Loading...
HomeMy WebLinkAboutFMC 2014Testing and Inspection Certificate Tanknology Inc. 11000 North MoPac Expressway, Suite 500, Austin, TX 78759 800-800-4633 www.tanknology.com Page 1 of 1 Test Date 1/8/2014 Tanknology WO#SC1-3416702 Test Purpose COMPLIANCE Customer PO#PO: 0015114456 Customer Location CHEVRON PRODUCTS COMPANY 145 S. STATE COLLEGE BLVD SUITE 400 BREA, CA 92821 CHEVRON 206561 3360 PANAMA LN. BAKERSFIELD, CA 93313 Attn: ANDREA VILCHIS Attn: TAMMY (714) 671-3223 (661) 396-7047 Test / Inspection Description Item Tested Date Tested Result Line Leak Detector (3 GPH) Tank T1 SUPREME Line 1 SUPREME 1/8/2014 Pass Line Leak Detector (3 GPH) Tank T2 PLUS Line 1 PLUS 1/8/2014 Pass Line Leak Detector (3 GPH) Tank T3 UNLEADED Line 1 UNLEADED 1/8/2014 Pass Impact Valve Inspection See test report for details 1/8/2014 Pass Leak Detection Monitoring System Inspection See test report for details 1/8/2014 Pass Spill Containment / Bucket SUPREME SB 1 - Fill - Direct 1/8/2014 Pass Spill Containment / Bucket PLUS SB 1 - Fill - Direct 1/8/2014 Pass Spill Containment / Bucket UNLEADED SB 1 - Fill - Direct 1/8/2014 Pass Tanknology Representative: Aaron Medina Technician: Edwin Pineda Telephone: (800) 964-0010 Technician Certification: (See forms) LDT 5000 Field Test Apparatus Line Leak Detector Test Page 1 of 1 Work Order:3416702 Date:1/8/2014 Site Name / ID:CHEVRON 206561 / 206561 Address:3360 PANAMA LN. City:BAKERSFIELD State:CA Zip:93313 Tank ID Product Product Line Tested From Existing/New Mechanical/Electronic Manufacturer/Model Serial No. Pump Operating Pressure (psi) Calibrated Leak (ml/min) Calibrated Leak (gph) Holding PSI *N/A for Electronic LD's Resiliency (ml) *N/A for Electronic LD's Metering PSI *N/A for Electronic LD's Opening Time (sec) *N/A for Electronic LD's Test Results T1 SUPREME SUPREME 1 6 Existing Mechanical FE Petro MLD BJ225 30.00 189.0 3.00 29.00 280.00 11 7.34 Pass T2 PLUS PLUS 1 6 Existing Mechanical FE Petro MLD 04090052 36.00 189.0 3.00 36.00 250.00 14 4.36 Pass T3 UNLEADED UNLEADED 1 6 Existing Mechanical FE Petro MLD 04121134 28.00 189.0 3.00 27.00 200.00 11 7.09 Pass Technician Comments: Technician Name:Edwin Pineda Certification #:2344 Technician Signature:Expire Date:4/5/2015 Environmental Compliance for Petroleum Systems © 2014 Tanknology Inc., Austin, TX.    All rights reserved.    tanknology.com Impact Valve Inspection Impact Valve Operational Inspection Work Order:3416702 Date:1/8/2014 Site Name/ID:CHEVRON 206561 Address:3360 PANAMA LN. City:BAKERSFIELD State:CA Zip:93313 Dispenser Number Grade Secure Mount? Valve Lock?Pass/ Fail Comments 1/2 87 Pass Fail Not Tested 1/2 89 Pass Fail Not Tested 1/2 91 Pass Fail Not Tested 3/4 87 Pass Fail Not Tested 3/4 89 Pass Fail Not Tested 3/4 91 Pass Fail Not Tested 5/6 87 Pass Fail Not Tested 5/6 89 Pass Fail Not Tested 5/6 91 Pass Fail Not Tested 7/8 87 Pass Fail Not Tested 7/8 89 Pass Fail Not Tested 7/8 91 Pass Fail Not Tested Technician Comments: Technician Name:Edwin Pineda Signature: Environmental Compliance for Petroleum Systems ©2014 Tanknology Inc., Austin, TX. All rights reserved. tanknology.com Appendix VI (Copies of Monitoring System Certification form and UST Monitoring Plot Plan available at http://www.swrcb.ca.gov.) MONITORING SYSTEM CERTIFICATION For Use By All Jurisdictions Within the State of California Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. A. General Information Facility Name:CHEVRON 206561 Bldg. No.: Site Address:3360 PANAMA LN.City:BAKERSFIELD Zip:93313 Facility Contact Person:TAMMY Contact Phone No.:661-396-7047 Make/Model of Monitoring System:Veeder Root TLS 350 Date of Testing/Servicing:1/8/2014 B. Inventory of Equipment Tested/Certified Check the appropriate boxes to indicate specific equipment inspected/serviced: Tank ID:T1 SUPREME - SUPREME In-Tank Gauging Probe.Model:MAG Annular Space or Vault Sensor.Model:VR-409 Piping Sump / Trench Sensor(s).Model:VR-352 Fill Sump Sensor(s).Model:VR-352 Mechanical Line Leak Detector.Model:FE Petro MLD Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model:PROBE/FLAPPER Other (specify equipment type and model in Section E on Page 2). Tank ID:T2 PLUS - PLUS In-Tank Gauging Probe.Model:MAG Annular Space or Vault Sensor.Model:VR-409 Piping Sump / Trench Sensor(s).Model:VR-352 Fill Sump Sensor(s).Model:VR-352 Mechanical Line Leak Detector.Model:FE Petro MLD Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model:PROBE/FLAPPER Other (specify equipment type and model in Section E on Page 2). Tank ID:T3 UNLEADED - UNLEADED In-Tank Gauging Probe.Model:MAG Annular Space or Vault Sensor.Model:VR-409 Piping Sump / Trench Sensor(s).Model:VR-352 Fill Sump Sensor(s).Model:VR-352 Mechanical Line Leak Detector.Model:FE Petro MLD Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model:PROBE/FLAPPER Other (specify equipment type and model in Section E on Page 2). Tank ID: In-Tank Gauging Probe.Model: Annular Space or Vault Sensor.Model: Piping Sump / Trench Sensor(s).Model: Fill Sump Sensor(s).Model: Mechanical Line Leak Detector.Model: Electronic Line Leak Detector.Model: Tank Overfill / High-Level Sensor.Model: Other (specify equipment type and model in Section E on Page 2). Dispenser ID:1/2 Dispenser Containment Sensor(s).Model:VR-208 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:3/4 Dispenser Containment Sensor(s).Model:VR-208 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:5/6 Dispenser Containment Sensor(s).Model:VR-208 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID:7/8 Dispenser Containment Sensor(s).Model:VR-208 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID: Dispenser Containment Sensor(s).Model: Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID: Dispenser Containment Sensor(s).Model: Shear Valve(s). Dispenser Containment Float(s) and Chain(s). *If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers’ guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a copy of the report; (check all that apply): System set- up Alarm history report Technician Name (print):Edwin Pineda Signature: Certification No.: 8026748-UT License. No.:743160 Class 'A' Testing Company Name:Tanknology Phone No.:(800) 800-4633 Testing Company Address:11000 N. MoPac Expressway Suite 500 Date of Testing/Servicing:1/8/2014 Monitoring System Certification Page 1 of 3 12/07 D. Results of Testing/Servicing Software Version Installed:330.01 Complete the following checklist: Yes No*Is the audible alarm operational? Yes No*Is the visual alarm operational? Yes No*Were all sensors visually inspected, functionally tested, and confirmed operational? Yes No*Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation? Yes No* N/A If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? Yes No* N/A For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) Sump/Trench Sensors; Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes; No Yes No* N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? 90% Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name and model for all replacement parts in Section E, below. Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) Product; Water. If yes, describe causes in Section E, below. Yes No*Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable Yes No*Is all monitoring equipment operational per manufacturer's specifications? * In Section E below, describe how and when these deficiencies were or will be corrected. E. Comments: Monitoring System Certification Page 2 of 3 12/07 F. In-Tank Gauging / SIR Equipment: Check this box if tank gauging is used only for inventory control. Check this box if no tank gauging or SIR equipment is installed. This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. Complete the following checklist: Yes No*Has all input wiring been inspected for proper entry and termination, including testing for ground faults? Yes No*Were all tank gauging probes visually inspected for damage and residue buildup? Yes No*Was accuracy of system product level readings tested? Yes No*Was accuracy of system water level readings tested? Yes No*Were all probes reinstalled properly? Yes No*Were all items on the equipment manufacturer's maintenance checklist completed? * In the Section H, below, describe how and when these deficiencies were or will be corrected. G. Line Leak Detectors (LLD): Check this box if LLDs are not installed. Complete the following checklist: Yes No* N/A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) Simulated leak rate: 3 g.p.h.; 0.1 g.p.h; 0.2 g.p.h. Yes No*Were all LLDs confirmed operational and accurate within regulatory requirements? Yes No*Was the testing apparatus properly calibrated? Yes No* N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? Yes No* N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? Yes No* N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? Yes No* N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? Yes No* N/A For electronic LLDs, have all accessible wiring connections been visually inspected? Yes No*Were all items on the equipment manufacturer's maintenance checklist completed? * In the Section H, below, describe how and when these deficiencies were or will be corrected. H.Comments: Page 3 of 3 12/07 SWRCB, January 2002 Page 1 of 1 Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: CHEVRON 206561 Date of Testing: 1/8/2014 Facility Address: 3360 PANAMA LN. , BAKERSFIELD, CA 93313 Facility Contact: TAMMY Phone: 661-396-7047 Date Local Agency Was Notified of Testing: 12/16/2013 Name of Local Agency Inspector (if present during testing): Ernie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY INC. Technician Conducting Test: Edwin Pineda Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: A-U License Number: 743160-8026748 Manufacturer Manufacturer Training Component(s)Date Training Expires PHILTITE SPILL BUCKETS 8/25/2015 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Spill Box T1 SUPREME supreme fill X Spill Box T2 PLUS plus fill X Spill Box T3 UNLEADED unleaded fill X Component Pass Fail Not Tested Repairs Made If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature:Date:1/8/2014 WO: 3416702 WATER WAS PUT IN FIVE GALLON BUCKETS AND PUT IN TRUCK FOR NEXT SITE. SWRCB, January 2002 Page 1 of 1 9. SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer Other (Specify): Test Method Used By: Pressure Vacuum Hydrostatic Other (Specify): Test Equipment Used:Equipment Resolution: Bucket Diameter: Bucket Depth: Wait time between applying pressure/vacuum/water and starting test Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI) : Pass/Fail Threshold or Criteria: Test Result: Spill Box # Tank T1 SUPREME SUPREME - Fill 1 - Direct - Below Grade in containment sump 12.00 14.00 0 min 10:30:00 14.00 in. H20 11:30:00 14.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Tank T2 PLUS PLUS - Fill 1 - Direct - Below Grade in containment sump 12.00 14.00 0 min 10:30:00 14.00 in. H20 11:30:00 14.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Tank T3 UNLEADED UNLEADED - Fill 1 - Direct - Below Grade in containment sump 12.00 14.00 0 min 10:30:00 14.00 in. H20 11:30:00 14.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # min +/- Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) WO: 3416702 Emergency Stop (E-Stop / ESO) Periodic Inspection Facility Information Technician Information Site #: CHEVRON 206561 206561 Date: 1/8/2014 Address: 3360 PANAMA LN. Name: Edwin Pineda City / State: BAKERSFIELD CA Technician Signature: The objective of this test is to provide assurance that the when the E-Stop switch is activated, all the fueling system circuits (turbines, and dispensers) are de-energized, and remain de-energized until they are re-set manually). The test procedures and guidelines shall be in accordance with the E-Stop Testing Process. SITE DATA 1 Number of E-Stop switches INSIDE of the building: 1 2 Number of E-Stop switches OUTSIDE of the building: 1 PERFORMANCE DATA Yes No NA 3 You have added or confirmed that all E-Stop locations are on the Site Diagram 4 Do all E-Stops shutdown power to ALL DISPENSERS 5 Do all E-Stops shutdown power to ALL STP's 6 Are ALL E-Stops clearly Labeled 7 Are the TURBINE BREAKERS clearly identified / labeled POST TEST 8 All equipment secured and any access ports, lids, enclosures are closed. 9 All safety barricades and test equipment has been properly removed 10 E-Stop was reset and all dispensing functions are normal E-Stop Inspection Results 11 PASS FAIL INCONCLUSIVE Comments (Clearly describe any deficiencies found) WO: 3416702 Product Tank Type (DW FRP, DW Steel, SW FRP) Tank Diameter Annular Riser Height (measured) Required (calculated) annular sensor length FRP tanks - see Note 1 below Steel tanks - see Note 2 Is req'd annular sensor length marked with tape & labeled with dimension (Y/N, document w/ photo)? Actual (measured) annular sensor length (to marked point) Are the DW pipe boots pulled back in tank sumps? (Y/N or N/A, note if can't be verified because clamshell is pointing down) Are tank sump sensors back in their holders and in the correct position? (Y/N or N/A document with photo) Tank 1 - SUPREME 1 Fiberglass 117.75 55.00 239.00 Y 251.00 Y Y Tank 2 - PLUS 2 Fiberglass 117.75 53.00 237.00 Y 252.00 Y Y Tank 3 - UNLEADED 3 Fiberglass 117.75 53.00 237.00 Y 253.00 Y Y DW Steel Tank Annular Calculation X = tank diameter + Riser Height Chevron Monitoring Certification Checklist Store Number: 206561 Address: 3360 PANAMA LN. BAKERSFIELD, CA 93313 Date: 1/8/2014 Technician: Edwin Pineda Company: TANKNOLOGY INC. (Y/N)Comments Has the Veeder Root Battery been replaced prior to failsafe? Y Has Veeder Root Programming before & after testing been verified? (especially tank manifolding setup - see Note 3) Y Has Veeder Root Programming before & after testing been attached to the Work Order? Y Are gasoline spin on-filters replaced during testing for ethanol per Chevron requirements (Cim Tek 300MB-10 or 400MB-10 or PetroClear 40510-A only) N Have all alarms generated during testing been noted in the station Alarm Log? (Y/N) Y Additional Comments: Note 1:DW FRP Tank Annular Calculations (circumference) X = ( 3.14 x tank diam/2 ) + riser height 10' diameter X = 188" + riser 8' diameter X = 151" + riser 6' diameter X = 113" + riser Note 2: Note 3: Certain Veeder Root Software versions will automatically revert to the default tank manifold settings anytime the programming is changed, such as when sensors are temporarily X'ed out, etc. Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:3416702 Site ID / Name:206561 / CHEVRON 206561 Address:3360 PANAMA LN. City:BAKERSFIELD State:CA Zip:93313 W.O.# SC1-3416702 Cust Ref#: PO: 0015114456 I10100 JAN 8, 2014 2:10 PM CHEVRON USA CSI-1849 3360 PANAMA LANE BAKERSFIELD CA 93304 SS-206561PH-396-7047 SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL I50301 JAN 8, 2014 2:10 PM # 1:CHEVRON USA CSI-1849 I50302 JAN 8, 2014 2:10 PM # 2:3360 PANAMA LANE I50303 JAN 8, 2014 2:10 PM # 3:BAKERSFIELD CA 93304 I50304 JAN 8, 2014 2:10 PM # 4:SS-206561PH-396-7047 I51700 JAN 8, 2014 2:10 PM SYSTEM TYPE AND LANGUAGE FLAG SYSTEM UNITS U.S. SYSTEM LANGUAGE ENGLISH SYSTEM DATE/TIME FORMAT MON DD YYYY HH:MM:SS xM I50F00 JAN 8, 2014 2:10 PM MON DD YYYY HH:MM:SS xM I60100 JAN 8, 2014 2:10 PM TANK CONFIGURATION DEVICE LABEL CONFIGURED 1 SUPREME ON 2 PLUS ON 3 UNLEADED ON 4 OFF I60200 JAN 8, 2014 2:10 PM TANK PRODUCT LABEL TANK PRODUCT LABEL 1 SUPREME 2 PLUS 3 UNLEADED 4 I60300 JAN 8, 2014 2:10 PM TANK PRODUCT CODE TANK PRODUCT LABEL 1 SUPREME 1 2 PLUS 2 3 UNLEADED 3 4 4 I60400 JAN 8, 2014 2:10 PM TANK FULL VOLUME TANK PRODUCT LABEL GALLONS 1 SUPREME 11849 2 PLUS 11849 3 UNLEADED 11849 4 0 I60700 JAN 8, 2014 2:10 PM TANK DIAMETER TANK PRODUCT LABEL INCHES 1 SUPREME 117.75 2 PLUS 117.75 3 UNLEADED 117.75 4 0.00 I60900 JAN 8, 2014 2:10 PM TANK THERMAL COEFFICIENT TANK PRODUCT LABEL 1 SUPREME 0.000700 2 PLUS 0.000700 3 UNLEADED 0.000700 4 0.000000 I61200 JAN 8, 2014 2:10 PM TANK MANIFOLDED PARTNERS TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS 1 SUPREME NONE NONE 2 PLUS NONE NONE 3 UNLEADED NONE NONE 4 NONE NONE I62100 JAN 8, 2014 2:10 PM TANK LOW PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 SUPREME 750 2 PLUS 750 3 UNLEADED 750 4 0 I62200 JAN 8, 2014 2:10 PM TANK HIGH PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 SUPREME 11256 2 PLUS 11256 3 UNLEADED 11253 4 0 I62300 JAN 8, 2014 2:10 PM TANK OVERFILL LEVEL LIMIT TANK PRODUCT LABEL GALLONS 1 SUPREME 10664 2 PLUS 10664 3 UNLEADED 10661 4 0 I62400 JAN 8, 2014 2:10 PM TANK HIGH WATER LEVEL LIMIT TANK PRODUCT LABEL INCHES 1 SUPREME 2.0 2 PLUS 2.0 3 UNLEADED 2.0 I62800 JAN 8, 2014 2:10 PM TANK MAXIMUM VOLUME LIMIT TANK PRODUCT LABEL GALLONS 1 SUPREME 11849 2 PLUS 11849 3 UNLEADED 11846 4 0 I62900 JAN 8, 2014 2:10 PM TANK DELIVERY REQUIRED LIMIT TANK PRODUCT LABEL GALLONS 1 SUPREME 1421 2 PLUS 1421 3 UNLEADED 1421 4 0 I70300 JAN 8, 2014 2:10 PM LIQUID TYPE SENSOR LOCATION TYPE 1 91 ANNULAR TRI-STATE (SINGLE FLOAT) 2 91 FILL DUAL FLT. DISCRIMINATING 3 91 STP SUMP DUAL FLT. HIGH VAPOR 4 89 ANNULAR TRI-STATE (SINGLE FLOAT) 5 89 FILL DUAL FLT. DISCRIMINATING 6 89 STP SUMP DUAL FLT. HIGH VAPOR 7 87 ANNULAR TRI-STATE (SINGLE FLOAT) 8 87 FILL DUAL FLT. DISCRIMINATING 9 87 STP SUMP DUAL FLT. HIGH VAPOR 10 DISP. PAN 1-2 TRI-STATE (SINGLE FLOAT) 11 DISP. PAN 3-4 TRI-STATE (SINGLE FLOAT) 12 DISP. PAN 5-6 TRI-STATE (SINGLE FLOAT) 13 DISP. PAN 7-8 TRI-STATE (SINGLE FLOAT) 14 TRI-STATE (SINGLE FLOAT) 15 TRI-STATE (SINGLE FLOAT) 16 TRI-STATE (SINGLE FLOAT) I90200 JAN 8, 2014 2:10 PM SOFTWARE REVISION LEVEL VERSION 330.01 SOFTWARE# 346330-100-B CREATED - 10.07.23.17.25 S-MODULE# 330160-004-a SYSTEM FEATURES: PERIODIC IN-TANK TESTS ANNUAL IN-TANK TESTS ISD I20600 JAN 8, 2014 2:11 PM CHEVRON USA CSI-1849 3360 PANAMA LANE BAKERSFIELD CA 93304 SS-206561PH-396-7047 TANK ALARM HISTORY TANK 1 SUPREME HIGH WATER ALARM JAN 8, 2014 12:56 PM JAN 15, 2013 11:17 AM JAN 27, 2012 11:40 AM OVERFILL ALARM JAN 8, 2014 12:34 PM JAN 15, 2013 10:57 AM JAN 27, 2012 11:21 AM LOW PRODUCT ALARM JAN 8, 2014 12:29 PM JAN 15, 2013 10:54 AM JAN 11, 2013 1:31 PM HIGH PRODUCT ALARM JAN 8, 2014 12:34 PM JAN 8, 2014 12:30 PM JAN 15, 2013 10:57 AM INVALID FUEL LEVEL JAN 8, 2014 12:28 PM JAN 15, 2013 11:24 AM JAN 15, 2013 10:54 AM PROBE OUT JAN 8, 2014 1:06 PM JAN 8, 2014 12:28 PM SEP 18, 2013 9:58 AM HIGH WATER WARNING JAN 8, 2014 12:56 PM JAN 15, 2013 11:17 AM JAN 27, 2012 11:40 AM DELIVERY NEEDED JAN 8, 2014 12:29 PM JAN 15, 2013 10:54 AM JAN 11, 2013 1:31 PM MAX PRODUCT ALARM JAN 8, 2014 12:30 PM JAN 15, 2013 10:57 AM JAN 27, 2012 11:22 AM LOW TEMP WARNING JAN 8, 2014 1:07 PM SEP 18, 2013 11:41 AM JAN 11, 2013 1:33 PM TANK 2 PLUS HIGH WATER ALARM JAN 8, 2014 12:48 PM SEP 18, 2013 5:59 PM JAN 15, 2013 11:19 AM OVERFILL ALARM JAN 8, 2014 12:29 PM JAN 15, 2013 10:56 AM LOW PRODUCT ALARM JAN 8, 2014 12:26 PM SEP 26, 2013 2:56 PM SEP 18, 2013 2:24 PM HIGH PRODUCT ALARM JAN 8, 2014 12:29 PM JAN 15, 2013 11:00 AM JAN 27, 2012 11:17 AM INVALID FUEL LEVEL JAN 8, 2014 1:31 PM JAN 8, 2014 12:51 PM JAN 8, 2014 12:26 PM PROBE OUT JAN 8, 2014 1:23 PM JAN 8, 2014 1:08 PM JAN 8, 2014 12:50 PM HIGH WATER WARNING JAN 8, 2014 12:48 PM SEP 18, 2013 5:59 PM JAN 15, 2013 11:19 AM DELIVERY NEEDED JAN 8, 2014 12:51 PM JAN 8, 2014 12:26 PM SEP 26, 2013 2:56 PM MAX PRODUCT ALARM JAN 8, 2014 12:29 PM JAN 15, 2013 11:00 AM LOW TEMP WARNING SEP 18, 2013 6:50 PM SEP 18, 2013 6:44 PM JAN 27, 2012 11:52 AM TANK 3 UNLEADED HIGH WATER ALARM JAN 8, 2014 12:54 PM JAN 15, 2013 11:14 AM JAN 27, 2012 11:17 AM OVERFILL ALARM JAN 8, 2014 12:29 PM SEP 26, 2013 11:10 PM AUG 23, 2013 2:17 AM LOW PRODUCT ALARM JAN 8, 2014 1:21 PM JAN 8, 2014 12:27 PM JAN 15, 2013 10:51 AM HIGH PRODUCT ALARM JAN 8, 2014 12:35 PM JAN 15, 2013 10:55 AM JAN 27, 2012 11:24 AM INVALID FUEL LEVEL JAN 8, 2014 12:27 PM JAN 15, 2013 10:51 AM NOV 17, 2012 3:16 PM PROBE OUT JAN 8, 2014 1:27 PM JAN 8, 2014 1:05 PM JAN 8, 2014 12:26 PM HIGH WATER WARNING JAN 8, 2014 12:54 PM JAN 15, 2013 11:14 AM JAN 27, 2012 11:17 AM DELIVERY NEEDED JAN 8, 2014 1:21 PM JAN 8, 2014 12:27 PM JAN 15, 2013 10:51 AM MAX PRODUCT ALARM JAN 8, 2014 12:35 PM JAN 15, 2013 10:55 AM JAN 27, 2012 11:24 AM LOW TEMP WARNING JAN 8, 2014 1:06 PM SEP 18, 2013 2:21 PM JAN 15, 2013 11:26 AM I30200 JAN 8, 2014 2:11 PM CHEVRON USA CSI-1849 3360 PANAMA LANE BAKERSFIELD CA 93304 SS-206561PH-396-7047 LIQUID ALARM HISTORY REPORT SENSOR LOCATION 1 91 ANNULAR JAN 8, 2014 12:16 PM FUEL ALARM JAN 8, 2014 10:21 AM SENSOR OUT ALARM JAN 8, 2014 10:06 AM FUEL ALARM 2 91 FILL JAN 8, 2014 10:21 AM SENSOR OUT ALARM JAN 8, 2014 10:05 AM LIQUID WARNING JAN 15, 2013 9:47 AM SENSOR OUT ALARM 3 91 STP SUMP JAN 8, 2014 10:22 AM SENSOR OUT ALARM JAN 8, 2014 10:04 AM LIQUID WARNING OCT 22, 2013 1:57 PM SENSOR OUT ALARM 4 89 ANNULAR JAN 8, 2014 12:19 PM FUEL ALARM JAN 8, 2014 11:58 AM FUEL ALARM JAN 8, 2014 10:22 AM SENSOR OUT ALARM 5 89 FILL JAN 8, 2014 10:21 AM SENSOR OUT ALARM JAN 8, 2014 10:12 AM LIQUID WARNING JAN 15, 2013 9:46 AM SENSOR OUT ALARM 6 89 STP SUMP JAN 8, 2014 10:21 AM SENSOR OUT ALARM JAN 8, 2014 10:11 AM LIQUID WARNING OCT 22, 2013 2:08 PM SENSOR OUT ALARM 7 87 ANNULAR JAN 8, 2014 10:22 AM SENSOR OUT ALARM JAN 8, 2014 10:10 AM FUEL ALARM JAN 8, 2014 10:10 AM FUEL ALARM 8 87 FILL JAN 8, 2014 10:21 AM SENSOR OUT ALARM JAN 8, 2014 10:08 AM LIQUID WARNING OCT 22, 2013 1:57 PM SENSOR OUT ALARM 9 87 STP SUMP JAN 8, 2014 10:21 AM SENSOR OUT ALARM JAN 8, 2014 10:06 AM FUEL ALARM OCT 22, 2013 2:10 PM SENSOR OUT ALARM 10 DISP. PAN 1-2 JAN 8, 2014 10:21 AM SENSOR OUT ALARM JAN 8, 2014 10:17 AM FUEL ALARM JAN 15, 2013 9:46 AM SENSOR OUT ALARM 11 DISP. PAN 3-4 JAN 8, 2014 10:21 AM SENSOR OUT ALARM JAN 8, 2014 10:17 AM FUEL ALARM JAN 15, 2013 9:46 AM SENSOR OUT ALARM 12 DISP. PAN 5-6 JAN 8, 2014 10:21 AM SENSOR OUT ALARM JAN 8, 2014 10:18 AM FUEL ALARM JAN 15, 2013 9:46 AM SENSOR OUT ALARM 13 DISP. PAN 7-8 JAN 8, 2014 10:21 AM SENSOR OUT ALARM JAN 8, 2014 10:20 AM FUEL ALARM JAN 15, 2013 9:46 AM SENSOR OUT ALARM I10100 JAN 8, 2014 2:13 PM CHEVRON USA CSI-1849 3360 PANAMA LANE BAKERSFIELD CA 93304 SS-206561PH-396-7047 SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL