HomeMy WebLinkAboutSB989 2014SWRCB, January 2002 Page __ of __
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed.form, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner/operator for submillal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: #2233 D & G I Date of Testing: 3/28/2014
Facility Address: 2732 Brundage Lane Bakersfield, CA93304
Facility Contact: Omero Garcia I Phone: 661-393-7000
Date Local Agency Was Notified of Testing: 3/20/2014
Name of Local Agency Inspector (if present during testing): Ernie Medina
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services
Technician Conducting Test:
Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester
License Type: CSLB I License Number:804904 ICC# 8022804 TT# 11-1756
p·•·r-• ···-· ·····' ···--··
Manufacturer Training
Manufacturer Component( s) Date Training Expires
UST 10/21/2015
Installaton/Retrofit
UST Service ICC 1-28-2015
technician
Star. Smith. Fibercast Fiber Glass Systems N.A.
3. SUMMARY OF TEST RESULTS
Not Repairs Component Pass Fail Not Repairs Component Pass Fail Tested Made Tested Made
UDC 1-2 X 0 0 0 0 0 0 0
87 Fill Spill Bucket X 0 0 0 0 0 0 0
87 Vapor Spill Bucket X 0 0 0 0 0 0 0
91 Fill Spill Bucket X 0 0 0 0 0 0 0
91 Vapor Spill Bucket X 0 0 0 0 0 0 0
Diesel Fill Spill Bucket X 0 0 0 0 0 0 0
Diesel Vapor Spill Bucket X 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
Water was rut back into test trailer and waste drum
To the best of my knowledge, t 1rate and in full compliance with legal requirements
Technician's Signature: Date: 3/28/2014
SWRCB, January 2002 Page __ of __
-
Test Method Developed By: D UDC Manufacturer x Industry Standard D Professional Engineer
D Other (SpecifY)
Test Method Used: D Pressure D Vacuum x Hydrostatic
D Other (SpecifY)
Test Equipment Used: Ts-sts Equipment Resolution:
UDC # 1-2 UDC# UDC# UDC#
UDC Manufacturer: Western
UDC Material: FRP
UDCDepth: 9.00"
Height from UDC Bottom to Top 0.00"
of Highest Piping Penetration:
Height from UDC Bottom to 0.00"
Lowest Electrical Penetration:
Condition of UDC prior to Clean & Dry
testing:
Portion ofUDC Tested Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
DYes DNo XNA DYes DNoDNA DYes DNoDNA DYes DNoDNA
Turbine shutdown response time NA
Is system programmed for fail-
safe shutdown?• DYes DNo XNA DYes DNoDNA DYes DNoDNA 0 Yes ONoDNA
Was fail-safe verified to be DYes DNo XNA DYes operational?* DNoDNA DYes DNoDNA DYes DNoDNA
Wait time between applying 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1): ~--... •~"" ... Test End Time: ~GG II ~'-''-'I'W
Final Reading (RF): Res lJits
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass DFail D Pass DFail D Pass 0 Fail D Pass D Fail
Was sensor removed for testing? DYes DNoDNA DYes DNo DNA DYes DNo DNA DYes DNo DNA
Was sensor properly replaced and DYes DNo DNA DYes DNo DNA DYes DNo DNA DYes ONo DNA verified functional after testing?
Comments -(include information on repairs made prior to testing, and recommended.follow-up for .failed test:.)
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to ill1Y of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page_ of_
9. SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes 0
Spill/Overfill Containment Boxes are Present, but were Not Tested D
Test Method Developed By: D Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer
D Other (Specify)
Test Method Used: OPressure 0 Vacuum x Hydrostatic
0 Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
Spill Box # 87 Spill Box # 87 Spill Box # 91 Spill Box # 91
Fill Vapor Fill Vapor
Bucket Diameter: 12.00" 12.00" 12.00" 12.00"
Bucket Depth: 12.00" 12.00" 12.00" 12.00"
Wait time between applying
pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min
starting test: I
Test Start Time: I
Initial Reading (R1): ·-_ ...
Test End Time: See IN ICON ~ee tNv• ~·~ Final Reading CRF): ~A~ I Lit~ Result $
Test Duration: -
Change in Reading (Rr-R1):
Pass/Fail Threshold or
Criteria:
Test Result: X Pass 0 Fail X Pass 0 Fail X Pass D Fail X Pass OFail
Comments -(include in[(Jrmation on repairs made prior to testing, and recommended follow-up forfailed tests)
SWRCB, January 2002 Page __ of __
9 SPILUOVERFILL CONTAINMENT BOXES
Facility is Not Equipped With SpiiVOverfill Containment Boxes 0
Spill/Overfill Containment Boxes are Present, but were Not Tested 0
Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer
0 Other (Specify)
Test Method Used: 0 Pressure r Vacuum x Hydrostatic
:=: Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
Spill Box # Diesel Spill Box # Diesel Spill Box# Spill Box# Fill Vapor
Bucket Diameter: 12.00" 12.00"
Bucket Depth: 12.00" 12.00"
Wait time between applying
pressure/vacuum/water and 5 Min 5 Min
starting test:
Test Start Time:
Initial Reading (R1): -••• -..-. ..
Test End Time: "ee1~ ~v~
Final Reading (RF): Kesu [Its
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or
Criteria:
Test Result: X Pass 0 Fail X Pass 0 Fail 0 Pass 0 Fail 0 Pass DFail
-------·-----------
Comments-(include information on repairs made prior to testing. and recommended follow-up .for.failed tests)
2233 D-G
2732 BRt.WllAGE L.AII:
BAKERSFIElD CA 93304
03/28/2014 10:011 AH
Sl.t:P LEA~ TEST REPI:flT
87 FSB
TEST STARTED 9:119 1111
TEST STARTED 03/28/2014
BEG Ill LEVEL 2. 3690 ltl
Elll TillE 10:04 ill1
EJID DATE 03/28/2014 av LEva 2. 3686 m
LEAK THRESHOLD 0. 002 ltl
TEST RES\lT PASSED
87 VSB
TEST STARTED 9:~9 AH
TEST STARTED 03/28/2014
BEG ltl LEVEL 6. 5668 Ill
Elll Tit£ 1o:o4 AH
Elll DATE 03/28/2014
EIIO LEVEL 6, 5563 Ill
lEAK THRES!lllD 0, 002 Ill
TEST RESUI..T PASSED
91 FSB
TEST STARTED 9:119 AH
TEST STARTED_ 03/2~/2014
BE'GIIII.EVEL 6. 3758 Ill
E/[) liiiE 10:04 AH
EIC DATE 03/28/2014
Elll LEVEl 6. 3757 Ill
LEA'< TlflESlla.D 0. 002 ltl
TEST RESll T PASSED
2233 D-G
2732 BR\Wn\GE L.AIE
BAXERSF I ElO CA 93304
03/28/2014 10:20 AH
SU11P LEAK TEST REPORT --
87 FSS
TEST STARTED 10:05 1111
TEST STARTED 03/28/2014
BEG Ill LEVEL 2. 3686 Ill
El!l TillE 10:20 1111
EIO DATE 03/28/2014
EID lEVEl 2.3681 ltl
lEAK THRESHOLD 0, 002 ltl
TEST RESllT PASSED
87 VSB
TEST STARTED 10:05 1111
TEST STARTED 03/28/2014
BEG I II lEVEl 6. 5662 ltl
EIO liiiE 10:20 A/1
E/[) DATE 03/28/2014
EJ[) lEVEL 6, 5656 Ill
lEAK TlflESHtx.O 0, 002 ltl
TEST RESULT PASSED
91 FSB
TEST STARTED 10:05 AH
TEST STARTED 03/28/2014
BEG Ill lEVEl. 6. 3757 Ill
Elll TII1E 10:20 AH
EIIO DATE 03/28/2014
EIIO lEVEl. 6, 3755 ltl
lEAK THRESHOLD 0.002 Ill
TEST RESIJL T PASSED
2233 1>-G
2732 BRIJAIIlAiiE l.ftJlE
BAKERSFIELD CA 93304
03/28/2014 10:113 AH
SUI1P LEAK TEST REPC.~T
we 1-2
TEST STARTED 10:28 AH
TEST STARTED 03/28/2014
BEGIIILEVEL. .0,2813JIL. _ em TilE 10:43 All
EI:O DATE 03/28/2014
EIIO LEVEL 0, 2871 HI
LEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
2233 0-G
2732 BRUAIIOAGE LAIIE
BAKERSFIELD CA 93304
03/28/20111 ll:OOAH
SUIIP lEAK TEST REPOOT
uoc 1-2
TEST STARTED 10:45 A/1
TEST STARTED 03/28/2014
BEG HI lEVEl 0. 2877 Ill
E/10 TillE 11:00 All
EIIO DATE 03/28/2014
EIIO lEVEL 0, 2877 Ill
LEAK THRESlD.O 0, 002 HI
TEST RESil. T PASSED
2233 D-G
2732 BRl!!IJAGE LNiE
BAKERSFIElD CA 93304
03/28/2014 · 10:U4 AH
Slt1P LEAK TEST REPORT
91 VSB
TEST STARTED 9:119 AH
TEST STARTED 03/28/2014
BEG Jt1 LEVa 7.02111 Ill
am TillE 1o:o4 AH
EIIO DI\TE 03/28/2014
EIIO LEVa 7, 0238 Ill
lEAl( THRESHOLD 0.002 Ill
TEST RfStJL T PASSED
OS FSB
TEST STARTED 9:119 All
TEST STARTED 03/28/2014
BEGIIILEVEl 3,1155 Ill
EIO TilE 10:04 All
EIO DATE 03/28/2010
EIO LEVEl 3. 1147 Ill
lEAl( TIRES!Dll 0, 002 Ill
TEST RES1l. T PASSED
OS VSB
TEST STARTED 9:119 AH
TEST STARTED 03/28/2014
BEGJtl lEVa 7, 6565 Ill
EJIO lli\E 10:04 All
EIIO 01\TE 03/28/2014
EIIO LEVa 7, 6560 Ill
LEAl( TI!RESHOLO 0, 002 Ill
TEST RESULT PASSED
2233 0-G
2732 BRltiDAGE LA!.£
BAKERSFIB.O CA 93304
03/28/2010 10:20 All
SUltP lEAK TEST REPORT
91 VSB
TEST STARTED 10:05 All
TEST STARTED 03/28/2014
BEGIII lEVa 7, 0238 Ill
EJIO TI11E 10:20 All
EJIO DATE 03/28/2014
EJIO LEVEL 7, 0234 Ill
LEM THRESiltO 0, 002 Ill
TEST RESa.T PASSED
OS FSB
TEST STARTED 10:05 All
TEST STARTED 03/28/2014
BEGIII LEVEL 3, 1145 Ill
810 TillE 10:20 All
EJIO DATE 03/28/2014
810 LEVEl 3, 1139 Ill
LEAK THR€SHOlO 0, 002 Ill
TEST RESULT PASSED
OS VSB
TEST STARTED 10:05 All
TEST STARTED 03/28/2010
BEG Ill lEVEl 7, 6555 Ill
Elll T111E 10:20 All
Elll DATE 03/28/2014
EllllEVa 7. 6553 Ill
LEAK Tft!<ESW.O 0, 002 Ill
TEST RESil.T PASS£0