HomeMy WebLinkAbout2014 REPAIR RESULTSSWRCB. January 2002 Page_of_
Secondary Containment Testing Report Form
71lis.form is intended.for use hy contractors pe1forming periodic testing of USTsecondm:J' containment systems. Use the
appropriate pages of thisfonn to report results for all components tested. The completedform, wrillen test procedures, and
printoutsfrom tests (if applicable). should he prm•ided to the facility mvnerloperatorfor submit/alto the local regulat01:1' agency.
1. FACILITY INFORMATION
T Date ofTesting: -Facility Name: #5562 Fastrip 116 5/23/2014
Facility Address: 1640 South Chester Avenue. Bakersfield. CA 93304
Facility Contact: Omero Garcia I Phone: 661-393-7000
Date Local Agency Was Notified ofTesting: 5/12/2014
Name of Local Agency fnspector (if present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services
Technician Conducting Test: Bryan A Self
Credentials: x CSLB Licensed Contractor x SWRCB Licensed Tank Tester
License Type: CSLB I License Number:804904 TT//11-1756
Manufacturer Training
Manufacturer Comeonent(s) Date Training Expires
UST I 0/21/2015
I nstallaton!Retro fit
UST Service ICC l-28-2015
technician
Star. Smith. Fibercast Fiber Glass Systems N.A.
Franklin Fueling
---········-
Sump Testing Ts-sts 08/22/2015
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail :-.lot Repairs
Tested Made Tested Made
87 East Secondary X UDC 7-8 X . -87 West Secondary X l J -, UDC Transition North X ~, I . ' -91 Secondary X , , , UDC Transition South X [ 1 ' I> .,
Diesel Secondary X [ 1 [ 1 [] '1 1 l 1
Siphon Secondary X I 1 [ 1 [ 1 -[ 1 [ 1 ( -87 East STP X L 1 ll [J r 1 II I I [1 ---87 West STP X _Q_ r 1 n r 1 ll l n
91 STP X II r 1 [J r 1 rJ L I
Diesel STP X l ; Ll r 1 II [ r: u
UDC 1-2 X f I I I ~ J lJ I [1 -UDC 3-4 X l 1 [ [] [ I J r .
UDC 5-6 X r. r "1 [I [ J c:
If hydrostatic testing was performed. describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBI.J<= FOR CONDUCTING TillS TESTING
To tire best of my knowledge, tlreJiu:ts stated in tlris document are ac&/1rate and in full compliance with legal requirement.\·
Technician's Signature: 76//
7
e ~ -vAl" -Date: 5123/2014
SWRCB, January 2002 Page __ of __
4. TANK ANNULAR TESTING
Test Method Developed By: Tank Manufacturer x Industry Standard !l Professional Engineer
Other (5'pec(f.i')
Test Method Used: f 1 Pressure x Vacuum llydrostatic
r Other (Spec((r)
Test Equipment Used: Calibrated Gages Equipment Rcsolution:0.0625"
:~;~: ~:-ht·.:~;~ ;:-:-·_ '' '~-f>;:·:.· ~ ·-
Tank# Tank# Tank# Tank# -Is Tank Exempt From Testing?1 Yes No Yes No Yes No Yes No
Tank Capacity:
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading {R1):
Test End Time:
final Reading(~):
Test Duration:
Change in Reading (~-R1):
Pass/Fail Tiueshold or Criteria:
Test Result: 0 Pass 0 FaiJ 0 Pass OFaiJ 0 Pass 0 FaiJ 0 Pass 0 Fail
Was sensor removed for testing? Yes No NA Yes No L NA · Yes No NA Yes No
Was sensor properly replaced and Yes No NA Yes No NA Yes No NA Yes No verified functional after testing?
Comments -(include information 011 repairs made prior to testing, and recommended folloll'-up for failed /ests)
1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, arc exempt from periodic containment
testing. {California Code of Regulations, Title 23, Section 2637(a)(6)}
NA
NA
SWRCB, January 2002 Page_ of_
5. SECONDARY PIPE TESTING
Test Method Developed By: U Piping Manufacturer x Industry Standard lJ Professional Engineer
t-Test Method Used:
Other (Specify)
x Pressure Vacuum -Hydrostatic
t-n Otller (Spec[fy)
Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625"
~f;:~*~·;:~r ·-:-.::-' .. ,-:.~'.~,.-<'·, ,~· Piping Run # 87 East Piping Run #87 West Piping Run# 91 Piping Run # Diesel
~
Piping Material: FRP FRP FRP FRP
Piping Manufacrurer: Smith Smith Smith Smith
Piping Diameter: 3.00" 3.00" 3.00" 3.00''
1---Length of Piping Run: 100' 100' 100' 100'
Product Stored: 87 87 91 Diesel -Method and location of
piping-run isolation: Test Boot Test Boot Test Boot Test Boot
Wait time between applying
pressure/vacuum/water and 5 min 5 min 5 min 5 min
starting test: -Test Start Time: !0:30am !0:30am I 0:30am !0:30am
Initial Reading {R1): 5.00" psi 5.00" psi 5.00" psi 5.00" psi --Test End Time: !1:30am II :30am !1:30am !1:30am
Final Reading(~):
1---
5.00" psi 5.00" psi 5.00" psi 5.00" psi
Test Duration: l hour I hour I hour I hour
Change in Reading {R1.-R1): 0.00" 0.00" 0.00" 0.00"
Pass/Fail 'll1reshold or 0.00" 0.00" 0.00" 0.00" Criteria:
Test Result: X Pass 0 Fail X Pass 0 Fail X Pass OFail X Pass 0 Fail -
Comments -(include il!{ormation on repairs made prior to testing, and recommended.follow-up.for.failed tests)
SWRCB, January 2002 Page of
5.SECONDARY PIPE TESTING
Test Method Developed By: ll Piping Manufacturer x Industry Standard f l Professional Engineer
Other (Spec[fy)
Test Method Used: x Pressure ll Vacuum I llydrostatic
Other (Spec(M
Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625"
~~~~li"' .::;·····.ftl!r-; .. . . -. --tl.... . .,, ,(~·v~:/1[,·,-,, '1jj."<'., ... : P1pmg Run# S1phon Piping Run# Piping Run# Piping Run #
Piping Material: FRP
Piping Manufacturer: Smith
Piping Diameter: 3.00"
Length ofPiping Run: 100'
Product Stored: 87 -Method and location of Test Boot piping-run isolation:
Wait time between applying
pressure/vacuum/water and 5 min
starting test: --Test Start Time: I 0:30am --Initial Reading (R1): 5.00" psi
Test End Time: I 1:30am -Final Reading(~): 5.00" psi
Test Duration: I hour
Change in Reading (~-R1): 0.00"
Pass/Fail "Threshold or 0.00" Criteria:
Test Result: X Pass 0 Fail OPass 0 Fail OPass 0 Fail OPass 0 Fail
--··--------------·····--···---
Comments-(include infonnation on repairs made prior to testing. and recommended fo!loii'-UfJ for failed tests)
SWRCB, January 2002 Page_ of
6. PIPING SUMP TESTING
Test Method Developed By: ~Sump Manufacturer x Industry Standard C Professional Engineer
I--
Other (Specify)
Test Method Used: Pressure Vacuum x Hydrostatic
n Other (Spec[fy)
Test Equipment Used: Ts-sts Equipment Resolution:
.. ~ ~ ... '· •.: : .
~ .. ~::.t\~'-~ -~-~~~~ .. : '4{ ' ~ ... Sump # 87 East Sump # 87 West Sump# 91 Sump # Diesel
Sump Diameter: 39.00" 39.00" 39.00" 39.00"
Sump Depth: 46.00" 46.00" 46.00" 47.00"
1---·-
Sump Material: FRP FRP FRP FRP
Height from Tank Top to Top of 16.00" 16.00" 12.00" 12.00" Highest Piping Penetration:
Height from Tank Top to Lowest 12.00" 12.00" 12.00" 12.00" Electrical Penetration: -
Condition of sump prior to testing: Clean & Dry Clean& Dry Clean & Dry Clean& Dry
I---
Portion ofSump Tested' Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
sump sensor detects liquid (both
product and water)/
CJYes IINo XNA UYcs I INo XNA Yes UNo XNA I I Yes nNo X NA
Turbine shutdown response time NA NA NA NA -Is system programmed for fail-safe
shutdown?' Yes No XNA Yes No XNA Yes No XNA Yes No XNA
-Was fail-safe verified to be
operational?' nYes No XNA Yes IJNo XNA I I Yes No XNA I Yes flNo X NA
Wait time between applying
pressure/vacuum/water and starting 5 min. 5 min. 5 min. 5 min.
test:
Test Start Time: -Initial Reading (R1):
Test End Time: ~--· .. •1'\ .. 1 ~--.... I"'\ II. I
Final Reading (RF): "''-''-' I I
__ ... V~~ II I ''-'1,. -.IL -_._._
Test Duration: n.t::::t ~I L:::t f'{es uns
Change in Reading (~-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail
Was sensor removed for testing? X Yes I lNo DNA X Yes II No ""'NA X Yes nNo DNA X Yes DNo lNA
Was sensor properly replaced and XYes llNo nNA X Yes No UNA X Yes No ....,NA XYes ~No INA verified functional after testing?
Comments -(include il!{ormation on repair.\ made prior to testing. and recommended.folloll'-up .for.failed test.\)
1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to 1!!lY of the questions indicated with an
asterisk (*) is "NO" or "NA ". the entire sump must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page_ of _
7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: r UDC Manufacturer x Industry Standard ~ Professional Engineer
f--
Other (Specifi~
Test Method Used: r Pressure Vacuum x Hydrostatic
Other (Spec{[v)
Test Equipment Used: Ts-sts Equipment Resolution:
··: ~~ ~· J ,< .. ;:-~.; .. . ·'.. ,.;: . ~~
..... · '; '' UDC # 1-2 uoc # 3-4 UOC # S-6 uoc # 7-8
UDC Manufacturer: Western Western Western Western -UDC Material: FRP FRP FRP FRP -UDC Depth: 33.00" 33.00" 33.00" 33.00" ·-Height from UDC Bottom to Top 9.00" 10.00" 9.00" 7.00"
of llighcst Piping Penetration: --Height from UDC Bottom to 13.00" 15.00" 13.00" 12.00"
Lowest Electrical Penetration: --Condition ofUDC prior to Clean & Dry Clean & Dry Clean & Dry Clean & Dry
testing: -Portion of UDC Tested Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?'
DYes IINo XNA Yes ! No X NA Yes !No XNA [I Yes 0 No X Nl\
Turbine shutdown response time N.A. N.A. N.A. N.A.
1---. Is system programmed for fatl-I Yes No XNA Yes No XNA Yes No XNA Yes No XNA safe shutdown?'
Was fail-safe verified to be ~Yes No XNA []Yes II No X NA l Yes II No XNA Yes J No XNA operational?'
Wait time between applying 5 Min 5 Min 5 Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1):
Test End Time: ~AA II ~r.nN see-m ICON
Final Reading (RF): -IJL n-.-..... _
Test Duration: l't:~ UIL:::» -·~~~ ..... ~
Chanse in Reading (R1-R1): -
Pass/Fail TI1reshold or Criteria:
Test Result: X Pass OFail X Pass OFail X Pass 0 Fail X Pass 0 Fail
Was sensor removed for testing? '"Yes No X Nl\ Yes No XNA Yes No XNA Yes No XNA
Was sensor properly replaced and 0 Yes II No XNA ~ Yes No XNA l Yes No XNA Yes n No X NA verified functional atlt:r testing?
Comments-(include information on repairs made prior to testing, and recommended follow-up forfailed test.\)
1 lftllC entire depth of the UDC is not tested, specify how much was tested. If tile answer to ill!Y of the questions indicated with an
asterisk(*) is "NO" or "N/\", the entire UDC must be tested. (See SWRCB LG-160)
SWRCB. January 2002 Page __ of __
?.UNDER-DISPENSER CONTAINMENT (UDC) TESTING ,...---,
Test Method Developed By: , UDC Manufacturer x Industry Standard Professional Engineer
t-Test Method Used:
Other (Speci/)~
~ Pressure Vacuum x Hydrostatic
Other (Spec{fy)
Test Equipment Used: Ts-sts Equipment Resolution:
~~~C\;t:;;i ;,_.. . : : . :' ·~:.-... ,.. .,-"······ UOC# Trans North UDC# Trans South UDC# UOC#
UDC Manufacturer: Western Western
UDC Material: fRP fRP
UDC Depth: 33.00" 33.00"
Height !Tom UDC Bottom to Top 9.00" 9.00"
ofllighcst Piping Penetration:
Height !Tom UDC Bottom to 13.00" 13.00"
Lowest Electrical Penetration:
Condition ofUDC prior to Clean & Dry Clean & Dry
testing:
Portion ofUDC Tested' Pipe Penetration Pipe Penetration
Docs turbine shut down when
UDC sensor detects liquid (both
~ct and water)?•
DYes No XNA LJ Y cs 11 No X NA lJYes UNo UNA Yes ··No INA
Turbine shutdown response time N.A. N.A.
Is system programmed for fail-
safe shutdown?· ~Yes No XNA Yes No XNA Yes No INA Yes No NA -Was fail-safe verified to be
operational?' -Yes No XNA r Yes No XNA Yes No _NA Yes !No NA
Wait time between applying 5 Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1): -... __ ...
Test End Time: "'~~ ··~ lvVI,.
Final Reading (RF): ~A~I I tit~
Test Duration: . -
Change in Reading (R1-R1):
Pass/fail Titreshold or Criteria:
Test Result: X Pass OFail X Pass 0 Fail 0 Pass OFail 0 Pass OFail
Was sensor removed for testing? 'l Yes No XNA Yes No XNA Yes No NA Yes No NA 1---Was sensor properly replaced and
J Yes 1No XNA 0 Yes No XNA Yes No NA rlYcs lNo JNA verified flmctional after testing?
Comments -(include information on repairs made prior to testing, and recommended follow-up for failed test.\)
1 If the entire depth of the UDC is not tested. specifY how much was tested. If the answer to any of the questions indicated with an
asterisk (*) is "NO" or "NA ". the entire UDC must be tested. (See SWRCB LG-160)
--·-
I
I
!
'
SWRCB, January 2002 Page_ of
8. FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps X
Fill Riser Containment Sumps are Present. but were Not Tested -Test Method Developed By: 'l Sump Manufacturer Industry Standard :J Professional Engineer
'l Other (5/Jec{fy) -
Test Method Used: [ Pressure I I Vacuum :-llydrostatic
n Other (Specify)
Test Equipment Used: Equipment Resolution:
.,,:, ) ..
·-FiJI Sump # Fill Sump# Fill Sump# Fill Sump#
Sump Diameter:
1-=-Sump Depth:
Height fi-om Tank Top to Top of
r-!:!ighcst PiEing Penetration:
• Height fi-om Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to
testing:
Portion of Sump Tested
Sump Material:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading (R1}:
Test End Time:
Final Reading (RF): r:r-o . est urat10n:
Change in Reading {R1-R1}:
Pass/Fail Threshold or Criteria:
Test Result: 0 Pass OFail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass OFail
Is there a sensor in the sump? -rl Yes II No I Yes "No Yes [)No l Yes No -Docs the sensor alarm when
either product or water is [J Yes L No nNA LJYes No UNA liVes IJNo NA Yes ~No NA
detected?
Was sensor removed for testing? ~Yes I No rNA ·-Yes No 'NA Yes No NJ\ Yes No NA
Was sensor properly replaced and DYes No NA Yes No :JNA Yes No NA Yes No NA verified functional aflcr testing?
--
Comments -(include il!formation on repairs made prior to testing, and recommended.follow-up forfai/ed tests) ~~------
4
5562 FASTRIP
1640 S OESTER AVE
BAKERSFIELD CA 93304
05/23/2014 9:59 AH
tu.R/1 REPIJlT
05/22/2014 7:09 PH
110 PROBE ~TECTED
stiiP !.'\), 3
05/22/2014 7:09 PH
110 PROOE [ETECTE.il
sti'.P 10. 2
05/22/2014 7:09 PH
lfJ 0ROBE DETECTED
SlW 10, 1 .
5562 FASTRIP
1640 S O£STER AVE
IW<ERSFIELD CA 93304
05/23/2014 10:38 AH
SUrtP lEVEL REPOOT
SlJIIP 81E STP
SlJIIP 91 STP
SUrtP OS STP
4. 475 Ill
3. 799 Ill
5. 623 Ill
.....
·~I
5562 FASTRIP
1640 S O!ESTER AVE
l!f,KERSFIElD CA 93304
05/23/2014 10:54 AH
SUIIP LEAK TEST REPORT
87E STP
TEST STARTED 10:39 AH
TEST STARTED 05/23/2014
BEGIII LEVEL 4,4759 Ill
Ell!l TillE 10:54 AH
EliD DATE 05/23/2014
EliD LEVEL 4, 4738 Ill
LEAK TI!RESH!l.D 0, 002 Ill
TEST RESlJI. T FAILED
91 STP
TEST STAATED 10:39 AH
TEST STARTED 05/23/2014
BEG Ill lEVEL 3.79811 Ill
EIID TIHE 10:54 AH
EIO DATE 05/23/2014
EID LEVEL 3. 7978 Ill
LEAK TlflES!IlLD O. 002 Ill
TEST RESI1. T PASSED
OS SlP
TEST STAATEO 10:39 AH
TEST STARTED 05/23/2014
BEG! II LEVEL 5.6225 Ill
Ellll TIHE 10:54 AH
Elll DATE 05/23/2014
Elll LEVEL 5.6214 Ill
l.£Al( THRESIWl 0, 002 Ill
TEST RESULT PASSED
'-~ -----· .. ---.·· --·
5562 FASTRIP
16<10 S O<:ESTER AVE
BAKERSFIELD CA 93304
05/23/2014 11:11 All
SUIP LEAK TEST Rfl'ORT
87E STP
TEST STARTED 10:56 AH
TEST STAATED 05/23/2014
BEGIIILEVB. 4.4740 Ill
ElK! TlltE 11:11AII
EliD DATE 05/23/2014
EliD LEVEL 4.4710 Ill
LEAK Tlf!ESHOLD 0, 002 Ill
TEST REStlT FAILED
91 STP
TEST STARTED 10:56 AH
TEST STARTED 05/23/2014
BEGIII LEVEL 3, 7989 Ill
EIID TIHE 11:11 AH
Elll DATE 05/23/2014
Ell! LEVEl 3.781J3 Ill
LEAK TlflESilOLD O. 002 Ill
TEST RESII. T FAILED
OS STP
TEST STARTED 10:56 AH
TEST STAATED 05/23/2014
BEG Ill LEVEL 5.6215 Ill
Elll TillE 11:11 All
Elll DATE 05/23/2014
EllD LEVEL 5.6212 Ill
LEAK THlESilOLD 0. 002 lfl
TEST RESil.T PASSED
5562 FASTRIP
1640 S CHESTER AVE
BAKERSFIElD CA 93304
(15/23/20 14 11:27 All
StJlf> lEAK TEST REPORT
87E STP
TEST STARTED 11:12 All
TEST STARTED (15/23/2014
BEG Ill lEVa 4, 4701 Ill
Elll TillE 11:21 AH
Elll DATE 05/23/2014
EllD lEVa 4, 4688 Ill
LEAK THRESHOLD 0. 002 Ill
TEST REStll. T PASSED
91 STP
TEST STARTED 11:12 HI
TEST STARTED 05/23/2014
BEG Ill lEVEl 3. 784 7 Ill
EIIO TIHE 11:27 All
EID DATE 05/23/2014
EIO LEVEL 3. 7799 Ill
lEAK TlflESHDLO 0, 002 Ill
TEST RESILT FAILED
OS SIP
TEST STARTED 11:12 All
TEST STARTED (15/23/20111
BEG II I lEVa 5, 6211 Ill
EIIO TillE 11:27 AH
EIIO DATE 05/23/2014 ao LEVa s. 6211 111
l£AK THRESID.O 0, 002 Ill
TEST RESUI. T PASSED
--·-···· -------,
5562 FASTRIP
16QO S OESTER AVE
BAKERSFIElD CA 93304
05/23/2014 11:44 AH
SUI1P lEAK TEST REP!:flT
81E STP
TEST STARTED 11:28 All
TEST STARTED 05/23/2014
BEGIIIlEVEl. 4,4681 Ill
EIIO TillE 11:113 All
EIID DATE 05/23/20111
EID LEVEL 0,4665 Ill
LEAl( TlliESHttO 0, 002 Ill
TEST RESll.T PASSEO
91 ~~.,_-,..
TEST STARTED 11:28 All
TEST STARTED 05/23/2014
BEG Ill LEVEL 3, 1793 Ill
E!O TIHE 11:43 All
Elll DATE 05/23/2014
a.u Leva 3. ms 111
LEAK TAAESI«JLO 0, 002 Ill
TEST RESULT FAILED
OS STP
TEST STARTED 11:28 AH
TEST STARTED 05/23/2014
BEG Ill lEVEl 5, 6210 Ill
EIO TillE 11:43 AH
810 DATE 05/23/2014
E1D lEVa 5. 6210 Ill
I LEAK THRESHllO o. 002 Ill
TEST REStLT PASSED
5562 FASTRIP
1640 S CHESTER AVE
BAKERSFIELD CA 93304
05/23/2014 12:12 PH
ALAR/I REPORT
05/23/2014
POVER 001111
05/23/2014
POWER lP
12:11 P/1
12:12 P/1
5562 FASTRIP :
1~0 S CHESTER AVE
BAKERSFIELD Cl\ 93304
05/23/2014 12:12 PH
SII'.P LEVEL REPIJU
SUt1P 87\1 STP
SUP UOC 1·2
SlW lKlC 3·4
5tH' TS II
3, 71l4 Ill
2. 874 Ill
4,525 Ill
4, 795 Ill
\ '; \
5562 FASTRIP
1640 S OlESTER AVE
BAKERSFIELD CA 933011
05/23/20111 12:32 P/1
SIH' LEAK TEST ~T
87\1 STP
TEST STAATED 12: l1 PH
TEST STAAlED 05/23/20111
BEG Ill LEVa 3. 7408 Ill
BID TillE 12:32 P/1
BID DATE 05/23/20111
Ellll LEVa 3, 7396 Ill
LEH< Tli61X.D 0, 002 Ill
TEST RESULT PASSED
UDC 1·2
TEST STAAl EO 12: l1 PH
TEST STAATED 05/23/20111
BEG Ill lEVa 2. 8740 Ill
EJID TillE 12:32 P/1
BIO DATE 05/23/2014
EJID LEVEL 2. 8739 Ill
LEAK TlilESHOLD 0, 002 Ill
TEST RESULT PASSED
uoc 3-4
TEST STAATED 12:11 PH
TEST STAATED 05/23/2014
BEG !II LEVa 4, 5258 Ill
Elll TII1E 12:32 PH
EJil DATE 05/23/2014
Elll LEVEL 4, 5260 Ill
lEAK TllRESilJt.D 0, 002 Ill
TEST REStl. T PASSED
TS II
TEST STAAT ED 12:11 PM
TEST STAATED 05/23/2014
BEGIII LEVEL II, 7953 Ill
EJID TIHE 12:32 PH
Elll DATE 05/23/2014
EJI) lEVa 4, 7952 Ul
LEAK THRES!lOLD 0, 002 Ill
lEST REStL T PASSED
~~; '\''!
5~62 ..FASTRI~.
161i0 S CHESTER-AVE--
BAKERSFIELD CA 933011
05/23/201/J 12:49 PM
SIJlP lEAK TEST REPOOT
8711 STP
TEST STAATED 12:311 PH
TEST STAATED 05/23/20111
BEG Ill lEVEl 3. 7396 Ill
Elll TillE 12:49 PH
Elll DATE 05/23/20111
Ell! LEVEL 3, 73911 Ill
mx llflESH!lo o. 002 111
TEST RESULT PASSED
uoc 1·2
TEST STARTED 12:311 PH
TEST STARTED 05/23/20111
BEGIIILEVEL 2.8741 Ill
EllD TillE 12:49 PH
BIO DATE 05/23/2014
EJIO LEVEL 2. 8737 Ill
LEAK ~ESllli.O 0, 002 Ill
TEST RESULT PASSED
ooc 3·4
TEST STARTED 12:311 PH
TEST STARTED 05/23/201/J
BEGIII LEVEL 4, 5260 Ill
Elll Til£ 12:119 PM
BID DATE 05/23/201/J
EIIO LEVEL 4, 5259 Ill
LEAK lHRESHOLO 0, 002 Ill
TEST RESUI.. T PASSED
TS II
TEST STARTED 12:311 Ptl
TEST STARTED 05/23/2014
BEGJIILEVEL a, 7953 Ill
EJ.D TillE 12:49 PH
BID DATE 05/23/20111
EllO LEVEL a, 7920 Ill
lEAK THRESHIJLD 0, 002 Ill
TEST RESILT FAILED