Loading...
HomeMy WebLinkAbout1.7-6553 Ph 1 Record Drawing# Am Kul 01-Amll I I inMI] IW i 16 "s qJ AL # #w M MIS* lot 9 sk 2 N a or # 1p # 4 1p AMLIMA ml!"t-md-wAilki . . . . . . . . . . . .... ......................... . . .. . . . . ......... 24. -SIM PREPARM UVN31 muu i iurq rvnruz)u), wtiLL im urut ilVLLT 31AlJlULr_U---ju rixLVLrql UU31 rml3zllVN3 UZ�INU CL 00 C) 5 STRIPPING AND GRUBBING* a w to cr WATER, CHEMICAL STABLIZER/SUPRESSANT, COVERED WffH A TARP OR- OTHER SUITABLE COVER,' OR PRIOR TO GENERAL SITE GRADING, EXISTING VEGETATION, SURFACE OBSTRUC110INS AND ANY E VEGETATIVE GROUND COVER6 4mom DEBRIS SHOULD BE STRIPPED'AND DISPOSED OF OUTSIDE THE CONSTRUCTION LIMffS. WE 0 FSTIMATF THF OF-PTH OF IPPING TO BE APPROXIMATELY 1 TO 3 INCHES., STRIPPED TOPSOILf 34* CONSTRUCTION SPEED LIMITS WILL BE POSTED. AS 15 MPH ON ALL UNPAVED AREAS AT THE LESS ANY DEBRIS, MAY BE. STOCKPILED AND REUSED FOR LANDSCAPE PURPOSES, HOWUM THIS CONSTRUCTION SITE, MATERIAL SHOULD NOT BE INCORPORATED INTO ENGINEERED FILL UNLESS IT IS POSSIBLE TO tu" w co 3: to co w L SUFFICIENTLY MIX MATERIAL TO PRODUCE AN ORGANIC CONTENT LESS 0.1 PERCENT BY WEIGHT. 35. PREMATURE REMOVAL OF GROUND COVER IN ADVANCE OF ' DEVELOPMENT SHALL -BE PROHIBITED, W 01 EXISTING VEGETATION SHALL NOT BE CLEARED UNTIL REOUIRED-BY CONSTRUCTION* MEASURES TO EXIS*nNG, UTILITIES, WELLS, AND SUBSURFACE OBSTRUC11ONS: PREVENT EROSION DURING AND IMMEDIATELY AFTER CONSTRUCTION SHALL BE DURING SITE DEMOLITION AND PRIOR TO ACTUAL SITE GRADING, A REASONABLE SEARCH SHOULD ESTABUSHED PRIOR TO THE START OF CLEARING, BE CONDUCTED TO LOCATE ANY ABMDONED UNDERGROUND STRUCTURES (E.G., IRRIGATION LINES), OR EXISTING UTIUTIES WHICH MAY BE PRESENT WnIN THE AREA OF CONSTRUCTION* 36. IF DURING THE CONSTRUnON ACTI\ATIES OR GROUND DISTURBANCE, CUI-TURAL RESOURCES ARE p.j THESE OBSTRUCTIONS- SHOULD BE PROPERLY ABANDONED ACCORDING TO REGULATORY UNCOVERED, THE SUBDIVIDER SHALL STOP WORK AND. RETA ' IN -A QUALIFIED ARCHEOLOGIST FOR FURTHER REQUIREMENT AND/OR REMOVED FROM THE PROJECT AREA. IF ANY AREAS OR POCKETS OF SOFT STUDY. SUBDIVIDER SHALL NOTIFY THE PROPER AUTHORITIES MD BE SUBJECT TO:ANY MITIGATION OR SATURATED SOILS, VOID SPACES MADE BY BURROWING ANIMALS OR SOIL DISTURBED 13Y MEASURES REQUIRED OF THE ARCHEOLOGIST. AGRICULTURAL ACTIVITIE5 ARE.- ENCOUNTERED, THEY SHOULD BE OVER-EXCAVATED TO FIRM APPROVED NATIVE MATERIAL AND REPLACED AS ENGINEERED FILL EXCAVATIONS FOR REMOVAL OF 37. M OPEN STREET PERMIT SHALL BE OBTAINED FROM THE.. CITY OF. BAKERSFIELD PUBUC WORKS THE ABOVE ITEMS. SHOULD BE. DISH-SHAPED (WITH SIDES SLOPED 1 .-3, VERTICAL TO HORIZONTAL DEPARTMENT FOR AW WORK PERFORMED WITHIN EXIS*nNG :ACCEPTE'D STREET RIGHT OF WAY. UNLESS OR FlATTF-R) AND BACKFILLEDATH ENGINEERED FILL. EXIS11NG WELLS WHICH MIGHT BE SECURED BY A SUBDIVISION AGREEMENT, SURETY BASED . ON AN APPROVED ENGINEER'S ESTIMATE FOR ASSOCIATED WITH PREVIOUS AGRICULTURAL USAGE OR DMLOPMENT SHOULD BE PROPERLY THE WORKED PERFORMED WITHIN RIGHT OF WAY AND INSURANCE AS REQUIRED SHALL BE PROVIDED ABANDONED IN ACCORDANCE WITH THE REQUIREMENTS OF THE KERN COUNTY ENVIRONMENTAL PRIOR TO ISSUANCE OF A PERMIT. HEALTH DEPARTMENT. 38.. THE CONTRACTOR AG'RES THAT IN ACCORDANCE WfTH 'GENERALLY -ACCEPTED CONSTRUCTION OVEREXCAVATION MD COMPACTION. PRACTICES, THE CONSTRUCTION CONTRACTOR -MLL BE REQUIRED- TO ' ASSUME SOLE AND COMPLETE NATIVE SOIL SHOULD BE CUT TO A MINIMUM OF 2 FEET BELOW ORIGINAL GRADE FILL RESPONSIBILITY OF JOB SITE CONDITIONS DURING THE COURSE'OF -CONSTRUCTION OF THE PROJECT, 'REQUIREMENT NECESSARY TO BRING THE SITE TO GRADE SHOULD BE PLACED IN THIN UNIFORM LIFTS AT OR INCLUDING SAFETY OF ALL PERSONS AND � PROPERTY, AND THAT, THIS SHALL � BE MADE TO NEAR OPTIMUM MOISTURE CONTENT AND COMPACTED TO A MINIMUM OF 907a OF THE MAXIMUM APPLY CONTINUOUSLY AND NOT BE UMITED TO NORMAL WORKING HOURSS' THE CONSTRUCTION DRY DENSITY AS'DETERMINED BY X�TM D 1557. IN AREAS WHERE CUTS EXCEED 2 FEET BELOW' CONTRACTOR FURTHFR AGREES TO DEFEND, INDEMNIFY .. AND - HOLD. THE DESIGN PROFESSIONAL EXISTING GROUND, COMPACTION OF NEAR SURFACE SOILS SHALI. CONSIST OF THE TOP 1 FOOT OF HARMLESS FROM ANY AND ALL UABILITY, REAL OR ALLEGED IN CON ' NECTION W" THE PERFORMANCE OF THE WORK OF THIS PROJECT, EXCEPTING UABILITY ARISING FRONI'THE SOLE NEGUGENCE OF THE EXPOSED SOIL., DESIGN PROFESSIONAL, CUT LOTS ARE SUBJECT TO REVIEW. BASED ON THF FINDINGS OF THE SOILS ENGINEER, OVEREXCAVAlION MD RECOMPACTION OF CUT LOTS TO PRODUCE A UNIFORM BUILDING PAD MAY 39, EXCAVATION SHALL BE ADEQUATELY SHORED, BRACED AND SHEETED'SO THAT THE EARTH WILL NOT BE REQUIRED. WITHIN PAVEMENT AREAS . THE SUBGRADE SHOULD BE COMPACTED TO AT LEAST 95 SLIDE OR SElTLf: AND SO THAT ALL EXISTING IMPROVEM ' ENTS OF AW KIND WILL BE FULLY PROTECTED PERCENT RELATIVE COMPACTION TO A DEPTH OF 12. INCHES, OR AS REQUIRED BY THE CITY OF FROM DAMAGE., ANY DAMAG ' E RESULTING FROM AlACK-OF ADEQUATE' SHORIN61 BRACING OR SHEETING BAKERSFIELD. THIS SUBGRADE COMPACTION SHOULD 13F PERFORMED AFTER UTILtTY INSTALLATION ' SHALL BE THE RESPONSIBILITY OF THE. CONTRACTOR AND HE SHALL EFFECT NECESSARY REPAIRS OR AND JUST PRIOR TO PLACING THE PAVEMENT SECTIONS, COMPACTION TEST SHALL CONFORM TO RECONSTRUC'n011 AT HIS OWN EXPENSE. WHERE THE EXCAVATION FOR - A CONDUIT- TRENCH, 'CONFORM ASTM TEST METHOD Dl 557, METHOD A STRUCTURE AND/OR BORING OR JACKING PIT IS REQUIRED,, THE CONTRACTOR SHALL TO THE APPLICABLE SAFETY ORDERS OF THE DIVISION OF INDUSTRIAL SAFElY OF THE STATE OF CALIFORNIA, 25t OBSTRUCTIONS INDICATED ARE FOR INFORMA110N ONLY. IT IS THE CONTRACTOR'S RESPONSIRLITY THE CONTRACTOR SHALL ALWAYS COMPLY WITH OSHA REQUIREMENTS. TOARIFY THE LOCATIONAD DEPTH WITH THE APPROPRIATE. AGENCIES. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT FOR THE UTILITY LOCATIONS PRtOR TO ANY 4014 THE CONTRACTOR SHALL COMPLY WITH THE RULES AND REGULAJIONS OF THE STATE CONSTRUCTION CONTSTRUC110N. -NEITHER THE OWNER OR THE ENGINER ASSUMES RESPONSIBILITY THAT THE SAFETY ORDER. OBSTRUCTIONS INDICATEDWILL BE THE OBSTRUCTIONS ENCOUNTERED, 41, THE CONTRACTOR SHALL NOT DESTROY ANY PERMANENT SURVEY POINTS. AW PERMANENT MONUMENTS 26. IT SHALL BE THE CONTRACTORIS RESPONS113117Y TO NOTIFY THE ENGINEER AND THE CITY OR POINTS DESTROYED SHALL BE REPLACED BY'A LICENSED -SURVEYOR AT THE INSPECTOR OF AW DIFFERENCES IN THE LOCA11ONS OF EXISTING UTIU11ES SHOWN, OR ANY CONTRACTOR'S EXPENSE, CONFLICTS WITH THE DESIGN, -BEFORE CONTINUING WITH WORK IN THAT AREAR 42. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION.OF SAID GRADING QUANTITIES PRIOR TO THE 27. IT SHALL BE THE RESPONSIBIUTY OF THE CONTRACTOR TO COORDINATE ALL NECESSARY -UTILITY START OF THE GRADING OPERATION, THE CONTRACTOR. * SHALL� ALSO BE RESPONSIBLE FOR DISTRIBUTING ANY 'LOTS RELOCATIONS., EXCESS MATERIAL OR SUPPLY MATERIAL FOR DEFICIENCIES TO. BRING .-PAVEMENT OR TO REQUIRED GRADE. CLARIFIC00M OF GRADING SHALL BE DONE BY THElNGINEER, AND THE CITY DEPARTMENT OF 28, ENGINEERED FILL MATERIALS: PUBLIC WORKS WILL NEED TO BE NOTIFIED, ALL ENGINERED FILL SOILS SHOULD BE NEARLY FREE OF ORGANIC OR OTHER DELETERIOUS DEBRIS, ESSENTIALLY LOW-PLASCITY, AND LESS THAN 6 INCHES IN MAXIMUM DIMENSION. 43, THE CONTRACTOR SHALL CONFIRM THE GROUND ELEVATIONS. AND OVERALL TOPOGRAPHY OF THE SITE PRIOR 'SHALL GENERAL, WELL-GRADED MIXTURES OF GRAVEL, SAND, NON-PLASTIC SILT, AND SMALL QUANTITIES TO THE START OF CONSTRUCTION, THE.CONTRACTOR NOTIFY QUAD KNOPF, INC,. IN WRITING 'WHICH OF CLAY ARE ACCEPTABLE FO a R USE AS ENGINEERED FILL, THE EARTH MATERIALS OBTAINED-ON IMMFDIAV.[..,Y OF ANY DIFFERENCES IN TOPOGRAPW FROM THAT SHOWN. ON THE PLANS MAY REQUIRE SITE MD CLASSIFIED SM, SP, SWs SC AND CL WITH EXPANSION INDICATED LESS THAN 20f CHANGES IN DESIGN. THE CITY DEPARTMENT OF PUBLIC WORKS'WILL ALSO NEED TO BE NOTIFIED, EXCLUSIVE OF AW DEBRIS ARE CONSIDERED SUITAOLE FOR USE AS ENGINEERED FILL, WHEN CONDITIONED TO THE PROPER MOISTURE RANGE AND CONTAINING LESS THAN 0,1 PERCENT 44. THE CONTRACTOR SHALL VERIFY THE EARTHWORK QUANTITY-AND BALANCE PRIOR TO COMMENCEMENT OF ORGANICS BY WEIGHT, GRADING OPERATIONS- THE CONTRACTOR IS TO NOTIFY. BEAZER HOMES, QUAD KNOPF INC., AND THE CITY DEPARTMENT OF PUBLIC WORKS IMMEDIATELY OF ANY. EARTHWORK BALANCE DISCREPANCIES BEFORE AND COMPACTION CRIT F.RA- DURING GRADING OF THE SITE. SOILS USED FOR ENGINEERED FILL SHOULD BE UNIFORMLY MOISTURE-CONDITIONED TO NEAR THE OPTIMUM MOISTURE CONTENT, PLAGED IN HORIZONTAL UFTS LESS THAN 8 INCHES IN LOOSE 45. THE CONTRACTOR SHALL UNDERCUT THE STREET -SUBGRADE. DURING ROUGH GRADING IN ORDER THAT THE * THICKNESS, AND COMPACTED TO'AT LEAST 90 PERCENT RELATIVE COMPACTION. DISKING AND/OR TRENCH SPOILS MAY BE LEFT IN THE STREET AREA - AND COMPACTED DURING FINAL SUBGRADE BLENDING MAY BE REQUIRED JO UNIFORMLY MOISTURE-CONDMON SOILS USED FOR ENGINEERED COMPACTION PRIOR TO PLACEMENT OF BASE ROCK, (THE -UNDERCUT SHALL BE ADEQUATE TO ACCEPT FILL* ALL TRENCH SPOILS, INCLUDING JOINT TRENCH SPOILS.) 29. SHOULD IT APPEAR THAT THE WORK TO BE DONEt OR MY MATO RELATIVE THERETO, IS NOT 46. ROUGH GRADING MD DIRT BALANCE TO BE COMPLETED PRIOR TO PAD FINISHING SO THAT PADS MAY BE SUFFICIENTLY DENLED OR EXPLAINED ON THESE PLANSs THE.CONTRACTOR SHALL CONTACT QUAD ADJUSTED TO FINAL BALANCE. THE CITY DEPARTMENT OF'PUBLIC WORKS IS TO'BE NOTIFIED FOR ANY PAD KNOPF INC. AT (661) 861-0997. ANY REVISIONS REQUIRE CITY DEPARTMENT OF PUBLIC WORKS ADJUSTMENTS, APPROVAL BEFORE PROC ING WITH RNSED PLANS. 47. UPON COMPLETION OF PAD GRADING, THE CONTRACTOR SHALL � REQUEST THE ENGINEER TO CHECK THE 30. DURING GRADING OPERATIONS, THE CONTRACTOR SHALL IMPLEMENT DUST CONTROL MEASURES ON GRADES. ANY PADS THAT DO NOT MEET THE SPECIFICATION. SHALL BE REGRADED. ANY REQUIRED SITE MD ON HAUL ROUTES.. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE APPLICATION OF RECHECK WILL BE CHARGED TO THE CONTRACTOR BY -THE, OWNER. WATER TO DEVELOPMENT SITES AND HAUL ROADS AT LEAST THREE TIMES -DAILY OR WHENEVER VISIBLE DUST IS CAPABLE OF DRIFTING FROM THE SITE OR APPROACHES 20 PERCENT CAPACITY', 48. THE CONTRACTOR SHALL MAINTAIN THE SITE IN AN ORDERLY - FASHION, FOLLOWING CESSATION OF TO MITIGATE THE IMPACT OF DUST AND EMISSIONS, SPRAYING SHOULD BE SUMCIENT TO ENSURE CONSTRUCTION ACTIVITY, ALL CONSTRUCTION DEBRIS SHALL -BE REMOVED FROM THE SITE. THAT SOILS DAMP, WITH THE FREQUENCY OF SPRAYING DEPENDENT ON WEATHER 49. THE CONTRACTOR SHALL NOTIFY THE CITY DEPARTMENT OF PUBUC WORKS WHERE IT IS REASONABLY CONDMONS. LIKELY THAT CORRECTIVE GRADING/SUDE REPAIR WORK WILL EXTEND BEYOND THE LIMITS OF GRADING 311. DURING GRADING OPERATIONS, ALL ACTMTY SHALL BE RESTRICTED TO PERIODS OF LOW WIND TO DELINEATED ON THESE PLANS5 4 REDUCE DUST EMISSIONS., CEASE GRADiNG ACTIV111ES DURING PERIODS OF HIGH WINDS (GREATER "10D. 50. A FULL TIME PALEONTOLOGICAL MONITOR WILL BE ON SITE DURING ..GROUND DISTURBANCE ACTIVMES NTHIN THAN 20 MPH OVER A ONE HOUR P 600 AND 700 FEET ELEVATION. IF FOSSILS ARE FOUND,'WITHIN-AN AREA BEING CLEARED OR GRADED EARTH 32. THE CONTRACTOR WILL 13E RESPONSIBLE FOR MY DAMAGE TO THE SffE OR SURROUNDING AREA DISTURBING SALVAGE OF THE FOSSILS. IF. CONSTRUCTION �- PERSONNEL MAKETHE DISCOVERY THE GRADING DUE TO DUST'OR EROSION, RESULTING FROM WORK DONE BY THE CONTRACTOR. CONTRACTOR SHALL IMMEDIATELY DIVERT CONSTRUCTION AND CALL THE MONITOR TO THE SITE FOR FOSSIL SALVAGE, AML jwwmmL 11T ()w NTRACTvm low v lw ON THIS PtM HAS BEEN PREPARED.MTH THE INTENT THAT QUAD.KNOPF (W. WILL BEPSFORMING THE CONSTRUCTION STAKING FOR THE COMPLETE PROJECT. 'IF HOWEM MOTHER ENGINEERING MD/OR SURVEYING FIRM SHOULD BE. EMPLOYED TO USE THESE PLANS - FOR THE PURPOSE OF CONSTRUCTION STON0. N0710E IS 14ERERY WN THAT THF RRM OF ZAD INOPF INC. - WILL NOT ASSUME A14Y RESPONSIBILTY FOR ERRORS OR 0MISSIONS, IF We; WHICH MIGHT OCCURAD 4HICH COULD HAVE BEEN AVOIDED,, CORRECTED OR MMGATED IF QUAD KNOPF INC. HAD PERFORMED THE STAKING WORK. L INDE#' 1. COVER SHEET 2. SHEET INDEX 3. GENERAL GRADING PLAN 40 NU AL GRADING PLAt 5., GENERAL GRADING PLAN 6. GRADING DETAILS 7. RETENTION BASIN DETAILS 51. ADD11IONAL AIR buAuqy mrriGATION MEASURES: INSTALL AND MAINTAIN A CONTROL DEVICE THAT MEETS THE SPECIFICATION OF SJVAPCD ROLE 8041 IF THE SItE EXCEEDS 150 VEHICLE TRIPS PER DAY ORVORE THAN 20 VEHICLE TRIPS PER DAY� BY VEHICLE WITH THREE OR MORE AXLES, CONTROL FUGITIVE DUST EMISSIONS DURING LAND CLEARING, GRUBBING, SCRAPING, EXCAVATION, LEVEUNG, GRADING OR CUT AND FILL OPERATIONS WTH APPLICATION OF WATER OR BY PRESOAKING, WHEN TRANSPORTING MATERIALS OF SITE, MAINTAIN A FREEBOARD UMIT OF AT LEAST 6 INCHES AND COVER OR EMCTIVELY WET TO LIMIT VISIBLE DUST EMISS101 NS, UMIT AND REM&E THE ACCUMULATION OF MUD AND/OR DIRT FROM ADJACENT -PUBLIC ROADWAYS, AT THE END OF �,ACH. WORKDAY. (USE OF DRY ROTARY BRUSHES IS PROHIBITED EXCEPT WHEN PRECEDED OR ACCOMPAN10 BY SUFFICIENT W NG TO LIMIT VISIBLE DUST EMISSIONS AND USE OF BLOWERS IS EXPRESSLY FORBIDDEN, C REMOVE TRA%KdUT FROM THE SITE AT THE END OF EACH WORKDAY, ASPHALT-CONOOETE PA\ANG sHALL: COMPLY wrrH SJVAPCD RULE 4641 AND RESTRICT USE OF CUTBACK, SLOWAMCURE MD EMULSinm ASPHALT PAVING MATERIALS, GRADING SHOULD BE CONDUCTED IN PHASES, THE PROJECT PEVELOPER SHALL REVEGETATE GRADED AREAS AS SOON AS IT IS FEASIBLE AFTER CONSTRUCTION' IS COMPLETED. 52, M111GATION MEASURES TO REDUCE CONSTRUCTION EQUIPMENT EXHAUST: MAINTAIN ALL WNSTRUCTION EQUIPMENT AS RECOMMENDED BY MANUFACTURER MANUALS. SHUT DOWN EQUIPMENT WHEN NOT IN USE FOR EXTENDED PERIODS OF TIME CONSTRUCTION EQUIPMENT SHALL OPERATE FOR NO LONGER THAN EIGHT (8) CUMULATIVE HOURS PER DAY4 USE ELECTRIC EQUIPMENT FOR CONSTRUCTION WHENEVER POSSIBLE IN LIEU OF DIESELL OR GASOLINE POWERED EQUIPMENT. CURTAIL USE OF HIGH-EmnNG CONSTRUCTION EQUIPMENT DURING PERIODS OF HIGH OR EXCESSIVE kt "Wft '" DAYS AS DECLARED BY THE AMBIENT POt,'*qANT CONCENTRAMONS SUCH AS !.SPARE THE-AIR SJVAPCD, ALL CONSTRU;-'o�TION VEHICLES ARE TO BE EQUIPPED WITH PROPER EMISSION CONTROL EQUIPMENT AND KE�,T IN GOOD MD PROPER RUNNING. ORDER TO SUBSTANTIALLY REDUCE NOX EMISSIONS. USE OF CATERPILLAR -PRE-CHAMBER DIESEL ENGINES OR EQUIVALENT SHALL BE UTILIZED IF ECONOMIC AND AVAILABLE TO REDUCE NOX EMISSIONS., A ALL CONSTRUCTION WORKERS, SHALL BE ENCOURAGED TO SHUTTLE (CARPOOL) TO RETAIL ESTABUSHMENT OR TO REMAIN ON-SITE DURING WNCH BREAKSO ALL CONSTRUCTION AND.GRQING ACTIVMES BE DISCONTINUED DURING THE FIRST STAGE SMOG ALERTS, CONSTRUCTION AND GRADING ACTIVMES SHALL NOT BE. ALLOWED DURING FIRST STAGE OZONE ALERTS.. OZONE ALERTS ARE DECLARED WHEN THE OZONE LEVEL EXCEEDS.0.20 PPM (1-HOUR AVERAGE). 53. ALL CONSTRUCTION PERSONNEL SHALL BE TRAINED IN SENSITIVE SPECIES IDENTIFICATION AND AVOIDANCE TECHNIQUES AND BE INSTRUCTED TO BE ON THE LOOKOUT FOR KIT FOX SIGNS DURING EARTH DISTURBANCE PHASES OF CONSTRU00N. ANY EVIDENCE OF SUCH DENS SHOULD BE AVOIDED AND REPORTED M RIE REVIEWING AGENCIES rOR RESOLUTIOR, 54* CONTRACTOR SHALL VERIFY LOCATION OF EXISTING HIGH PRESSURE GAS PIPEUNE AND SHALL PROTECT UNE IN PLACE, 46 TION Ldt'm�02AL DES RIP BEING A PORTION OF THE'NO RTHEAST QUARTER, LOT 1 OF PMW 04-0357 OF SEC 27 T30S R27E MOB & M IN THE CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA, APN* 497-020-22 VICINTY mala§.AP ESTIMATED QUANTITIES CUT: 70,989 CYDS FILL: 53j614 CYDS NET: 17,375 CYDS THESE 0DANTITIES 00 N()T INCLUDF ANY SHRINKAGE, SUBSIDENCE, OVER-EXCAVATION4 OR ANY SPECIAL CONDMONS OR RE04 UIREMENTS THAT MAY BE SPECIFIED IN THE GEOTECHNICAL INVESTIGATION REPORT, THESE QUANTITIES IN THE AREAFORPERMIT PURPOSES ONLY. ALL CONTRACTORS BIDDING ON THIS PROJECT SHOULD MAKE THER OWN DETERMINATION OF EARTHWORK QUANTMES PRIOR TO SUBMrMNG A BID. IT IS APPROXIMAT�D THAT, USING A 20% SHRINKAGE FACTOR, THERE WILL BE APPROXIMATELY 3,000 CUBIC YARDS OF EXCESS THAT IS TO BE USED IN THE LANDSCAPING AREAS AND THE PAD AREAS. NO OFFSITE DISPOSAL SHOULD BE REQUIRED, ..mjjjpp"-* I � ..::::,ii 01 �6 > r 0> 00 fn to CL 00 C) 5 a w to cr z 9 4w. E z 4mom a 0 Nor"* IL 0 0 tu" w co 3: to co w L W 01 p.j C.14 ..mjjjpp"-* I � ..::::,ii 01 �6 > r 0> PIP- PLOT DAM 6/5/06 JOB NO... 050309 050309-01�Mdwg scALE. LICTV kin I OF 7 00 fn to CL 00 C) 5 a w to cr z 9 co E z 4mom a 0 Nor"* IL 0 0 tu" w co 3: to co w L PIP- PLOT DAM 6/5/06 JOB NO... 050309 050309-01�Mdwg scALE. LICTV kin I OF 7 uj CL 00 C) 5 a w to cr z 9 0 E Z'0 4mom 0 0 z tu" w co 3: to co w L PIP- PLOT DAM 6/5/06 JOB NO... 050309 050309-01�Mdwg scALE. LICTV kin I OF 7 uj *vp% 0 E Z'0 0 z tu" w co 3: to co w W 01 PIP- PLOT DAM 6/5/06 JOB NO... 050309 050309-01�Mdwg scALE. LICTV kin I OF 7 1.0 t • IF i� i t r f f � t 1 ifl Nlb. • � r ul 2 g 1 ' E C Co CL to to co ���� "w * eti r cm cf1 N A ul 2 g O E Z = a 0 z W� � cl UD LO zm m � rU N� 001 pow to co LL.* in Wi E) % CL L PLOT DATE* 5/3/06 4 JOB NO** 050309 FILE NAMFo,- 050309—MP—GRADINGAW9 SE NO., 3 OF 7 nw 4k OVA- cftl 4-8 > Z3 �v z 03 0 ar a 0) cr) 0 0 z %kW OD 00 8 *.wool .cr► 81 C. N-C PLOT DATE: JOB NO#* 050309 FILE NAME: 050309-MP-OWING.4wg SCALLO 1 0=4# SHEET NO** 4 OF 7 �I 4k OVA- cftl 4-8 > Z3 �v z 03 0 ar a 0) cr) 0 0 z %kW OD 00 8 *.wool .cr► 81 C. N-C PLOT DATE: JOB NO#* 050309 FILE NAME: 050309-MP-OWING.4wg SCALLO 1 0=4# SHEET NO** 4 OF 7 .ER i zw ma :z 00: rx Ix CL °d '� a cn c;s 0000 1 u: 0 z 00 ;r cm CY dw PLOT DATE: 6/5/06 JOB No, 050309 FILE NAME: 050309-MP--GWING*dwg sckell I *=4W I SHEET NO., OF 7 0 ■ i ��iYVINY MMYP# cp C) .. t > >: CL 1+ 4 �i 4 •MiII1F 1 �r �1 F:8E:�1 1 TER COURT .......... .......... IL BERKSHIRE R► y "Vla DYER ORNE --mil NOW 5 SELLERS WAY . ....... . ... . ��� iMENSEN DRIVE a 1111111 0 ■ i ��iYVINY MMYP# cp C) .. t > >: CL 1+ 4 �i 4 •MiII1F 1 �r �1 MIN M $-MEET F:8E:�1 1 TER COURT .......... .......... IL BERKSHIRE R► y "Vla DYER ORNE --mil NOW 5 SELLERS WAY . ....... . ... . ��� iMENSEN DRIVE MIN M $-MEET F:8E:�1 1 TER COURT DYER ORNE --mil NOW 5 .. PLOT DATE: 6/5/ 06 O JOB W 050309 FILE NAME 050309—DET—Ol.dwg r; s N.: SS,7 A 355. 0 vld3� �FG 343.5 IM I FG 343.5 mono%. ,..000�-tu* 343.5 FG 34Jo 5 1 � l FG 33.5 4 U "0" r 343.5 o HIGH WATER - -� ELEVATION 352.0 1* SUMP TO BE CONSTRUCTED CITY ERSFIELD NDARDS S-9, 840, AND 1: THE 8 7'FBMBf? BASIN SH L BE OVEREXCA ED TO A PTM OF 2.5 FEET AND 8 C LED WITH CLEAN C ONLESS SA IFIED SW IN THE UNIFIED SOILS CLASSIFICATION SYSTEM OENSUREADEQUATEPERMEA@IL FOR WATER TO DRAIN IN SE DAYS OR LESS (PER THE SOIL ABSORPTION EVALUATIO PROPOSED DRAINAGE BASIN 7EN7AT1 TRACT 6553, PANAMA LA E AND ' MOUNTAIN R► ROAD, BAKERSFIELD PREPA a CA PREPA Y KRAZAN & ASSOCIATES, INC.). an 3. SUBTRAC71.33•FT FRO GIVEN ELEVATIONS IN ORDER TO MATCH ELEVATIONS GIVEN FOR IRACT6478,o THE DIFFERENCEIN ELEVATIONS IS DUE TO A 1.33off DIFFERENCE IN VERTICAL DATUM BETWEEN THE FIELD SUR Y DATA COLLECTED FOR TRACT 6478 AND THE FIELD SURVEY ATA COLLECTED FOR 77?4CT 6553* S84'55'S4 °E 131-93' FG 356.4 RETAINING WALL SCALE, 1 *M-*-*20 I FG 355.0 355* ONTM.-IL DESIGN WA T-E-R- DEPTH � 8.5 FT REQL4RED VOLUME VOLUME,*~ 3.74 ACRE-F 9UMP.Y0..,L.UME AT. DEPTH k"'I MA A(b) BOTTOM AREA � A(b)".W& 147420 SF 0,633 AC A(l)' -- SLJRFACE AREA @ h - 8.5 FT *-� 25286 SF � 0*58 AC A(m) � SURFACE AREA @ h Aft 4*25 FT 1%577 SF - Oo45 AC -PROMDED 3484 ACREfo �ktMf114�� Qty shelf CORI&M to qyi flookloont"I Ufth&% sold 841W40 #Ave aw wo* I uM 7` 111116 CbMa Oak 010 , NW W*ww**d sk" of prov-6011 untm alhotv�s# dtfttt*O by the Mir d"qM##t. GdOor L14 PLAN "Wm"ft" AMA"& %too *TEMPORARY FENCE pie 9110- fat REQUIRED IF TRACT A r . Nownw~ 6478 RETENTION � BASIN NOT YET s CONSTRUCTED AT SECTION A A TIME OF E CONSTRUCTION FOR WOW Kwola 11 6553 TR4CT ' � 46 4io M I RETENTION BASIN, R"I Almm"Aa to im tacy COB S -10 W 12' MIN ACCESS ROAD Uj PROPOSED SUMP FOR �'? TRACT 6478 RETENTION lot BASINS TO BE COMBINED �' I 0 0 BY DEVELOPER LAST TO kf 0 CONSTRUCT BASIN, z P. vWx v ff Old- %*a V404 to qp* A 41 A6t 0x#*#d 'Tzi FG 355.0 355* ONTM.-IL DESIGN WA T-E-R- DEPTH � 8.5 FT REQL4RED VOLUME VOLUME,*~ 3.74 ACRE-F 9UMP.Y0..,L.UME AT. DEPTH k"'I MA A(b) BOTTOM AREA � A(b)".W& 147420 SF 0,633 AC A(l)' -- SLJRFACE AREA @ h - 8.5 FT *-� 25286 SF � 0*58 AC A(m) � SURFACE AREA @ h Aft 4*25 FT 1%577 SF - Oo45 AC -PROMDED 3484 ACREfo �ktMf114�� Qty shelf CORI&M to qyi flookloont"I Ufth&% sold 841W40 #Ave aw wo* I uM 7` 111116 CbMa Oak 010 , NW W*ww**d sk" of prov-6011 untm alhotv�s# dtfttt*O by the Mir d"qM##t. GdOor L14 PLAN "Wm"ft" AMA"& %too 41r pie 9110- fat A r . Nownw~ � Alt vark siNixt-t mrars :9 ow spimmis "emoft o: s tat ew"Oot 100garleatio" lmiatltj "Umard *0tallst,44 . StStj$ (jf SECTION A A rr=0P4rtAtAW"*; And t"s 01140fat "4664611 L E "L"A WOW Kwola 11 OW&P bAam :Ibn*.l be a, K# bulme lat froutas *A a strM. a" 11001 0 0AWDS 4110d I*Mti011 ' � 46 4io M I b R"I Almm"Aa to im tacy n z W J ice FAIrk ' speof buw Aill it at be SWIRT"" IV 2, In co kf WIL111 to# to tm 41ir P. vWx v ff Old- %*a V404 to qp* A 41 A6t 0x#*#d 'Tzi c�j . 10XV60114 "nal in vow dut-ft ileftletuve shall bo M On" "018116A aft-or Sim& NA 164"1 .404r."Itt, 11241 to S 1140 ttvft* C'n""t *halt ;WM94n ry AdAtkitiv*1 1AM1016 Mar vrz-,t" 00 too, lei" MOM No -0 4i 404mto SMU 'bit cam with Amite 614"MV04 -Ulpt'alt d ls c n do cowyst to Section .2( hsn"4 ,;a pipe 1:4111 shall bo v1sad to stroum. PLAN SECTION ionct SM4 tft#4 Aikil caftfurn t-0 tie* .Matt !t 1he" OK City at makeT111#14 S!t4*"gv or""Is 013 Of AM* 21.0* Ve"!3v:2* triv but AA4 S-114 MOOMM tI611191h Apt" in a k1l N*V dish ilit Uvins 4,491,101kht 9114 titt"ar fo"t . 4 je j# 1.00 Ok 114416-90 0*11 t* #1v4Ft11vvA with r*rmnmv ♦terxiant SUOh SO WV&P A* AdAltimut tv*sja"jt to tag !La tg jPali V#t% 10L N A AWCO VIA $111#001S thiatt bor as dirtgu4 hv rko phgjMr. 11 Won -ftwo t? 14vatt 1w tim I OF Ld irr REVISPOmb juL %9 Of 044 4402 01 -"diva .!14411 to tNj Sit* St at start1tatia. C., Iv. caw. *04form 1a C I tv 41f uvmft 111A 1.0 11 IDOPOVIR401T b#911M Il-ollv­ tar Orainjv%%, *POWAP1116 ot "d . .... .... .. W wuvwnt mom" 110% STANDARD 44* P161 L P ms* Wed 01111ft 10. FOOT FENCE but "&-widd Wr 90flic,F101 an$ #r i11R lot 0.0.+I(I I at Too mis vollem ()RAINAGE vftASfN. U GATE "a ELEVATION CAT Y OF IBAKERSFIELD OUTLET STRUCUR sift PILI OP ea. 4e Tt CALIFORNIA S9 ,YaW A N W z 5 1 2.5v . ... ... ... 12' MIN ACCESS PAD ROAD'* 2% SLOPE 2% RETENTION N 11, - 4 BASIN SIDEYARD S J: 0 I.DX SLOPE, 11.5 4 MIN* RETAINING WAS 1,009/Mm .1' 8E %0� I I I N.- -FsmF WS W MCT 6553 7RCT .6478 12' MIN 2' MIN WATER SURFACE . . . . . . .......... . ........... . ELEVATION 352.0 I t 'k 1� N: j;' BOTTOM ELEVATION _+t s �a -.'tie 343.5 M& .... ....... (AT RETDM.N SAS MWEN TRACT 6553 AND TRACT 6478) NTS z 2.5' RETAINING IV. 4 4 REMNTION BASIN t Al OL M S UTI ^0 Zoo-to.'*;: A r � owl s O 41 ik 27 t 1 o vt, E "Waft'm ' � 46 4io M I b R"I n z W � c� In co kf ma OX Won wsft - tat T too c�j v"% is fell W. W.-Ol Sim& NA tl *101 Itm raft too, lei" MOM No gifts* . !L J 0 a 6 # 0 fi je j# 1.00 Ok IF . 7 ,O:� 10L N A A 060" i7& +...... .... ...... r ctm*rpt com Iv. caw. Ab "T 3 *01L jaw 44* P161 L P 10. FOOT FENCE PEDESTRIAN PEDESTRIAN GATE GATE 0. am v4"Its, or. A 4 (W A 4 4 6 0 A %. 4- 4 0 1 .0e Mt 4 + AM 4 act- P" 0 1 04. � fj - a... ie 400 10 4 k 6 A x + d # A s -4 111E # _Jll' "6 - IP DOUBLE foil' A T E SPA. A-m Class -Ir PC+ C"c mil be to and am' 4« 4 1 1 55% 110 0 ftift of 0.5D hot. ChIM ■ LWA 411*11111 MIN thelt W14m 11 t Qj ASyV A 3vt , Vat# I v COW0#10 sw be C141.6 as, 4 5 Hato) load OWN te 0 to to 5 Ite stun% U40" -end 9041 00.5111 b* III aggV40M W11h It* swft" of caftom $owl 1016 10004(6d vanalAt a" two6h fili%~ It of $9010h 90-4 of tho ward 3104clutall"s. Stolle of A"O"q C"CA00 0011 C6410101 no ftwilivol Maim plow wift I 1i spot" ftivral Room 14 01114fift" ftm IN city toohelf, Cwbmq as spot1#4 by por*rd 0#6044v 3-10 S"011 to aftlywad 4C4fttf4U SUN k CW#o WIth a *M OqMM#o JeW" ca"ing f4s ?M 9 of me swoord 6 ethoolms P*EVjC�r%-"WC) Jul, End. Gaw P4wvos shom bs *$W I# sh* "tio"*# if" Ntf wit 0"ill d dif""I W Iftowitaffiel bra M Ofid 0a . . .. .. ..... . COW4"O1do MM OM W 041"1140#4 V5, 11#41 om *04S 140"1141 trol 11"filiftri and oi f"sivo mofter of STANDARD *bolls t4dwod taturb" suesm Is"rsqiarot tt v*4 bl.vs*4 *I* Quawk fooirle. to oftsifumil tact 14# 14016 &* latud CHAIN Ll NK Iffla POV0611 61%d too W, we rmftfo 1"A v" Of f"111#6 GA 1 U AN ...... ............ ClIrY OF 13AXIERSPIKLO CALIFORNIA NO n WW%M"M- "WARM5 IRR, - I 114tallatim of fewiy% to it atordaw M) tb*.M"0"*Mft Of tim of the ORA $ cavions eat it., "Steadrd Sat fi scation, rimwm- of Cali fOM144 mwparsm Of aditions A 60 x fi* --- euv* vnj I bg 001CIT MUA W*r all ftwil QtY Wks �a thiek x 9 0 dl CWb Shall bo Wmedo lot either. M.'a 112" 01 f M WOW the CUM % and thf fabric Shall be Inwo 0"WM Mall be Clas 1080 (5 sad) 04 2hall be Nithin 2 51v0v SWAceaf mrMs mall jet lod ....... ...... Math, v* b"h flfti"o comitt 0811 catain To I A"Wit ives, ol, jri*r Writt" 411 ­l to obtai from thv e SM11 be tevii Wt h a i 0111w4ee MT4 tO SOCUM Ww7effiB he 61rdard W, W-am sped iiifl;i� *Lch DPW PIMP- SM11 be '1$t4lled Ot 811 "Oft 14 10ft life iT I of It dogrem AMP EW OMW ud fiate Posts shall be brjjW to the Namt AMP . f C ,W lire Pst with gdvmizW di ENLW.A,.LLj as I - - ­1 All & fifirit0tal bran toed sun REIMM alvoWzOd 319" 001 truss nds let or tros t otard. I , ft UW, &S, ti M"bom Fill* e = 20 4*011 be fastend tp 69 P0141 Temilul Pot or- CWW Pat with 1141" x 3/44 be bonds at All on Fawc SM11 be fiat ftw to JIM PCs with fabric bergs SPNW A"im 1 1Xt 14" amrtv 'M tO JaSt rmer aid bottom tml cm surn owl h A. c bffA ameed &PPM wataly 2411 WMA Chain link f4mv f*tic shall conform to the Oeeifieattorf Of Ast), dKIlutiont A 3%, Class I, sorw w� aotl WU1) bV M ed trill? tc, and '100 With mtvact ion OflRutoageath.0 26wftt. REV16 UL 119- STANI)ARD CHAIN LINK FENCE NOTE "Wt6w "Noni to 0t**Wj1 it own at vW MIN CITY OF SAKERSP119LD gimoo ftne " somitutI94 rent Ito a" *# WNW wo "n *MY 1W ttft"W Oft MO Of JOWL CALIFORNIA S4010 n a- Up tooto rY Z 0 W CL -46a V� I f8 ;a 0) Rt co" 8 I L2 CO 00 Z T- CD to M %.00, Cr # u: cr) L 1110111" --- ­--111111111111111111111111� PLOT DATE: fij5r /08 SHEET NO. 3 ............ W � s O E _ ' � a n z W � c� In co c�j 1110111" --- ­--111111111111111111111111� PLOT DATE: fij5r /08 SHEET NO. 3 ............