Loading...
HomeMy WebLinkAboutTract 6824 - Drainage Study 2 Table of Contents 1.0 PURPOSE ................................................................................................................. 3 2.0 GUIDELINES ............................................................................................................ 3 3.0 DESIGN APPROACH ............................................................................................... 3 4.0 CONCLUSION AND RECOMMENDATIONS ............................................................ 5 Soil Map .................................................................................................. back of report Hydrology Calculations ........................................................................... back of report Inlet Sizing Calculations .......................................................................... back of report Hydraulic Calculations and Pipe Profiles ................................................. back of report Basin Exhibit ............................................................................ sleeve in back of report Drainage Exhibit ...................................................................... sleeve in back of report Reference ............................................................................................... back of report 3 1.0 PURPOSE The purpose for this drainage study is as follows: 1. To provide a storm drainage system in accordance with the City of Bakersfield requirements and guidelines. 2. To provide an economical and reasonable design for storm drain conveyance and disposal facilities. 2.0 GUIDELINES The following design standards were used in the development of this study: 1. Initial times to concentration (roof to gutter) are 15 minutes for R-1 Development. 2. Approximately a third of the site is Soil Group A - Cajon sandy loam, overblown, 0 to 2 percent slopes and the remaining two-thirds is Soil Group B - Kimberlina fine sandy loam. The soil group was obtained from the US Department of Agriculture Soils Survey. Refer to the attached Soil Map at the back of report. 3. The runoff coefficients used are: A. 0.15 - Park B. 0.42 - R-1, 6,000 S.F. C. 0.38 - R-1, 7,500 S.F. D. 0.95 - Pavement, drives, and roofs 3. Rainfall intensity curves used are those shown on Plate D-1 of the City of Bakersfield, Subdivision & Engineering Manual. 4. Sub-areas using multiple run-off coefficients are given a weighted average based on the area relative to each coefficient. 3.0 DESIGN APPROACH The contributing areas to the retention basin are all zoned residential and therefore were modeled as such so that the improvements were accurate. This report also studies the required pipe sizes for the main lines leading from Panama Lane to the basin. The affected project area for these improvements is dictated by the flat terrain that is present. More specifically the improvements are designed to benefit all areas bounded to the east by Tract 6536, to the north by Panama Lane, to the south by Tract 6916 and to the west by Mountain Vista Drive that takes storm drain runoff out to the Basin Drainage Area. Drainage Areas A and 1 will discharge into a catch basin (CB #5) located at the intersection of Monahan Street and Voyageurs Drive. CB #6A will collect the discharge produced by Areas B and 2 at the intersection of Monahan Street and Acton Court. CB #6 will collect the discharge produced by Area 3 at the intersection of Monahan Street and Balmorhea Street. Drainage Area 5 will discharge into a catch basin (CB #8) located at the intersection of Mountain Vista Drive and Lockhart Lane. Drainage Area 5 has its own weighted coefficient value from portions of Mountain Vista Drive and the residential lots. Drainage Areas 4, 6, and 7 will discharge catch basins (CB #7, CB #9, & CB #10) located at the intersection of Balmorhea Street and Lockhart Lane. CB #11 will collect the discharge produced by Area 8 on Mountain Vista Drive between Juntura Way and Lockhart Lane. A catch basin (CB #12) will be located at the intersection of Juntura Way and Mountain Vista Drive which will collect the discharge produced by Area 9. Drainage Areas 10 & 11 will have will discharge into two catch basins (CB #13 & CB #14) adjacent to the tract boundary on Fort Sanders Avenue. Drainage Area 12 is the largest sub-area in the study where runoff is conveyed via cross gutters along Voyageurs Drive. The discharge will be collected by a 4 catch basin (CB #15) on the corner of Fort Sanders Avenue and Voyageurs Drive. CB #16 will collect the discharge produced by Area 13 at the intersection of Fort Sanders Avenue and Bellingham Way. Two catch basins (CB #17 & CB #18) will be located at the knuckle of Fort Sanders Avenue and Balmorhea Street which will collect the discharge produced by Area 14 and Area 15. The retention basin area consists of the residential lots, park, and the two adjoining streets. The flows for the sizing of the pipes were estimated utilizing the City of Bakersfield Rational Method in accordance with the Subdivision Standards. Flows were computed for the 10-year event using the formula Q = CIA, where Q is the flow in cubic feet per second, C is the runoff coefficient, I is the intensity in inches per hour, and A is the catchment’s area in acres. Since the main purpose of this report is the storm drain system leading to the basin and the curb capacities were determined based the 5-year storm event. The proposed retention basin on the southwest corner of tract will be at the bottom elevation of 333 and handle all of the discharge from Tract 6824. Per the City of Bakersfield’s request, the ultimate buildout basin volumes (provided and required) were calculated. This basin will be expanded in the future to accommodate the runoff from Tentative Tract 6916. The required basin volume was calculated using the City of Bakersfield sump volume equation (V=0.15 x Ʃ (CxA)). The total contributing area equals 78.10 acres; this acreage is divided into the areas as noted above. The coefficient values are provided for each area, and the calculations for the required and provided volumes are shown below and on the Basin Exhibit. Area Acres Coefficient C x A TRACT 6824 Park 0.77 0.15 0.12 R-1, 6000 SF 23.22 0.42 9.75 R-1, 7500 SF 10.98 0.38 4.17 Panama Lane and Mountain Vista Drive 3.99 0.95 3.79 TRACT 6824 Ʃ(CXA) = 17.83 TRACT 6916 * R-1, 7500 SF 35.74 0.38 13.58 Berkshire Road and Mountain Vista Drive 3.41 0.95 3.24 TRACT 6916 Ʃ(CXA) = 16.82 TRACTS 6824 & 6916 Ʃ(CXA) = 34.65 TOTAL 78.10 VOLUME REQUIRED (AF) = 5.19 * Assumed based on a plan provided by the City of Bakersfield The rational method for the 10-year event was performed using Autodesk Storm Sewers 2012. This program routes the flows and calculates the HGL for the system. The program has the ability to calculate the time of concentrations, but it also allows you to enter your own time. A spreadsheet similar to the curb capacity spreadsheet was used to determine the initial time of concentrations in a 10-year event. The flows from the 10-year event were calculated and routed. Starting HGL at the basin was estimated to be 4’ above the basin bottom. 5 4.0 CONCLUSION AND RECOMMENDATIONS The flows from the 10-year event were calculated and routed. The beginning HGL was estimated to be 4’ above the basin bottom at each outlet structure. All the pipes in this system were sized to be 18” RCP and 24” RCP. The HGL is not less than 0.5’ below the existing grade at any manhole. The main objectives of this study were to design an economical storm drain system and meet the design standards set by the City of Bakersfield. The storm drain system will be able to handle a 10-year event. The Basin Exhibit, part of this study, shows the designed basin that allows for the expansion to the adjacent southerly tract. The basin will have a total water depth of 8’ with a minimum of 1’ of freeboard. The basin for only Tract 6824 will be able to store 2.82 acre-feet of water with a required volume for is 2.64 AF. The basin for the completed condition will be able to store 6.30 acre-feet of water. The depth of the basin is 12 deep with a water surface of 341. The required volume for both tracts is 5.19 AF. SOIL MAP Not to Scale TRACT6824 Soil Map 127 Cajon sandy loam, overblown, 0 to 2 percent slopes 174 Kimberlina fine sandy loam, 0 to 2 percent slopes HYDROLOGY CALCULATIONS CITY OF BAKERSFIELD RATIONAL METHOD (In accordance with City of Bakersfield Standards) TABLE OF RUNOFF COEFFICIENTS R-1, 6000 SF 0.42 JOB TITLE:VTT 6824 - Onsite Improvements R-1, 7500 SF 0.38 DATE:R-1, 10000 SF0.34 REVISION DATE:R-1, 15000 SF0.27 Rational Values:R-2 0.55 Event:10YEAR Values: 5, 10, 50R-3, R-4, M-H 0.8 M.A.P.6 in./yr. Values: 6, 10, 15, 20, 25, 30Commercial 0.9 Industrial 0.8 Curve Values Parks 0.15 a:2.38I=a+bTc (Tc<20min.)Grasslands, Type A Soil0.15 b:-0.058Grasslands, Type B Soil0.25 P60:0.550I=K1*(6.02*Tc)^(0.17*LN(p60/K1)Grasslands, Type C Soil0.35 K1:40.00 (Tc>=20min.)Grasslands, Type D Soil0.45 Pavement, drives & roofs0.95 Backyards 0.05 Lawn-landscape 2% slope0.100.17 Lawn-landscape 2-7% slope0.150.22 Lawn-landscape 7% slope 0.20 0.35 SUBAREACIARslt TcLdHQV Trial Tc Roof toTmD NAMERunoff Intensity TotalTimeLengthElev.FlowVel.MIN.GutterTravelPipe Coef.(in./hr.)Area Conc.Feet Diff.Slope CFS FPS Time Time Dia. AC.MIN.Feet %MIN.MIN.In. PIPE SIZING CALCULATIONS Area A 0.950.583891.000.26% Area 1 0.382.945592.060.37% Areas A & 1 0.471.803.5210.009483.060.32%3.00 2.0510.000 7.71 CB #5 to MH-1 [PIPE 32]501.70 0.4918 10.49 MH-1 to MH-2 [PIPE 3]0.471.773.52574 2.95 1.6710.49 5.7218 16.22 Area B 0.950.684050.680.17% Area 2 0.382.285521.810.33% Areas B & 2 0.511.802.9610.009572.490.26%2.72 1.7710.000 9.01 CB #6A to MH-2 [PIPE 33]451.54 0.4918 10.49 MH-2 to MH-3 [PIPE 4]0.491.446.4881 4.57 2.5916.22 0.5218 16.74 Area 3 0.351.282.3718.934241.580.37%1.06 1.8018.9315 3.93 CB #6 to MH-3 [PIPE 30]250.60 0.7018 19.63 MH-3 to MH-4 [PIPE 5]0.451.248.8547 4.97 2.8119.63 0.2818 19.91 MH-4 to MH-5 [PIPE 6]0.451.228.8581 4.91 1.5619.91 0.8724 20.78 Area 4 0.381.371.7817.332861.470.51%0.93 2.0517.3315 2.33 CB #7 to MH-5 [PIPE 31]150.53 0.4818 17.81 MH-5 to MH-7 [PIPE 7]0.441.3510.6339 6.31 2.0117.81 0.3224 18.13 Area 5 0.951.801.4410.008733.790.43%2.46 2.2210.000 6.55 CB #8 to MH-6 [PIPE 14]151.39 0.1818 10.18 October 12, 2013 P:\PROJECTS\05160.02-ULA-6824\Studies\Drainage\Calculations\Hydrology_10yr.xls Page 1 SUBAREACIARslt TcLdHQV Trial Tc Roof toTmD NAMERunoff Intensity TotalTimeLengthElev.FlowVel.MIN.GutterTravelPipe Coef.(in./hr.)Area Conc.Feet Diff.Slope CFS FPS Time Time Dia. AC.MIN.Feet %MIN.MIN.In. MH-6 to MH-7 [PIPE 15]0.951.791.44118 2.45 1.3910.18 1.4218 11.60 Area 6 0.421.173.0921.247112.360.33%1.51 1.9021.2415 6.24 CB #9 to MH-7 [PIPE 29]250.86 0.4918 21.73 MH-7 to MH-8 [PIPE 8]0.481.1515.1649 8.43 2.6821.73 0.3024 22.03 Area 7 0.421.470.3815.71560.250.45%0.23 1.3115.7115 0.71 CB #10 to MH-8 [PIPE 28]1890.13 23.7618 39.47 MH-8 to MH-9 [PIPE 10]0.480.7415.54471 5.58 1.7839.47 4.4224 43.90 Area 8 0.611.802.0010.006362.430.38%2.20 1.9510.000 5.44 CB #11 to MH-12 [PIPE 12]1901.24 2.5418 12.54 MH-12 to MH-13 [PIPE 13]0.611.652.0032 2.02 0.6412.54 0.8224 13.37 Area 9 0.951.800.4010.002671.030.39%0.68 1.6510.000 2.70 CB #12 to MH-13 [PIPE 41]250.39 1.0818 11.08 MH-13 to MH-9 [PIPE 13(1)]0.671.602.40130 2.57 1.4513.37 1.4918 14.86 MH-9 to MH-10 [PIPE 11]0.510.6917.94113 6.26 1.9943.90 0.9424 44.84 Area 10 0.401.123.1022.579184.190.46%1.38 2.0222.5715 7.57 CB #13 to MH-14 [PIPE 25]250.78 0.5318 23.10 Area 11 0.151.341.0717.924054.721.17%0.21 2.3117.9215 2.92 CB #14 to MH-14 [PIPE 26]310.12 4.3018 22.22 MH-14 to MH-15 [PIPE 9]0.341.104.17160 1.54 0.8723.10 3.0718 26.17 Area 12 0.421.169.8921.3610004.550.46%4.82 2.6221.3615 6.36 CB #15 to MH-15 [PIPE 24]152.73 0.0918 21.45 MH-15 to MH-16 [PIPE 38]0.401.0014.06175 5.56 1.7726.17 1.6524 27.82 Area 13 0.421.371.0917.352330.910.39%0.63 1.6517.3515 2.35 CB #16 to MH-16 [PIPE 23]250.36 1.1718 18.52 MH-16 to MH-17 [PIPE 39]0.400.9615.15351 5.76 1.8327.82 3.1924 31.00 MH-17 to MH-11 [PIPE 40]0.400.8915.15408 5.32 1.6931.00 4.0124 35.01 P:\PROJECTS\05160.02-ULA-6824\Studies\Drainage\Calculations\Hydrology_10yr.xls Page 2 SUBAREACIARslt TcLdHQV Trial Tc Roof toTmD NAMERunoff Intensity TotalTimeLengthElev.FlowVel.MIN.GutterTravelPipe Coef.(in./hr.)Area Conc.Feet Diff.Slope CFS FPS Time Time Dia. AC.MIN.Feet %MIN.MIN.In. Area 15 0.421.174.3621.268083.440.43%2.13 2.1521.2615 6.26 CB #17 to MH-10 [PIPE 27]161.21 0.2218 21.48 MH-10 to MH-11 [PIPE 2]0.400.8519.5161 6.69 2.1332.66 0.4824 33.14 Area 14 0.421.211.5020.274740.900.19%0.76 1.5020.2715 5.27 CB #18 to MH-11 [PIPE 36]600.43 2.3218 22.59 MH-11 to SUMP [PIPE 37]0.450.6838.9566 11.98 3.8144.43 0.2924 44.71 Required Sump Capacity = 0.15 x C x A = 2.64ac-ft C =0.45 A =38.95ac P:\PROJECTS\05160.02-ULA-6824\Studies\Drainage\Calculations\Hydrology_10yr.xls Page 3 INLET SIZING CALCULATIONS 5 Year Storm Project Description TR6824.SPF Project Options CFS Elevation Rational User-Defined Hydrodynamic YES NO Analysis Options Aug 27, 2013 00:00:00 Aug 27, 2013 01:00:00 Aug 27, 2013 00:00:00 0 days 0 01:00:00 days hh:mm:ss 0 00:05:00 days hh:mm:ss 0 00:05:00 days hh:mm:ss 30 seconds Runoff (Dry Weather) Time Step .......................................... Runoff (Wet Weather) Time Step ........................................ Reporting Time Step ............................................................ Routing Time Step ................................................................ Enable Overflow Ponding at Nodes ...................................... Skip Steady State Analysis Time Periods ............................ Start Analysis On .................................................................. End Analysis On ................................................................... Start Reporting On ................................................................ Antecedent Dry Days ............................................................ File Name ............................................................................. Flow Units ............................................................................. Elevation Type ...................................................................... Hydrology Method ................................................................. Time of Concentration (TOC) Method .................................. Link Routing Method ............................................................. Black Ops Real Estate, LLC Page 1 of 4 11/27/2013 5 Year Storm Inlet Summary Element Catchbasin Max (Rim)Inlet Initial Ponded Peak Peak Flow Peak Flow Inlet Max Gutter Max Gutter ID Invert Elevation Location Water Area Flow Intercepted Bypassing Efficiency Spread Water Elev. Elevation Elevation by Inlet during Peak during Peak during Peak Inlet Flow Flow Flow (ft)(ft)(ft)(ft²)(cfs)(cfs)(cfs)(%)(ft)(ft) CB #10 341.60 346.07 On Sag 341.60 25.00 0.21 N/A N/A N/A 1.66 346.17 CB #11 339.50 343.92 On Sag 341.00 25.00 1.73 N/A N/A N/A 11.08 344.43 CB #12 340.00 344.81 On Sag 340.00 25.00 0.54 N/A N/A N/A 4.17 345.05 CB #13 338.40 342.86 On Sag 338.40 25.00 1.17 N/A N/A N/A 8.53 343.32 CB #14 338.75 342.78 On Sag 338.75 25.00 0.18 N/A N/A N/A 1.38 342.86 CB #15 339.25 343.64 On Sag 339.25 25.00 4.07 N/A N/A N/A 19.78 344.33 CB #16 339.80 344.32 On Sag 339.80 25.00 0.52 N/A N/A N/A 4.02 344.55 CB #17 338.00 344.33 On Sag 338.00 25.00 1.80 N/A N/A N/A 11.41 344.85 CB #18 338.35 344.56 On Sag 341.00 25.00 0.64 N/A N/A N/A 4.96 344.85 CB #5 342.30 346.93 On Sag 342.30 25.00 2.34 N/A N/A N/A 13.63 347.50 CB #6 342.00 346.40 On Sag 342.00 25.00 0.88 N/A N/A N/A 6.85 346.79 CB #6A 342.80 347.26 On Sag 342.80 25.00 2.14 N/A N/A N/A 12.84 347.81 CB #7 341.50 346.04 On Sag 341.50 25.00 0.77 N/A N/A N/A 5.94 346.38 CB #8 341.50 346.00 On Sag 341.50 25.00 1.94 N/A N/A N/A 12.03 346.53 CB #9 341.50 345.89 On Sag 341.50 25.00 1.28 N/A N/A N/A 9.02 346.36 Black Ops Real Estate, LLC Page 2 of 4 11/27/2013 5 Year Storm Roadway & Gutter Input Element Roadway Roadway Roadway Gutter Gutter Gutter ID Longitudinal Cross Manning's Cross Width Depression Slope Slope Roughness Slope (ft/ft)(ft/ft)(ft/ft)(ft)(in) CB #10 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #11 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #12 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #13 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #14 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #15 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #16 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #17 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #18 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #5 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #6 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #6A N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #7 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #8 N/A 0.0200 0.0150 0.0833 2.00 0.0656 CB #9 N/A 0.0200 0.0150 0.0833 2.00 0.0656 Black Ops Real Estate, LLC Page 3 of 4 11/27/2013 5 Year Storm Inlet Results Element Peak Peak Peak Flow Peak Flow Inlet Max Gutter Max Gutter Time of Total Total Time ID Flow Lateral Intercepted Bypassing Efficiency Spread Water Depth Max Depth Flooded Flooded Inflow by Inlet during Peak during Peak during Peak Occurrence Volume Inlet Flow Flow Flow (cfs)(cfs)(cfs)(cfs)(%)(ft)(ft)(days hh:mm)(ac-in)(min) CB #10 0.21 0.21 N/A N/A N/A 1.66 0.10 0 00:16 0.00 0.00 CB #11 1.73 1.73 N/A N/A N/A 11.08 0.51 0 00:00 0.00 0.00 CB #12 0.54 0.54 N/A N/A N/A 4.17 0.24 0 00:10 0.00 0.00 CB #13 1.17 1.17 N/A N/A N/A 8.53 0.46 0 00:23 0.00 0.00 CB #14 0.18 0.18 N/A N/A N/A 1.38 0.08 0 00:23 0.00 0.00 CB #15 4.07 4.07 N/A N/A N/A 19.78 0.69 0 00:23 0.00 0.00 CB #16 0.52 0.52 N/A N/A N/A 4.02 0.23 0 00:17 0.00 0.00 CB #17 1.80 1.80 N/A N/A N/A 11.41 0.52 0 00:00 0.00 0.00 CB #18 0.64 0.64 N/A N/A N/A 4.96 0.29 0 00:00 0.00 0.00 CB #5 2.34 2.34 N/A N/A N/A 13.63 0.57 0 00:10 0.00 0.00 CB #6 0.88 0.88 N/A N/A N/A 6.85 0.39 0 00:19 0.00 0.00 CB #6A 2.14 2.14 N/A N/A N/A 12.84 0.55 0 00:10 0.00 0.00 CB #7 0.77 0.77 N/A N/A N/A 5.94 0.34 0 00:17 0.00 0.00 CB #8 1.94 1.94 N/A N/A N/A 12.03 0.53 0 00:10 0.00 0.00 CB #9 1.28 1.28 N/A N/A N/A 9.02 0.47 0 00:21 0.00 0.00 Black Ops Real Estate, LLC Page 4 of 4 11/27/2013 Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 5 - Drainage Study Area 5 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= 1.50 Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 2.34 Highlighted Q Total (cfs)= 2.34 Q Capt (cfs)= 2.34 Q Bypass (cfs)= -0- Depth at Inlet (in)= 4.41 Efficiency (%)= 100 Gutter Spread (ft)= 12.07 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 6 - Drainage Study Area 6 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 0.88 Highlighted Q Total (cfs)= 0.88 Q Capt (cfs)= 0.88 Q Bypass (cfs)= -0- Depth at Inlet (in)= 2.30 Efficiency (%)= 100 Gutter Spread (ft)= 3.27 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 6A - Drainage Study Area 6A Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 2.13 Highlighted Q Total (cfs)= 2.13 Q Capt (cfs)= 2.13 Q Bypass (cfs)= -0- Depth at Inlet (in)= 4.14 Efficiency (%)= 100 Gutter Spread (ft)= 10.95 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 7 - Drainage Study Area 7 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 0.77 Highlighted Q Total (cfs)= 0.77 Q Capt (cfs)= 0.77 Q Bypass (cfs)= -0- Depth at Inlet (in)= 2.10 Efficiency (%)= 100 Gutter Spread (ft)= 2.45 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 8 - Drainage Study Area 8 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 1.93 Highlighted Q Total (cfs)= 1.93 Q Capt (cfs)= 1.93 Q Bypass (cfs)= -0- Depth at Inlet (in)= 3.88 Efficiency (%)= 100 Gutter Spread (ft)= 9.85 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 9 - Drainage Study Area 9 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 1.28 Highlighted Q Total (cfs)= 1.28 Q Capt (cfs)= 1.28 Q Bypass (cfs)= -0- Depth at Inlet (in)= 2.95 Efficiency (%)= 100 Gutter Spread (ft)= 5.98 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 10 - Drainage Study Area 10 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 0.21 Highlighted Q Total (cfs)= 0.21 Q Capt (cfs)= 0.21 Q Bypass (cfs)= -0- Depth at Inlet (in)= 0.88 Efficiency (%)= 100 Gutter Spread (ft)= 0.89 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 11 - Drainage Study Area 11 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 1.73 Highlighted Q Total (cfs)= 1.73 Q Capt (cfs)= 1.73 Q Bypass (cfs)= -0- Depth at Inlet (in)= 3.60 Efficiency (%)= 100 Gutter Spread (ft)= 8.72 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 12 - Drainage Study Area 12 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 0.54 Highlighted Q Total (cfs)= 0.54 Q Capt (cfs)= 0.54 Q Bypass (cfs)= -0- Depth at Inlet (in)= 1.66 Efficiency (%)= 100 Gutter Spread (ft)= 1.66 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 13 - Drainage Study Area 13 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 1.17 Highlighted Q Total (cfs)= 1.17 Q Capt (cfs)= 1.17 Q Bypass (cfs)= -0- Depth at Inlet (in)= 2.78 Efficiency (%)= 100 Gutter Spread (ft)= 5.27 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Nov 19 2013 Catch Basin 14 - Drainage Study Area 14 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 0.18 Highlighted Q Total (cfs)= 0.18 Q Capt (cfs)= 0.18 Q Bypass (cfs)= -0- Depth at Inlet (in)= 0.80 Efficiency (%)= 100 Gutter Spread (ft)= 0.80 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Oct 15 2013 Catch Basin 15 - Drainage Study Area 15 Curb Inlet Location= Sag Curb Length (ft)= 7.00 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 4.07 Highlighted Q Total (cfs)= 4.07 Q Capt (cfs)= 4.07 Q Bypass (cfs)= -0- Depth at Inlet (in)= 4.02 Efficiency (%)= 100 Gutter Spread (ft)= 10.44 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Wednesday, Sep 11 2013 Catch Basin 16 - Drainage Study Area 16 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.00 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 0.52 Highlighted Q Total (cfs)= 0.52 Q Capt (cfs)= 0.52 Q Bypass (cfs)= -0- Depth at Inlet (in)= 3.20 Efficiency (%)= 100 Gutter Spread (ft)= 1.21 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Wednesday, Sep 11 2013 Catch Basin 17 - Drainage Study Area 17 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.00 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= 2.00 Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 1.80 Highlighted Q Total (cfs)= 1.80 Q Capt (cfs)= 1.80 Q Bypass (cfs)= -0- Depth at Inlet (in)= 4.76 Efficiency (%)= 100 Gutter Spread (ft)= 5.19 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Oct 15 2013 Catch Basin 18 - Drainage Study Area 18 Curb Inlet Location= Sag Curb Length (ft)= 3.50 Throat Height (in)= 4.50 Grate Area (sqft)= -0- Grate Width (ft)= -0- Grate Length (ft)= -0- Gutter Slope, Sw (ft/ft)= 0.083 Slope, Sx (ft/ft)= 0.020 Local Depr (in)= -0- Gutter Width (ft)= 2.00 Gutter Slope (%)= -0- Gutter n-value= -0- Calculations Compute by:Known Q Q (cfs)= 0.64 Highlighted Q Total (cfs)= 0.64 Q Capt (cfs)= 0.64 Q Bypass (cfs)= -0- Depth at Inlet (in)= 1.86 Efficiency (%)= 100 Gutter Spread (ft)= 1.86 Gutter Vel (ft/s)= -0- Bypass Spread (ft)= -0- Bypass Depth (in)= -0- HYDRAULIC CALCULATIONS AND PIPE PROFILES 10-YEAR STORM 10 Year Report Project Description TR6824.SPF Project Options CFS Elevation Rational User-Defined Hydrodynamic YES NO Analysis Options Aug 27, 2013 00:00:00 Aug 27, 2013 01:00:00 Aug 27, 2013 00:00:00 0 days 0 01:00:00 days hh:mm:ss 0 00:05:00 days hh:mm:ss 0 00:05:00 days hh:mm:ss 30 seconds Number of Elements Qty 0 15 32 16 1 0 15 0 31 0 31 0 0 0 0 0 0 Rainfall Details 10 year(s) Outlets .......................................................................... Pollutants .............................................................................. Land Uses ............................................................................ Return Period........................................................................ Links...................................................................................... Channels ...................................................................... Pipes ............................................................................ Pumps .......................................................................... Orifices ......................................................................... Weirs ............................................................................ Nodes.................................................................................... Junctions ...................................................................... Outfalls ......................................................................... Flow Diversions ........................................................... Inlets ............................................................................ Storage Nodes ............................................................. Runoff (Dry Weather) Time Step .......................................... Runoff (Wet Weather) Time Step ........................................ Reporting Time Step ............................................................ Routing Time Step ................................................................ Rain Gages ........................................................................... Subbasins.............................................................................. Enable Overflow Ponding at Nodes ...................................... Skip Steady State Analysis Time Periods ............................ Start Analysis On .................................................................. End Analysis On ................................................................... Start Reporting On ................................................................ Antecedent Dry Days ............................................................ File Name ............................................................................. Flow Units ............................................................................. Elevation Type ...................................................................... Hydrology Method ................................................................. Time of Concentration (TOC) Method .................................. Link Routing Method ............................................................. Black Ops Real Estate, LLC Page 1 of 25 12/18/2013 10 Year Report Subbasin Summary Subbasin Area Weighted Peak Time of ID Runoff Runoff Concentration Coefficient (ac)(cfs)(days hh:mm:ss) AREA 10 3.10 0.4000 1.39 0 00:22:34 AREA 11 1.07 0.1500 0.21 0 00:17:55 AREA 12 9.89 0.4200 4.82 0 00:21:21 AREA 13 1.09 0.4200 0.61 0 00:17:21 AREA 14 1.50 0.4200 0.76 0 00:20:16 AREA 15 4.36 0.4200 2.13 0 00:21:15 AREA 3 2.37 0.3500 1.05 0 00:18:55 AREA 4 1.78 0.3800 0.91 0 00:17:19 AREA 5 1.44 0.9500 2.30 0 00:10:00 AREA 6 3.09 0.4200 1.51 0 00:21:14 AREA 7 0.42 0.4200 0.25 0 00:15:42 AREA 8 2.00 0.6100 2.05 0 00:10:00 AREA 9 0.40 0.9500 0.64 0 00:10:00 AREAS A & 1 3.52 0.4700 2.79 0 00:10:00 AREAS B & 2 2.96 0.5100 2.54 0 00:10:00 Black Ops Real Estate, LLC Page 2 of 25 12/18/2013 10 Year Report Link Summary Element Element Diameter or From Inlet To (Outlet)Outlet Length Average Manning's Peak Design Flow Peak Flow/Peak Flow Peak Flow Peak Flow Total Time Reported ID Type Height (Inlet)Invert Node Invert Slope Roughness Flow Capacity Design Flow Velocity Depth Depth/Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (in)(ft)(ft)(ft)(%)(cfs)(cfs)(ft/sec)(ft)(min) 2 Pipe 24 MH-10 337.00 MH-11 336.00 61.42 1.6300 0.0130 23.93 28.87 0.83 8.12 2.00 1.00 0.00 SURCHARGED 3 Pipe 18 MH-1 341.37 MH-2 340.68 574.00 0.1200 0.0130 2.21 4.70 0.47 1.76 1.36 0.91 0.00 Calculated 4 Pipe 18 MH-2 340.68 MH-3 340.27 330.74 0.1200 0.0130 2.86 4.70 0.61 1.77 1.50 1.00 8.00 SURCHARGED 5 Pipe 18 MH-3 340.27 MH-4 340.21 47.27 0.1300 0.0130 3.50 4.70 0.74 1.98 1.50 1.00 11.00 SURCHARGED 6 Pipe 18 MH-4 340.21 MH-5 340.11 81.15 0.1200 0.0130 3.50 4.70 0.74 1.98 1.50 1.00 11.00 SURCHARGED 7 Pipe 18 MH-5 340.11 MH-7 340.06 38.85 0.1300 0.0130 4.39 4.70 0.93 3.39 1.50 1.00 10.00 SURCHARGED 8 Pipe 18 MH-7 340.06 MH-8 340.00 49.02 0.1200 0.0130 6.64 4.70 1.41 3.83 1.45 0.97 0.00 > CAPACITY 9 Pipe 18 MH-14 338.37 MH-15 338.17 160.27 0.1200 0.0130 1.54 4.70 0.33 0.87 1.50 1.00 14.00 SURCHARGED 10 Pipe 18 MH-8 340.00 MH-9 337.97 470.98 0.4300 0.0130 6.79 6.90 0.98 5.09 1.24 0.83 0.00 Calculated 11 Pipe 18 MH-9 337.97 MH-11 335.73 112.46 1.9900 0.0130 11.06 14.82 0.75 6.26 1.50 1.00 1.00 SURCHARGED 12 Pipe 18 CB #11 339.50 MH-12 339.25 189.49 0.1300 0.0130 3.04 4.70 0.65 3.64 0.87 0.58 0.00 Calculated 13 Pipe 18 MH-12 339.25 MH-13 339.21 31.75 0.1300 0.0130 1.85 4.70 0.39 1.69 0.90 0.60 0.00 Calculated 14 Pipe 18 MH-13 339.21 MH-9 339.05 129.84 0.1200 0.0130 2.40 4.70 0.51 2.78 0.73 0.51 0.00 Calculated 15 Pipe 18 MH-7 341.50 CB #8 341.35 119.44 0.1300 0.0130 2.20 4.70 0.47 2.43 0.77 0.51 0.00 Calculated 23 Pipe 18 CB #16 339.80 MH-16 339.77 25.00 0.1200 0.0130 0.61 4.70 0.13 1.99 0.42 0.28 0.00 Calculated 24 Pipe 18 CB #15 339.25 MH-15 339.23 15.00 0.1300 0.0130 4.80 4.70 1.02 3.57 1.50 1.00 4.00 SURCHARGED 25 Pipe 18 CB #13 338.40 MH-14 338.37 25.37 0.1200 0.0130 1.38 4.70 0.29 1.98 1.50 1.00 14.00 SURCHARGED 26 Pipe 18 CB #14 338.75 MH-14 338.71 31.40 0.1300 0.0130 0.20 4.70 0.04 0.98 1.50 1.00 10.00 SURCHARGED 27 Pipe 18 CB #17 339.75 MH-10 338.94 16.28 4.9800 0.0130 2.13 23.43 0.09 6.66 0.72 0.55 0.00 Calculated 28 Pipe 18 CB #10 341.60 MH-8 341.58 15.00 0.1300 0.0130 0.25 4.70 0.05 1.57 0.22 0.15 0.00 Calculated 29 Pipe 18 CB #9 341.50 MH-7 341.47 25.00 0.1200 0.0130 1.51 4.70 0.32 2.60 0.54 0.36 0.00 Calculated 30 Pipe 18 CB #6 342.00 MH-3 341.97 25.17 0.1200 0.0130 1.04 4.70 0.22 2.33 0.45 0.30 0.00 Calculated 31 Pipe 18 CB #7 341.50 MH-5 341.48 15.00 0.1300 0.0130 0.91 4.70 0.19 2.21 0.51 0.34 0.00 Calculated 32 Pipe 18 CB #5 342.30 MH-1 342.24 50.40 0.1200 0.0130 2.75 4.70 0.58 3.05 0.76 0.51 0.00 Calculated 33 Pipe 18 CB #6A 342.80 MH-2 342.26 45.39 1.1900 0.0130 2.52 11.46 0.22 4.63 0.52 0.35 0.00 Calculated 36 Pipe 18 CB #18 338.35 MH-11 338.19 17.68 0.9000 0.0130 9.06 9.99 0.91 6.19 1.03 1.00 0.00 SURCHARGED 37 Pipe 24 MH-11 335.00 SUMP 333.00 62.98 3.1800 0.0130 28.22 40.31 0.70 8.98 2.00 1.00 53.00 SURCHARGED 38 Pipe 18 MH-15 338.17 MH-16 337.97 174.79 0.1100 0.0130 6.18 4.70 1.32 3.50 1.50 1.00 14.00 SURCHARGED 39 Pipe 18 MH-16 337.97 MH-17 337.55 350.48 0.1200 0.0130 6.31 4.70 1.34 3.67 1.41 0.94 0.00 > CAPACITY 40 Pipe 24 MH-17 337.55 MH-10 337.00 346.16 0.1600 0.0130 6.22 10.12 0.61 3.50 1.10 0.55 0.00 Calculated 41 Pipe 18 CB #12 340.00 MH-13 339.97 24.97 0.1200 0.0130 0.63 4.70 0.13 2.01 0.35 0.23 0.00 Calculated Black Ops Real Estate, LLC Page 3 of 25 12/18/2013 10 Year Report Inlet Summary Element Catchbasin Max (Rim)Inlet Initial Ponded Peak Peak Flow Peak Flow Inlet Allowable Max Gutter Max Gutter ID Invert Elevation Location Water Area Flow Intercepted Bypassing Efficiency Spread Spread Water Elev. Elevation Elevation by Inlet during Peak during Peak during Peak Inlet Flow Flow Flow (ft)(ft)(ft)(ft²)(cfs)(cfs)(cfs)(%)(ft)(ft)(ft) CB #10 341.60 346.07 On Sag 341.60 25.00 0.25 N/A N/A N/A 7.00 1.96 346.18 CB #11 339.50 343.92 On Sag 341.00 25.00 2.05 N/A N/A N/A 7.00 12.52 344.46 CB #12 340.00 344.81 On Sag 340.00 25.00 0.64 N/A N/A N/A 7.00 4.96 345.09 CB #13 338.40 342.86 On Sag 338.40 25.00 1.39 N/A N/A N/A 7.00 9.52 343.34 CB #14 338.75 342.78 On Sag 338.75 25.00 0.21 N/A N/A N/A 7.00 1.63 342.87 CB #15 339.25 343.64 On Sag 339.25 25.00 4.82 N/A N/A N/A 7.00 22.15 344.38 CB #16 339.80 344.32 On Sag 339.80 25.00 0.61 N/A N/A N/A 7.00 4.76 344.59 CB #17 339.75 344.33 On Sag 339.75 25.00 2.13 N/A N/A N/A 7.00 12.83 344.88 CB #18 338.35 344.56 On Sag 341.00 25.00 0.76 N/A N/A N/A 7.00 5.89 344.90 CB #5 342.30 346.93 On Sag 342.30 25.00 2.78 N/A N/A N/A 7.00 15.32 347.53 CB #6 342.00 346.40 On Sag 342.00 25.00 1.05 N/A N/A N/A 7.00 7.97 346.85 CB #6A 342.80 347.26 On Sag 342.80 25.00 2.54 N/A N/A N/A 7.00 14.39 347.84 CB #7 341.50 346.04 On Sag 341.50 25.00 0.91 N/A N/A N/A 7.00 7.03 346.44 CB #8 341.50 346.00 On Sag 341.50 25.00 2.30 N/A N/A N/A 7.00 13.48 346.56 CB #9 341.50 345.89 On Sag 341.50 25.00 1.51 N/A N/A N/A 7.00 10.10 346.39 Black Ops Real Estate, LLC Page 4 of 25 12/18/2013 10 Year Report Subbasin Hydrology Subbasin : AREA 10 Input Data Area (ac) .....................................................................3.10 Weighted Runoff Coefficient ......................................0.4000 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size: 7,500 SF, less than 25 years 1.55 B (0-2%)0.38 R1 - Lot Size: 6,000 SF, less than 25 years 1.55 B (0-2%)0.42 Composite Area & Weighted Runoff Coeff.3.10 0.40 Subbasin Runoff Results Total Rainfall (in) ........................................................0.42 Total Runoff (in) ..........................................................0.17 Peak Runoff (cfs) .......................................................1.39 Rainfall Intensity .........................................................1.118 Weighted Runoff Coefficient ......................................0.4000 Time of Concentration (days hh:mm:ss) ....................0 00:22:34 Black Ops Real Estate, LLC Page 5 of 25 12/18/2013 10 Year Report Subbasin : AREA 11 Input Data Area (ac) .....................................................................1.07 Weighted Runoff Coefficient ......................................0.1500 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. Lawns and Landscape Areas, less than 25 years 1.07 B (2-6%)0.15 Composite Area & Weighted Runoff Coeff.1.07 0.15 Subbasin Runoff Results Total Rainfall (in) ........................................................0.39 Total Runoff (in) ..........................................................0.06 Peak Runoff (cfs) .......................................................0.21 Rainfall Intensity .........................................................1.310 Weighted Runoff Coefficient ......................................0.1500 Time of Concentration (days hh:mm:ss) ....................0 00:17:55 Black Ops Real Estate, LLC Page 6 of 25 12/18/2013 10 Year Report Subbasin : AREA 12 Input Data Area (ac) .....................................................................9.89 Weighted Runoff Coefficient ......................................0.4200 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size: 6,000 SF, less than 25 years 9.89 B (0-2%)0.42 Composite Area & Weighted Runoff Coeff.9.89 0.42 Subbasin Runoff Results Total Rainfall (in) ........................................................0.41 Total Runoff (in) ..........................................................0.17 Peak Runoff (cfs) .......................................................4.82 Rainfall Intensity .........................................................1.161 Weighted Runoff Coefficient ......................................0.4200 Time of Concentration (days hh:mm:ss) ....................0 00:21:22 Black Ops Real Estate, LLC Page 7 of 25 12/18/2013 10 Year Report Subbasin : AREA 13 Input Data Area (ac) .....................................................................1.09 Weighted Runoff Coefficient ......................................0.4200 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size: 6,000 SF, less than 25 years 1.09 B (0-2%)0.42 Composite Area & Weighted Runoff Coeff.1.09 0.42 Subbasin Runoff Results Total Rainfall (in) ........................................................0.39 Total Runoff (in) ..........................................................0.16 Peak Runoff (cfs) .......................................................0.61 Rainfall Intensity .........................................................1.339 Weighted Runoff Coefficient ......................................0.4200 Time of Concentration (days hh:mm:ss) ....................0 00:17:21 Black Ops Real Estate, LLC Page 8 of 25 12/18/2013 10 Year Report Subbasin : AREA 14 Input Data Area (ac) .....................................................................1.50 Weighted Runoff Coefficient ......................................0.4200 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size: 6,000 SF, less than 25 years 1.50 B (0-2%)0.42 Composite Area & Weighted Runoff Coeff.1.50 0.42 Subbasin Runoff Results Total Rainfall (in) ........................................................0.41 Total Runoff (in) ..........................................................0.17 Peak Runoff (cfs) .......................................................0.76 Rainfall Intensity .........................................................1.204 Weighted Runoff Coefficient ......................................0.4200 Time of Concentration (days hh:mm:ss) ....................0 00:20:16 Black Ops Real Estate, LLC Page 9 of 25 12/18/2013 10 Year Report Subbasin : AREA 15 Input Data Area (ac) .....................................................................4.36 Weighted Runoff Coefficient ......................................0.4200 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size: 6,000 SF, less than 25 years 4.36 B (0-2%)0.42 Composite Area & Weighted Runoff Coeff.4.36 0.42 Subbasin Runoff Results Total Rainfall (in) ........................................................0.41 Total Runoff (in) ..........................................................0.17 Peak Runoff (cfs) .......................................................2.13 Rainfall Intensity .........................................................1.165 Weighted Runoff Coefficient ......................................0.4200 Time of Concentration (days hh:mm:ss) ....................0 00:21:16 Black Ops Real Estate, LLC Page 10 of 25 12/18/2013 10 Year Report Subbasin : AREA 3 Input Data Area (ac) .....................................................................2.37 Weighted Runoff Coefficient ......................................0.3500 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size 10,000 SF, less than 25 years 2.00 B (0-2%)0.34 R1 - Lot Size: 7,500 SF, less than 25 years 0.37 B (0-2%)0.38 Composite Area & Weighted Runoff Coeff.2.37 0.35 Subbasin Runoff Results Total Rainfall (in) ........................................................0.40 Total Runoff (in) ..........................................................0.14 Peak Runoff (cfs) .......................................................1.05 Rainfall Intensity .........................................................1.262 Weighted Runoff Coefficient ......................................0.3500 Time of Concentration (days hh:mm:ss) ....................0 00:18:56 Black Ops Real Estate, LLC Page 11 of 25 12/18/2013 10 Year Report Subbasin : AREA 4 Input Data Area (ac) .....................................................................1.78 Weighted Runoff Coefficient ......................................0.3800 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size: 7,500 SF, less than 25 years 1.78 B (0-2%)0.38 Composite Area & Weighted Runoff Coeff.1.78 0.38 Subbasin Runoff Results Total Rainfall (in) ........................................................0.39 Total Runoff (in) ..........................................................0.15 Peak Runoff (cfs) .......................................................0.91 Rainfall Intensity .........................................................1.340 Weighted Runoff Coefficient ......................................0.3800 Time of Concentration (days hh:mm:ss) ....................0 00:17:20 Black Ops Real Estate, LLC Page 12 of 25 12/18/2013 10 Year Report Subbasin : AREA 5 Input Data Area (ac) .....................................................................1.44 Weighted Runoff Coefficient ......................................0.9500 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. Pavement, drives and roofs, less than 25 years 1.44 B (0-2%)0.95 Composite Area & Weighted Runoff Coeff.1.44 0.95 Subbasin Runoff Results Total Rainfall (in) ........................................................0.28 Total Runoff (in) ..........................................................0.27 Peak Runoff (cfs) .......................................................2.30 Rainfall Intensity .........................................................1.684 Weighted Runoff Coefficient ......................................0.9500 Time of Concentration (days hh:mm:ss) ....................0 00:10:00 Black Ops Real Estate, LLC Page 13 of 25 12/18/2013 10 Year Report Subbasin : AREA 6 Input Data Area (ac) .....................................................................3.09 Weighted Runoff Coefficient ......................................0.4200 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size: 6,000 SF, less than 25 years 3.09 B (0-2%)0.42 Composite Area & Weighted Runoff Coeff.3.09 0.42 Subbasin Runoff Results Total Rainfall (in) ........................................................0.41 Total Runoff (in) ..........................................................0.17 Peak Runoff (cfs) .......................................................1.51 Rainfall Intensity .........................................................1.166 Weighted Runoff Coefficient ......................................0.4200 Time of Concentration (days hh:mm:ss) ....................0 00:21:14 Black Ops Real Estate, LLC Page 14 of 25 12/18/2013 10 Year Report Subbasin : AREA 7 Input Data Area (ac) .....................................................................0.42 Weighted Runoff Coefficient ......................................0.4200 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size: 6,000 SF, less than 25 years 0.38 B (0-2%)0.42 Composite Area & Weighted Runoff Coeff.0.38 0.42 Subbasin Runoff Results Total Rainfall (in) ........................................................0.37 Total Runoff (in) ..........................................................0.16 Peak Runoff (cfs) .......................................................0.25 Rainfall Intensity .........................................................1.434 Weighted Runoff Coefficient ......................................0.4200 Time of Concentration (days hh:mm:ss) ....................0 00:15:43 Black Ops Real Estate, LLC Page 15 of 25 12/18/2013 10 Year Report Subbasin : AREA 8 Input Data Area (ac) .....................................................................2.00 Weighted Runoff Coefficient ......................................0.6100 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size: 7,500 SF, less than 25 years 1.20 B (0-2%)0.38 Pavement, drives and roofs, less than 25 years 0.80 B (0-2%)0.95 Composite Area & Weighted Runoff Coeff.2.00 0.61 Subbasin Runoff Results Total Rainfall (in) ........................................................0.28 Total Runoff (in) ..........................................................0.17 Peak Runoff (cfs) .......................................................2.05 Rainfall Intensity .........................................................1.684 Weighted Runoff Coefficient ......................................0.6100 Time of Concentration (days hh:mm:ss) ....................0 00:10:00 Black Ops Real Estate, LLC Page 16 of 25 12/18/2013 10 Year Report Subbasin : AREA 9 Input Data Area (ac) .....................................................................0.40 Weighted Runoff Coefficient ......................................0.9500 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. Parking, 25 years or greater 0.40 B (0-2%)0.95 Composite Area & Weighted Runoff Coeff.0.40 0.95 Subbasin Runoff Results Total Rainfall (in) ........................................................0.28 Total Runoff (in) ..........................................................0.27 Peak Runoff (cfs) .......................................................0.64 Rainfall Intensity .........................................................1.684 Weighted Runoff Coefficient ......................................0.9500 Time of Concentration (days hh:mm:ss) ....................0 00:10:00 Black Ops Real Estate, LLC Page 17 of 25 12/18/2013 10 Year Report Subbasin : AREAS A & 1 Input Data Area (ac) .....................................................................3.52 Weighted Runoff Coefficient ......................................0.4700 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. R1 - Lot Size: 7,500 SF, less than 25 years 2.94 B (0-2%)0.38 Pavement, drives and roofs, less than 25 years 0.58 B (0-2%)0.95 Composite Area & Weighted Runoff Coeff.3.52 0.47 Subbasin Runoff Results Total Rainfall (in) ........................................................0.28 Total Runoff (in) ..........................................................0.13 Peak Runoff (cfs) .......................................................2.79 Rainfall Intensity .........................................................1.684 Weighted Runoff Coefficient ......................................0.4700 Time of Concentration (days hh:mm:ss) ....................0 00:10:00 Black Ops Real Estate, LLC Page 18 of 25 12/18/2013 10 Year Report Subbasin : AREAS B & 2 Input Data Area (ac) .....................................................................2.96 Weighted Runoff Coefficient ......................................0.5100 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres)Group Coeff. Pavement, drives and roofs, less than 25 years 0.68 B (0-2%)0.95 R1 - Lot Size: 7,500 SF, less than 25 years 2.28 B (0-2%)0.38 Composite Area & Weighted Runoff Coeff.2.96 0.51 Subbasin Runoff Results Total Rainfall (in) ........................................................0.28 Total Runoff (in) ..........................................................0.14 Peak Runoff (cfs) .......................................................2.54 Rainfall Intensity .........................................................1.684 Weighted Runoff Coefficient ......................................0.5100 Time of Concentration (days hh:mm:ss) ....................0 00:10:00 Black Ops Real Estate, LLC Page 19 of 25 12/18/2013 10 Year Report Junction Input Element Invert Ground/Rim Element Initial Initial Surcharge Surcharge Ponded ID Elevation (Max)Depth Water Water Elevation Depth Area Elevation Elevation Depth (ft)(ft)(ft)(ft)(ft)(ft)(ft)(ft²) MH-1 341.37 347.36 5.99 341.37 0.00 341.37 -5.99 0.00 MH-10 336.15 345.06 8.91 341.00 4.85 336.15 -8.91 0.00 MH-11 335.00 344.50 9.50 335.00 0.00 335.00 -9.50 0.00 MH-12 339.25 344.85 5.60 339.25 0.00 339.25 -5.60 0.00 MH-13 339.21 344.90 5.69 339.21 0.00 339.21 -5.69 0.00 MH-14 338.37 343.31 4.94 338.37 0.00 338.37 -4.94 0.00 MH-15 338.17 343.64 5.47 338.17 0.00 338.17 -5.47 0.00 MH-16 337.97 344.75 6.78 337.97 0.00 337.97 -6.78 0.00 MH-17 337.55 345.74 8.19 337.55 0.00 337.55 -8.19 0.00 MH-2 340.68 347.98 7.30 341.00 0.32 340.68 -7.30 0.00 MH-3 340.27 346.91 6.64 341.00 0.73 340.27 -6.64 0.00 MH-4 340.21 346.78 6.57 341.00 0.79 340.21 -6.57 0.00 MH-5 340.11 346.47 6.36 341.00 0.89 340.11 -6.36 0.00 MH-7 340.06 346.35 6.29 340.06 0.00 340.06 -6.29 0.00 MH-8 340.00 346.50 6.50 341.00 1.00 340.00 -6.50 0.00 MH-9 337.97 345.37 7.40 341.00 3.03 337.97 -7.40 0.00 Black Ops Real Estate, LLC Page 20 of 25 12/18/2013 10 Year Report Junction Results Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs)(cfs)(ft)(ft)(ft)(ft)(ft)(ft)(days hh:mm)(days hh:mm)(ac-in)(min) MH-1 2.75 0.00 342.59 1.22 0.00 4.77 341.84 0.47 0 00:15 0 00:00 0.00 0.00 MH-10 8.06 0.00 340.64 4.49 0.00 4.42 337.61 1.46 0 00:00 0 00:00 0.00 0.00 MH-11 50.05 0.00 341.77 6.77 0.00 2.73 337.35 2.35 0 00:00 0 00:00 0.00 0.00 MH-12 3.04 0.00 340.16 0.91 0.00 4.69 339.63 0.38 0 00:11 0 00:00 0.00 0.00 MH-13 2.45 0.00 340.09 0.88 0.00 4.81 339.60 0.39 0 00:11 0 00:00 0.00 0.00 MH-14 1.54 0.00 340.98 2.61 0.00 2.33 339.68 1.31 0 00:22 0 00:00 0.00 0.00 MH-15 6.27 0.00 340.93 2.76 0.00 2.71 339.65 1.48 0 00:22 0 00:00 0.00 0.00 MH-16 6.62 0.00 340.19 2.22 0.00 4.56 339.25 1.28 0 00:23 0 00:00 0.00 0.00 MH-17 6.31 0.00 338.87 1.32 0.00 6.87 338.45 0.90 0 00:24 0 00:00 0.00 0.00 MH-2 4.67 0.00 342.47 1.79 0.00 5.51 341.56 0.88 0 00:15 0 00:00 0.00 0.00 MH-3 3.55 0.00 342.23 1.96 0.00 4.68 341.39 1.12 0 00:16 0 00:00 0.00 0.00 MH-4 3.50 0.00 342.12 1.91 0.00 4.66 341.33 1.12 0 00:16 0 00:00 0.00 0.00 MH-5 4.36 0.00 341.96 1.85 0.00 4.51 341.25 1.14 0 00:16 0 00:00 0.00 0.00 MH-7 6.66 0.00 341.80 1.74 0.00 4.55 341.16 1.10 0 00:16 0 00:00 0.00 0.00 MH-8 6.85 0.00 341.41 1.41 0.00 5.09 340.88 0.88 0 00:16 0 00:00 0.00 0.00 MH-9 8.77 0.00 340.75 2.78 0.00 4.62 338.59 0.62 0 00:00 0 00:00 0.00 0.00 Black Ops Real Estate, LLC Page 21 of 25 12/18/2013 10 Year Report Pipe Input Element Length Pipe Inlet Inlet Outlet Outlet Total Average Manning's Entrance Exit/Bend Initial ID Diameter or Invert Invert Invert Invert Drop Slope Roughness Losses Losses Flow Height Elevation Offset Elevation Offset (ft)(in)(ft)(ft)(ft)(ft)(ft)(%)(cfs) 2 61.42 24.000 337.00 0.85 336.00 1.00 1.00 1.6300 0.0130 0.5000 0.5000 0.00 3 574.00 18.000 341.37 0.00 340.68 0.00 0.69 0.1200 0.0130 0.5000 0.5000 0.00 4 330.74 18.000 340.68 0.00 340.27 0.00 0.41 0.1200 0.0130 0.5000 0.5000 0.00 5 47.27 18.000 340.27 0.00 340.21 0.00 0.06 0.1300 0.0130 0.5000 0.5000 0.00 6 81.15 18.000 340.21 0.00 340.11 0.00 0.10 0.1200 0.0130 0.5000 0.5000 0.00 7 38.85 18.000 340.11 0.00 340.06 0.00 0.05 0.1300 0.0130 0.5000 0.5000 0.00 8 49.02 18.000 340.06 0.00 340.00 0.00 0.06 0.1200 0.0130 0.5000 0.5000 0.00 9 160.27 18.000 338.37 0.00 338.17 0.00 0.20 0.1200 0.0130 0.5000 0.5000 0.00 10 470.98 18.000 340.00 0.00 337.97 0.00 2.03 0.4300 0.0130 0.5000 0.5000 0.00 11 112.46 18.000 337.97 0.00 335.73 0.73 2.24 1.9900 0.0130 0.5000 0.5000 0.00 12 189.49 18.000 339.50 0.00 339.25 0.00 0.25 0.1300 0.0130 0.5000 0.5000 0.00 13 31.75 18.000 339.25 0.00 339.21 0.00 0.04 0.1300 0.0130 0.5000 0.5000 0.00 14 129.84 18.000 339.21 0.00 339.05 1.08 0.16 0.1200 0.0130 0.5000 0.5000 0.00 15 119.44 18.000 341.50 1.44 341.35 -0.15 0.15 0.1300 0.0130 0.5000 0.5000 0.00 23 25.00 18.000 339.80 0.00 339.77 1.80 0.03 0.1200 0.0130 0.5000 0.5000 0.00 24 15.00 18.000 339.25 0.00 339.23 1.06 0.02 0.1300 0.0130 0.5000 0.5000 0.00 25 25.37 18.000 338.40 0.00 338.37 0.00 0.03 0.1200 0.0130 0.5000 0.5000 0.00 26 31.40 18.000 338.75 0.00 338.71 0.34 0.04 0.1300 0.0130 0.5000 0.5000 0.00 27 16.28 18.000 339.75 0.00 338.94 2.79 0.81 4.9800 0.0130 0.5000 0.5000 0.00 28 15.00 18.000 341.60 0.00 341.58 1.58 0.02 0.1300 0.0130 0.5000 0.5000 0.00 29 25.00 18.000 341.50 0.00 341.47 1.41 0.03 0.1200 0.0130 0.5000 0.5000 0.00 30 25.17 18.000 342.00 0.00 341.97 1.70 0.03 0.1200 0.0130 0.5000 0.5000 0.00 31 15.00 18.000 341.50 0.00 341.48 1.37 0.02 0.1300 0.0130 0.5000 0.5000 0.00 32 50.40 18.000 342.30 0.00 342.24 0.87 0.06 0.1200 0.0130 0.5000 0.5000 0.00 33 45.39 18.000 342.80 0.00 342.26 1.58 0.54 1.1900 0.0130 0.5000 0.5000 0.00 36 17.68 18.000 338.35 0.00 338.19 3.19 0.16 0.9000 0.0130 0.5000 0.5000 0.00 37 62.98 24.000 335.00 0.00 333.00 0.00 2.00 3.1800 0.0130 0.5000 0.5000 0.00 38 174.79 18.000 338.17 0.00 337.97 0.00 0.20 0.1100 0.0130 0.5000 0.5000 0.00 39 350.48 18.000 337.97 0.00 337.55 0.00 0.42 0.1200 0.0130 0.5000 0.5000 0.00 40 346.16 24.000 337.55 0.00 337.00 0.85 0.55 0.1600 0.0130 0.5000 0.5000 0.00 41 24.97 18.000 340.00 0.00 339.97 0.76 0.03 0.1200 0.0130 0.5000 0.5000 0.00 Black Ops Real Estate, LLC Page 22 of 25 12/18/2013 10 Year Report Pipe Results Element Peak Time of Design Flow Peak Flow Travel Peak Flow Peak Flow Reported ID Flow Peak Flow Capacity Velocity Time Depth Depth/Condition Occurrence Total Depth Ratio (cfs)(days hh:mm)(cfs)(ft/sec)(min)(ft) 2 23.93 0 00:00 28.87 8.12 0.13 2.00 1.00 SURCHARGED 3 2.21 0 00:11 4.70 1.76 5.44 1.36 0.91 Calculated 4 2.86 0 00:12 4.70 1.77 3.11 1.50 1.00 SURCHARGED 5 3.50 0 00:16 4.70 1.98 0.40 1.50 1.00 SURCHARGED 6 3.50 0 00:16 4.70 1.98 0.68 1.50 1.00 SURCHARGED 7 4.39 0 00:17 4.70 3.39 0.19 1.50 1.00 SURCHARGED 8 6.64 0 00:13 4.70 3.83 0.21 1.45 0.97 > CAPACITY 9 1.54 0 00:22 4.70 0.87 3.07 1.50 1.00 SURCHARGED 10 6.79 0 00:16 6.90 5.09 1.54 1.24 0.83 Calculated 11 11.06 0 00:00 14.82 6.26 0.30 1.50 1.00 SURCHARGED 12 3.04 0 00:00 4.70 3.64 0.87 0.87 0.58 Calculated 13 1.85 0 00:11 4.70 1.69 0.31 0.90 0.60 Calculated 14 2.40 0 00:11 4.70 2.78 0.78 0.73 0.51 Calculated 15 2.20 0 00:10 4.70 2.43 0.82 0.77 0.51 Calculated 23 0.61 0 00:17 4.70 1.99 0.21 0.42 0.28 Calculated 24 4.80 0 00:21 4.70 3.57 0.07 1.50 1.00 SURCHARGED 25 1.38 0 00:22 4.70 1.98 0.21 1.50 1.00 SURCHARGED 26 0.20 0 00:19 4.70 0.98 0.53 1.50 1.00 SURCHARGED 27 2.13 0 00:21 23.43 6.66 0.04 0.72 0.55 Calculated 28 0.25 0 00:16 4.70 1.57 0.16 0.22 0.15 Calculated 29 1.51 0 00:21 4.70 2.60 0.16 0.54 0.36 Calculated 30 1.04 0 00:19 4.70 2.33 0.18 0.45 0.30 Calculated 31 0.91 0 00:17 4.70 2.21 0.11 0.51 0.34 Calculated 32 2.75 0 00:10 4.70 3.05 0.28 0.76 0.51 Calculated 33 2.52 0 00:10 11.46 4.63 0.16 0.52 0.35 Calculated 36 9.06 0 00:00 9.99 6.19 0.05 1.03 1.00 SURCHARGED 37 28.22 0 00:00 40.31 8.98 0.12 2.00 1.00 SURCHARGED 38 6.18 0 00:22 4.70 3.50 0.83 1.50 1.00 SURCHARGED 39 6.31 0 00:23 4.70 3.67 1.59 1.41 0.94 > CAPACITY 40 6.22 0 00:24 10.12 3.50 1.65 1.10 0.55 Calculated 41 0.63 0 00:10 4.70 2.01 0.21 0.35 0.23 Calculated Black Ops Real Estate, LLC Page 23 of 25 12/18/2013 10 Year Report Inlet Input Element Inlet Catchbasin Max (Rim)Inlet Initial Ponded Grate ID Location Invert Elevation Depth Water Area Clogging Elevation Elevation Factor (ft)(ft)(ft)(ft)(ft²)(%) CB #10 On Sag 341.60 346.07 4.47 341.60 25.00 0.00 CB #11 On Sag 339.50 343.92 4.42 341.00 25.00 0.00 CB #12 On Sag 340.00 344.81 4.81 340.00 25.00 0.00 CB #13 On Sag 338.40 342.86 4.46 338.40 25.00 0.00 CB #14 On Sag 338.75 342.78 4.03 338.75 25.00 0.00 CB #15 On Sag 339.25 343.64 4.39 339.25 25.00 0.00 CB #16 On Sag 339.80 344.32 4.52 339.80 25.00 0.00 CB #17 On Sag 339.75 344.33 4.58 339.75 25.00 0.00 CB #18 On Sag 338.35 344.56 6.21 341.00 25.00 0.00 CB #5 On Sag 342.30 346.93 4.63 342.30 25.00 0.00 CB #6 On Sag 342.00 346.40 4.40 342.00 25.00 0.00 CB #6A On Sag 342.80 347.26 4.46 342.80 25.00 0.00 CB #7 On Sag 341.50 346.04 4.54 341.50 25.00 0.00 CB #8 On Sag 341.50 346.00 4.50 341.50 25.00 0.00 CB #9 On Sag 341.50 345.89 4.39 341.50 25.00 0.00 Black Ops Real Estate, LLC Page 24 of 25 12/18/2013 10 Year Report Inlet Results Element Peak Peak Peak Flow Peak Flow Inlet Max Gutter Max Gutter Max Gutter Time of Total Total Time ID Flow Lateral Intercepted Bypassing Efficiency Spread Water Elev.Water Depth Max Depth Flooded Flooded Inflow by Inlet during Peak during Peak during Peak during Peak Occurrence Volume Inlet Flow Flow Flow Flow (cfs)(cfs)(cfs)(cfs)(%)(ft)(ft)(ft)(days hh:mm)(ac-in)(min) CB #10 0.25 0.25 N/A N/A N/A 1.96 346.18 0.11 0 00:16 0.00 0.00 CB #11 2.05 2.05 N/A N/A N/A 12.52 344.46 0.54 0 00:00 0.00 0.00 CB #12 0.64 0.64 N/A N/A N/A 4.96 345.09 0.28 0 00:10 0.00 0.00 CB #13 1.39 1.39 N/A N/A N/A 9.52 343.34 0.48 0 00:22 0.00 0.00 CB #14 0.21 0.21 N/A N/A N/A 1.63 342.87 0.09 0 00:22 0.00 0.00 CB #15 4.82 4.82 N/A N/A N/A 22.15 344.38 0.74 0 00:22 0.00 0.00 CB #16 0.61 0.61 N/A N/A N/A 4.76 344.59 0.27 0 00:23 0.00 0.00 CB #17 2.13 2.13 N/A N/A N/A 12.83 344.88 0.55 0 00:00 0.00 0.00 CB #18 0.76 0.76 N/A N/A N/A 5.89 344.90 0.34 0 00:00 0.00 0.00 CB #5 2.78 2.78 N/A N/A N/A 15.32 347.53 0.60 0 00:10 0.00 0.00 CB #6 1.05 1.05 N/A N/A N/A 7.97 346.85 0.45 0 00:19 0.00 0.00 CB #6A 2.54 2.54 N/A N/A N/A 14.39 347.84 0.58 0 00:10 0.00 0.00 CB #7 0.91 0.91 N/A N/A N/A 7.03 346.44 0.40 0 00:17 0.00 0.00 CB #8 2.30 2.30 N/A N/A N/A 13.48 346.56 0.56 0 00:10 0.00 0.00 CB #9 1.51 1.51 N/A N/A N/A 10.10 346.39 0.50 0 00:21 0.00 0.00 Black Ops Real Estate, LLC Page 25 of 25 12/18/2013 Au t o d e s k S t o r m a n d S a n i t a r y A n a l y s i s Au t o d e s k S t o r m a n d S a n i t a r y A n a l y s i s Au t o d e s k S t o r m a n d S a n i t a r y A n a l y s i s FORT SANDERS AVENUE STORM DRAIN PROFILE HG L HG L Au t o d e s k S t o r m a n d S a n i t a r y A n a l y s i s Au t o d e s k S t o r m a n d S a n i t a r y A n a l y s i s Au t o d e s k S t o r m a n d S a n i t a r y A n a l y s i s MONAHAN STREET STORM DRAIN PROFILE HG L HGL Au t o d e s k S t o r m a n d S a n i t a r y A n a l y s i s Au t o d e s k S t o r m a n d S a n i t a r y A n a l y s i s Au t o d e s k S t o r m a n d S a n i t a r y A n a l y s i s BALMORHEA STREET STORM DRAIN PROFILE BASIN EXHIBIT DRAINAGE EXHIBIT REFERENCE 1 David Fidelino From:Miguel Loreto Sent:Thursday, January 02, 2014 10:45 AM To:David Fidelino Subject:FW: Tract 6824: Sump Design Review Attachments:BASIN Layout1.pdf; 02213109 Soil Absorption Update (Tract 6824).pdf fyi From: Don Richardson [mailto:drichard@bakersfieldcity.us] Sent: Monday, December 09, 2013 3:11 PM To: Manpreet Behl Cc: Miguel Loreto Subject: FW: Tract 6824: Sump Design Review Manny, The Water Resources Department has approved the basin design for Tract 6824, based on the attached documents. If PW has any concerns please contact Miguel Loreto at McIntosh. Thanks Don RichardsonDon RichardsonDon RichardsonDon Richardson Superintendent Water Resources Department City Of Bakersfield 661-326-3715 From: Miguel Loreto [mailto:mloreto@mcintoshassoc.com] Sent: Monday, December 09, 2013 2:34 PM To: Don Richardson; David Fidelino Cc: Manpreet Behl; Art Chianello; Jason Meadors Subject: RE: Tract 6824: Sump Design Review Don, Per our telephone conversation, I am attaching a revised report from Krazan with the basin exhibit matching the one on our plans. I am also attaching an exhibit for the anticipated ultimate build out of the basin. Please do not hesitate to call if you have any questions or need additional information. Sincerely, Miguel A. Loreto Project Manager 2 2001 Wheelan Court Bakersfield, CA 93309 (661) 834-4814 Fax (661) 834-0972 http://www.mcintoshassoc.com From: Don Richardson [mailto:drichard@bakersfieldcity.us] Sent: Wednesday, November 27, 2013 3:52 PM To: Miguel Loreto; David Fidelino Cc: Manpreet Behl; Art Chianello; Jason Meadors Subject: RE: Tract 6824: Sump Design Review Miguel, Please relocate the access ramp to the East side of the basin as shown on the Krazan Plans. This is a safer access than the one coming of the entrance to the subdivision. Also, include our request that a block wall be installed completely around the perimeter of the Basin. Current plans indicate that a block wall is on the west side and partially on the north side of the basin fence line. Consistent type of fencing is preferred for maintenance and aesthetics purposes. Thanks Don RichardsonDon RichardsonDon RichardsonDon Richardson Superintendent Water Resources Department City Of Bakersfield 661-326-3715 From: Miguel Loreto [mailto:mloreto@mcintoshassoc.com] Sent: Wednesday, November 27, 2013 3:37 PM To: Don Richardson; David Fidelino Cc: Manpreet Behl; Art Chianello; Jason Meadors Subject: RE: Tract 6824: Sump Design Review Don, Thank you for the quick review. The McIntosh plan for the sump are the most current based on close review and city comments. The one from Krazan was a preliminary layout. I will have this revised and make sure that Krazan’s plans match ours. We should have the revisions back to you by next week. Thank you, Miguel A. Loreto 3 Project Manager 2001 Wheelan Court Bakersfield, CA 93309 (661) 834-4814 Fax (661) 834-0972 http://www.mcintoshassoc.com From: Don Richardson [mailto:drichard@bakersfieldcity.us] Sent: Wednesday, November 27, 2013 3:25 PM To: David Fidelino Cc: Miguel Loreto; Manpreet Behl; Art Chianello; Jason Meadors Subject: RE: Tract 6824: Sump Design Review David, The McIntosh & Associate drainage basin plans do not match the Krazan Geotechnical Soils Absorption Evaluation report plans. Please address the following: 1. Ramp in different locations. (City prefers Krazan Plans) 2. Outlet Structures in different Locations. These should be corrected to reflect the proper locations of these features. Also on page #4 under site preparation, it is recommending that the basin be over excavated 24’ and backfilled to finished basin grade. The City Water Resources Department would like to be notified when this process takes place to conduct an inspection of the site. The City Water Resources Department would also like to request that a block wall be installed completely around the perimeter of the Basin. Current plans indicate that a block wall is on the west side and partially on the north side of the basin fence line. Consistent type of fencing is preferred for maintenance and aesthetics purposes. Thanks Don RichardsonDon RichardsonDon RichardsonDon Richardson Superintendent Water Resources Department City Of Bakersfield 661-326-3715 From: David Fidelino [mailto:dfidelino@mcintoshassoc.com] Sent: Wednesday, November 27, 2013 2:20 PM To: Don Richardson Cc: Miguel Loreto Subject: Tract 6824: Sump Design Review Dear Mr. Don Richardson, We instructed by Manny Behl to forward a copy of Basin Site Design for your approval. For your use and review a copy of the Basin Evaluation from Krazan and Associates, Inc. and Retention Basin Exhibit . 4 If you have any further questions or information regarding this project, please contact me at 661-834-4814 x119. Thank You David Fidelino McIntosh & Associates 2001 Wheelan Court Bakersfield, CA 93309 Phone: 661.834.4814 www.mcintoshassoc.com