HomeMy WebLinkAboutCircle K 5600 Auburn SB-989 repair reportb Is {~ environmental services, inc. 25971 Towne Centre Drive, Foothill Ranch, CA 92610 Tel: (949) 460-5200 Fax: (949) 460-5210 Date: To: From: Sent Via: 4/14/2014 Ernie Medina Bakersfield Fire Dept. 1500 Truxtun Ave Bakersfield, CA 93301 Billy Moothart Email Re: Repairs Circle K Store #2708605 5600 AUBURN ST BAKERSFIELD, CA 93306 TRANSMITTAL The following test report(s) are included: Repairs Comments: Please do not hesitate to call me at (949) 460-5200 if you have any questions or concerns regarding this work. 987228 SWRCB, January 2002 Page __ of __ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION ~ Facility Name: Circle K Store #2708605 I Date of Testing: 4/10/2014 Facility Address: 5600 AUBURN ST, BAKERSFIELD, CA 93306 Facility Contact: Piceno, Tonya I Phone: (661) 871-6273 Date Local Agency Was Notified of Testing: 4/4/2014 Name of Local Agency Inspector (if present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Belshire Environmental Services, Inc. Teclmician Conducting Test: Saul Gonzalez Credentials: l:2l CSLB Licensed Contractor D SWRCB Licensed Tank Tester License Type: A -General Engineering Contractor I License Number: 808313 Manufacturer Training Manufacturer Compu nent( s) Date Training Expires See Attached 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made Tank Annulars D D D D D D D D Secondary Pipe D D D D D D D D Piping Sump 2 ~ D D D D D D D UDC D D D D D D D D Fill Sump D D D D D D D D Spill Bucket 4 ~ D D D D D D D If hydrostatic testing was performed, describe what was done with the water after completion of tests: 0 Placed in drums left on site for proper disposition. ~ Transported to next site for use in additional testing. CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements "-~it-; Technician's Signature: Jciif< ------------~~~~~/~~~~----------------Date: __ ____:4"'-/"'"'10"""'/2,_,0"""1""'4 ___ _ 6. PIPING SUMP TESTING Test Method Developed By: D Sump Manufacturer J:8l Industry Standard D Professional Engineer D Other (SpecifY) Test Method Used: D Pressure D Vacuum [81 Hydrostatic D Other (SpecifY) Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" Sump# 89 Sump# 91 Sump# Sump# Sump Diameter: 42" 42" Sump Depth: 55" 53" Sump Material: Fiberglass Fiberglass Height from Tank Top to Top of 14" 14" Hi1:1:hest Piping Penetration: Height from Tank Top to Lowest 10" 10" Electrical Penetration: Condition of sump prior to testing: Good Good Portion of Sump Tested1 2' Above Pen. 2" Above Pen. Does turbine shut down when sump sensor detects liquid (both DYes D No J:8lNA D Yes D No J:8l NA DYes D No J:8lNA DYes D No J:8lNA product and warer p' Turbine shutdown response time N/A N/A Is system programmed for fail-safe shutdown?* DYes D No J:8l NA DYes D No J:8l NA DYes D No J:8lNA DYes D No J:8lNA Was fail -safe verified to be DYes D No J:8lNA DYes D No J:8lNA DYes D No J:8lNA DYes D No J:8l NA UJ tal?* Wait time between applying pressure/vacuum/water and starting 30 minutes 30 minutes test: Test Start Time: 01:24PM 01:41PM 12:33 PM 12:49 PM Initial Reading (Rr): 5.1026 5.1041 6.9897 6.9874 Test End Time: 01:40PM 01:56PM 12:48 PM 01:04PM Final Reading (RF): 5.1043 5.1033 6.988 6.9892 Test Duration: 15 min. 15 min. 15 min. 15 min, Change in Reading (RF-Rr): -0.0017 0.0008 0.0017 -0.0018 Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002 Test Result: Pass Pass Was sensor removed for testing? Yes Yes Was sensor properly replaced and Yes Yes verified functional after testing'Z_ Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) Sensor functionality was not confirmed. This procedure is not part of the Secondarv Containment Testin2: scope of work. 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to fillY of the questions indicated with an asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160) 9. SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Eqwwt:d With Spill/Overfill Cont:-1inment Boxes Q . Spill/Overfill C:ont:-JimnP.nt Boxes are Present, but were Not Tested D Test Method Developed By: D Spill Bucket Manufacturer [2] Industry Standard D Professional Engineer D Other (SpecifY) Test Method Used: D Pressure D Vacuum t2l Hydrostatic D Other (SpecifY) Test Equipment Used: lncon Sump Tester Equipment Resolution: +/-0.002" I Spil~Box # ~B ~llBox# ~VB Spill Box# 91 111! SJ!ill Box# _21 VB Bucket Diameter: 12" 12" 12" 12" Bucket Depth: 14" 14" 14" 14" Wait time between applying pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes starting test: Test Start Time: 01:24PM 01:41PM 01:24PM 01:41PM 12:49 PM 01:05PM 12:33 PM 12:49 PM Initial Reading (R1): 6.417 6.476 6.5691 6.5707 6.4481 6.447 7.1811 7.1808 Test End Time: 01:40PM 01:56PM 01:40PM 01:56PM 01:04PM 01:20PM 12:48 PM 01:04PM Final Reading (RF): 6.4177 6.479 6.5708 6.5706 6.4472 6.4471 7.1807 7.1806 Test Duration: 15 min. 15 min. 15 min. 15 min. 15 min. 15 min. 15 min. 15 min. Change in Reading (RF-Rr): -0.0007 -0.0030 -0.0017 0.0001 0.0009 -0.0001 0.0004 0.0002 Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +!-0.002" +/-0.002" Test Result: Pass Pass Pass Pass Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) Name Gonzalez, Saul Gonzalez, Saul Gonzalez, Saul Gonzalez, Saul Gonzalez, Saul Gonzalez, Saul Gonzalez, Saul Gonzalez, Saul Manufacturer Training Training OPW Fueling Containment Systems-FlexWorks OPW EVR Phase I Phil Tite Spill Collectors & Associated Hardware FiberGlass Systems Piping (Formerly AO Smith) Modern Welding Tank Installation Containment Solutions Installation Contractor Xerxes UST Installation Training Seminar INCON Level4-Franklin Sump Test System Completed 8/9/2012 7/31/2012 6/18/2013 10/28/2011 7/20/2012 3/15/2013 12/21/2012 6/15/2012 Expires 8/9/2014 7/31/2014 6/18/2015 10/28/2014 7/20/2015 3/15/2015 12/21/2015 6/15/2014 89TS 89TS 91TS 91TS TEST STARTED 1:24 PM TEST STARTED 1:41 PM TEST STARTED 12:33 PM TEST STARTED 12:49 PM TEST STARTED 04/10/2014 TEST STARTED 04/10/2014 TEST STARTED 04/10/2014 TEST STARTED 04/10/2014 BEGIN LEVEL 5, 1026 IN BEGIN LEVEL 5, 1041 IN BEGIN LEVEL 6, 9897 IN BEGIN LEVEL 6,9874 IN END TIME 1 :4o PM END TIME 1:56 PM END TIME 12:48 PM END TIME 1:04 PM END DATE 04/10/2014 END DATE 04/10/2014 END DATE 04/10/2014 END DATE 04/10/2014 END LEVEL 5, 1043 IN END LEVEL 5, 1033 IN END LEVEL 6,9880 IN END LEVEL 6,9892 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0, 002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED 89VB 89VB 91VB 91VB TEST STARTED 1:24 PM TEST STARTED 1:41 PM TEST STARTED 12:33 PM TEST STARTED 12:49 PM TEST STARTED 04/10/2014 TEST STARTED 04/10/2014 TEST STARTED 04/10/2014 TEST STARTED 04/10/2014 BEGIN LEVEL 6, 5691 IN BEGIN LEVEL 6,5707 IN BEGIN LEVEL 7, 1811 IN BEGIN LEVEL 7, 1808 IN END TIME 1:40 PM END TIME 1:56PM END TIME 12:48 PM END TIME 1:04 PM END DATE 04/10/2014 END DATE 04/10/2014 END DATE 04/10/2014 END DATE 04/10/2014 END LEVEL 6,5708 IN END LEVEL 6,5706 IN END LEVEL 7, 1807 IN END LEVEL 7, 1806 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0, 002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED 89FB 89FB 91FB 91FB TEST STARTED 1:24 PM • TEST STARTED ·1 :41 PM TEST STARTED 12:49 PM TEST STARTED 1:05 PM TEST STARTED 04/10/2014 TEST STARTED 04/10/2014 TEST STARTED 04/10/2014 TEST STARTED 04/10/2014 BEGIN LEVEL 6, 4170 IN BEGIN LEVEL 6,4176 IN BEGIN LEVEL 6,4481 IN BEGIN LEVEL 6,4470 IN END TIME 1 :4o PM END TIME 1:56 PM END TIME 1:04 PM END TIME 1:20PM END DATE 04/10/2014 END DATE 04/10/2014 END DATE 04/10/2014 END DATE 04/10/2014 END LEVEL 6,4177 IN END LEVEL 6,4179 IN END LEVEL 6,4472 IN END LEVEL 6, 4471 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED