GENERAL NOTES
1. WALL: HEIGHT VARIES (SEE PLANS)
COLOR: TO BE DETERMINED BY OWNER
CAP: GROUTED
DESIGN WIND: 70 MPH
2. ALL STATIONING. DATA WAS CALCULATED FROM CENTERLINE, OFFSETS ARE TO THE LANDSCAPE EASEMENT.
3. HEIGHT OF WALL SHALL BE 6'-0" MIN. MEASURED FROM GROUND AT HIGHEST SIDE OF WALL.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARING AND GRADING THE AREA ALONG THE WALL LINE.
5. CONTRACTOR SHALL OBTAIN AND PROVIDE ALL PERMITS REQUIRED BY CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT
AND /OR ENGINEERING &SURVEY SERVICES.
6. ALL SURVEYING REQUIRED SHALL BE PROVIDED INITIALLY BY DEVELOPER ON A ONE TIME ONLY BASIS. ALL OTHERS WILL
BE CHARGED OUT ON AN HOURLY BASIS.
7. BEARING SOIL SHALL BE COMPACTED TO 90% OF MAXIMUM DRY DENSITY AS DETERMINED BY A.S.T.M. D -1557 TO A
DEPTH OF 12 INCHES BELOW BOTTOM OF FOOTING.
S. WATER PROOF SURFACE SHALL BE APPLIED PER 1997 U.B.C.. COAT ONLY THAT PORTION BELOW LOT PAD GRADE DOWN
TO FOOTING. ALL OTHER SURFACES ABOVE THE FOOTING SHALL BE SEALED WITH A CLEAR WATER SEAL SUCH AS
"AQUA - SEAL ", OR APPROVED EQUAL.
9. EXPANSION JOINTS SHALL BE CONSTRUCTED AT PILASTERS AT MAXIMUM 96 FOOT INTERVALS. EXPANSION JOINTS SHALL
BE FREE OF ALL MORTAR AND GROUT FROM TOP OF FOOTING TO TOP OF WALL.
10. BLOCKS AND BRICKS SHALL BE SET ON GRADE, TRUE, PLUMB, AND STRAIGHT. CURVES SHALL BE LAID OUT ON NO
GREATER THAN 8 FOOT CHORDS. HORIZONTAL MORTAR COURSES ON BLOCK SHALL BE 1/2 INCH, +/ -1/8 INCH. ALL
REINFORCING STEEL SHALL BE TIED FIRMLY IN PLACE PRIOR TO PLACEMENT OF BLOCK. OPEN END BLOCK WILL BE
ALLOWED IN GROUTED CELLS ONLY. NO BROKEN BLOCK WILL 8E FLOWED. ALL CONSTRUCTION OF NON - MODULAR
PIECES SHALL BE DONE WITH SAWCUTS. REINFORCING STEEL SPLICES SHALL BE A MINIMUM OF THIRTY- INCHES (30'x.
11. BLOCK COLOR SHALL BE UNIFORM IN TEXTURE AND COLOR AT SPECIFIED LOCATION IN PLAN.
12. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES PRIOR TO COMMENCEMENT OF WORK AND NOTIFY ENGINEER IF
CONFLICT WITH UTILITIES EXISTS. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRS TO DAMAGED UTILITIES CAUSED BY
HIS FORCES, BUT NOT COSTS TO RELOCATE IN THE EVENT OF PROPER NOTIFICATION AHEAD OF THE CONSTRUCTION.
13. ALL PROPER SAFELY PRECAUTIONS, INCLUDING SNORING AND BRACING OF WALL SHALL BE PROVIDED BY THE
CONTRACTOR, ESPECIALLY IN THE EVENT THAT FULL HEIGHT GROUTING METHOD IS USED.
14. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY
WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT OF WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT,
A DEPOSIT BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT OF WAY AND
INSURANCE SHALL BE POSTED PRIOR TO ISSURANCE OF THE PERMIT.
15. FOOTINGS SHALL NOT EXCEED THE WIDTH SHOWN ON THE PLANS BY MORE THAN 2 INCHES. ANY FORM WORK
NECESSARY TO MAINTAIN THIS FOOTING WIDTH SHALL EXTEND BELOW THE FINISHED TOP OF GRADE AT LEAST 16 INCHES
OR THE DEPTH OF THE FOOTING, WHICHEVER IS LESS,
16. ALL CONSTRUCTION EQUIPMENT SHALL BE PROPERLY AND ROUTINELY MAINTAINED, AS RECOMMENDED BY MANUFACTURER
MANUALS, TO CONTROL EXHAUST EMISSIONS.
17. CONSTRUCTION EQUIPMENT SHALL BE SHUT DOWN WHEN NOT IN USE FOR EXTENDED PERIODS OF TIME TO REDUCE
EMISSIONS ASSOCIATED WITH IDLING ENGINES.
18. ELECTRIC CONSTRUCTION EQUIPMENT SHOULD BE USED WHENEVER POSSIBLE IN LIEU OF FOSSIL FUEL -FIRED EQUIPMENT.
19. FUGITIVE DUST EMISSIONS FROM ALL DISTURBED AREAS, INCLUDING STORAGE PILES, WHICH ARE NOT BEING ACTIVELY
UTILIZED FOR CONSTRUCTION PURPOSES, SHALL .BE STABILIZED USING WATER, CHEMICAL STABILIZERS /SUPPRESSANTS,
COVERED WITH A TARP OR OTHER SUITABLE COVER, OR PLANTED WITH VEGETATIVE GROUND COVER.
20. FUGITIVE DUST EMISSIONS FROM ALL ON -SITE UNPAVED ROADS AND OFF -SITE ACCESS ROADS SHALL BE STABILIZED
THROUGH THE USE OF WATER OR CHEMICAL STABILIZERS /SUPPRESSANTS.
21. FUGITIVE DUST EMISSIONS FROM ALL LAND CLEARING, GRUBBING, SCRAPING, EXCAVATION, LAND LEVELING, GRADING, CUT
AND FILL, AND DEMOLITION ACTIVITIES SHALL BE CONTROLLED BY APPLYING WATER OR BY PRESOAKING.
22. WHEN MATERIALS ARE TRANSPORTED OFF SITE, ALL MATERIAL SHALL BE COVERED OR EFFECTIVELY WETTED TO LIMIT
VISIBLE DUST EMISSIONS, AND AT LEAST SIX INCHES OF FREEBOARD SPACE FROM THE TOP OF THE CONTAINER SHALL
BE MAINTAINED.
23. ALL OPERATIONS SHALL LIMIT OR EXPEDITIOUSLY REMOVE THE ACCUMULATION OF MUD OR DIRT FROM ADJACENT PUBLIC
STREETS AT THE END OF EACH WORKDAY. (THE'-USE OF DRY ROTARY BRUSHES IS EXPRESSLY PROHIBITED EXCEPT
WHERE PRECEDED OR ACCOMPANIED BY SUFFICIENT WETTING TO LIMIT THE VISIBLE DUST EMISSIONS. USE OF BLOWER
DEVICES IS EXPRESSLY FORBIDDEN).
24. FUGITIVE DUST EMISSIONS SHALL BE CONTROLLED WITH THE APPLICATION OF SUFFICIENT WATER OR CHEMICAL
STABILIZERS /SUPPRESSANTS WHENEVER MATERIALS ARE ADDED T0, OR REMOVED FROM, OUTDOOR STORAGE PILES,
25. VEGETATION COVER ON THE SITE SHALL BE RETAINED UNTIL CONSTRUCTION BEGINS.
26. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION THE CITY CONSTRUCTION INSPECTION DEPARTMENT AND PARKS
DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE.
CITY CONSTRUCTION INSPECTION DEPARTMENT 326 -3049
PARKS DEPARTMENT 326 -3117
27. PRIOR TO INSTALLATION OF ANY SIGNAGE, THE SUBDIVIDER SHALL SUBMIT TWO COPIES OF THE SUBDIVISION
IDENTIFICATION SIGN PLANS TO THE BUILDING DIRECTOR FOR REVIEW AND APPROVAL PURSUANT TO BMC SECTION
17.60.110(N). ONE COPY OF THE SIGN PLAN SHALL BE SUBMITTED TO THE PARKS DIVISION FOR REVIEW AND APPROVAL.
SIGN PLANS SHALL INCLUDE COPY, DIMENSIONS, COLOR, MATERIAL, LIGHTING, ANCHORAGE, AND LOCATION OF SIGN(S).
APPROVAL OF THESE WALL PLANS. BY THE PUBLIC WORKS DIRECTOR DOES NOT INCLUDE APPROVAL OF ANY SIGNAGE.
28. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION AND /OR REPAIR OF EXISTING IRRIGATION EQUIPTMENT AND
PROTECTION AND /OR REPLACEMENT OF EXISTING PLANT MATERIAL. ALL REPAIRS AND REPLACEMENTS MUST BE
COMPLETED BY A LICENSED LANDSCAPER. IN LIEU OF THE USE OF A LICENSED LANDSCAPER THE CONTRACTOR WILL BE
RESPONSIBLE FOR SUBMITTING AN IRRIGATION MODIFICATION PLAN FOR REVIEW AND APPROVAL BY THE PARKS DIVISION
PRIOR TO ANY REPAIRS OR REPLACEMENT TAKING PLACE. FURTHERMORE, IT IS THE CONTRACTOR'S RESPONSIBLITY TO
INSURE THAT ALL EXISTING PLANT MATERIAL THAT IS AFFECTED BY THE WALL CONSTRUCTION ACTIVITIES RECEIVE AN
ADEQUATE AMOUNT OF WATER TO INSURE WEALTHY PLANT GROWTH DURING THE ENTIRE CONSTRUCTION PHASE
1. COVER SHEET
2. PLAN AND PROFILE PANAMA LANE
3. PLAN AND PROFILE MOUNTAIN RIDGE DRIVE
4. PLAN AND PROFILE MOUNTAIN RIDGE DRIVE
5. PLAN AND PROFILE MOUNTAIN RIDGE DRIVE
6. PLAN AND PROFILE BERKSHIRE ROAD
Block Wall Construction Plans
CT 6553- ASH
RtYISION gPPRD1/ED W(:
DATE R0PNEY L. WELWRN,,Tk R.C. E, 69388 . 8 - 30 --08
PROJECT BNGINEE.R
8-o -7
DATE iA P. WpW R.C. 32178 EXP. l2 -31 -07
ENGINEER N
0 .Mggdqhm
200' 0' 200'
SCALE: 1 = 200
SHEET 2
BLOCK WALL
No m an wm Nunn rAn L&AIUS # , mow • ..,.,
go oft me m/m
I � p..o up.. I
#
# LU
;... UPTON AVENUE -•--� I
I
I
i
I I
A i
I t
� I i
r I
KINNE'TT AVRNUE � I
zr`
c
`np'�'?
'� Q
I 044
a0_
> U
�-
I
0
I
# I
z
#I
L0
I
z
>°
W
x
..
#
ui
V)
J
co W
< 3:
z
w w
0
ry
0
N
Ul
I
N
0
I
I
i
I I
A i
I t
� I i
r I
KINNE'TT AVRNUE � I
zr`
c
`np'�'?
'� Q
I 044
a0_
> U
�-
I
0
o
z
won
L0
,S
E
0
>°
W
x
..
o
N
ui
V)
J
co W
< 3:
z
w w
0
ry
0
N
Ul
I
I
i
I I
A i
I t
� I i
r I
KINNE'TT AVRNUE � I
LEGEND
� #I
I #I
# #I
Nt. BLOCK WALL
- -- SHEEP LAYOUT
TOP OF MONUMENT IN PANAMA LANE t 1280 FEET EAST OF 4,179.67 LF PUBLIC WALLS
INSTERSECTION WITH MOUNTAIN RIDGE ROAD. ELEV. 362.18 PER CITY
OF BAKERSFIELD BENCH MARK BOOK ON FILE AT THE OFFICE OF
THE CITY ENGINEER.
Es \2005\ 050309 \ACAD\IMPROVEMENTS \BLOCKWALL \050309--01 -CDV- WALL.dwg 8/15/8006 1012141 AM PDI
zr`
c
`np'�'?
'� Q
I 044
a0_
> U
�-
I
0
o
z
L0
,S
E
0
>°
W
x
..
o
N
ui
V)
J
co W
< 3:
z
w w
0
ry
0
N
Ul
N
0
im Q
z
d
H
V)
0
m
n
- - - - -- - -
- - - - -
-
--
- - -
LEGEND
� #I
I #I
# #I
Nt. BLOCK WALL
- -- SHEEP LAYOUT
TOP OF MONUMENT IN PANAMA LANE t 1280 FEET EAST OF 4,179.67 LF PUBLIC WALLS
INSTERSECTION WITH MOUNTAIN RIDGE ROAD. ELEV. 362.18 PER CITY
OF BAKERSFIELD BENCH MARK BOOK ON FILE AT THE OFFICE OF
THE CITY ENGINEER.
Es \2005\ 050309 \ACAD\IMPROVEMENTS \BLOCKWALL \050309--01 -CDV- WALL.dwg 8/15/8006 1012141 AM PDI
1 I
r
_ I
BERKSHIRE ROAD 1003.45 LOCK
#
I
SHEET 6
I
I
VI AP
NOT TO sc,A.e
GENERAL
A. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE
SECTIONS OF THE UNIFORM BUILDING CODE (UBC) 1997 EDITION.
AND CITY OF BAKERSFIELD DEVELOPMENT STANDARDS, LATEST EDITIONS.
FOUNDATIONS
A. FOR ALLOWABLE SOIL BEARING VALUES REFER TO THE SOIL BEARING
SCHEDULE ON THE SOILS REPORT DATED JANUARY 6,2006 BY KRAZAN &ASSOCIATES.
1. REINFORCING: DEFORMED ASTM, A615, GRADE 40
2. CEMENT: PORTLAND CEMENT, TYPE II, ASTM C -150
3. AGGREGATE: ASTM C -33
4. WATER: CLEAN AND DRINKABLE.
B. CONCRETE MIX DESIGN FOR FOOTINGS AND WALL GROUTING
1. CLASS B CONCRETE, 2500 PSI 0 28 DAYS
2. 5.0 SACKS OF CEMENT (MIN.) PER CUBIC YARD
3. 1 1/290 AGGREGATE (MAX.)
4. 4lo SLUMP (MAX.)
C. ADMIXTURES: ONLY AS APPROVED BY THE ENGINEER.
T
z
1. CONCRETE BLOCK MASONRY UNITS: ASTM C -90
2. REINFORCING MATERIALS: ASTM A515, GRADE 40 DEFORMED
3. ADMIXTURES: ONLY AS APPROVED BY THE ENGINEER
B. MORTAR
1. STRENGTH: TYPE S, 1200 PSI 0 7 DAYS AND 1800 PSI 0 28 DAYS
C. GROUT:
1. STRENGTH: TYPE S 1200 PSI 0 7 DAYS AND 1800 PSI 0 28 DAYS
2. CONCRETE BLOCK MASONRY UNITS SHALL BE DRY AND CLEAN BEFORE
GROUTING OPERATION.
3. LOWER 3 COURSES ARE TO BE ALLOWED TO CURE FOR 3 FULL DAYS
AFTER GROUTING PRIOR TO PLACING OR SETTING ANY FURTHER BLOCK
COURSE THEREON.
STAT
I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS COMPLY WITH THE CITY OF BAKERSFIELD ORDINANCES,
STANDARDS AND DESIGN CRITERIA, AND THAT THEY INCLUDE ALL IMPROVEMENTS OF THE ADVISORY AGENCY OR OTHER
REVIEW BOARD.
I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS, AND ANY ERRORS, OMISSIONS OR
VIOLATION OF THOSE ORDINANCES, STANDARD, AND DESIGN CRITERIA SHALL BE CORRECTED DURING CONSTRUCTION.
REVIEWED BY:
sli
ASSISTANT PUBLIC WORKS DIRECTOR
DATE
loe'Olc7le<�> e,
PUBLIC WORKS DIRECTOR -CITY OF BAKERSFIELD DATE
RAUL M. ROJAS, R.C.E. 39880- EXP. 12 -31 -07
zr`
c
`np'�'?
'� Q
I 044
a0_
> U
�-
I
0
o
z
1 I
r
_ I
BERKSHIRE ROAD 1003.45 LOCK
#
I
SHEET 6
I
I
VI AP
NOT TO sc,A.e
GENERAL
A. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE
SECTIONS OF THE UNIFORM BUILDING CODE (UBC) 1997 EDITION.
AND CITY OF BAKERSFIELD DEVELOPMENT STANDARDS, LATEST EDITIONS.
FOUNDATIONS
A. FOR ALLOWABLE SOIL BEARING VALUES REFER TO THE SOIL BEARING
SCHEDULE ON THE SOILS REPORT DATED JANUARY 6,2006 BY KRAZAN &ASSOCIATES.
1. REINFORCING: DEFORMED ASTM, A615, GRADE 40
2. CEMENT: PORTLAND CEMENT, TYPE II, ASTM C -150
3. AGGREGATE: ASTM C -33
4. WATER: CLEAN AND DRINKABLE.
B. CONCRETE MIX DESIGN FOR FOOTINGS AND WALL GROUTING
1. CLASS B CONCRETE, 2500 PSI 0 28 DAYS
2. 5.0 SACKS OF CEMENT (MIN.) PER CUBIC YARD
3. 1 1/290 AGGREGATE (MAX.)
4. 4lo SLUMP (MAX.)
C. ADMIXTURES: ONLY AS APPROVED BY THE ENGINEER.
T
z
1. CONCRETE BLOCK MASONRY UNITS: ASTM C -90
2. REINFORCING MATERIALS: ASTM A515, GRADE 40 DEFORMED
3. ADMIXTURES: ONLY AS APPROVED BY THE ENGINEER
B. MORTAR
1. STRENGTH: TYPE S, 1200 PSI 0 7 DAYS AND 1800 PSI 0 28 DAYS
C. GROUT:
1. STRENGTH: TYPE S 1200 PSI 0 7 DAYS AND 1800 PSI 0 28 DAYS
2. CONCRETE BLOCK MASONRY UNITS SHALL BE DRY AND CLEAN BEFORE
GROUTING OPERATION.
3. LOWER 3 COURSES ARE TO BE ALLOWED TO CURE FOR 3 FULL DAYS
AFTER GROUTING PRIOR TO PLACING OR SETTING ANY FURTHER BLOCK
COURSE THEREON.
STAT
I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS COMPLY WITH THE CITY OF BAKERSFIELD ORDINANCES,
STANDARDS AND DESIGN CRITERIA, AND THAT THEY INCLUDE ALL IMPROVEMENTS OF THE ADVISORY AGENCY OR OTHER
REVIEW BOARD.
I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS, AND ANY ERRORS, OMISSIONS OR
VIOLATION OF THOSE ORDINANCES, STANDARD, AND DESIGN CRITERIA SHALL BE CORRECTED DURING CONSTRUCTION.
REVIEWED BY:
sli
ASSISTANT PUBLIC WORKS DIRECTOR
DATE
loe'Olc7le<�> e,
PUBLIC WORKS DIRECTOR -CITY OF BAKERSFIELD DATE
RAUL M. ROJAS, R.C.E. 39880- EXP. 12 -31 -07
G��ktER * b/
o
zr`
c
`np'�'?
'� Q
I 044
a0_
> U
�-
o�
0
o
z
L0
,S
E
0
>°
W
x
..
o
N
ui
V)
J
co W
< 3:
z
w w
0
ry
0
N
Ul
N
0
im Q
z
d
H
V)
0
m
n
G��ktER * b/
o
zr`
c
`np'�'?
'� Q
I 044
a0_
> U
�-
o�
0
o
m
w Q
o cep
ti
V_
0
V-
lw
(3
cr
m
Gj w
m�
•w
�U
Q t.i.J
3CL
,E 0, 00
W 0) 0 0 0
I
a
U cc� p
w M M
W W
M U-
2o _
�
�w'v m
w ¢ W
0) tl) m <C
U
%OEM z
0
m
ui
w Cc
/ o0
� r
a
w
0-
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309- 01 -COV -WALL
SCALE:
AS SHOWN
SHEET NO.
1 OF 6
w-
L FYI
LU,
r
0-
N
cc
0
o
L0
,S
E
0
z
>°
W
x
..
o
N
ui
z
S
a
J
co W
< 3:
z
w w
0
ry
0
N
Ul
N
0
im Q
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309- 01 -COV -WALL
SCALE:
AS SHOWN
SHEET NO.
1 OF 6
w-
L FYI
LU,
r
GENERAL NOTES
CITY Jr BAKERSFIELD
lt4 THE COUNTY O I (IFIRIV STATE OF CALIFORNIA
Block Wall Construction Plans
1. WALL: HEIGHT VARIES (SEE PLANS)
COLOR: TO BE DETERMINED BY OWNER
CAP: GROUTED
ml
SIGN _PISIP 70 MPH
DESIGN ONE
SOIL TYPE: Sp r
F
2. ALL STATIONING DATA WAS CALCULATED FROM CENTERLINE, OFFSETS ARE TO THE LANDSCAPE EASEMENT.
3. HEIGHT OF WALL SHALL BE 6' -0" MIN. MEASURED FROM GROUND AT HIGHEST SIDE OF WALL.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARING AND GRADING THE AREA ALONG THE WALL LINE.
5. CONTRACTOR SHALL OBTAIN AND PROVIDE ALL PERMITS REQUIRED BY CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT
AND /OR ENGINEERING & SURVEY SERVICES.
6. ALL SURVEYING REQUIRED SHALL BE PROVIDED INITIALLY BY DEVELOPER ON A ONE TIME ONLY BASIS. ALL OTHERS WILL
BE CHARGED OUT ON AN HOURLY BASIS.
7. BEARING SOIL SHALL BE COMPACTED TO 90% OF MAXIMUM DRY DENSITY AS DETERMINED BY A.S.T.M. D -1557 TO A
DEPTH OF 12 INCHES BELOW BOTTOM OF FOOTING.
8. WATER PROOF SURFACE SHALL BE APPLIED PER 1997 U.B.C.. COAT ONLY THAT PORTION BELOW LOT PAD GRADE DOWN
TO FOOTING. ALL OTHER SURFACES ABOVE THE FOOTING SHALL BE SEALED WITH A CLEAR WATER SEAL SUCH AS
"AQUA-SEAL', OR APPROVED EQUAL.
9. EXPANSION JOINTS SHALL BE CONSTRUCTED AT PILASTERS AT MAXIMUM 50 FOOT INTERVALS. EXPANSION JOINTS SHALL
BE FREE OF ALL MORTAR AND GROUT FROM TOP OF FOOTING TO TOP 6r*WALL.
10. BLOCKS AND BRICKS SHALL BE SET ON GRADE, TRUE, PLUMB, AND STRAIGHT. CURVES SHALL BE LAID OUT ON NO
T CHORDS. HORIZONTAL MORTAR COURSES ON BLOCK SHALL BE 1 2 INCH, +/ -1
GREATER THAN 8 F00 8 INCH. ALL / /
REINFORCING STEEL SHALL BE TIED FIRMLY IN PLACE PRIOR TO PLACEMENT OF BLOCK. OPEN END BLOCK WILL BE
B
ALLOWED IN N GROUTED CELLS ONLY. Y. NO BROKEN BLOCK WILL BE ALLOWED. ALL CONSTRUCTION OF NON-MODULAR
PIECES SHALL BE DONE WITH SAWCUTS. REINFORCING STEEL SPLICES SHALL BE A MINIMUM OF THIRTY - INCHES (30").
11. BLOCK COLOR SHALL BE UNIFORM IN TEXTURE AND COLOR AT SPECIFIED LOCATION IN PLAN.
12. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES PRIOR TO COMMENCEMENT OF WORK AND NOTIFY ENGINEER IF
CONFLICT WITH UTILITIES EXISTS. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRS TO DAMAGED UTILITIES CAUSED BY
HIS FORCES, BUT NOT COSTS TO RELOCATE IN THE EVENT OF PROPER NOTIFICATION AHEAD OF THE CONSTRUCTION.
13. ALL PROPER SAFETY PRECAUTIONS, INCLUDING SHORING AND BRACING OF WALL SHALL BE PROVIDED BY THE
CONTRACTOR, ESPECIALLY IN THE EVENT THAT FULL HEIGHT GROUTING METHOD IS USED.
14. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC .WORKS DEPARTMENT FOR ANY
WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT OF WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT,
A DEPOSIT BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE RIGHT OF WAY AND
INSURANCE SHALL BE POSTED PRIOR TO INSURANCE OF THE PERMIT.
15. FOOTINGS SHALL NOT EXCEED THE WIDTH SHOWN ON THE PLANS BY MORE THAN 2 INCHES. ANY FORM WORK
NECESSARY TO MAINTAIN THIS FOOTING WIDTH SHALL EXTEND BELOW THE FINISHED TOP OF GRADE AT LEAST 16 INCHES
OR THE DEPTH OF THE FOOTING, WHICHEVER IS LESS.
16. ALL CONSTRUCTION EQUIPMENT SHALL BE PROPERLY AND ROUTINELY MAINTAINED, AS RECOMMENDED BY MANUFACTURER
MANUALS, TO CONTROL-EXHAUST EMISSIONS.
17. CONSTRUCTION EQUIPMENT SHALL BE SHUT DOWN WHEN NOT IN USE FOR EXTENDED PERIODS OF TIME TO REDUCE
EMISSIONS ASSOCIATED WITH IDLING ENGINES.
18. ELECTRIC CONSTRUCTION EQUIPMENT SHOULD BE USED WHENEVER POSSIBLE IN LIEU OF FOSSIL FUEL -FIRED EQUIPMENT.
19. FUGITIVE DUST EMISSIONS FROM ALL DISTURBED AREAS, INCLUDING STORAGE PILES, WHICH ARE NOT BEING ACTIVELY
UTILIZED FOR CONSTRUCTION PURPOSES, SHALL BE STABILIZED USING WATER, CHEMICAL STABILIZERS /SUPPRESSANTS,
COVERED WITH A TARP OR OTHER SUITABLE COVER, OR PLANTED WITH VEGETATIVE GROUND COVER.
20. FUGITIVE DUST EMISSIONS FROM ALL ON -SITE UNPAVED ROADS AND OFF -SITE ACCESS ROADS SHALL BE
STABILIZED
THR0,ljGH THE USE OF WATER OR CHEMICAL STABILIZERS /SUPPRESSANTS.
21. FUGITIVE DUST EMISSIONS FROM ALL LAND CLEARING, GRUBBING, SCRAPING, EXCAVATION, LAND LEVELING, GRADING, CUT
AND FILL, AND DEMOLITION ACTIVITIES SHALL BE CONTROLLED BY APPLYING WATER OR BY PRESOAKING.
22. WHEN MATERIALS ARE TRANSPORTED OFF SITE, ALL MATERIAL SHALL BE COVERED OR EFFECTIVELY WETTED TO LIMIT
VISIBLE DUST EMISSIONS, AND AT LEAST SIX INCHES OF FREEBOARD SPACE FROM THE TOP OF THE CONTAINER SHALL
BE MAINTAINED.
23. ALL .OPERATIONS SHALL LIMIT OR EXPEDITIOUSLY REMOVE THE ACCUMULATION OF MUD OR DIRT FROM ADJACENT PUBLIC
STREETS AT THE END OF EACH WORKDAY. ( THE USE OF DRY ROTARY BRUSHES IS EXPRESSLY PROHIBITED EXCEPT
WHERE PRECEDED OR ACCOMPANIED BY SUFFICIENT WETTING TO LIMIT THE VISIBLE DUST EMISSIONS. USE OF BLOWER
DEVICES IS EXPRESSLY FORBIDDEN).
24. FUGITIVE DUST EMISSIONS SHALL BE CONTROLLED WITH THE APPLICATION OF SUFFICIENT WATER OR CHEMICAL
STABILIZERS /SUPPRESSANTS WHENEVER MATERIALS ARE ADDED TO, OR REMOVED FROM, OUTDOOR STORAGE PILES.
25. VEGETATION COVER ON THE SITE SHALL BE RETAINED UNTIL CONSTRUCTION BEGINS.
26. PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION THE CITY CONSTRUCTION INSPECTION DEPARTMENT AND PARKS
DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE.
CITY CONSTRUCTION INSPECTION DEPARTMENT 326 -3049
PARKS DEPARTMENT 326 -3117
27. PRIOR TO INSTALLATION OF ANY SIGNAGE, THE SUBDIVIDER SHALL SUBMIT TWO COPIES OF THE SUBDIVISION
IDENTIFICATION SIGN PLANS TO THE BUILDING DIRECTOR FOR REVIEW AND APPROVAL PURSUANT TO BMC SECTION
17.60.110(N ) . ONE COPY OF THE SIGN PLAN SHALL BE SUBMITTED TO THE PARKS DIVISION FOR REVIEW AND APPROVAL.
INCLUDE COPY DIMENSIONS COLOR MATERIAL LIGHTING ANCHORAGE, AND LOCATION OF SIGN (S).
SIGN PLANS SHALL f f f ( )
I NA
APPROVAL OF THESE WALL PLANS BY THE PUBLIC WORKS DIRECTOR DOES NOT INCLUDE APPROVAL OF AN Y S G GE .
28. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION AND /OR REPAIR OF EXISTING IRRIGATION EQUIPMENT AND
PROTECTION AND /OR REPLACEMENT OF EXISTING PLANT MATERIAL. ALL REPAIRS AND REPLACEMENTS MUST BE
COMPLETED BY A LICENSED LANDSCAPER. IN LIEU OF THE USE OF A LICENSED LANDSCAPER THE CONTRACTOR WILL BE
RESPONSIBLE FOR SUBMITTING AN IRRIGATION MODIFICATION PLAN FOR REVIEW AND APPROVAL BY THE PARKS DIVISION
PRIOR TO ANY REPAIRS OR REPLACEMENT TAKING PLACE. FURTHERMORE, IT IS THE CONTRACTOR'S RESPONSIBILITY TO
INSURE THAT ALL EXISTING PLANT MATERIAL THAT IS AFFECTED BY THE WALL CONSTRUCTION ACTIVITIES RECEIVE AN
ADEQUATE AMOUNT OF WATER TO INSURE HEALTHY PLANT GROWTH DURING THE ENTIRE CONSTRUCTION PHASE
SHEET INDEX
7.
COVER SHEET
W/
O'
cr) N
2.
PLAN
AND
PROFILE
PANAMA LANE
3.
PLAN
AND
PROFILE
MOUNTAIN
RIDGE DRIVE
4.
PLAN
AND
PROFILE
MOUNTAIN
RIDGE DRIVE
5.
PLAN
AND
PROFILE
MOUNTAIN
RIDGE DRIVE
6.
PLAN
AND
PROFILE
BERKSHIRE
ROAD
L: \Pro jects \2005 \050. 309 \ACRD \IMPROVEMENTS \BLOCKWALL \050309- 01- COV- WALL. clwg 8/15/2006 10-,21.-11 AM PDT
6553 - A S HELA ND MEADOWS
200' 0' 200'
SCALE: 1 "= 200'
VICINITY MAP.
NOT TO SCALE
SAL
z
REVISION 1Q APPROVED BY:
Kul It
sm m
- ���_ ® ®���� RODNEY L. ILBURN, JR., CIVIL ENGINEER DATE
-- -- -- --
i SHEET 2 R.C.E. 69388 -EXP. 06 -30 -08 -_
f S89' _
100.99,- _
1
BLOCK WALL
':..a_. ..... -_. .°.:•_ _.... __:.. ......._vr....... -
_.,._. 1
-_
no mm
M
f }.
3
f1 .._.......::. ....�s
f ................ .... . __._ ........
-
I MARIAN P. SHAW, CIVIL ENGINEER IV DATE
t
... 21 - EXP 1 -31 -07
R.C.E. 3 78 2 -
1 1.
4
I
Mme; .....:_....._._. =�,._- rr .....n,;. .... _.... -
I h -
a
.....
..... . ...
S
:r
v
f 1
Y_ E
t
1 I .... - ; -c _._... _.. _.
AL NOTES
............ .... . ... . ..
.... . ...... . . ............ ...... .... .... E
yyyggg
1 t ,6 . .. .......... . .........
. ............
.......... ........ ...
........ f
1 ( r ' ............. ... _ g
:
f f GENERAL
___-
-'°'i' .xxxdpp .cars xxr. rr!rtxctalurivau,et�muuYbd..... iwif. d!z.r!rtar.e,�:r_tz.cc.r.r®'* r �::. ....__ .. .
S
r
r
s .__ _ - :�_ A. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE
_ -
f , 1 SECTIONS OF THE UNIFORM BUILDING CODE (UBC) 1997 EDITION.
AND CITY OF BAKERSFIELD DEVELOPMENT STANDARDS, LATEST EDITIONS.
1 FOUNDATIONS
1 , .... . . .............. . . ........ . ...... ..............
........... . ....... ....... ....... .... . .. .
1 ( 1 :_. __ __ __.. _ A. FOR ALLOWABLE SOIL BEARING VALUES REFER TO THE SOIL BEARING ..........
f f r SCHEDULE ON THE SOILS REPORT DATED JANUARY 6,2006 BY KRAZAN & ASSOCIATES.
--
b
.. - -_ -_ -
■1 - _..
r
CONCRETE
r..
1t'.._..._
_ . br`°'wSdriwW
.xx
A. MATERIALS
'" : a
.. :... 1 R
EINFO R DEFORMED ASTM, A615, GRADE 40
1 + f 2. CEMENT: PORTLAND CEMENT, TYPE 11, ASTM C -150
1 I 3. AGGREGATE: ASTM C -33
:
DRINKABLE.
- 4. WATER: CLEAN AND
= B. CONCRETE MIX DESIGN FOR FOOTINGS AND WALL GROUTING
_ 1. CLASS B CONCRETE, 2500 PSI 0 28 DAYS
?_. 5.0 SACKS OF CEMENT MIN. PER CUBIC YARD
(MAX . )
1 W
M._ .�R...� . . _ �.
I 4 4 LUMP (MAX.)
..r NIfRh"pa luvrrwt' 'ri...:....?a- .-.v'. _v --�a- -sxi�c,iifwoa5v'vriuutl�: _. _ _ 3
I _ '�°°frF,wwxApi(XF°VN.a _ 1' rSr1r�FFFSFF :usr.++...crc :_'-::_. _.. r. ...: �.. ..
s x__a c. ., -- p -v -r_v c uvuu:r:.....,. .. . : _. . :.:: _. _.... 3
_
... C. ADMIXTURES. ONLY AS APPROVED BY THE ENGINEER.
- =__ _- ...... .
4
_-
1
f
f W
cv A. MATERIALS
i (:: 1. G E LOCK ONR I - GRADE N. a
1 ...:...... ... _._. - -. F
1� 1 ........ _ _.....-
1 a, MAS R : 0 WI N P CIAL INSPECTION .
2. I ASTM A615 MED
1'
- - 3. ADMIXTURES: ONLY AS A THE ENGINEER
3
1 j = B.
- -_
MORTAR
_ .__.
.... v: -.: _. - -_ vY
1
1. STRENGTH: TYPE S. 1200 PSI @ 7 DAYS AND 1800 PSI ® 28 DAYS
1r _ _
u' txplr. -'xu
...... r ...:.......................: _ . ra ", .. rr' €, >« �_ _�. xw- k -irr.� "..,.,.r,,.a .-_: ,
:... ,r° .... .___.._....__ tax
...... '.:. x::... .....__.... .__.. _ _.. .. .. ....... ... �x. 'kxnxxapaxp,a,y
I
- C GRO UT.
1. STRENGTH. 00 PSI 0 8 D YS PER ASTM C476
f = 2. CONCRETE BLO A RY UNI A L AND CLEAN BEFORE
GROUTING OPERATION.
1:.. . .... _ .... _.... _ € f .
I _ .:: _ ..
f f is - -- 3. LOWER 3 COURSES ARE TO BE ALLOWED TO CURE FOR 3 FULL DAYS
AFTER GROUTING PRIOR TO PLACING OR SETTING ANY FURTHER BLOCK
3 e
f E TER
WALLS S AL B OUTED IN MAXIMUM 4 -0 LIFTS.
err
.. ._ 4 _4G _ ^�`G9'k'.iHhC -0rir'!IKrtr
f I 4 f�
vmrrEraTJrtnrdfu ....... ... __
4..- Jc._..:... ._. ..... - _..c........ _....:.. .. v- mvtvwuurv- 4a.�F.
........ W
1
r
P
1 1
1
_.
t
ENGINEER'S STATEMENT
f f I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS COMPLY WITH THE CITY OF BAKERSFIELD ORDINANCES,
M
1 I x STANDARDS AND DESIGN CRITERIA, AND THAT THEY INCLUDE ALL IMPROVEMENTS OF THE ADVISORY AGENCY OR
1; b
OTHER REVIEW BOARD. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS, AND AN
1 E R
_ 9
p 4. -
1 s
- E
v t --
... �n .............. ...: ..
Lu
ERRORS OMISSIONS OR VIOLATION OF THOSE ORDINANCES,. STANDARD AND DESIGN CRITERIA SHALL BE CORRECTED
1 T + I = t-
a _ _ _ 4 3 DURING C ONSTRUCTION
.
1
= r
1
f I _
= 1 Q
s
,
y
1 9
1 1
1 fa: - - - .......... ....
1 ' 1
i
1
.. . r = REVIEWED - - ......... :_-
.. xsxpxxx d°..... 4Ar. - ------- . � .��crMiiliAn- mumEi'v5 ' � ... _ . . f , F
__._. ...._...
..... .............. ...
c: z
-z :. :'' • - e.. d mum -...
s
9.
-
1 -
I
��
.... ..... ..... ...
TRAFFIC ENGINEER DATE
_
900Q 148" E
I4
f 1003.45 BLOCK WALL 1 - -
1 t f
f
f SHEET 6 f
1 ASSISTANT PUBLIC WORKS DIRECTOR DATE
1
1
1
APPROVED BY:
LEGEND
BLOCK WALL
SHEEP LAYOUT
QUANTITY.
4,198.93 LF PUBLIC WALLS
BENCH MARK.
TOP OF MONUMENT IN PANAMA LANE f 1280 FEET EAST OF
INSTERSECTIN WITH MOUNTAIN RIDGE ROAD. ELEV. 362.18 PER CITY
OF BAKERSFIELD BENCH MARK BOOK ON FILE AT THE OFFICE OF
THE CITY ENGINEER.
PUBLIC WORKS DIRECTOR -CITY OF BAKERSFIELD DATE
RAUL M. ROJAS, R.C.E. 39880- EXP. 12 -31 -07
BSNRB =A VA
CI LL USA
1- 800 - 227 -YB00
o Poo
PO rn o 0 0
CL
z o 00 ao z
X O W Y
0
0
PO co cy
L m
L
o Z) Q w Q o
rn cn m F- w y
W
y-- _
U
m
�l1 m
Q z
NW Q
d-
W/
O'
cr) N
CO)
�O
t/r)
L
O
.6
W
o
H
U
v_
Q
C
zN
C>
W
O
0 ..
CO) aN
z
J
M J W
Lo Q
z
Ld
to:,!: cl)
CO
> C,4
W
° 04
� N
CL
Qo>
cr j o
d
Z
H
O
U-
V)
W
J
J
z
�
�
V)
O
F_
�
U)
Z
O
0
>
C
w
ly
tY
V)
w
o
m
0
w
o
00
o Poo
PO rn o 0 0
CL
z o 00 ao z
X O W Y
0
0
PO co cy
L m
L
o Z) Q w Q o
rn cn m F- w y
W
y-- _
U
m
�l1 m
Q z
NW Q
d-
W/
O'
cr) N
CO)
�O
L
O
.6
W
o
U
v_
Q
C
zN
C>
W
=
O
0 ..
CO) aN
z
J
M J W
Lo Q
z
Ld
to:,!: cl)
CO
> C,4
W
° 04
� N
CL
Qo>
cr j o
PLOT DATE:
JOB NO.:
050309
Fl LE NAME:
050309- 01 -COV -WALL
SCALE:
AS SHOWN
SHEET NO.:
R 1 OF 6
00
0') V-) 0 :m
(m "t
CD 0 0
L-L:
ILO 0
00 00 Z:
x C)
C) <
V) :D
0'-', C W UJ m
C) Ne 3: r-1
C) < Lu
(n M
ui
m
0
W CU
Cr
<
LLi
CL <
CL ry
L r) I
W
CO Z
3:
0!5
Qa
w
Z
z a 4
C 0 r4
� c°� w Z 0
:5 +
X 0
6� u-) CO CL 04
0 W LO
LL- .
4)
z C 0) C9
3 0
E Lo
0 z w �°�m 0
+
L
>
0 0
04
ly- 0
W
04 4) J
co r C4 *41. :? In
L
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309-02—PAN—WALL
SCALE: 1 " —40' HORIZ.
1 1 as =4' VERT. I
L ,\Projects \2005\050309\ ACAD\IMPRO VEMENTS\ BLOCKW ALL \050309-02-P AN - W ALL.d wg 6/21/2006 9:29:47 AM PST
SHEET NO.:
�mw R2 OF 6
<
L4
vi
Cl.
LLI
m
CD
Z
F-
0
0
U-
46
V)
F-
U
uJ
U)
<
z
0
0
z
0
0
V)
r-
5;
°--
W
Of
C)
U)
LLi
U
m
0
1
LLI
CY)
CO
00
0') V-) 0 :m
(m "t
CD 0 0
L-L:
ILO 0
00 00 Z:
x C)
C) <
V) :D
0'-', C W UJ m
C) Ne 3: r-1
C) < Lu
(n M
ui
m
0
W CU
Cr
<
LLi
CL <
CL ry
L r) I
W
CO Z
3:
0!5
Qa
w
Z
z a 4
C 0 r4
� c°� w Z 0
:5 +
X 0
6� u-) CO CL 04
0 W LO
LL- .
4)
z C 0) C9
3 0
E Lo
0 z w �°�m 0
+
L
>
0 0
04
ly- 0
W
04 4) J
co r C4 *41. :? In
L
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309-02—PAN—WALL
SCALE: 1 " —40' HORIZ.
1 1 as =4' VERT. I
L ,\Projects \2005\050309\ ACAD\IMPRO VEMENTS\ BLOCKW ALL \050309-02-P AN - W ALL.d wg 6/21/2006 9:29:47 AM PST
SHEET NO.:
�mw R2 OF 6
<
L4
C:) 00
re) cy) r10 :m
r-r) 0) -4- 0
LLi (j) 0 0
> I I
71 00 00 C) :z
D Nel
F-
x c) Lu
D M
C) (D <
LLJ W m
0 C:) j <
X C)
LLI
U
Li
r
cu m
cy-
< Z:
La -
<
CL ry
L 0
Li\Pro le ct s\ 2005\ 050309\ AC AD\ IMPROVEMENTS\ BLOC KWALL \050309- 03 -M RIDGE-W ALL dwg 8/25/2006 2-,22,52 PM PDT
ui - I
co
oW
co
a.
w cr.
z
low
z
cl) 0 WZS 0 C4
w 0 0
-fj 04
L o
L-
nj
z ct) J
co)
to
to
C 0
z W 0- G) 4- (o 0 0 LLI
0 > U0�
w C:)
.2 04
[if 04
0 o--.. < c V.
04 S? co
%a-00 J�
L co 'CZ446 3 0 �= co),
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309 -03- FRIDGE -WALL
SCALE: 1#4=40' HORIZ.
1 is =4* VERT.
SHEET NO.:
R31 O-F- 6
vi
a_
uj
:z
°O
U-
LU
r
(n
<
cn
U.j
cr-
0
0
m
5;
o-
Gi
r?,
CL,
0
V)
U-1
T-
m
0
1
w
0)
<
00
C:) 00
re) cy) r10 :m
r-r) 0) -4- 0
LLi (j) 0 0
> I I
71 00 00 C) :z
D Nel
F-
x c) Lu
D M
C) (D <
LLJ W m
0 C:) j <
X C)
LLI
U
Li
r
cu m
cy-
< Z:
La -
<
CL ry
L 0
Li\Pro le ct s\ 2005\ 050309\ AC AD\ IMPROVEMENTS\ BLOC KWALL \050309- 03 -M RIDGE-W ALL dwg 8/25/2006 2-,22,52 PM PDT
ui - I
co
oW
co
a.
w cr.
z
low
z
cl) 0 WZS 0 C4
w 0 0
-fj 04
L o
L-
nj
z ct) J
co)
to
to
C 0
z W 0- G) 4- (o 0 0 LLI
0 > U0�
w C:)
.2 04
[if 04
0 o--.. < c V.
04 S? co
%a-00 J�
L co 'CZ446 3 0 �= co),
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309 -03- FRIDGE -WALL
SCALE: 1#4=40' HORIZ.
1 is =4* VERT.
SHEET NO.:
R31 O-F- 6
o 00
Lj 0 C)
1-0
:2-r 00 00 :z
D
F-
x c w
Q L—L
(D
co
F-
X
rn U) m
U
Ld
Z
W cu m
w
<
CL
Ld Q
Q-
Q- ry
L r-)
ui I
co i
m
vi
in
o W
0
w cr.
22
a-
Z��
co)
W 4
LLJ
+
4.0 =
0 o
z C
0
C/)
tc)
C 0
to 0
z
t 0
+ t
> C
CD
cm
C4 to �
�JM'H^
z
F-
0
0
LL-
0
F-
0
Ld
<
z
3:
O
Cn
0
F-
Ld
U)
z
D!
z
0
10
V)
cl.
5;
Lu
cy-
C)
V)
Ld
0
m
0
1
uj
0)
N
I
00
o 00
Lj 0 C)
1-0
:2-r 00 00 :z
D
F-
x c w
Q L—L
(D
co
F-
X
rn U) m
U
Ld
Z
W cu m
w
<
CL
Ld Q
Q-
Q- ry
L r-)
ui I
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309-04-MRIDGE-WALL
SCALE: 1'• =40' HORIZ.
I is@ =4' VERT.
L.,\Pro i e cts\2005 \050309\ACAD\ IMPROVEMENTS \BLOCKW ALL\ 050309-0 4-MR I DGE- W ALL,clw g 6/2I/2006 AM FS I
SHEET NO.:
R4 OF 6
co i
in
o W
0
w cr.
22
Z��
co)
W 4
0 c
+
4.0 =
0 o
z C
C/)
tc)
C 0
to 0
z
t 0
+ t
> C
C-4 c
cm
C4 to �
�JM'H^
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309-04-MRIDGE-WALL
SCALE: 1'• =40' HORIZ.
I is@ =4' VERT.
L.,\Pro i e cts\2005 \050309\ACAD\ IMPROVEMENTS \BLOCKW ALL\ 050309-0 4-MR I DGE- W ALL,clw g 6/2I/2006 AM FS I
SHEET NO.:
R4 OF 6
C:) r-, to M 0-)
1'0 0) 0
0) C:) C)
> I I
CL
0 to to 0
C:) ui
Ci OC) 00 M
-J
<
:D
W Cr C:y m
LLi
-J X m
C:) < ui w
U) m F-
r
m
W CU
ry
< z
CL
Ld
of- <
CL
L
Tim
CO o�
m
vi
3: w
0 (9
00
w Cr
�ZM
CL
ZEN
0
Cl) to
W
0
N
Z �"�
w
LLi
=�d
6�
Lf)
to
Ca CL CO
0
�o
M
J
z
�s
C 0)
9 *0
M
CL
F- cr
7
Ls q*
t 0
Lo 00
ti
Ld w
:2
LLJ
>
ty-
0
d)
0 c-4
04
<04
0
Cv-
N 4) co
NW > 0
a: —i imm
ca CO)
�
:z
I--
0
0
U-
1-:8
V)
F-
r
0
V)
Z:
0
U)
0
F-
U)
z
ry
m
0
0
Q-
LAJ
Of
of
U
LLI
U
co
0
ui
C%4
I--
<
I
in
00
C:) r-, to M 0-)
1'0 0) 0
0) C:) C)
> I I
CL
0 to to 0
C:) ui
Ci OC) 00 M
-J
<
:D
W Cr C:y m
LLi
-J X m
C:) < ui w
U) m F-
r
m
W CU
ry
< z
CL
Ld
of- <
CL
L
Tim
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309-05-MRIDGE-WALL
SCALE: 1"=40' HORIZ.
1 1 $1 =4' VERT.
\Projects\ 2005\050 309\ACAD\IMPRO VEMENTS \BLOCK WALL\ 050309-05-MR IDGE- W ALL.dw g 6/21/2006 9:41,45 AM PST
SHEET NO.:
R5 OF 6
CO o�
3: w
0 (9
00
w Cr
�ZM
ZEN
0
Cl) to
W
0
N
Z �"�
w
4)
=�d
6�
Lf)
to
Ca CL CO
0
�o
M
J
z
�s
C 0)
9 *0
I
C0 J Tm
Lo Go
CL
F- cr
7
Ls q*
t 0
Lo 00
ti
Ld w
:2
LLJ
>
ty-
0
d)
0 c-4
04
<04
a- W
:2
Cv-
N 4) co
NW > 0
a: —i imm
ca CO)
�
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309-05-MRIDGE-WALL
SCALE: 1"=40' HORIZ.
1 1 $1 =4' VERT.
\Projects\ 2005\050 309\ACAD\IMPRO VEMENTS \BLOCK WALL\ 050309-05-MR IDGE- W ALL.dw g 6/21/2006 9:41,45 AM PST
SHEET NO.:
R5 OF 6
C) 00
0
C) 0 0
> I I LL:
< < .- T- r)
0 C.0 (0 0
Z 00 00 Z:
Z) -,
F_
x 0 Lu
3 C) <
D
F_ Ld
LLI
0
0 :D < W X LL,
CY) Ne
0
LLi
0
C:L
m
Cu m
<
a_
<
L
0 1
m
vi
0
co a:
3:w
0 a�
Cl
WCO)
CL
W
Om�..
LLJ
m
z
0
co) r*ft
w
0
Cq
0
z 0
=�N
0
co am
0
LL_ O
z =
. V)
4) T-
J°f
c
<
F-
m
CID 0
z
Lli W
Ly N
.0
0
+
0
>
0 <
0:�
04
04
<
CL LLJ
F-
Co
r*-. :? (0
C14
CA
0
0
LL_
F-
0
Ld
S
V)
O0
0
0
CLI
C)
U)
LAi
IV_
C)
m
0
1
Ui
CY)
F-
1*4t4w
00
�y
C) 00
0
C) 0 0
> I I LL:
< < .- T- r)
0 C.0 (0 0
Z 00 00 Z:
Z) -,
F_
x 0 Lu
3 C) <
D
F_ Ld
LLI
0
0 :D < W X LL,
CY) Ne
0
LLi
0
C:L
m
Cu m
<
a_
<
L
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309 —06— BERSKSHI RE —WALL
SCALE: 1"=40' HORIZ.
1 1 $1 =4' VERT. I
L -, \ Projects\ 2005\ 050309\AC AD\ IMPROVEMENTS\ BLOCK WALL\050309- 06 -BERK SHIRE- W ALL. dw g 6/21/2006 945:34 AM PST
SHEET NO.:
R6 OF 6
0 1
0
co a:
3:w
0 a�
Cl
WCO)
W
Om�..
z
0
co) r*ft
w
0
Cq
0
z 0
=�N
LO
(n LO
co am
0
LL_ O
z =
. V)
4) T-
J°f
c
<
F-
LI L_
0 !
CID 0
z
Lli W
Ly N
.0
0
+
0
>
0 <
0:�
04
04
<
CL LLJ
C) C
Co
r*-. :? (0
C14
CA
PLOT DATE:
JOB NO.:
050309
FILE NAME:
050309 —06— BERSKSHI RE —WALL
SCALE: 1"=40' HORIZ.
1 1 $1 =4' VERT. I
L -, \ Projects\ 2005\ 050309\AC AD\ IMPROVEMENTS\ BLOCK WALL\050309- 06 -BERK SHIRE- W ALL. dw g 6/21/2006 945:34 AM PST
SHEET NO.:
R6 OF 6