Loading...
HomeMy WebLinkAbout1.8-6553 Ph 1I E I I "I ON IWw � 2 I 3 Underground Service Alert Call** TOLL FREE 811 TWO WORKING DAYS BEFORE YOU DIG NOTIFIED U.S.A. DATE TICKED # BY H WORD SUMMARY LI TRENCH — STREET AREA:, (IL Q Z EXCAVATE /TRENCH /BORE / oleo BACKFILL /PAVE TRENCH —PVT PROPERTY: EXCAVATE /TRENCH / BACKFILL 000 GAS PIPE + GAS MAT'L. PROVIDE +INSTALL 000 PERMIT — ENCROACHMENT: APPLY +SECURE 0*0 TYPICAL. DISTRIBUTION TRENCH 24" WIDE FINISH GRADE (COMMON) m a m U C N 0 v TCC Not, 6 6 G 5„ 6„ P P s s 7'0 1) 2" SAND SHADING AROUND GAS & ELECTRIC IF SOIL IS NOT ROCK FREE 2) SEE OTHER DETAIL IF NON -PG &E STREETLIGHT IS IN TRENCH 3) ONLY PARTIES PARTICIPATING IN U.S.A. ARE ALLOWED IN JOINT TRENCH 4) ANY PARTY EXCEEDING ITS TRENCH ALLOTMENT SHALL MAKE ARRANGEMENTS TO ENSURE THAT TRENCH WILL ACCOMMODATE ADDED FACILITIES 5) GAS TO GO ON SIDE OF TRENCH . NEAREST STREET 6) WHEN COMMUNICATION DUCTS ARE INSTALLED, A MINIMUM OF 12" RADIAL SEPARATION SHALL BE MAINTAINED FROM GAS FACILITIES. EXCEPTION: WITH MUTUAL AGREEMENT, WHEN 4" DIAMETER OR SMALLER GAS PIPE IS INSTALLED, THE SEPARATION MAY BE REDUCED TO NOT LESS THAN 6 ". 6" GAS REQUIRES 12" SEPARATION FROM TELEPHONE OR TV TYPICAL- SERVICE TRENCH FINISH GRADE 42" MIN T T C C 12" MIN 6" MIN. 00 0 POSSIBLE 2" SHADING 1) 2" SAND SHADING AROUND GAS & ELECTRIC IF NATIVE SOIL IS NOT ROCK FREE. 2) SEE OTHER DETAIL ' IF MUNICIPAL STREETLIGHT IS IN TRENCH 3) ONLY PARTIES PARTICIPATING IN U.S.A. ARE ALLOWED IN THIS TRENCH SUBSTRUCTURES R BACKFILL SURFACE __J p A � a- _ . � r= o ': Z 0:: W o SUBSTRUCTURE TOTAL COMPANY TRENCH AGENT PM Transformer 9 PG &E APPLICANT 6" cao X X C:) PMH4 PM Fuse 1 PG&E APPLICANT � 0 1- Ne En W cn 7 Box 2 PG &E APPLICANT 6„ o X .. =� X i C.7 C-I 5 Box 2 PG &E APPLICANT 6" X E-I X Z > . 3 Box 1 PG &E APPLICANT 6" w X w X Lo ° n 2 Box 44 PG &E APPLICANT 6" .. X , X 4 5 1) Developer to do all trenching, shading, and backfilling. 2) 'Refer to each party's installation instructions for more precise description of substructures and other requirements. 3) Gas and electric facilities will require sand. shading if native soil is not rock free. PG &E will inspect backfill material. 4) Ground to be within .2 ft of finish grade prior to trenching. 5) Gas and electric facilities require at least 3' of separation (undisturbed soil) .from parallel runs of water, sewer or storm drain. 6) Pre— construction meeting required at least 2 weeks prior to start of installation. 7) Call USA at least 48 hours. prior to any trenching.- 8) Contact PG &E representative LES INGLE prior to making any changes to this drawing. 9) Developer shall contact all involved parties prior to making any changes to this.drawing, 10) Developer is responsible for obtaining all encroachment permits. 11) PG &E to install gas main and services. PG &E to do tie -in. 12) PG &E to install. electric substructures and electric cable. P/L LJ PROPOSED TRENCH 60' LOCAL STRZET SECTIigN NON —WATER J'I11E (N, T, S, SUBSTRUCTURE VERIFICATION STAMP PLEASE NOTE AND SIGN. All P.G.dc E. ENCLOSURES AND BOXES HAVE BEEN SET TO GRADE ACCORDING TO GRADE STAKES PROVIDED BY DEVELOPERS ENGINEER. ALL COSTS TO RELOCATE OR RE— ADJUST BOXES AT A LATER DATE WILL BE BILLED TO THE DEVELOPER. PLEASE HAVE YOUR JOB SUP. VERIFY THE CORRECTED GRADE OF ALL ENCLOSURES AND BOXES. AND SIGN AND DATE DRAWING. THANK YOU SIGNED DATE PROJECT CONDITIONS STAMP Type(s) of Work: Q New Business ❑ PG &E Maintenance & Construction Project Conditions: ❑ NONE APPARENT (if project design changes, contact ADE) or ❑ CONDITIONS APPLY: ❑ PERMITS ❑ TAILBOARD ❑ OTHER (Provide additional information on line below) BY. Belinda Gursky BABG 02 -01 -13 SIGNATURE. NAME. [CORPORATE ID]. DATE R/W 6 I 7 8 I 9 NOTES: APPLICANT TRENCH. 1. CALL "USA"" 2 WORKING. DAYS BEFORE EXCAVATING. UNDERGROUND SERVICE ALERT 1- 800 - 227 -2600 2. SPECIFIC CONDI110NS REQUIRED BY PG &E FOR JOINT TRENCH .WORK ARE OUTLINED IN PG &E'S UTILITY OPERATIONS STANDARD $5453. 3. BACKFILL MATERIAL REQUIREMENTS ARE DETAILED IN U.O. STANDARD S5453, EXHIBIT B. 4. PG &E INSPECTOR TO APPROVE ALL EXCAVATIONS AND TRENCHES (LOCATION AND BACKFILL MATERIAL) PRIOR TO BACKFILLING. 5. TRENCHING AGENT TO DISPOSE OF ALL SPOIL. 6. MINIMUM COVER FROM FINAL GRADE REQUIRED FOR ALL FACILITIES IN THE STREET AREA. 7. TRENCHING AGENT TO SECURE ALL PERMITS. 8. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING WATER, SEWER, AND STORM DRAIN LINES, EITHER UNDER OR OVER, AS REQUIRED TO MEET PG &E COVER AND CLEARANCE REQUIREMENTS. REFER TO G.S. STANDARD 463 -4. 9. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE TRENCH SPOIL WITH 1009 SELECT BACKFILL AS REQUIRED BY PG &E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY, OR STATE REQUIREMENTS. 10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND /OR PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY, OR STATE REQUIREMENTS. 11. APPLICANT TO PROVIDE AND INSTALL ANY PROTECTION EQUIPMENT (BARRIER POSTS, FENCES, ETC...) REQUIRED BY PG &E. 12. THE APPLICANT /CONTRACTOR WILL ACCEPT RESPONSIBILITY OF MAINTENANCE OF THE TRENCH (E.G. COMPACTION, PAVING, ETC..) FOR A PERIOD OF TWO (2) YEARS OR AS SPECIFIED IN THE PERMIT, WHICHEVER IS LONGER. 13. TRENCHING AGENT TO MAINTAIN THE REQUIRED DISTANCE OF FIVE (3) FEET BETWEEN GAS AND THE WET UTILITIES. P/L ROW 6' LE 9' 4' 5' 4,5' I I ° °8 ,� vo 4 W ru�l� °'o0 1 �l:l..— ItIII- PROPOSED TRENCH PAN4#4 Z 4NI_ S1 CT117N (N, T, S, TYPICAL'STUB INSTALLATION 60). STREET SECTION (NON —WATER SIDE) LOT LINE LOT LINE 18" T GSTC STUB C I 10' OO � � � .MAIN TRENCH 1 0 1 - R/W 10' LEGEND P ELECTRIC PRIMA Y S ELECTRIC SECONDARY T TELEPHONE C CABLE MAIN TRENCH - - - - -- SERVICE TRENCH EXISTING UNDERGROUND FACILITY (9) PADMOUNT TRANSFORMERS HC; (1) PROPOSED PMH -4 PADMOUNT FUSE (44) PROPOSED SECONDARY BOXES 17 X 30N � 3� (1) PROPOSED 24" x 36" SECONDARY BOX � 5� (2) PROPOSED 3' x 5' PRIMARY ENCLOSURE L?J (2)' PROPOSED 4 �5 " x 8'6" PRIMARY ENCLOSURE / SLASH INDICA TES CHANGE IN OCCUPANCY INDICA TES TRENCH FOOTAGE & OCCUPANCY (1) 4'x4'x4' 8ELLHOLES L __J -- STREET LIGHT LOCA TION NOTE: WATER /SEWER MUST BE OFFSET BY 3' FROM ANY PG &E GAS MAIN OR SERVICE. P/L L_ PROPOSED TRENCH Ni UNTAIN R1_ IGE PRI VZ irLFCTILNI (NI PANAMA LANE Q ° o� _ BERKSHIRE ROAD z JOB SITE 0 M MCCUTCHEN ROAD Q Lv z �n PG &E REP. 0 PHONE: 10 N W N W W Z C/) UTILITY IF SIZE TELEPHONE GAS 81 NDA GURSKY �I- ELECTRIC CYNDY SANDOVAL (559)347-529.5 IFLEPHONE BR /AN fRANZ (661)631 -3492 CABLE TV cO TRENCH% � Z cao C:) �- CM 0 N o � 0 1- Ne En W cn N S . M . o as ..� .. =� .. i C.7 C-I cn z o En a. GAS PLAT 5026 -J7, J8 E-I Z > . GAS PLA T 5126 -J7 N tG1 w L z w GAS CPA 5126 -00 w X11 Lo ° n �- ro U- .. , W [-� a L U W J V W "Q Cn tZ V) m � � O ..� p z o Q a Q w a T �-y FIE w -%- MEN Q.. tJ �0000������ ■0�0� v ■0�0 ■1■ MENINEEMENINEENINE P/L LJ PROPOSED TRENCH 60' LOCAL STRZET SECTIigN NON —WATER J'I11E (N, T, S, SUBSTRUCTURE VERIFICATION STAMP PLEASE NOTE AND SIGN. All P.G.dc E. ENCLOSURES AND BOXES HAVE BEEN SET TO GRADE ACCORDING TO GRADE STAKES PROVIDED BY DEVELOPERS ENGINEER. ALL COSTS TO RELOCATE OR RE— ADJUST BOXES AT A LATER DATE WILL BE BILLED TO THE DEVELOPER. PLEASE HAVE YOUR JOB SUP. VERIFY THE CORRECTED GRADE OF ALL ENCLOSURES AND BOXES. AND SIGN AND DATE DRAWING. THANK YOU SIGNED DATE PROJECT CONDITIONS STAMP Type(s) of Work: Q New Business ❑ PG &E Maintenance & Construction Project Conditions: ❑ NONE APPARENT (if project design changes, contact ADE) or ❑ CONDITIONS APPLY: ❑ PERMITS ❑ TAILBOARD ❑ OTHER (Provide additional information on line below) BY. Belinda Gursky BABG 02 -01 -13 SIGNATURE. NAME. [CORPORATE ID]. DATE R/W 6 I 7 8 I 9 NOTES: APPLICANT TRENCH. 1. CALL "USA"" 2 WORKING. DAYS BEFORE EXCAVATING. UNDERGROUND SERVICE ALERT 1- 800 - 227 -2600 2. SPECIFIC CONDI110NS REQUIRED BY PG &E FOR JOINT TRENCH .WORK ARE OUTLINED IN PG &E'S UTILITY OPERATIONS STANDARD $5453. 3. BACKFILL MATERIAL REQUIREMENTS ARE DETAILED IN U.O. STANDARD S5453, EXHIBIT B. 4. PG &E INSPECTOR TO APPROVE ALL EXCAVATIONS AND TRENCHES (LOCATION AND BACKFILL MATERIAL) PRIOR TO BACKFILLING. 5. TRENCHING AGENT TO DISPOSE OF ALL SPOIL. 6. MINIMUM COVER FROM FINAL GRADE REQUIRED FOR ALL FACILITIES IN THE STREET AREA. 7. TRENCHING AGENT TO SECURE ALL PERMITS. 8. CONTRACTOR IS RESPONSIBLE FOR CROSSING EXISTING WATER, SEWER, AND STORM DRAIN LINES, EITHER UNDER OR OVER, AS REQUIRED TO MEET PG &E COVER AND CLEARANCE REQUIREMENTS. REFER TO G.S. STANDARD 463 -4. 9. THE CONTRACTOR WILL BE REQUIRED TO REMOVE AND REPLACE TRENCH SPOIL WITH 1009 SELECT BACKFILL AS REQUIRED BY PG &E SPECIFICATIONS, AND ANY LOCAL CITY, COUNTY, OR STATE REQUIREMENTS. 10. THE CONTRACTOR WILL BE REQUIRED TO PLACE TEMPORARY AND /OR PERMANENT PAVING IN ACCORDANCE WITH ANY LOCAL CITY, OR STATE REQUIREMENTS. 11. APPLICANT TO PROVIDE AND INSTALL ANY PROTECTION EQUIPMENT (BARRIER POSTS, FENCES, ETC...) REQUIRED BY PG &E. 12. THE APPLICANT /CONTRACTOR WILL ACCEPT RESPONSIBILITY OF MAINTENANCE OF THE TRENCH (E.G. COMPACTION, PAVING, ETC..) FOR A PERIOD OF TWO (2) YEARS OR AS SPECIFIED IN THE PERMIT, WHICHEVER IS LONGER. 13. TRENCHING AGENT TO MAINTAIN THE REQUIRED DISTANCE OF FIVE (3) FEET BETWEEN GAS AND THE WET UTILITIES. P/L ROW 6' LE 9' 4' 5' 4,5' I I ° °8 ,� vo 4 W ru�l� °'o0 1 �l:l..— ItIII- PROPOSED TRENCH PAN4#4 Z 4NI_ S1 CT117N (N, T, S, TYPICAL'STUB INSTALLATION 60). STREET SECTION (NON —WATER SIDE) LOT LINE LOT LINE 18" T GSTC STUB C I 10' OO � � � .MAIN TRENCH 1 0 1 - R/W 10' LEGEND P ELECTRIC PRIMA Y S ELECTRIC SECONDARY T TELEPHONE C CABLE MAIN TRENCH - - - - -- SERVICE TRENCH EXISTING UNDERGROUND FACILITY (9) PADMOUNT TRANSFORMERS HC; (1) PROPOSED PMH -4 PADMOUNT FUSE (44) PROPOSED SECONDARY BOXES 17 X 30N � 3� (1) PROPOSED 24" x 36" SECONDARY BOX � 5� (2) PROPOSED 3' x 5' PRIMARY ENCLOSURE L?J (2)' PROPOSED 4 �5 " x 8'6" PRIMARY ENCLOSURE / SLASH INDICA TES CHANGE IN OCCUPANCY INDICA TES TRENCH FOOTAGE & OCCUPANCY (1) 4'x4'x4' 8ELLHOLES L __J -- STREET LIGHT LOCA TION NOTE: WATER /SEWER MUST BE OFFSET BY 3' FROM ANY PG &E GAS MAIN OR SERVICE. P/L L_ PROPOSED TRENCH Ni UNTAIN R1_ IGE PRI VZ irLFCTILNI (NI PANAMA LANE Q ° o� _ BERKSHIRE ROAD z JOB SITE 0 M MCCUTCHEN ROAD Q Lv z �n PG &E REP. 0 PHONE: 10 N W N W W Z C/) W &NN4 O a 0 x z w x H E-� Z O LES IN6LE (661) 342--7948 ALL FIELD CHANGES REQUIRE PRIER APPROVAL FROR UTILITY CONTACT PERSON TELEPHONE GAS 81 NDA GURSKY �I- ELECTRIC CYNDY SANDOVAL (559)347-529.5 IFLEPHONE BR /AN fRANZ (661)631 -3492 CABLE TV cO (661)395 -.3324 � � Z cao C:) �- CM 0 N o � 0 1- Ne En W cn N S . M . o as ..� .. =� .. i C.7 C-I cn z o En a. GAS PLAT 5026 -J7, J8 E-I Z > . GAS PLA T 5126 -J7 N tG1 w L z w GAS CPA 5126 -00 w X11 Lo ° n �- ro U- .. , W [-� a L U W J V W "Q Cn tZ V) m � � O ..� p z o Q a Q w a T �-y so 0 � w -%- Q.. tJ W &NN4 O a 0 x z w x H E-� Z O LES IN6LE (661) 342--7948 ALL FIELD CHANGES REQUIRE PRIER APPROVAL FROR UTILITY CONTACT PERSON TELEPHONE GAS 81 NDA GURSKY (559)347 -5038 ELECTRIC CYNDY SANDOVAL (559)347-529.5 IFLEPHONE BR /AN fRANZ (661)631 -3492 CABLE TV RYAN L INDSAY (661)395 -.3324 5 4 3 2 W OC 0 z Z C> 0 i= CA- W C C] .M � � Z C:) �- N Z 1- Ne En W cn N Z fY IV rs"t i C.7 46 Z _ W m M •� Z U N tG1 w Q w N = X11 �- .. , W V) 0 W J V W "Q Cn tZ V) m 0 a a v W OC 0 z Z C> 0 i= CA- Q x U Z IL 0 1 INCH 0 W C C] � � Z C:) �- Z GY'� p N CU IV i -< 46 Q E--. W m M •� <c Z Q x U Z IL 0 1 INCH 0 cn W N z W z o o N W W �► W �r l N i0 a N a _ o W Q BAKERSFIELD ... . 00 C> M GAS PLAT 5 026_ j 8 J8 I� ci Z 1 GAS PL T 5126 -J7 GAS CPA 5126 -00 w Z LO �.. cn CD OD o LO z z o o N W �► W �r l W Q I� ci Z