HomeMy WebLinkAbout10500 Stockdale Hwy - Drainage StudyThe Shops at Riverwalk – Phases 2B &3
Drainage Study
2
Background
Castle & Cooke California, Inc. has been contracted to prepare drainage study for
additional improvements within an existing commercial development. This commercial
project, on approximately 16.21 acres, is located on Stockdale Highway between Buena
Vista Road and Calloway Drive in the City of Bakersfield, CA. The site, while generally
flat in topography, gently slopes to the southwesterly.
The project is currently partially developed with vacant pads, paved parking, and
several existing restaurants along Stockdale Highway. The proposed layout will alter the
current configuration of the parking lot. The existing storm drain lines in the parking lot
consist of 18” RCP lines based on the approved plans. Several existing storm drain
lines will be protected in place and incorporated as part of the new storm drain system.
The analysis will focus on the series of existing and proposed catch basin. There will be
four tie-in points which ultimate ties into the mainline paralleling Stockdale Highway.
This study will also focus on the watershed contributing to this existing storm drain
system. It will also verify the capacity existing storm drain pipes with flows generated
from proposed development.
Purpose
This study will present the findings pertaining to the anticipated storm water runoff for
the drainage areas tributary to and generated by the contributing to existing and
proposed inlets within the existing commercial development. The study also provides
analysis to size inlets and pipes by quantifying the flow to each pipe and analyzing the
hydraulic grade lines stays within the existing and proposed storm drain system.
Approach
The procedure used to determine the design flows are outlined in the City of Bakersfield
Subdivision & Engineering Design Manual (hereafter referred to as the Manual). The
pertinent steps are as follows:
1. Using a topographical map, the design grades, and the proposed development
layout, determine the sub-basin boundaries within the watershed. Record the
sub-basin characteristics in a tabular format similar to the one provided in the
Manual.
2. Determine the average velocity using the SCS Average Velocity Chart
3. Determine the initial time of concentration, (Tc), based on Section 2.3.2.1 of the
Manual by using the roof gutter time and average velocity.
4. Establish the intensity based on the Intensity-Duration curves for a given event
using Sheet D-1 in the Manual.
5. Determine the flow to the concentration point.
6. Route the flow to the downstream concentration points and divide the study area
into defined subareas that incrementalized all flow contributions to the proposed
drainage inlets.
7. Estimate flows utilizing the City’s Rational Method in accordance with the
Subdivision Standards
The Shops at Riverwalk – Phases 2B &3
Drainage Study
3
Assumptions
The following information was assumed to apply:
1. The runoff coefficient of 0.90 is consistent over the commercial zones and a
runoff coefficient of 0.15 is applied to landscaped areas.
2. These calculations are based on the current precise grading plans.
Summary of Results
There will be four separate drainage areas with four separate tie-in points located on the
site (see table below). A few drainage areas (Areas 1a, 3a, and 3b) included the
landscaping sloping towards the proposed parking lot. These areas used a composite
coefficient to calculate the proposed runoff. It was assumed that most of the proposed
commercial buildings would drain to the back. A roof to gutter time of 10 minutes was
used for these drainage areas. The revised drainage system will consist of existing and
proposed storm drain ranging in size from 12” to 18” in diameter. The proposed on-site
pipes were sized to have enough capacity for the generated flows.
The following table will summarize the results of the hydrology calculations at tie-in
points. Refer to the Hydrology Calculations for the complete results.
Tie-in
Point
Area
(acres)
Tc
(mins)
Proposed
Q10 (cfs)
1 2.94 18.34 3.25
2 3.78 13.44 5.44
3 6.76 26.93 5.67
4 2.73 12.01 4.14
Civil 3d Hydraflow Express uses the slope, size, and, known/proposed discharge to
determine pipe capacity. This program was used for verifying the capacity of the
existing pipes located just downstream of the tie-in points. These calculations show
there’s sufficient capacity to handle the proposed flows (see appendix). The sizes,
lengths, and slopes of these existing pipes can be viewed on the Drainage Exhibit.
There are 2’x2’ Christy Box Inlets proposed onsite which was sized using the Hydraflow
software (see appendix). These inlets will be able to handle 8.25 cfs with a maximum
depth of 1 foot and a radial spread of 53 feet. The new inlet locations will be spread out
throughout the site as shown on the Precise Grading Plan.
The Shops at Riverwalk – Phases 2B &3
Drainage Study
4
Vicinity Map
Not to Scale@
The Shops at
Riverwalk
The Shops at Riverwalk – Phases 2B &3
Drainage Study
5
ATTACHMENTS
· HYDROLOGY CALCULATIONS
· PIPE CAPACITY CALCULATIONS
· INLET SIZING CALCULATIONS
· DRAINAGE EXHIBIT
CITY OF BAKERSFIELD RATIONAL METHOD
(In accordance with City of Bakersfield Standards)
TABLE OF RUNOFF COEFFICIENTS
R-1, 6000 SF 0.42
JOB TITLE:THE SHOPS AT RIVERWALK - PHASES 2B/3R-1, 7500 SF 0.38
DATE:R-1, 10000 SF 0.34
REVISION DATE:R-1, 15000 SF 0.27
Rational Values:R-2 0.55
Event:10YEAR Values: 5, 10, 50R-3, R-4, M-H 0.8
M.A.P.6 in./yr. Values: 6, 10, 15, 20, 25, 30Commercial 0.9
Industrial 0.8
Curve Values Parks 0.15
a:2.38I=a+bTc (Tc<20min.)Grasslands, Type A Soil0.15
b:-0.058Grasslands, Type B Soil0.25
P60:0.550I=K1*(6.02*Tc)^(0.17*LN(p60/K1)Grasslands, Type C Soil0.35
K1:40.00 (Tc>=20min.)Grasslands, Type D Soil0.45
Pavement, drives & roofs0.95
Backyards 0.05
Lawn-landscape 2% slope0.100.17
Lawn-landscape 2-7% slope0.150.22
Lawn-landscape 7% slope 0.20 0.35
SUBAREACIARslt TcLdHQV Trial Tc Roof toTmD
NAMERunoff Intensity TotalTimeLengthElev.FlowVel.MIN.GutterTravelPipe
Coef.(in./hr.)Area Conc.Feet Diff.Slope CFS FPS Time Time Dia.
AC.MIN.Feet%MIN.MIN.In.
PIPE SIZING CALCULATIONS
Area 1a 0.791.651.5112.552752.10.75%1.96 1.8012.5510 2.55
Pipe 1 332.50 0.2212
12.76
Pipe 2 0.791.641.51222 1.94 1.1012.76 3.3618
16.13
Pipe 3 0.791.441.51129 1.71 0.9716.13 2.2218
18.34
Area 1b 0.901.801.4310.001803.31.84%2.32 2.7010.000 1.11
Pipe 4 162.95 0.0918
10.09
Tie-In Point 1 0.841.312.94 3.25 18.34
Area 2a 0.901.751.2010.931613.42.14%1.89 2.9010.9310 0.93
Pipe 5 0.901.751.2086 1.89 1.0710.93 1.3418
12.27
Area 2b 0.901.760.6610.611102.62.35%1.05 3.0010.6110 0.61
Pipe 6 1871.33 2.3312
12.95
Area 2c 0.901.741.9211.001753.82.19%3.01 2.9111.0010 1.00
Pipe 7 0.901.632.58142 3.78 4.8112.95 0.4912
13.44
Tie-In Point 2 0.901.603.78 5.44 13.44
January 27, 2014
Q:\PROJECTS\680693\studies\Drainage -Phases 2&3\Calculations\35769271.xls Page 1
SUBAREACIARslt TcLdHQV Trial Tc Roof toTmD
NAMERunoff Intensity TotalTimeLengthElev.FlowVel.MIN.GutterTravelPipe
Coef.(in./hr.)Area Conc.Feet Diff.Slope CFS FPS Time Time Dia.
AC.MIN.Feet%MIN.MIN.In.
Area 3a 0.771.352.0917.672952.30.79%2.18 1.8417.6715 2.67
Pipe 8 331.23 0.4518
18.12
Pipe 9 0.771.332.09195 2.14 1.2118.12 2.6918
20.81
Pipe 10 0.771.182.0989 1.90 1.0820.81 1.3718
22.18
Area 3b 0.881.721.6411.301952.91.49%2.49 2.5011.3010 1.30
Pipe 11 261.41 0.3018
11.60
Pipe 12 0.821.133.7345 3.45 1.9522.18 0.3818
22.56
Pipe 13 0.821.123.7376 3.41 1.9322.56 0.6518
23.21
Area 3c 0.901.740.2511.051823.82.09%0.39 2.9011.0510 1.05
Pipe 14 150.22 1.1318
12.17
Pipe 15 0.821.093.98254 3.58 2.0323.21 2.0918
25.31
Pipe 16 0.821.033.9810.00116 3.36 1.9025.31 1.0118
26.32
Area 3d 0.901.730.7711.211461.61.11%1.20 2.0011.2110 1.21
Pipe 17 1260.68 3.1018
14.32
Area 3e 0.901.711.0611.531832.11.13%1.63 2.0011.5310 1.53
Pipe 18 0.851.005.81101 4.91 2.7826.32 0.6118
26.93
Area 3f 0.901.800.9510.002053.91.90%1.54 2.7210.000 1.26
Pipe 19 990.87 1.9018
11.90
Tie-In Point 3 0.850.986.76 5.67 26.93
Area 4a 0.901.761.2310.761342.92.16%1.94 2.9310.7610 0.76
Pipe 20 882.47 0.5912
Pipe 21 0.901.761.23112 1.94 2.4710.76 0.7512
11.52
Area 4b 0.901.681.5012.012703.31.24%2.27 2.2412.0110 2.01
Pipe 22 592.89 0.3412
Tie-In Point 4 0.901.682.73 4.14 12.01
Q:\PROJECTS\680693\studies\Drainage -Phases 2&3\Calculations\35769271.xls Page 2
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jan 28 2014
Exist 18" Pipe Downstream of Point #1
Circular
Diameter (ft)= 1.50
Invert Elev (ft)= 1.00
Slope (%)= 0.24
N-Value= 0.013
Calculations
Compute by:Known Q
Known Q (cfs)= 3.25
Highlighted
Depth (ft)= 0.87
Q (cfs)= 3.250
Area (sqft)= 1.07
Velocity (ft/s)= 3.05
Wetted Perim (ft)= 2.60
Crit Depth, Yc (ft)= 0.69
Top Width (ft)= 1.48
EGL (ft)= 1.01
0 1 2 3
Elev (ft)Section
0.50
1.00
1.50
2.00
2.50
3.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jan 28 2014
Exist 18" Pipe Downstream of Point #2
Circular
Diameter (ft)= 1.50
Invert Elev (ft)= 1.00
Slope (%)= 0.80
N-Value= 0.013
Calculations
Compute by:Known Q
Known Q (cfs)= 5.44
Highlighted
Depth (ft)= 0.82
Q (cfs)= 5.440
Area (sqft)= 0.99
Velocity (ft/s)= 5.50
Wetted Perim (ft)= 2.50
Crit Depth, Yc (ft)= 0.90
Top Width (ft)= 1.49
EGL (ft)= 1.29
0 1 2 3
Elev (ft)Section
0.50
1.00
1.50
2.00
2.50
3.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jan 28 2014
Exist 18" Pipe Downstream of Point #3
Circular
Diameter (ft)= 1.50
Invert Elev (ft)= 1.00
Slope (%)= 0.45
N-Value= 0.013
Calculations
Compute by:Known Q
Known Q (cfs)= 5.67
Highlighted
Depth (ft)= 1.02
Q (cfs)= 5.670
Area (sqft)= 1.28
Velocity (ft/s)= 4.43
Wetted Perim (ft)= 2.91
Crit Depth, Yc (ft)= 0.92
Top Width (ft)= 1.40
EGL (ft)= 1.32
0 1 2 3
Elev (ft)Section
0.50
1.00
1.50
2.00
2.50
3.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jan 28 2014
Exist 18" Pipe Downstream of Point #4
Circular
Diameter (ft)= 1.50
Invert Elev (ft)= 1.00
Slope (%)= 0.36
N-Value= 0.013
Calculations
Compute by:Known Q
Known Q (cfs)= 4.14
Highlighted
Depth (ft)= 0.89
Q (cfs)= 4.140
Area (sqft)= 1.09
Velocity (ft/s)= 3.78
Wetted Perim (ft)= 2.64
Crit Depth, Yc (ft)= 0.78
Top Width (ft)= 1.47
EGL (ft)= 1.11
0 1 2 3
Elev (ft)Section
0.50
1.00
1.50
2.00
2.50
3.00
Reach (ft)
Inlet Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Jan 23 2014
50% Clogging Factor - 2'x2' Inlet
Drop Grate Inlet
Location= Sag
Curb Length (ft)= -0-
Throat Height (in)= -0-
Grate Area (sqft)= 1.50
Grate Width (ft)= 2.00
Grate Length (ft)= 2.00
Gutter
Slope, Sw (ft/ft)= 0.020
Slope, Sx (ft/ft)= 0.020
Local Depr (in)= -0-
Gutter Width (ft)= 2.00
Gutter Slope (%)= -0-
Gutter n-value= -0-
Calculations
Compute by:Q vs Depth
Max Depth (in)= 12
Highlighted
Q Total (cfs)= 8.25
Q Capt (cfs)= 8.25
Q Bypass (cfs)= -0-
Depth at Inlet (in)= 12.57
Efficiency (%)= 100
Gutter Spread (ft)= 106.77
Gutter Vel (ft/s)= -0-
Bypass Spread (ft)= -0-
Bypass Depth (in)= -0-