Loading...
HomeMy WebLinkAboutSB989 2014 RETESTSWRCB, January 2002 Page ____ of ____ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: California Mini Mart Date of Testing: 2/13/2014 Facility Address: 1129 Union Ave. Bakersfield, Ca. Facility Contact: Phone: Date Local Agency Was Notified of Testing : Name of Local Agency Inspector (if present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Advanced Compliance Technician Conducting Test: Bruce W. Hinsley Credentials: X CSLB Licensed Contractor  SWRCB Licensed Tank Tester License Type: C61/D40 License Number: 971259 Manufacturer Training Manufacturer Component(s) Date Training Expires Incon TS-STS 9/17/2014 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made Tank #2 STP Sump X   X     Tank #4 STP Sump X   X     91 UL Product Line X   X     Diesel Product Line X   X                                                                     If hydrostatic testing was performed, describe what was done with the water after completion of tests: Containments were clean, water was removed from site and be used in future testing. CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician’s Signature:________________________________________________ Date: 2/13/2014 SWRCB, January 2002 Page ____ of ____ 4. SECONDARY PIPE TESTING Test Method Developed By:  Piping Manufacturer X Industry Standard  Professional Engineer  Other (Specify) Test Method Used: X Pressure  Vacuum  Hydrostatic  Other (Specify) Test Equipment Used: Nitrogen / Pressure Gauge Equipment Resolution: Piping Run # 91 UL Piping Run # Diesel Piping Run # Piping Run # Piping Material: Fiberglass Fiberglass Piping Manufacturer: A/O Smith A/O Smith Piping Diameter: 3” 3” Length of Piping Run: 75’ 10’ Product Stored: 91 UL Diesel Method and location of piping-run isolation: Test Boot Test Boot Wait time between applying pressure/vacuum/water and starting test: 10 Min. 10 Min. Test Start Time: 11:00 11:00 Initial Reading (RI): 5.0 Psi. 5.0 Psi. Test End Time: 12:00 12:00 Final Reading (RF): 5.0 Psi. 5.0 Psi. Test Duration: 1 Hr. 1 Hr. Change in Reading (RF-RI): 0.0 Psi. 0.0 Psi. Pass/Fail Threshold or Criteria: 0.2 Psi. 0.2 Psi. Test Result: X Pass  Fail X Pass  Fail  Pass  Fail  Pass  Fail Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB, January 2002 Page ____ of ____ 5. PIPING SUMP TESTING Test Method Developed By:  Sump Manufacturer X Industry Standard  Professional Engineer  Other (Specify) Test Method Used:  Pressure  Vacuum X Hydrostatic  Other (Specify) Test Equipment Used: Incon TS-STS Equipment Resolution: 0.0002 Sump # 2 Sump # 4 Sump # Sump # Sump Diameter: 42” 42” Sump Depth: 64” 64” Sump Material: FRP FRP Height from Tank Top to Top of Highest Piping Penetration: 42” 42” Height from Tank Top to Lowest Electrical Penetration: 12” 12” Condition of sump prior to testing: Clean Clean Portion of Sump Tested1 70% 70% Does turbine shut down when sump sensor detects liquid (both product and water)?* X Yes  No  NA X Yes  No  NA X Yes  No  NA X Yes  No  NA Turbine shutdown response time 3 Sec. 3 Sec. Is system programmed for fail-safe shutdown?* X Yes  No  NA X Yes  No  NA X Yes  No  NA X Yes  No  NA Was fail-safe verified to be operational?* X Yes  No  NA X Yes  No  NA X Yes  No  NA X Yes  No  NA Wait time between applying pressure/vacuum/water and starting test: 10 Min. 10 Min. Test Start Time: 16:32/16:47 14:10/14:25 Initial Reading (RI): 5.8067 /5.8060 7.4743/7. 4753 Test End Time: 16:47/17:02 14:25/14:40 Final Reading (RF): 5.8062 /5.8046 7. 4750/7. 4755 Test Duration: 30 Min. 30 Min. Change in Reading (RF-RI): 0.0005/0.0014 0.0007/0.0002 Pass/Fail Threshold or Criteria: 0.002 0.002 Test Result: X Pass  Fail X Pass  Fail  Pass  Fail  Pass  Fail Was sensor removed for testing? X Yes  No  NA X Yes  No  NA X Yes  No  NA X Yes  No  NA Was sensor properly replaced and verified functional after testing? X Yes  No  NA X Yes  No  NA X Yes  No  NA X Yes  No  NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is “NO” or “NA”, the entire sump must be tested. (See SWRCB LG-160)