HomeMy WebLinkAboutSB989 2014SWRCB, January 2002 Page __ of __
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST second01y containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, wrillen test procedures, and
printouts from tests (if applicable), should be provided to the facility owner/operator for submillal to the local regulatory agency.
l. FACILITY INFORMATION
Facility Name: #3351 Howard's I Date of Testing: 3/31/2014
Facility Address: 32000 Panama Lane
Facility Contact: Omero Garcia I Phone: 661-393-7000
Date Local Agency Was Notified of Testing: 3/20/2014
Name of Local Agency Inspector (if present during testing): Ernie Medina
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services
Technician Conducting Test:
Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester
License Type: CSLB J License Number:804904 ICC# 8022804 TT# I 1-1756
·-
Manufacturer Training
Manufacturer Component(s) Date Training Expires
UST 10/21/2015
lnstallaton!Retrofi t
UST Service ICC 1-28-2015
technician
Star. Smith. Fibercast Fiber Glass Systems N.A.
3. SUMMARYOFTESTRESULTS
Not Repairs Component Pass Fail Not Repairs Component Pass Fail Tested Made Tested Made
UDC 1-2 South X 0 0 0 91 Fill Spill Bucket X [J 0 [l
UDC 1-2 North X 0 [l 0 91 Vapor Spill Bucket X n 0 0
UDC 3-4 South X L 0 ;] Diesel Fill Spill Bucket X c J
UDC 3-4 North X 0 0 0 :J 0 ,-. .....
UDC 5-6 South X 0 0 0 0 n 0 0
UDC 5-6 North X 0 0 0 0 0 0 0
UDC 7-8 South X 0 [] 0 [_] 0 0 0
UDC 7-8 North X 0 0 0 0 r ~ 0 '--'
87 Fill Spill Bucket X 0 0 0 (] 0 J
87 Vapor Spill Bucket X 0 0 0 0 [] 0 0
87-2 Fill Spill Bucket X 0 0 0 n 0 0 0
87-2 Vapor Spill Bucket X [_] 0 0 0 0 0 0
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
Water was .e_ut back into test trailer and waste drum
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my kllow/etlg~etlr_·, __ '_this_tlocumttfil'prdJccurate anti i11 full compliallce with legal requirements
Technician's Signature: ~ ri-/'l_,t_,t// Date: 3/28/2014
SWRCB, January 2002 Page __ of __
.. _,. ~--.-.-__ _._...._ __ .. ~----··--.-.-. ._._ -.-' -.
Test Method Developed By: D UDC Manufacturer x Industry Standard D Professional Engineer
0 Other (Specify)
Test Method Used: 0 Pressure D Vacuum x Hydrostatic
D Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
UDC # 1-2 South UDC # 1-2 North UDC #3-4 South UDC # 3-4 North
UDC Manufacturer: Western Western Western Western
UDC Material: FRP FRP FRP FRP
UDC Depth: 15.00" 15.00" 15.00" 15.00"
Height from UDC Bottom to Top 0.00" 0.00" 0.00" 0.00"
of Highest Piping Penetration:
Height from UDC Bottom to 0.00" 0.00" 0.00" 0.00"
Lowest Electrical Penetration:
Condition ofUDC prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry
testing:
Portion ofUDC Tested Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both DYes ONo XNA DYes ONoXNA DYes ONo X NA 0 Yes DNo XNA
product and water)?•
Turbine shutdown response time NA NA NA NA
Is system programmed for fail-
safe shutdown?· DYes .-.No XNA DYes ONoXNA DYes ONo XNA Yes ~No X NA
Was fail-safe verified to be DYes DNo X NA DYes DNoXNA rYes DNo XNA DYes DNo X NA operational?"
Wait time between applying 5 Min 5 Min 5 Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time: ~--.... --.... ~"'"' 1~11 'n~• Initial Reading (R1): '-'Ct: II' \I UN ~~ .,...., ...
Test End Time: R~~ tltc: -Kesu ItS
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass D Fail X Pass DFail X Pass DFail X Pass DFail
Was sensor removed for testing? DYes DNo ,...,NA 0 Yes DNo DNA w Yes DNo ONA C'Yes DNo DNA
Was sensor properly replaced and DYes DNo DNA DYes ONo DNA DYes DNo DNA 0 Yes DNo DNA verified functional after testing?
Comments-(include information on repairs made prior to testing, and recommended follow-up/or failed tests)
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to~ of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page __ of __
----. -----. ----~·-------·--·--------
Test Method Developed By: D UDC Manufacturer x Industry Standard D Professional Engineer
D Other (Specify)
Test Method Used: rPressure D Vacuum x Hydrostatic
._ Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
~~zr:,,_,._,., ~i:: "' .~s.~m:s;:s:~; ."![ ;,: .·;~· '· '··· UDC # 5-6 South UOC # 5-6 North UOC # 7-8 South UDC # 7-8 North
UDC Manufacturer: Western Western Western Western
UDC Material: FRP FRP FRP FRP
UDC Depth: 15.00" 15.00" 15.00" 15.00"
!Ieight from UDC Bottom to Top 0.00" 0.00" 0.00" 0.00"
of Highest Piping Penetration:
Height from UDC Bottom to 0.00" 0.00" 0.00" 0.00"
Lowest Electrical Penetration:
Condition of UDC prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry
testing:
Portion of UDC Tested1 Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both 0 Yes DNo XNA []Yes DNoXNA DYes DNo X NA DYes CJNo X NA
product and water)?•
Turbine shutdown response time NA NA NA NA
Is system programmed for fail-
safe shutdown?· 0 Yes DNo XNA Yes uNoXNA CYes UNo XNA C Yes CNo XNA
Was fail-safe verified to be ~Yes :;No X NA DYes operational?• DNoXNA DYes ONo X NA DYes w No X NA
Wait time between applying 5 Min 5 Min 5 Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R!): ~--.. II"' 1"\ lU s~~•N :oN
Test End Time: "'"" .. ·--· ... " u. Final Reading (RF): Kes LJitS nt::nJ U::»
Test Duration:
Change in Reading CRr-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass DFail X Pass DFail X Pass D Fail X Pass 0 Fail
Was sensor removed for testing? [1 Yes 0 No DNA 0 Yes rNo DNA DYes fJNo DNA DYes DNo DNA
Was sensor properly replaced and DYes DNo DNA DYes CJNo DNA DYes ONo DNA DYes ONo DNA verified functional after testing?
Comments-(include information on repairs made prior to testing, and recommendedfollow-upforfai/ed tests)
1 If the entire depth of the UDC is not tested, specifY how much was tested. If the answer to ill!Y of the questions indicated with an
asterisk(*) is ''NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160)
'
SWRCB, January 2002 Page __ of __
10. SPILUOVERFILL CONTAINMENT BOXES
Facility is Not Equipped With S ill/Overfill Containment Boxes 0
SpilVOverfill Containment Boxes are Present, but were Not Tested
Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer
0 Other (Specify)
Test Method Used: OPressure 0 Vacuum x Hydrostatic
0 Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
~·-· "5: ~~.?::·~1;:-"<::l:~;~~~:· <';; ·~ Spill Box # 87 Spill Box # 87 Spill Box# 87-2 Spill Box # 87-2
Fill Va or Fill Va or
Bucket Diameter: 12.00" 12.00" 12.00" 12.00"
Bucket Depth: 12.00" 12.00" 12.00" 12.00"
Wait time between applying
pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min
startin test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading CRF-R1):
Pass/Fail Threshold or
Criteria:
Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail X Pass OFail
Comments-{include information on repairs made prior to testing, and recommended.follow-up[or failed tests)
SWRCB, January 2002 Page __ of __
9 SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With SpiiVOverfill Containment Boxes 0 !
Spill/Overfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer
[J Other (Specify)
Test Method Used: Pressure 0 Vacuum x Hydrostatic
0 Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
", ....
l~;}iit.;.. Spill Box # 91 Spill Box# 91 Spill Box # Diesel Spill Box# Fill Vapor Fill
Bucket Diameter: 12.00" 12.00" 12.00"
Bucket Depth: 12.00" 12.00" 12.00"
Wait time between applying
pressure/vacuum/water and 5 Min 5 Min 5 Min
starting test:
Test Start Time:
Initial Reading (R1):
Test End Time: See INCU N
Final Reading (RF): R~4E::IIIt~
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or
Criteria:
Test Result: X Pass DFail X Pass DFail X Pass DFail D Pass 0 Fail
Comments -(include information on repairs made prior to testing, and recommended.follow-up[or.failed tests)
Name:
Street:
City:
Tenns:
~fiDE'+. CJo <'~
\UST¥ " ~-,..,oc1\0
~fiDE"+,
CJo ~ ~UST(J. -,,CES•~
'BUILD WITH CONFIDENCE" "COMPLIANCE WITH CONFIDENCE"
Lic.970703 Lic.804904
Toll Free #: 1-800-339-9930
Confidence UST
16250 Meacham Road
Bakersfield CA 93314
Description of work performed:
.7./<J:;" A -~~ ~.,4/;A.
1A/..t£rs~
Job Order /Invoice#: ~'Z'$ t;.~.4
Date Called Time To Whom
Site Name: S~.r/ Rc-AIAeLG
Street: 3Zooc; -9JJ" .... ;.L ~
City: 1'5~ -· State: C.A Zip: '7'~/~
Store No: .'?3~/
-C>v..~Z/.ue.... <:7/J#J .7 JII!~_,./L e.Y.P" t'Y.A]f";. r;.,
At~-~-r ·",., ~17'. ~~-i'> ·?;~
q,A 7 _1-.;·/7 .If/{; ,.-?£-/, ALJ.e.-~ ~.e.-~/~///~ "' ,
nt£.& £:17 ; YCc-7' /.L~/. ,
TRAVEL and LABOR (0.5 Hour Minimum Labor Charge) OVERTIME (5:00 PM -7:00AM)
Date Technician(s) Name Start End Total OT Start OTEnd OTTotal
~AIIHI Dvl/~ A-~,4' Travel
'{ Labor
Travel
Date Technician(s) Name Start End Total OT Start OTEnd OTTotal
Travel
Labor
Travel
Date Technician(s) Name Start End Total OT Start OTEnd OTTotal
Travel
Labor
Travel
' SUPPLIES -MATERIALS-RENTALS Check One i
Qty. UST Parts Site Parts
I $'~ brA./11/~ !fA?.-.HA .. ..,.. bl!tl!.rJ-..1 x~ IPS.-
COMMENTS
Store Employee Print Name: Technician Print Name:
Store Employee Signature: I Date Technician Signature: 1 Date
INVOICE -WL iiTt. SITF. CANARY
3351 HOVAROS
32000 PAUAHA LAtlE
BAKERSFIELD CA 93313
03/31/2014 9:32 AH
SUHP LEAK TEST REPORT
87 FSB -TEST STARTED 9:11 AH
TEST STARTED 03/31/2014
BEG ttl lEVEL 5, 9538 W
Eta> TII1E 9:32 AH
EtiD DATE 03/31/2014
EtiO lEVa 5. 9546 w
LEAK THRESHOLD O. 002 JU
TEST RESULT PASSED
87 VSB
TEST STARTED 9:11 AH
TEST STARTED 03/31/2014
BEGIIl LEVa 6. 7327 Itl
EtiO Tlt1E 9:32 AH
EtlD DATE 03/31/2014
EtiO lEVa 6, 7328 Jtl
LEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
OS FSB
TEST STARTED 9:17 AH
TEST STARTED 03/31/2014
BEGJU LEVa a, 7125 Itl
EtiO TII1E 9:32 AH
EtiO DATE 03/31/201a
am Leva 4, 7131 w
LEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
·~
3351 HO\IARDS
32000 PAtlAHA LAtlE
BAKERSFiaD CA 93313
03/31/2014 9!48 AH
SUHP LEAK TEST REPORT
87 FSB
TEST STARTED 9:33 AH
TEST STARTED 03/31/2014
BEGW lEVEL 5, 9546 Ill
EtiO TII1E 9:48 AH
EtiO DATE 03/31/2014
aro Leva 5. 9545 Ill
LEAK THRESHOLD 0, 002 Itl
TEST RESULT PASSED
87 VSB
TEST STARTED 9:33 AH
TEST STARTED 03/31/2014
BEGIIILEVEL 6, 7329 Ill
EtlO TIME 9:a8 AH
EtlD DATE 03/31/2014
am LEVEL 6, 7327 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
OS FSB
TEST STARTED 9:33 AH
TEST STARTED 03/31/2014
BEGIII lEVa 4, 7131 W am TII1E 9:a8 AH
am DATE 03/31/2014
am LEVa a. 7119 Ill
LEAK THRESHOlD 0, 002 Itl
TEST RESULT PASSED
3351 HOVAROS
32000 PAIIAHA LAIIE
BAKERSFIRD CA 93313
03/31/2014 9:32 AH
sut'R lEAA TEST REPORT
872FSB --~ ............
TEST STAR TEO,. -9: l7 Al1
TEST STARTED 03/31/2014
BEG Ill LEVEL 6, 7639 Ill
EJlO TillE 9:32 AH
810 DATE 03/31/2014
EJIO LEVEL 6. 7636 Ill
LEAK THRESHOLD O. 002 Ill
TEST RESl!T PASSED
872VS8
TEST STARTED 9:17 At1
TEST STARtED 03/31/2014
BEG Ill LEVEL 6. 9032 Itl
EJl) TillE 9:32 At1
Ell) DATE 03/31/2014
Elll LEVEL 6. 9025 Ill
LEAK THRESHil.D 0. 002 Ill
TEST REStl.T PASS£0
91 FS!!
TEST STARTED 9:17 AN
TEST STARTED 03/31/2014
BEGIIl LEVEL 5. 7279 Ill
EJIO TitlE 9:32 AN
810 DATE 03/31/2014
910 LEVa 5. 7279 Ill
lEAK THRESHOlD 0, 002 Ill
TEST RESULT PASSED
91 VSB
TEST STARTED 9:11 AH
TEST STARTED 03/31/2014
BEG Ill lEVa 5. 9723 111
EJD TIHE 9:32 AH
Elll DATE 03/31/2014
EJD lEVEL 5. 9720 Ill
lEAK THRES!Wl 0, 002 Ill
TEST REStlT PASSED
3351 HOV~.RDS
32000 PAIIAIIA lAIIE
BAKERSFiaO CA 93313
03/31/2014 9:08 All
stJtf LEA'< TEST REPORT
872FSB
TEST STARTED 9:33 Ali
TEST STARTED 03/31/2014
BEGIII LEVEL 6.7635 Ill
ElKl TIHE 9:48 Al1
ElKl OATE 03/31/2014
EllO lEVEL 6, 7634 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
872VSB
TEST STARTED 9:33 Ali
---TEST STARTED 03/31/2014
BEG !II LEVEL 6, 9025 Ill
EJIO TIHE 9:48 Al1
EJIO DATE 03/31/2014
EJ,'I) LEVEL 6, 9022 Ill
lEAK T~SHOLO 0,002 Ill
TEST RESULT PASSED
91 FSB
TEST STARTED 9:33 AN
TEST STARTED 03/31/2014
BEG Ill LEVEL 5. 7282 Ill
EIIO TIHE 9:48 AH
EllO DATE 03/31/2014
EJ/0 LEVEL 5. 7283 Ill
LEAK 'MES!O..O 0, 002 Ill
TEST RESLlT PASSED
91 VSB
TEST STARTED 9:33 Al1
TEST STARTED 03/31/2014
BEG Ill lEVEL 5, 9719 Ill
EJIO TIHE 9!118 AH
Elll DATE 03/31/2014
81l lEVEL 5,9718 Ill
LEAK THRESHOLD 0,002 Ill
TEST RESll.T PASSED
335i'HOVAROS -
32000 PAtiAHA lAt!E
BAKERSFIELD CA 93313
03/31/20111 10:51 Ali
SUtiP lEAK TEST REPORT
1-2 s
TEST STARTED 10:36 Ali
TEST STARTED 03/31/20111
BEGIU LEVEL 2. 7850 Ill
EliO TIME 10:51 Ali
810 DATE 03/31/2014
810 lEVEL 2. 7840 Ill
lEAK THRESHOLD 0, 002 Jtl
TEST RESULT PASSED
1-2 tl
TEST STARTED 10:36 AH
TEST STARTED 03/31/2014
BEGJU LEVEL 3, 4439 Ill
8D TitlE 10:51 Ali
8ID DATE 03/31/2014
810 LEVEL 3, 11437 Ill
lEAK THRESHOLD 0, 002 Jtl
TEST RESULT PASSED
-..... ..
. .,
I 1 •
3351 HOVARDS
32000 PAtlAHA lAtiE
BAKERSFIELD CA 93313
03/31/20111 11:09 Ali
SUMP l£AK TEST REPORT
1-2 s
TEST STARTED 10:54 AH
TEST STARTED 03/31/2014
BEGJU lEVEL 2. 7847 Ill
810 TitlE 11:09 Ali
81D DATE 03/31/2014
810 lEVEL 2, 7849 Ill
lEAK THRESHOLD 0,002 IU
TEST RESULT PASSED
1-2 u
TEST STARTED 10:5d AH
TEST STARTED 03/31/20111
BEG HI lEVEL 3, 4436 Ill
END TitlE 11!09 A/1
810 DATE 03/31/20111
810 LEVEL 3, 4437 Ill
l£AK THRESHOLD 0,002 Ill
TEST RESULT PASSED
3351 HOVAROS
32000 PAUAHA lAUE
BAKERSFIELD CA 93313
03/31/201/l 12:02 Pl1
SUI1P LEAK TEST REPORT
I • .3-t s
TEST STARTED 11:47 AH
TEST STARTED 03/31/2014
BEGIU LEVEL 0, 6736 IU
EliO TIME 12:02 Pl1
-m)·OATE·--~03/31/2014 ·-
EllO LEVEL 0, 6736 m
lEAK THRESHOLD 0, 002 JU
TEST RESULT PASSED
l .. '! tl
TEST STARTED 11:47 AH
TEST STARTED 03/31/2014
BEGIU lEVEl 1, 6297 W
EliO TIHE 12:02 PH
EtlO DATE 03/31/201/l
EllO LEVa 1, 6308 JU
LEAK THRESHOLD 0, 002 JU
TEST RESULT PASSED
-. . ...__..,. .. __ .
•
3351 HOVAROS
32000 PAtlAHA LAtlE
BAKERSFIELD CA 93313
03/31/2014 12:18 Pl1
SUH? LEAK TEST REPORT
3"'\ s
TEST STARTED 12:03 PH
TEST STARTED 03/31/201/l
BEGIU lEVEl 0, 6735 Ill
EtiO TIME 12:18 Pl1
EtiD DATE 03/31/2014
em LEVEL o. 6737 m
LEAK THRESHOLD 0,002 Jtl
TEST RESULT PASSED
j-'{ t~
TEST STARTED 12:03 Pl1
TEST STARTED 03/31/2014
BEGIU LEVEL l, 6306 Jtl
EllO TIME 12:18 Pl1
EllO DATE 03/31/2014
EllO lEVEl 1. 6310 Itl
LEAK THRESHOLD 0,002 W
TEST RESULT PASSED \