Ill
LEAK THRESHOlD 0, 002 Ill
TEST RESll T PASSED
lJDC 3-4
TEST STARTED 3:35 PH
TEST STARTED 03/18/2014
BEG! II LEVEL 3, 6208 Ill
Elll TitlE 3:50 PH
E!ll DATE 03/18/2014
Elll LEVEL 3, 6204 Ill
LEAK T~ESIIctD 0, 002 Ill
TEST RESU!. T PASSED
TEST STARTED 3:35 PH
TEST STARTED 03/18/201/1
BEG Ill LEVEL 5, 8366 Ill
E!O TillE 3:50 PH
Elll DATE 03/18/20111
EID LEVEL 5, 8363 Ill
LEAK THRESI«<LO 0, 002 Ill
TEST RESll. T PASSED
IDC 1-8
TEST STARTED 3:35 PH
TEST STARTED 03/18/2014
BEGIIILEVa II, 3546 Ill
Elll TillE 3:50 PH
Elll DATE 03/18/2014
EJIO LEVEL /1, 3543 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
7185 FASTRIP
3701 Hll«i AVE
BAKERSFIELD CA 93309
03/18/2014 11:09 PH
SUIIP LEAK TEST REPORT
UDC 1-2
TEST STARTED 3:511 PH
TEST STARTED 03/18/2014
BEG Ill LEVEL ll, 2892 Ill
Elll TilE 1!:09 PH
Elll DATE 03/18/2014
Elll LEVEL II, 2904 Ill
LEA'< TllRESi!OLO 0. 002 Ill
TEST RESllT PASSED
uoc 3-4
TEST START ED 3:511 PH
TEST STARTED 03/18/20111
BEGIIILEVEL 3. 6191 Ill
E/0 TI11E 1!:09 PH
EID DATE 03/18/2014
EllO LEVEL 3, 6200 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
UOCH
TEST STARTED 3:54 PH
TEST STARTED 03/18/2014
BEG Ill LEVEL 5, 8358 Ill
Elll TI/1E 4:09 PH
Elll DATE 03/18/2014
Elll LEVEL 5, 8356 Ill
LEAK T~ESHOLD 0, 002 Ill
TEST RESULT PASSED
IIJC 7-8
TEST STARTED 3:50 PH
TEST STARTED 03/18/2014
BEG Ill LEVEL 4, 3539 ltl
EllO TitlE 11:09 PH
E/10 DATE 03/18/20111
Elll LEVEL tl, 3538 Ill
LEAK THRESHOLD O, 002 Ill
TEST RESULT PASSED
7785 FASTR IF'
370111111G AVE
BAKERSFIELD CA 93309
.--....
03/18/20111 4:28 PH
SlJ1P LEAK TEST REPORT
VT BOX
TEST STARTED t1:12 PH
TEST STARTED 03/18/2014
BEG Ill LEVEL 2. 8088 Ill
E/10 TillE 1!:28 P/1
E/10 DATE 03/18/2014
E/10 LEVEL 2. 8089 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESll.T PASSED
7785 FASTRIP
3701 HIIIG AVE
BAKERSFJaD CA 93309
03/18/2014 4:48 PH
sun> LEAK 1 EST REPORT
Vi BOX
TEST STARTED 4:33 PH
TEST STARTED 03/.18/2014
BEG Ill LEVEL 2. 8086 Ill
Elll TitlE 4:48 PH
EIIO DATE 03/18/2014
EID LEVa 2. 8085 Ill
LEAK THRESI!llO 0, 002 Ill
TEST RESULT PASSED
7785 FASTRIP
3701 HHlG AVE
BAKERSFIElD CA 93309
03/18/2014 10:18 Al1
SUMP LEAK TEST REPORT
81 FSB
TEST STARTED 10:03 All
TEST STARTED 03/18/2014
BEGIII lEV8. 5, ?!134 Ill
EJKJ TillE 10: 18 All
EJlO DATE 03/18/2014
EIID lEVa 5, 7932 Ill
LEAK TltllESHOLD 0, 002 Ill
TEST RESUlT PASSED
87 VSB
TEST STARTED 10:03 All
TEST STAqTED 03/18/2014
BEGIIILEVB. 7, 5220 Ill
EJIO TillE 10:18 N1
EJIO DATE 03/18/2014
EllO lEVEl 7, 5209 HI
LEAK TltllESHOLD 0, 002 Ill
TEST RESI.l T PASSED
1785.FASTRIP
3701 HHIG AVE
BAKERSFIElD CA 93309
03/18/2014 10:35 Al1
SUI1.0 lEAK TEST REPII!T
87 FSB
TEST STARTED 10:19 All
TEST STARTED 03/18/2014
BEG Ill lEVB. 5, 7934 Ill
Elll TlHE 10:35 All
EJil DATE 03/18/2014
E!Kl LEVEL 5, 7935 Ill
lEAK TlllESilOtD 0. 002 Ill
TEST RESULT PASSED
87 VSB
TEST STARTED 10:19 All
TEST STARTED 03/18/2014
BEGJIILEVB. 7, 5209 Ill
EJIO Tl~ 10:35 Ali em DATE 03/18/2014
am lEVB. 1. 5204 111
LEAA Tlf!ESHOI.Il 0, 002 Ill
TEST RESULT PASSED
7785 FASTRIP
3701 HlllG AVE
BAKERSFIElD CA 93309
03/18/2014 1:26 PH
SUI1P lEAK' TEST REPMT
91FS8
TEST STARTED 1:11 PH
TEST STARTED 03/18/2014
llEGIIILEVB. 5, 3988 Ill
Ellll Tli\E 1:26 PH
em DATE 03/18/2014
EllD LEVa 5. 3988 Ill
LEAK TltllESHCl.D 0.002 111
TEST RESI.lT PASSED
91 VSB
TEST STARTED 1 :11 Pt1
TEST STARTED 03/18/2014
BEGIIIlEVa 7,3301 Ill
E!ID TillE 1:26 PH
EllO DATE 03/18/2014
EllD LEVEl 7,3298 Ill
LEAK TltllESHilO 0, 002 Ill
TEST RESI.lT PASSED
DSVSB
TEST STARTED 1: 11 PH
TEST STARTED 03/18/2014
BEG Ill lEVEl 5, 9328 Ill
E!IO Tl~ 1:26 PH
E!ID DATE 03/18/2014
E!IO LEVEL 5, 9021 Ill
LEAK THRESIIOLO 0, 002 Ill
TEST RESULT FAILED
<I ?185 FASTRIP
3701.1t111G AVE I
BA.~ERSF I ElD Cfl 93J99
--· -t• , ~· o3t1et201~··,:osw-:?""---• 1 t .. I. • J
SUH? lEAK TEST REPII!T
91 FSB
TEST STARTED 12:54 Pll
TEST STARTED 03/18/2014
BEG Ill lEVEl 5, 3987 Ill
EJIO TIHE 1:09 PH
EJIO DATE 03/18/2014 am LEVEL 5. 3992 111
LEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
91 VSB
TEST STARTED 12:54 PH
TEST STARTED 03/18/2014
BEGIIIlEVa 7,3300 Ill
BID TillE 1:09 PH
EJIO DATE 03/18/2010
EJIO LEVEL 7, 3299 Ill
LEAK THRESHOI.O 0, 002 Ill
TEST RESll. T PASSED
Dsvsa
TEST STAATED 12:54 PH
TESHtAAlt:O -{)3li8t2014 ·--
BEG Ill lEVEl 5, 9789 Ill
E!IO TillE 1:09 P/1
EllD DATE 03/18/2010
EllD LEVEL 5, 9442 Ill
LEA.X THRESHOLD 0, 002 Ill
TEST RESlA.T FAILED
·~