Loading...
HomeMy WebLinkAboutPM 11952 Approval of Street and Grading Improvement Plans Ph 1 Freddie Porter From: Steve Choate [Schoate@bakersfieldcity.us] Sent: Thursday, January 13, 2011 8:10 AM To: Kath McWhorter Cc: Steve DeBranch; Freddie Porter Subject: Re: Improvement Plans for PM 11952 Page 1 of 1 5/10/2011 Plans are acceptable to City Water >>> "Kath McWhorter" <KMcWhorter@bolthouseproperties.com> 1/11/2011 10:22 AM >>> Hi Steve,Attached are the preliminary Street Improvement Plans for Bolthouse Drive and Preliminary Grading Plan for PM 11952, which are being prepared in conjunction with recording Parcel Map No. 11952 Phase 1. The improvements have been phased per the conditions of approval of the Tentative Map, with the first phase of construction being to construct Bolthouse Drive, full width, from Buena Vista Road to the westerly boundary of Phase 1. We are proposing a temporary AC turnaround at the end of the Phase 1 improvements, with a 20-ft wide, 4” thick gravel access road to the Drainage Sump, which is outside and adjacent to the PM 11952 boundary. When Parcel 7 of PM 11952 is recorded, Bolthouse Drive will be extended full-width to the parcel map boundary, and another temporary turnaround will be installed in front of the sump. As additional property to the west is developed, Bolthouse Drive will ultimately be constructed to collector standards along the sump frontage.The Public Works Department has asked for the Water Resources Department’s consent to construction of the temporary gravel access road as shown on the plans. Please review the areas clouded in red on the plans, and advise of your consent at your earliest convenience. If you have any questions, do not hesitate to contact me.Thank you,Kath McWhorter, R.C.E., P.L.S.Director of EngineeringBolthouse Properties, LLC2000 Oak Street, Suite 250Bakersfield, CA 93301Ph: 661.323.4005Cell: 661.204.0999KMcWhorter@bolthouseproperties.com