Loading...
HomeMy WebLinkAbout2013 RESULTSSWRCB, January 2002 Page __ of __ Secondary Containment Testing Report Form This form is intendedfor use by contractors pe1jorming periodic testing of UST secondwy containment systems. Use the appropriate pages ofthis.form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility ownerloperatorfor submittal to the local regulato1y agency. 1. FACILITY INFORMATION Facility Name: #3360 Farrell's Fastrip I Date of Testing: 9/5/2013 Facility Address: 6401 White Lane, Bakersfield, CA 93309 Facility Contact: Omero Garcia, Craig Lincoln I Phone: 661-399-7000 Date Local Agency Was Notified of Testing: N/A Name of Local Agency Inspector (if present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Techni cian Conducting Test: Frank Landa Credentials: x CSLB Licensed Contractor x SWRCB Licensed Tank Tester License Type: CSLB I License Number:804904 ICC# 8180171180 18524 Manufacturer Training Manufacturer Component(s) Date Trainin g Expires UST 11 /22/2013 Installaton/Retro fit UST Service ICC 1-28-2015 technician Star. Smith. Fibercast Fiber Glass Systems N.A. 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made DSL Annular 0 0 X 0 91 STP X 0 0 0 87 Annular 0 0 X 0 UDC #1-2 X 0 0 0 91 Annular 0 0 X 0 UDC #3 -4 X 0 0 0 DSL Secondary X 0 0 0 UDC #5-6 X 0 0 0 DSL Vent Secondary X 0 0 0 UDC #7-8 X 0 0 0 87 Second ary X 0 0 0 DSL Fill Sump X 0 0 0 87 Vent Secondary X 0 0 0 87 Fill Sump X 0 0 0 91 Secondary X 0 0 0 91 Fill Sump X 0 0 0 91 Vent Secondary X 0 0 0 87 Vapor Bucket X 0 0 0 Vapor Return Secondary X 0 0 0 91 Vapor Bucket X 0 0 0 DSL STP X 0 0 0 0 0 0 0 87 STP X 0 0 0 0 0 0 0 If hydrostatic testing was performed, describe what was done with the water after completion of tests: Water was put back into test trailer and waste drum RESPONSffiLE FOR CONDUCTING THIS TESTING To the best of my knowled e, t ocument are accurate and in full compliance with legal requirements Technician's Signa ture: __ --'---'---'-''fl£--'c::~,~!<'-'14.1L-==..---------"D'-"a""te::.:.: -"-9'-'/ 5:.:.:/2=..:0"-'1'""3- SWRCB, January 2002 Page __ of __ 4 TANK ANNULAR TESTING Test Method Developed By: x Tank Manufacturer 0 Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic 0 Other (Specify) Test Equipment Used: Calibrated Gages Equipment Resolution: Tank# DSL Tank# 87 Tank# 91 Tank# Is Tank Exempt From Testing?1 X Yes O No X Yes DNo X Yes DNo D Yes D No Tank Capacity: Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (Rr): Test Duration: Change in Reading (Rr-R1): Pass/Fail Threshold or Criteria: Test Result: D Pass D Fail D Pass D Fail D Pass D Fail D Pass D Fail Was sensor removed for testing? D Yes D No DNA DYes DNo DNA DYes DNo DNA DYes DNo DNA Was sensor properly replaced and D Yes DNo DNA DYes DNo DNA DYes DNo DNA DYes DNo CNA verified functional after testing? Comments -(include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) Tanks have wet Annulars. 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {Cali fornia Code of Regulations, Title 23, Section 2637(a)(6)} SWRCB, January 2002 Page __ of __ 5. SECONDARY PIPE TESTING Test Method Developed By: 0 Piping Manufacturer x Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic 0 Other (Specify) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Piping Run # DSL Piping Run # DSL Piping Run #87 Piping Run #87 Vent Vent Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass Piping Manufacturer: Smith Smith Smith Smith Piping Diameter: 3" 3" 3" 3" Length of Piping Run: 100' 150' 100' 150' Product Stored: DSL Vent Regular Vent Method and location of Boot in STP Boot in Fill Sump Boot in STP Boot in Fill Sump _l)iQing:run isolation: Wait time between applying pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min starting test: Test Start Time: 9:00am 9:00am 9:00am 9:00am Initial Reading (RJ): 5 PSI 5 PSI 5 PSI 5 PSI Test End Time: 10:00 am 10:00 am 10:00 am 10:00 am Final Reading (RF): 5 PSI 5 PSI 5 PSI 5 PSI Test Duration: I Hour I Hour I Hour I Hour Change in Reading (RF-RJ): 0.00" 0.00" 0.00" 0.00" Pass/Fail Threshold or 0.00" 0.00" 0.00" 0.00" Criteria: Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail X Pass OFail Comments -(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB, January 2002 Page __ of __ 5. SECONDARY PIPE TESTING Test Method Developed By: 0 Piping Manufacturer x Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic 0 Other (Specify) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" "" Piping Run # 91 Piping Run# 91 Vent Piping Run #Vapor Piping Run# Return Piping Material: Fiberglass Fiberglass Fiberglass Piping Manufacturer: Smith Smith Smith Piping Diameter: ..,, 3" ..,, .) .) Length of Piping Run: 100' 150' 80' Product Stored: Premium Vent Vapor Return Method and location of Boot in STP Boot in STP Boot in 87 STP piping-run isolation: Wait time between applying pressure/vacuum/water and 5 Min 5 Min 5 Min starting test: Test Start Time: 9:00am 9:00am 9:00am Initial Reading (R1): 5 PSI 5 PSI 5 PSI Test End Time: 10:00 am 10:00 am 10:00 am Final Reading (RF): 5 PSI 5 PSI 5 PSI Test Duration: I Hour 1 Hour 1 Hour Change in Reading (RF-R1): 0.00" 0.00" 0.00" Pass/Fail Threshold or 0.00" 0.00" 0.00" Criteria: Test Result: X Pass OFail X Pass 0 Fail X Pass 0 Fail 0 Pass OFail Comments -(include information on repairs made prior to testing, and recommended follow-up for failed tests) I SWRCB, January 2002 Page __ of __ 6. PIPING SUMP TESTING Test Method Developed By: D Sump Manufacturer x Industry Standard D Professional Engineer D Other (SpecifY) Test Method Used: D Pressure D Vacuum x Hydrostatic D Other (Specify) Test Equipment Used: Ts-sts Equipment Resolution: * II Sump #DSL I Sump#87 I Sump# 91 I Sump# Sump Diameter: 36" 36" 36" Sump Depth: 63" 63" 63" Sump Material: Fiberglass Fiberglass Fiberglass Height from Tank Top to Top of 32" 23" 32" Highest Piping Penetration: Height from Tank Top to Lowest 12" 12" 12" Electrical Penetration: Condition of sump prior to testing: Clean Clean Clean Portion of Sump Tested 1 34" 25" 34" Does turbine shut down when sump sensor detects liquid (both D Yes DNo XNA D Yes DNoXNA D Yes D NoXNA D Yes DNo D NA product and water)?* Turbine shutdown response time NA NA NA Is system programmed for fail-safe shutdown?* D Yes DNo XNA D Yes DNoXNA D Yes D NoXNA D Yes DNo D NA Was fail-safe verified to be D Yes D No XNA D Yes DNoXNA D Yes D NoXNA D Yes DNo D NA operational?* Wait time between applying pressure/vacuum/water and starting 5Min 5Min 5Min test: Test Start Time: Initial Reading (R1): ~--IILI"-• •- Test End Time: "'~~ 1111'-'VI' ~ -Final Reading (RF): t(eSUitS Test Duration: - Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass DFail X Pass D Fail X Pass DFail D Pass D Fail Was sensor removed for testing? X Yes DNo DNA X Yes D No DNA X Yes D No DNA D Yes DNo D NA Was sensor properly replaced and X Yes DNo DNA X Yes D No DNA X Yes DNo DNA DYes DNo D NA verified functional after testing? Comments-(include information on repairs made prior to testing, and recommended follow-up for .failed tests) 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to illlY of the questions indicated with an asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160) I I SWRCB, January 2002 Page __ of __ 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: D UDC Manufacturer x Industry Standard D Professional Engineer D Other (Sp ecifY) Test Method Used: D Pressure D Vacuum x Hydrostatic D Other (SpecifY) Test Equipment Used: Ts-sts Equipment Resolution: 1-2 UDC # 3-4 UDC #5-6 UDC #7-8 UDC Manufacturer: Unknown Unknown Unknown Unknown UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass UDC Depth: 34" 34" 34" 34" Height from UDC Bottom to Top 16" 16" 16" 16" of Highest Piping Penetration: Height from UDC Bottom to 12" 12" 12" 12" Lowest Electrical Penetration: Condition of UDC prior to Clean Clean Clean Clean testing: Portion ofUDC Tested 1 18" 18" 18" 18" Does turbine shut down when UDC sensor detects liquid (both D Yes DNo XNA D Yes D NoXNA D Yes DNo XNA D Yes D No XNA product and water)?* Turbine shutdown response time NA NA NA NA Is system programmed for fail-D Yes DNo XNA D Yes D No X NA D Yes DNo XNA D Yes DNo XNA safe shutdown?* Was fail-safe verified to be D Yes DNo XNA D Yes D NoXNA D Yes DNo XNA D Yes DNo XNA operational?* Wait time between applying 5 Min 5 Min 5 Min 5 Min pressure/vacuum/water and starting test Test Start Time: .,. .. ,., ..... ., ... -.... ~ .. ·~ Initial Reading (R1): c,.,.. ~· (" f'\ I\ I ~oo I Test End Time: ---. ... --·· -. ' ; ·~ -Final Reading (RF): Ke~ i)UitS I ~e~ Test Duration: M C Jl! •4 ... l ., Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass D Fail X Pass D Fail X Pass DFail X Pass D Fail Was sensor removed for testing? X Yes D No DNA X Yes D No DNA X Yes DNo DNA X Yes DNo DNA Was sensor properly replaced and X Yes D No D NA X Yes DNo DNA X Yes DNo DNA X Yes DNo DNA verified functional after testing? Comments -(include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. lfthe answer to ill!Y of the questions indicated with an asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page __ of __ 8 FILL RISER CONTAINMENT SUMP TESTING . Facility is Not Equipped With Fill Riser Containment Sumps D Fill Riser Containment Sumps are Present, but were Not Tested D Test Method Developed By: D Sump Manufacturer D Industry Standard D Professional Engineer D Other (Specify) Test Method Used: D Pressure D Vacuum D Hydrostatic D Other (Specify) Test Equipment Used: Equipment Resolution: Fill Sump #DSL Fill Sump #87 Fill Sump #91 Fill Sump# Sump Diameter: 38" 38" 38" Sump Depth: 70" 70" 70" Height from Tank Top to Top of 17'' 24" 17" Highest Piping Penetration: Height from Tank Top to Lowest 16" 24" 16" Electrical Penetration: Condition of sump prior to Clean Clean Clean testing: Portion of Sump Tested 19" 26" 19" Sump Material: Fiberglass Fiberglass Fiberglass Wait time between applying 5 Min 5 Min 5 Min pressure/vacuum/water and starting test: Test Start Time: Initial Reading (R1): -. -. Test End Time: ~ee IN~ 'N Final Reading (RF): D ~',HI!• I ....... Test Duration: • '"'"""" ...... I."' Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass 0 Fail X Pass DFail · X Pass DFail D Pass DFail Is there a sensor in the sump? X Yes DNo X Yes D No X Yes D No X Yes D No Does the sensor alarm when either product or water is D Yes D No XNA DYes DNo XNA DYes DNo XNA DYes DNo XNA detected? Was sensor removed for testing? X Yes DNo o NA X Yes DNo DNA X Yes DNo DNA X Yes DNo DNA Was sensor properly replaced and X Yes DNo D NA X Yes DNo DNA X Yes DNo DNA X Yes DNo DNA verified functional after testing? Comments -(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB, January 2002 Page __ of __ 9 SPILL/OVERFILL CONTAINMENT BOXES II Facility is Not Equipped With Spill/Overfill Containment Boxes 0 II Spill/Overfill Containment Boxes are Present, but were Not Tested 0 Test Method Developed By: 0 Spill Bucket Manufacturer x Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: 0 Pressure 0 Vacuum x Hydrostatic 0 Other (Specify) Test Equipment Used: Ts-sts Equipment Resolution: ''" I Spill Box #87 Vapor I Spill Box #91 Vapor I Spill Box# I Spill Box# I Bucket Diameter: 12" 12" Bucket Depth: 10" 10" Wait time between applying pressure/vacuum/water and 5 Min 5 Min starting test: Test Start Time: Initial Reading (R1): Test End Time: ~"" 1~1 f"nM Final Reading (RF): """"'"' II,. --·· -. I .L Test Duration: l't:~:H Jl L::. Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass 0 Fail X Pass o Fail 0 Pass 0 Fail 0 Pass 0 Fail Comments-(include information on repairs made prior to testing, and recommendedfollow-upfor.failed tests) 3350 FARRELLS 3360 FARKELLS 6a01 IJH!iE LN 6~01 \iH!TE LN BAKERSFIELD CA I. BAKERSFIELD CA 661-393-7000 661-383-7000 li031371 11031371 08/05/2013 1!37 PM 09/05/2013 1: 11 P~1 SUMP LEAK TEST REPORT SU!1P LEAK TEST REPORT UDC1-2 lJDCl-2 UDC1-2 TEST STARTED 12:56 f'H TEST STARTED 1:18 PM TEST STARTED 1:22 PH TEST STARTED 09/05/2013 TEST STARTED 09/05/2013 TEST STARTED 09/05/2013 BEGiN LEVEL 1. 3216 JN BEGIN LEVEL 1, 0957 iN BEGIN LEVEL 1. 321£1 IN END TIME 1:11 PM END TIME 1:33 PM END TIME 1:37PM EUO DATE 09/05/2013 END DATE 09/05/2013 END DATE 09/05/2013 END LEVEL 1, 3214 iN END LEVEL 1. 09Q3 lN END LEVEL 1, 3213 IN LEAK THRESHOLD 0,002 iN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0. 002 IN TEST RESULT PASSED TEST RESULT PASSED TEST ~ESULT PASSED UDC3-Ll UDC3-Il UDC3~a TEST STARTED 12:56 PH TEST STARTED TESi STARTED 09/05/20 13 1:22 PM TEST STARTED U8 PM BEGHJ LEVEL 3.9288 lN TEST STARTED 09/05/2013 TESi STARTED 09/05/2013 END TIME 1:11 PM BEGiN LEVEL 3,9290 IN BEGiN LEVEL 5,826il IN END DATE 09/05/2013 END TlME 1:37 PM END TIME 2:03 PM END LEVEL 3,9289 IN END DATE 09/05/2013 END DATE 09/05/2013 LEAK THRESHOLD 0, 002 IN END LEVEL 3,9280 IN EflO LEVEL 6. 8252 It1 TEST RESULT PASSED LEAK THRESHOLD 0,002 IN LEAK THRESHOLD o. 002 w TEST RESULT PASSED TEST RESULT PASS EO 3360 F.~RRELLS 6401 WHITE LN BAKERSFIELD CA 661-393-7000 WD31371 09/05/2013 2:21 PM SUMP LEAK TEST REPORT UDCS-6 TEST STARTED 2:05 PM TEST STARTED 09/05/2013 BEGIN LEVEL /l,O/l56 IN END TIME 2:21 PM END DATE 09/05/2013 EtJO LEVEL /l, Oll55 IN LEAK THRESHOLD 0, 002 II·J TEST RESULT PASSED UDC7-8 TEST STARTED 12:58 PM TEST STARTED 08/05/2013 BEGW LEVEL 5, 1588 IN END TIME 1:14 P11 END DATE 09/05/2013 am LEVEL 5. 1587 JIJ LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 3360 FARRELLS 6/l01 WHITE LN BAKERSFIELD CA 661-393-7000 WD31371 08/05/2013 SUMP LEAK TEST REPORT UOC5-6 TEST STARTED TEST STARTED BEGW LEVEL END fiNE END DATE END LEVEL 2:25 P~l 08/05/2013 n.oa55 IN 2:/lO PM 08/05/2013 a.0457 IN LEPK THRESHOLD TEST RESULT o. 002 w PASSED UOC7-8 TEST STARTED 1:18PM TEST STARTED 08/05/2013 BEGIN LEVEL 5. 1584 HJ am TIME 1:33 PM END DATE 09/05/2013 Hm LEVEL s. 155a w LEAK THRESHOLD 0. 002 IN TEST RESULT PASSED 87VAP 87VAP TEST STARTED 2:25 D~\ TEST STARTED 2:05 PM TEST STARTED 09/05/2013 TEST STARTED 09/05/2013 BEGIN LEVEl 5. 6828 IN BEGIN LEVEL 5. 6832 ltJ EIJD T li1E 2: DO PM Elm T!ME 2:21 PM END DATE 09/05/2013 END DATE 09/05/2013 Er/D LFVEL 5. 6828 ltJ EIJD LEVEL 5, 5830 HJ LEAK THRESHOLD 0.002 IN LFAK THRESI-IOLO 0. 002 JJJ TEST RESULT PASSED TEST RESULT PASSED 91VAP 91VAP lEST STARTED 2:25 Pr1 TESI STARTED 2:05 PM TEST s-ARTEO 08/05/2013 TEST STARTED 08/05/2013 BEGIN LEVEL Q, 1907 It~ BEGiN LEVEL D, 1903 W Etm TH1F 2:no PH EtlO TIME 2:21 Pf1 END DATE 09/05/2013 Etm DATE 09/05/2013 EtlD LEVEL a. 1910 Hl EtiO LEVEL a, 1906 w LEAK THRESHOLD 0. 002 Itl LEAK THRESHOLD o. 002 ill TEST RESULT PASSED TEST RESULT PASSED 33GO FARRf:LLS sao 1 liH JTF LN BAKERSFIELD CA 661-393-7000 1/031371 09/05/?013 9:13 AM SUMP LEAK TEST REPORT OSLSTP TEST STAR-eD 8:58 AM fEST STARTED 08/05/2013 m:r-: LrVEL 2. 7903 IN •• ~tJ TIHr fl: 13 AM END DATE 09/05/2013 [t;Q LEVEL 2. 7896 IN l FAK THRESHOLD O. 002 IN ll-.Si RESUL I PASSED 91STP TEST STARTED 10:16 AM TEST STARTED 09/05/20 13 BEGIN LEVEL 5.0675 IN END TIME io:31 AM END DATE 09/05/2013 END LEVEL 5.0676 IN LEAK THRESHOLD 0, 002 IN TEST RESULT PASSED I 87STP TEST START EO 8:58 ~M TEST STARTED 09/05/2013 BEGIN LEVEL 1.2n28 iN END TIME l~; 13 AM END DATE 09/05/201 3 EtJU LEVEL 1. 2aao IN LEAK T~PESHDLO 0. 002 :N TEST RESULT PASSED 3360 FARRELL$ 6401 ~HI TE LN BAKERSFIELD CA 661-393-7000 \1031371 09/05/2013 9:29 AM SUMP LEPK lEST f<EPORl OSLSTP TEST STARTEil 9: ld AM TEST STARn=D 09/05/2013 BEGIN LEVEL 2, 7895 IN END TIME 9:29 AM EtlD DATE 09/05/?013 END LEVEL 2. 7892 IN LEAK THRESHOLD 0, 002 IU TEST RESULT PASSED 91STP TEST STARTED 9: lli AM TEST STARTED 09/05/20 13 BEGIN LEVEL 3, 0962 IN END TIME 9:29 AN END DATE 09/05/?013 E~JD LEVEL 3, 0976 HI LEAK THRESHOLD 0. 002 IN TEST RESULT PASSEO 87SiP TEST STARTED 9:10 /\M TEST STARTED 09/05/2013 BEGitl LEVEL 1. 2~37 IN END TIME 9:29 A~ END DATE 09!05/20~3 END LEVEL 1, 2635 IN LEAK THRESHOLD o. 002 :tJ fEST RESULT PASSED 3360 FARRELLS 6/lO 1 WH lTE l.N BAKERSFIELD CA 661-393-7000 W031371 09/05/2013 12:07 PM SUrlP LEAK TEST REPORT DSLFILL TEST STARTED 11:51 Al1 TEST STARTED 09/05/2013 BEGIN LEVEL 3, 7555 IN EtJO TIME 12:06 PM Etm DATE 09/05/2013 END LEVEL 3. 7560 IN LEAK THRESHOLD o. oo2 m rEST RESULT PASSED 87FILL TEST STARTED 11:51 AM TEST STARTED 09/05/2013 BEGIN LEVEL s, ooas HI EtiD Tl ME 12:06 PM EtJO DATE 09/05/2013 END LEVEL 5,00118 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 91FILL TEST STARTED 11:51 AM TEST STARTED 09/05/2013 BEGIN LEVEL 4,51511 IN END TIME 12:06 PM END DATE 09/05/2013 END LEVEL 4,5150 IN LEAK THRESHOLD 0, 002 W TEST RESULT PASSED 3360 FARRELLS 6401 IIHJTE LN BAKERSFIELD CA 661-393-7000 \·1031371 09/05/2013 12:li2 Pi1 SUMP LEAK TEST REPORT DSLFILL TEST STARTED 12:26 PM TEST STARTED 09/05/2013 BEGiN LEIJEL 3, 7558 IN GW TI ME 12:1l2 PM END DATE 09/05/2013 END LEVEL 3, 7556 IN LEAK THRESHOLD 0. 002 w TEST RESULT F'ASSED 87FILL TEST STARTED 12:26 PM TEST STARTED 09/05/2013 BEGW LEVEL 5,001l6 IN END TI ME 12:112 PM END DATE 09/05/2013 EtlD LEVEL 5,ooa7 IN LEAK THRESHOLD 0, 002 IN TEST RESULT PASSED 91F!LL TEST STARTED TEST STARTED BEGIN LEVEL END TI ME END DATE 12:26 PM 09/05/2013 a. ms it~ 12:42 PM 09/05/2013 END LEVEL ~.51aLJ IN LW THRESHOLD 0, 002 W TEST RESULT PASSED