Loading...
HomeMy WebLinkAboutSB989 2014SWRCB, January 2002 Page __ of __ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: #7785 Fastrip #32 I Date ofTesting: 3/18/2014 Facility Address: 370 I Ming A venue, Bakersfield, CA 93309 Facility Contact: Omero Garcia I Phone: ( 661 )3 93-7000 Date Local Agency Was Notified of Testing : 3/12/2014 Name of Local Agel)cy Inspector (if present during testing): Emie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Technician Conducting Test: Bryan A Self Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester License Type: CSLB I License N umber:804904 ICC# 8022804-UT TT#l l-1756 Manufacturer Training Manufacturer Component(s) Date Training Expires UST 10/2112015 Installaton/Retrofi t UST Service ICC 1-28-2015 technician Star. Smith. Fibercast Fiber Glass Systems N.A. 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made 87 Product Secondary X 0 0 0 UDC 3-4 X 0 0 0 91 Product Secondary X 0 0 0 UDC 5-6 X 0 0 0 Diesel Product Secondary X 0 0 0 UDC 7-8 X 0 0 0 87 Vent Secondary X 0 0 0 Vent Box X 0 0 0 91 Vent Secondary X 0 0 0 87 Fill Sump X 0 0 0 Diesel Vent Secondary X 0 0 0 91 Fill Sump X 0 0 0 Vapor Return Secondary X 0 0 0 Diesel Fill Sump X 0 0 0 Abandon Secondary X 0 0 0 87 Fill Spill Bucket X 0 0 0 87 STP Sump X 0 0 0 87 Vapor Spill Bucket X 0 0 0 91 STP Sump X 0 0 0 91 Fill Spill Bucket X 0 0 0 Diesel STP Sump X 0 0 0 91 Vapor Spill Bucket X 0 0 0 UDC 1-2 X 0 0 0 Diesel Fill Spill Bucket X 0 0 0 lfhydrostatic testing was performed, describe what was done with the water after completion of tests: Water was put back into test trailer and waste drum CERTIFICATION OF TECHNICIAN RESPONSJ E FOR CONDUCTING THIS TESTING To the best of my know/ell tefacts stated in this d ~~ accurate and in full compliance with legal requirements Technician's Signature: Date: 03/1 8/2014 SWRCB, January 2002 Page __ of __ 4 TANK ANNULAR TESTING Test Method Developed By: D Tank Manufacturer x Industry Standard D Professional Engineer D Other (Specify) Test Method Used: D Pressure x Vacuum D Hydrostatic D Other (Specify) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Tank # 87 Tank # 91 Tank # Diesel Tank# Is Tank Exempt From Testing?1 X Yes D No X Yes D No X Yes D No D Yes D No Tank Capacity: Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: 0 Pass 0 Fail D Pass 0 Fail 0 Pass O Fail 0 Pass D Fail Was sensor removed for testing? 0 Yes O No D NA D Yes O No D NA 0 Yes O No D NA D Yes O No DNA Was sensor properly replaced and D Yes O No D NA D Yes D No D NA D Yes D No D NA 0 Yes D No DNA verified functional after testing? Comments -(include information on repairs made prior to testing, and recommended.follow-up.forfailed test~) 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)} SWRCB, January 2002 Page _ of __ 5.SECONDARY PIPE TESTING Test Method Developed By: 0 Piping Manufacturer x Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic []Other (Specify) Test Equipment Used: Calibrated Gages I Equipment Resolution:0.0625" Piping Run #87 Piping Run # 87 Vent Piping Run #Vapor Piping Run # 91 Vent Return Piping Material: FRP FRP FRP FRP Piping Manufacturer: Smith Smith Smith Smith Piping Diameter: 3.00" 3.00" 4.00" 3.00" Length of Piping Run: 200' 200' 200' 200' Product Stored: Regular Regular Vapor Return Super Method and location of Test Boot Test Boot Test Boot Test Boot piping-run isolation: Wait time between applying pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min starting test: Test Start Time: 10:45 AM 10:45 AM 10:45 AM 10:45 AM Initial Reading (R1): 5.00"PSI 5.00"PSI 5.00"PSI 5.00"PSI Test End Time: I 1:45AM I 1:45AM 11:45 AM I 1:45AM Final Reading (RF): 5.00"PSI 5.00"PSI 5.00"PSI 5.00"PSI Test Duration: I Hour I Hour I Hour I Hour Change in Reading (RF-RI): 0.00" 0.00" 0.00" 0.00" Pass/Fail Threshold or 0.00" 0.00" 0.00" 0.00" Criteria: Test Result: X Pass O Fail X Pass 0 Fail X Pass O Fail X Pass 0 Fail Comments-(include information on repairs made prior to testing. and recommendedfollow-up[orfailed tests) SWRCB, January 2002 Page __ of __ 5 SECONDARY PIPE TESTING Test Method Developed By: J Piping Manufacturer x Industry Standard w Professional Engineer 0 Other (Specify) Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic 0 Other (Specify) Test Equipment Used: Calibrated Gages I Equipment Resolution:0.0625" Piping Run #91 Piping Run # Diesel Piping Run # Diesel Vent Piping Run # Abandon Piping Material: FRP FRP FRP FRP Piping Manufacturer: Smith Smith Smith Smith Piping Diameter: 3.00" 3.00" 4.00" 3.00" Length of Piping Run: 200' 200' 200' 200' Product Stored: Super Diesel Diesel NA Method and location of Test Boot Test Boot Test Boot Test Boot piping-nm isolation: Wait time between applying pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min starting test: Test Start Time: 10:45 AM 10:45 AM 10:45 AM 10:45 AM Initial Reading (R1): 5.00"PSI 5.00"PSI 5.00"PSI 5.00"PSI Test End Time: I 1:45AM 11:45 AM 11:45 AM 11:45 AM Final Reading (RF): 5.00"PSI 5.00"PSI 5.00"PSI 5.00"PSI Test Duration: I Hour I !lour I !lour I Hour Change in Reading (RF-R1): 0.00" 0.00" 0.00" 0.00" Pass/Fail Threshold or 0.00" 0.00" 0.00" 0.00" Criteria: Test Result: X Pass O Fail X Pass 0 Fail X Pass O Fail X Pass OFail Comments -(include information on repairs made prior to testing. and recommended.follow-upfor failed tests) SWRCB, January 2002 Page __ of __ 6.PIPING SUMP TESTING Test Method Developed By: 0 Sump Manufacturer x Industry Standard 0 Professional Engineer 0 Other (SpecifY) Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic 0 Other (SpecifY) Test Equipment Used: Ts-sts Equipment Resolution: Sump# 87 Sump# 91 Sump# Diesel Sump# Sump Diameter: 36.00" 36.00" 36.00" Sump Depth: 67.00" 67.00" 66.00" Sump Material: FRP FRP FRP Height from Tank Top to Top of 32.00" 30.00" 34.00" Highest Piping Penetration: Height from Tank Top to Lowest 22.00" 20.00" 24.00" Electrical Penetration: Condition of sump prior to testing: Clean & Dry Clean & Dry Clean & Dry Portion of Sump Tested1 Pipe Penetration Pipe Penetration Pipe Penetration Does turbine shut down when sump sensor detects liquid (both product and water)?• D Yes O No XNA D Yes DNoXNA D Yes O NoXNA D Yes D No DNA Turbine shutdown response time NA NA NA Is system programmed for fail-safe shutdown?· DYes DNo XNA D Yes D NoXNA D Yes D NoX NA D Yes D No D NA Was fail-safe verified to be DYes DNo XNA D Yes D NoXNA D Yes D NoXNA D Yes DNo D NA operational?• Wait time between applying pressure/vacuum/water and starting 5 Min 5 Min 5 Min test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (Rr-): Test Duration: Change in Reading (RF-RJ): Pass/Fail Threshold or Criteria: Test Result: X Pass D Fail X Pass D Fail X Pass D Fail 0 Pass D Fail Was sensor removed for testing? D Yes D No XNA D Yes D No XNA D Yes O No XNA D Yes D No DNA Was sensor properly replaced and D Yes D No XNA D Yes DNo XNA D Yes D No XNA D Yes D No D NA verified functional after testing? Comments -(include information on repairs made prior to testing, and recommendedfo/low-up for failed tests) 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to ill!Y of the questions indicated with an asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page __ of __ 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: D UDC Manufacturer x Industry Standard D Professional Engineer D Other (Specify) Test Method Used: D Pressure D Vacuum x Hydrostatic D Other (Spec[ty) Test Equipment Used: Ts-sts Equipment Resolution: UDC # 1-2 UDC # 3-4 UDC# 5-6 UDC # 7-8 UDC Manufacturer: Western Western Western Western UDC Material: FRP FRP FRP FRP UDC Depth: 31.00" 31.00" 31.00" 31.00" Height from UDC Bottom to Top 9.50" 9.50" 9.50" 9.50" of Highest Piping Penetration: Height from UDC Bottom to 3.00" 3.00" 3.00" 3.00" Lowest Electrical Penetration: Condition of UDC prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry testing: Portion of UDC Tested Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration Does turbine shut down when UDC sensor detects liquid (both product and water)?• D Yes D No XNA DYes D NoXNA D Yes DNo XNA DYes DNo XNA Turbine shutdown response time NA NA NA NA Is system programmed for fail- safe shutdown?· D Yes D No XNA D Yes D NoXNA D Yes DNo XNA DYes DNo XNA Was fail-safe verified to be D Yes D No XNA D Yes D NoXNA D Yes DNo XNA DYes DNo XNA operational?• Wait time between applying 5 Min 5 Min 5 Min 5 Min pressure/vacuum/water and starting test Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass D Fail X Pass D Fail X Pass D Fail X Pass D Fail Was sensor removed for testing? DYes D No XNA DYes D No XNA D Yes D No XNA D Yes D No XNA Was sensor properly replaced and D Yes DNo XNA DYes D No verified functional after testing? XNA D Yes D No XNA D Yes D No XNA Comments -(include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to @Y of the questions indicated with an asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page of 7 .UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: U UDC Manufacturer x Industry Standard ...... Professional Engineer 0 Other (Specify) Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic 0 Other (SpecifY) Test Equipment Used: Ts-sts Equipment Resolution: UDC #Vent Box UDC# UDC# UDC# UDC Manufacturer: Western UDC Material: FRP UDC Depth: 38.00" Height from UDC Bottom to Top 15.00" of Highest Piping Penetration: Height from UDC Bottom to 18.00" Lowest Electrical Penetration: Condition of UDC pri?r to Clean & Dry testing: Portion ofUDC Tested Pipe Penetration Does turbine shut down when UDC sensor detects liquid (both product and water)?• D Yes C No XNA Yes No D NA DYes No t..J NA D Yes No NA Turbine shutdown response time NA Is system programmed for fail- safe shutdown?· D Yes DNo XNA 0 Yes ONo ONA DYes J No ONA D Yes ONo ONA Was fail-safe verified to be D Yes DNo XNA DYes ONo DNA DYes D No ONA D Yes ONo ONA operational?• Wait time between applying 5 Min pressure/vacuum/water and starting test Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-Rr): Pass/Fail Threshold or Criteria: Test Result: X Pass DFail D Pass DFail D Pass D Fail D Pass D Fail Was sensor removed for testing? J Yes O No XNA J Yes DNo D NA 0 Yes ONo DNA D Yes ONo DNA Was sensor properly replaced and DYes ;J No XNA Yes ['No D NA ~Yes DNo DNA O Yes O No NA verified functional after testing? Comments-(include information on repairs made prior to testing, and recommended[ollow-up[or f ailed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to illlY of the questions indicated with an asteri sk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page __ of __ FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sumps u Fill Riser Containment Sumps are Present, but were Not Tested 0 Test Method Developed By: 0 Sump Manufacturer [] Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic 0 Other (Specify) Test Equipment Used: Equipment Resolution: Fill Sump # 87 Fill Sump # 91 Fill Sump # Diesel Fill Sump # Sump Diameter: 36.00" 36.00" 36.00" Sump Depth: 60.00" 62.00" 65.00" Height fi·om Tank Top to Top of NA NA NA Highest Piping Penetration: Height from Tank Top to Lowest 18.00" 18.00" 14.00" Electrical Penetration: Condition of sump prior to Clean & Dry Clean & Dry Clean & Dry testing: Portion of Sump Tested Collar Collar Collar Sump Material: FRP FRP FRP Wait time between applying 5 Min. 5 Min. 5 Min. pressure/vacuum/water and starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass O Fail X Pass 0 Fail X Pass 0 Fail 0 Pass 0 Fail Is there a sensor in the sump? X Yes ONo X Yes O No X Yes 0 No D Yes lJ No Does the sensor alarm when either product or water is D Yes ONo X NA 0 Yes ONo XNA 0 Yes O No XNA D Yes O No DNA detected? Was sensor removed for testing? D Yes ONo XNA DYes ONo XNA 0 Yes ONo XNA 0 Yes ONo DNA Was sensor properly replaced and r Yes J No XNA 0 Yes ;::;No XNA 0 Yes ONo XNA 0 Yes ..... No l NA verified functional after testing? Comments-(include information on repairs made prior to testing, and recommendedfollow-up[or failed tests) SWRCB, January 2002 Page __ of __ 9.SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With SpiiVOverfill Containment Boxes 0 Spill/Overfill Containment Boxes are Present, but were Not Tested 0 Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer 0 Other (SpecifY) Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic 0 Other (SpecifY) Test Equipment Used: Ts-sts I Equipment Resolution: Spill Box # 87 Fill Spill Box# 87 Vapor Spill Box# 91 Fill Spill Box# 91 Vapor Bucket Diameter: 12.00" 12.00" 12.00" 12.00" Bucket Depth: 12.00" 12.00" 12.00" 12.00" Wait time between applying pressure/vacuum/water and 5 Min. 5 Min. 5 Min. 5 Min. starting test Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-Rt): Pass/Fail Threshold or Criteria: Test Result: X Pass 0 Fail X Pass 0 Fail X Pass D Fail X Pass 0 Fail Comments-(include information on repairs made prior to testing, and recommendedfollow-up.for failed tests) SWRCB, January 2002 Page __ of __ 9. SPILUOVERFILL CONTAINMENT BOXES Facility is Not Equipped With SpiiVOverfill Containment Boxes 'l Spill/Overfill Containment Boxes are Present, but were Not Tested 0 Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer 0 Other (Specijj~ Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic 0 Other (Specify) Test Equipment Used: Ts-sts J Equipment Resolution: Spill Box# Diesel Fill Spill Box# Diesel Vapor Spill Box# Spill Box# Bucket Diameter: 12.00" 12.00" Bucket Depth: 12.00" 12.00" Wait time between applying pressure/vacuum/water and 5 Min. 5 Min. starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass 0 Fail 0 Pass X Fail 0 Pass 0 Fail D Pass 0 Fail Comments-{include information on repairs made prior to testing, and recommendedfollow-up[or f ailed tests) 7785 FASTRIP 3701 HIIIG AVE BAXERSFIElD CA 93309 D3/18/2014 2:31 PH Sill\? LEAK TEST REPII!T '87 STP TEST STARTED 2:15 PH TEST STARTED 03/18/2014 BEGIII LEVEL 5,2225 111 aiJ Till£ 2:30 Ptt Elll DATE 03/18/2014 EllllEVR 5.2226 111 LEAK THRESHOLD 0.002 111 TEST REStU PASSED OS STP TEST ST ARTEO 2:15 PH TEST STARTED 03/18/2014 BEG Ill lEVEl 5.8821 Ill 00 Till£ 2:30 PH Elll DATE 03/18/2014 Ell! lEVEL 5,8824 Ill lEAK TlmESH!lO 0.002 111 TEST REstl.T PASSED 7785 FP.STRIP 3701 HIIIG AVE BA.'<ERSFIEtD CA 93309 D3/18/2014 2:47 PH SIJ'.P LEAK TEST REPORT 87 STP TEST STARTED 2:31 PH TEST STARTED D3/18/2014 BEG Ill lEVEL 5.2227 Ill EllO TitlE 2:47 PH EllO DATE 03/18/2014 ElK> LEVEl 5,2228 111 LEAK TlmESHOLO 0.002 111 TEST REStlT PASSED OS STP TEST STARTED 2:31 Ptt TEST STARTED 03/18/2014 BEG Ill lEVEl 5,8826 Ill E1ll TitlE 2:47 Ptt E1ll DATE 03/18/2014 ElllLEVEL s. 8824 Ill LEAK TlllESH(lD 0, 002 Ill TEST REStU PASSED 7785 FASTRIP 3701 Hlll!i AVE BAKERSFIELD CA 93309 03/18/2014 1:19 Ptt SU'P LEAK TEST Rtro.llT TEST STARTED 1:04 P/1 TEST STAATED 03/18/2014 BEG Ill LEVEL -s:-0234 Ill-- E1ll TillE 1:19 PH E1ll DATE 03/18/2014 E110 LEVEL 6. 0241 It/ LEAK TlfiESHOLD 0, 002 Ill TEST RESUI. T PASSED 7785 FASTRIP 3701 Hlll!i AVE BAKERSFiao CA 93309 03/18/2014 1:117 PH SUif' I.EAX TEST REPORT 91Sff.~ TEST STARTED 1:32 PH TEST STARTED 03/18/2014 '·.· BEG Ill lEVEl 6. 0243 Ill EJID TltE 1:117 PH E1/0 DATE 03/18/2014 EIIO LEVEL 6.0226 Ill LEAK THRESHOLD 0. 002 Ill TEST RESULT PASSED 7785 FASTRIP 3701 HlfiG AVE BAXERSFiaO CA 93309 03/18/2014 9:59 All SUI1P LEAK TEST REPmT OS FILl TEST STARTED 9:110 All TEST STARTED 03/18/2010 BEG Ill lEVEL 1, 0760 Ill EID TillE 9:59 All El«l DATE 03/18/2014 El«l LEVa I. 0766 Ill lEAK THRESHOLD 0. 002 Ill TEST RESULT PASSED 91 Fill TEST STARTED 9:Q4 Al1 TEST STARTED 03/18/2010 BEG !II LEVa 0. 5803 Ill BID TIHE 9:59 All EIID DATE 03/18/2014 EIID LEVEl 0,5815 Ill LfAK TllRESOOLO 0. 002 Ill TEST RESIA. T PASSED 87 FILL TEST STARTED 9:40 All TEST STARTED 03/18/2010 BEli Ill LEVEl 2. 7581 Ill EJD TIHE 9:59 Al1 Elll DATE 03/18/2014 EIJO LEVEL 2. 7580 Ill LEAK TllRESI!ll.D 0, 002 Ill TEST RESIA. T PASSED OS FSB .i,,~.;~:. TEST S~TED 9:1l4 All TESrSTrolTEIT·'03/16!@14-- BElilll LEVa 7, 3267 Ill EJD TillE 9:59 Al1 Elll DATE 03/18/2014 BID LEVa 7, 3269 Ill LEAK TmESH!lO 0, 002 Ill TEST REStl T PASS£0 TI85 FASTRIP 3701 HII.G AVE BAKERSF!aD CA 93309 03/16/2010 to: 18 All SUtl? LEAK TEST REPMT OS FILl TEST STARTED 10:02 All TEST STARTED 03/18/2010 BEG Ill lEVEl 1, 0763 Ill EID TIHE 10:18 All Elll DATE 03/18/2010 EID LEVB. 1, 0764 HI LEAK TllRESHOI.O 0, 002 Ill TEST RES!JtT PASSED 91 Fill TEST STARTED 10:02 Al1 TEST STARTED 03/18/2014 BEGIII LEVB. 0,5810 Ill EID TIHE 10:18 Al1 EID DATE 03/18/2014 EJD LEVa 0. 5813 Ill lEAK mlESI!DLO 0, 002 Ill TEST RESULT PASSED 87 FILL TEST STARTED 10:02 All TEST STARTED 03/18/2014 BEli Ill LEVEL 2, 7579 Ill EJID Til£ 10:18 All EIID DATE 03/16/2010 em LEVEL 2. 7582 111 lEAK Tlf{ESIIJLO 0, 002 Ill TEST RESULT PASSED OSFS8 TEST STARTED 10:02 Al1 TEST STARTED 03/18/2014 BElilll LEVEL 7, 3265 Ill EID TillE 10:18 All EID DATE 03/18/2014 EllO lEVEL 7. 3259 Ill LEAK THRESHOLD O. 002 Ill TEST REStU PASSED l 7785 FASTRIP 3701 Hll«i AVE BAKERSFIELD CA 93309 03/18/2014 3:50 PH SW1P LEAK lEST REPORT IIJC 1-2 TEST STARTED 3:35 PH TEST STARTED 03/18/20111 BEGIIILEVEL 1!,2890 Ill Elll TillE 3:50 PH Elll DATE 03/18/20111 Elll LEVEL ll, 2891 Ill LEAK THRESHOlD 0, 002 Ill TEST RESll T PASSED lJDC 3-4 TEST STARTED 3:35 PH TEST STARTED 03/18/2014 BEG! II LEVEL 3, 6208 Ill Elll TitlE 3:50 PH E!ll DATE 03/18/2014 Elll LEVEL 3, 6204 Ill LEAK T~ESIIctD 0, 002 Ill TEST RESU!. T PASSED TEST STARTED 3:35 PH TEST STARTED 03/18/201/1 BEG Ill LEVEL 5, 8366 Ill E!O TillE 3:50 PH Elll DATE 03/18/20111 EID LEVEL 5, 8363 Ill LEAK THRESI«<LO 0, 002 Ill TEST RESll. T PASSED IDC 1-8 TEST STARTED 3:35 PH TEST STARTED 03/18/2014 BEGIIILEVa II, 3546 Ill Elll TillE 3:50 PH Elll DATE 03/18/2014 EJIO LEVEL /1, 3543 Ill LEAK THRESHOLD 0, 002 Ill TEST RESULT PASSED 7185 FASTRIP 3701 Hll«i AVE BAKERSFIELD CA 93309 03/18/2014 11:09 PH SUIIP LEAK TEST REPORT UDC 1-2 TEST STARTED 3:511 PH TEST STARTED 03/18/2014 BEG Ill LEVEL ll, 2892 Ill Elll TilE 1!:09 PH Elll DATE 03/18/2014 Elll LEVEL II, 2904 Ill LEA'< TllRESi!OLO 0. 002 Ill TEST RESllT PASSED uoc 3-4 TEST START ED 3:511 PH TEST STARTED 03/18/20111 BEGIIILEVEL 3. 6191 Ill E/0 TI11E 1!:09 PH EID DATE 03/18/2014 EllO LEVEL 3, 6200 Ill LEAK THRESHOLD 0, 002 Ill TEST RESULT PASSED UOCH TEST STARTED 3:54 PH TEST STARTED 03/18/2014 BEG Ill LEVEL 5, 8358 Ill Elll TI/1E 4:09 PH Elll DATE 03/18/2014 Elll LEVEL 5, 8356 Ill LEAK T~ESHOLD 0, 002 Ill TEST RESULT PASSED IIJC 7-8 TEST STARTED 3:50 PH TEST STARTED 03/18/2014 BEG Ill LEVEL 4, 3539 ltl EllO TitlE 11:09 PH E/10 DATE 03/18/20111 Elll LEVEL tl, 3538 Ill LEAK THRESHOLD O, 002 Ill TEST RESULT PASSED 7785 FASTR IF' 370111111G AVE BAKERSFIELD CA 93309 .--.... 03/18/20111 4:28 PH SlJ1P LEAK TEST REPORT VT BOX TEST STARTED t1:12 PH TEST STARTED 03/18/2014 BEG Ill LEVEL 2. 8088 Ill E/10 TillE 1!:28 P/1 E/10 DATE 03/18/2014 E/10 LEVEL 2. 8089 Ill LEAK THRESHOLD 0, 002 Ill TEST RESll.T PASSED 7785 FASTRIP 3701 HIIIG AVE BAKERSFJaD CA 93309 03/18/2014 4:48 PH sun> LEAK 1 EST REPORT Vi BOX TEST STARTED 4:33 PH TEST STARTED 03/.18/2014 BEG Ill LEVEL 2. 8086 Ill Elll TitlE 4:48 PH EIIO DATE 03/18/2014 EID LEVa 2. 8085 Ill LEAK THRESI!llO 0, 002 Ill TEST RESULT PASSED 7785 FASTRIP 3701 HHlG AVE BAKERSFIElD CA 93309 03/18/2014 10:18 Al1 SUMP LEAK TEST REPORT 81 FSB TEST STARTED 10:03 All TEST STARTED 03/18/2014 BEGIII lEV8. 5, ?!134 Ill EJKJ TillE 10: 18 All EJlO DATE 03/18/2014 EIID lEVa 5, 7932 Ill LEAK TltllESHOLD 0, 002 Ill TEST RESUlT PASSED 87 VSB TEST STARTED 10:03 All TEST STAqTED 03/18/2014 BEGIIILEVB. 7, 5220 Ill EJIO TillE 10:18 N1 EJIO DATE 03/18/2014 EllO lEVEl 7, 5209 HI LEAK TltllESHOLD 0, 002 Ill TEST RESI.l T PASSED 1785.FASTRIP 3701 HHIG AVE BAKERSFIElD CA 93309 03/18/2014 10:35 Al1 SUI1.0 lEAK TEST REPII!T 87 FSB TEST STARTED 10:19 All TEST STARTED 03/18/2014 BEG Ill lEVB. 5, 7934 Ill Elll TlHE 10:35 All EJil DATE 03/18/2014 E!Kl LEVEL 5, 7935 Ill lEAK TlllESilOtD 0. 002 Ill TEST RESULT PASSED 87 VSB TEST STARTED 10:19 All TEST STARTED 03/18/2014 BEGJIILEVB. 7, 5209 Ill EJIO Tl~ 10:35 Ali em DATE 03/18/2014 am lEVB. 1. 5204 111 LEAA Tlf!ESHOI.Il 0, 002 Ill TEST RESULT PASSED 7785 FASTRIP 3701 HlllG AVE BAKERSFIElD CA 93309 03/18/2014 1:26 PH SUI1P lEAK' TEST REPMT 91FS8 TEST STARTED 1:11 PH TEST STARTED 03/18/2014 llEGIIILEVB. 5, 3988 Ill Ellll Tli\E 1:26 PH em DATE 03/18/2014 EllD LEVa 5. 3988 Ill LEAK TltllESHCl.D 0.002 111 TEST RESI.lT PASSED 91 VSB TEST STARTED 1 :11 Pt1 TEST STARTED 03/18/2014 BEGIIIlEVa 7,3301 Ill E!ID TillE 1:26 PH EllO DATE 03/18/2014 EllD LEVEl 7,3298 Ill LEAK TltllESHilO 0, 002 Ill TEST RESI.lT PASSED DSVSB TEST STARTED 1: 11 PH TEST STARTED 03/18/2014 BEG Ill lEVEl 5, 9328 Ill E!IO Tl~ 1:26 PH E!ID DATE 03/18/2014 E!IO LEVEL 5, 9021 Ill LEAK THRESIIOLO 0, 002 Ill TEST RESULT FAILED <I ?185 FASTRIP 3701.1t111G AVE I BA.~ERSF I ElD Cfl 93J99 --· -t• , ~· o3t1et201~··,:osw-:?""---• 1 t .. I. • J SUH? lEAK TEST REPII!T 91 FSB TEST STARTED 12:54 Pll TEST STARTED 03/18/2014 BEG Ill lEVEl 5, 3987 Ill EJIO TIHE 1:09 PH EJIO DATE 03/18/2014 am LEVEL 5. 3992 111 LEAK THRESHOLD 0, 002 Ill TEST RESULT PASSED 91 VSB TEST STARTED 12:54 PH TEST STARTED 03/18/2014 BEGIIIlEVa 7,3300 Ill BID TillE 1:09 PH EJIO DATE 03/18/2010 EJIO LEVEL 7, 3299 Ill LEAK THRESHOI.O 0, 002 Ill TEST RESll. T PASSED Dsvsa TEST STAATED 12:54 PH TESHtAAlt:O -{)3li8t2014 ·-- BEG Ill lEVEl 5, 9789 Ill E!IO TillE 1:09 P/1 EllD DATE 03/18/2010 EllD LEVEL 5, 9442 Ill LEA.X THRESHOLD 0, 002 Ill TEST RESlA.T FAILED ·~