Loading...
HomeMy WebLinkAbout2014 RETEST RESULTSSWRCB, January 2002 Paoe of b ---- Secondary Containment Testing Report Form This form is intended for use by contractors petforming periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completedform, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: #3346 Fastrip #621 I Date ofTesting: 6111/2014 Facility Address: 805 34th Street, Bakersfield, CA 9330 I Facility Contact: Omero Garcia I Phone: (661)393-7000 Date Local Agency Was Notified ofTesting: 6/6114 Name of Local Agency Inspector (if present during testing): Shane Gardeneer 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Teclmician Conducting Test: Bryan A Self Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester License Type: CSLB I License Number:804904 ICC# 8022804-UT TT#ll-1756 Manufacturer Training Manufacturer Component(s) Date Training Expires UST 10/2112015 Installaton/Retro fit UST Service ICC 1-28-2015 technician Star. Smith. Fibercast Fiber Glass Systems N.A. 3 SUMMARY OF TEST RESULTS . Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made 87 Secondary Line X 0 0 0 Trans East X 0 0 0 87-2 Secondary Line X 0 0 0 0 0 0 0 91 Secondary Line X 0 0 0 0 0 0 0 Diesel Secondary Line X 0 0 0 0 0 0 0 87-2 STP Sump X 0 0 0 0 0 0 0 91 STP Sump X 0 0 0 0 0 0 0 Diesel STP Sump X 0 0 0 0 0 0 0 UDC 1-2 X 0 0 0 0 0 0 0 UDC 3-4 X 0 0 0 0 0 0 0 UDC 5-6 X 0 0 0 0 0 0 0 UDC 7-8 X 0 0 0 0 0 0 0 Trans West X 0 0 0 0 0 0 0 If hydrostatic testing was performed, describe what was done with the water after completion oftests: Water was put back into test trailer and waste drum CONDUCTING THIS TESTING To the best of my knowledg and in full compliance with legal requirements Technician's Signature:..,L,,L.,L......,L...Y~4JL._ __ _,.~"-?-"""""'sr--¥~-__).D""a...,t""'e:'--___,6"-'/ 1,_,1""'/2"-"0'-!....!.1 4 SWRCB, January 2002 Page __ of __ 5 SECONDARY PIPE TESTING Test Method Developed By: D Piping Manufacturer x Industry Standard D Professional Engineer D Other (SpecifY) Test Method Used: x Pressure D Vacuum 0 Hydrostatic D Other (SpecifY) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Piping Run #87 Piping Run # 87-2 Piping Run# 91 Piping Run # Diesel Piping Material: FRP FRP FRP FRP Piping Manufacturer: Smith Smith Smith Smith Piping Diameter: 3.00" 3.00" 3.00" 3.00" Length of Piping Run: 150' 160' 170' 180' Product Stored: Regular Regular Super Diesel Method and location of Test Boot piping-run isolation: Test Boot Test Boot Test Boot Wait time between applying pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min starting test: Test Start Time: 9:45AM 9:45AM 9:45AM 9:45AM Initial Reading (R1): 5.00" PSI 5.00" PSI 5.00" PSI 5.00" PSI Test End Time: 10:45 AM 10:45 AM 10:45 AM 10:45 AM Final Reading (RF): 5.00" PSI 5.00" PSI 5.00" PSI 5.00" PSI Test Duration: 1 Hour I Hour 1 Hour I Hour Change in Reading (RF-RJ): 0.00" 0.00" 0.00" 0.00" Pass/Fail Threshold or 0.00" 0.00" 0.00" 0.00" Criteria: Test Result: X Pass 0 Fail X Pass OFail X Pass 0 Fail X Pass 0 FaiJ Comments -(include information on repairs made prior to testing, and recommended follow-up for .failed tests) SWRCB, January 2002 Page __ of __ 6 PIPING SUMP TESTING . Test Method Developed By: D Sump Manufacturer x Industry Standard D Professional Engineer D Other (Specify) Test Method Used: D Pressure D Vacuum x Hydrostatic D Other (Specify) Test Equipment Used: Ts-sts Equipment Resolution: S ump # 87-2 Sump # 91 Sump # Diesel Sump# Sump Diameter: 36.00" 36.00" 36.00" Sump Depth: 57.00" 57.00" 57.00" Sump Material: FRP FRP FRP Height from Tank Top to Top of 18.00" 15.00" 22.00" Highest Piping Penetration: Height from Tank Top to Lowest 16.00" 20.00" 14.00" Electrical Penetration: Condition of sump prior to testing: Clean& Dry Clean & Dry Clean & Dry Portion of Sump Tested1 Pipe Penetration Pipe Penetration Pipe Penetration Does turbine shut down when sump sensor detects liquid (both D Yes D NoX NA DYes product and water)?• D NoXNA D Yes D NoXNA D Yes DNo DNA Turbine shutdown response time NA NA NA NA Is system programmed for fail-safe shutdown?• D Yes D NoXNA DYes DNoXNA D Yes D NoXNA D Yes D NoD NA Was fail-safe verified to be DYes D NoXNA D Yes operational?• D NoXNA D Yes D NoXNA D Yes D No D NA Wait time between applying pressure/vacuum/water and starting SMin SMin SMin test: Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass D Fail X Pass D Fail X Pass D Fail D Pass D Fail Was sensor removed for testing? X Yes D No D NA X Yes D No D NA X Yes DNo D NA D Yes DNo D NA Was sensor properly replaced and X Yes D No D NA XYes D No D NA X Yes DNo D NA D Yes DNo D NA verified functional after testing? Comments -(include information on repairs made prior to testing, and recommended.fol/ow-upfor failed tests) 1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to ill}Y of the questions indicated with an asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page __ of __ 7 UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: D UDC Manufacturer x Industry Standard D Professional Engineer D Other (Specify) Test Method Used: D Pressure D Vacuum x Hydrostatic D Other (Specify) Test Equipment Used: Ts-sts Equipment Resolution: UDC # 1-2 UDC#3-4 UDC#S-6 UDC#7-8 UDC Manufacturer: Western Western Western Western UDC Material: FRP FRP FRP FRP UDC Depth: 31.00" 31.00" 31.00" 31.00" Height from UDC Bottom to Top 9.50" 9.50" 9.50" 9.50" of Highest Piping Penetration: Height from UDC Bottom to 3.00" 3.00" 3.00" 3.00" Lowest Electrical Penetration: Condition ofUDC prior to Clean & Dry testing: Clean & Dry Clean & Dry Clean & Dry Portion of UDC Tested Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration Does turbine shut down when UDC sensor detects liquid (both product and water)?' D Yes D No XNA D Yes D NoXNA D Yes DNo XNA DYes DNo XNA Turbine shutdown response time NA NA NA NA Is system programmed for fail- safe shutdown?' D Yes D No XNA D Yes D NoXNA D Yes DNo XNA DYes DNo XNA Was fail-safe verified to be D Yes D No XNA D Yes DNoXNA D Yes DNo XNA DYes DNo XNA operational?' Wait time between applying 5 Min 5 Min 5 Min 5 Min pressure/vacuum/water and starting test Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (Rr-R1): Pass/Fail Threshold or Criteria: Test Result: X Pass DFail X Pass D Fail X Pass DFail X Pass DFail Was sensor removed for testing? X Yes D No DNA X Yes DNo D NA X Yes D No D NA X Yes D No D NA Was sensor properly replaced and XYes D No DNA X Yes DNo D NA X Yes D No D NA X Yes D No D NA verified functional after testing? Comments -(include information on repairs made prior to testing, and recommended follow-up forfailed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to illlY of the questions indicated with an asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160) SWRCB, January 2002 Page __ of __ 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: 0 UDC Manufacturer x Industry Standard D Professional Engineer D Other (Specify) Test Method Used: D Pressure D Vacuum x Hydrostatic 0 Other (Specify) Test Equipment Used: Ts-sts Equipment Resolution: UDC # Tans East UDC #Trans West UDC# UDC# UDC Manufacturer: Western Western UDC Material: FRP FRP UDC Depth: 31 .00" 31 .00" Height from UDC Bottom to Top 9.50" 9.50" of Highest Piping Penetration: Height from UDC Bottom to 3.00" 3.00" Lowest Electrical Penetration: Condition ofUDC prior to Clean & Dry Clean & Dry testing: Portion ofUDC Tested' Pipe Penetration Pipe Penetration Does turbine shut down when UDC sensor detects liquid (both product and water)?• D Yes D No XNA D Yes D NoXNA DYes DNo DNA D Yes DNo DNA Turbine shutdown response time NA NA Is system programmed for fail- safe shutdown?· D Yes D No XNA D Yes D NoXNA D Yes DNo DNA DYes DNo DNA Was fail -safe verified to be D Yes D No XNA D Yes operational?• D NoXNA D Yes DNo DNA DYes DNo DNA Wait time between applying 5Min 5 Min pressure/vacuum/water and starting test Test Start Time: Initial Reading (R1): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RJ): Pass/Fail Threshold or Criteria: Test Result: X Pass 0 Fail X Pass D Fail 0 Pass D Fail 0 Pass D Fail Was sensor removed for testing? X Yes D No D NA X Yes D No D NA D Yes D No D NA D Yes DNo D NA Was sensor properly replaced and XYes D No D NA X Yes D No DNA D Yes D No D NA DYes D No DNA verified functional after testing? Comments -(include information on repairs made prior to testing, and recommendedfo/low-up.forfailed tests) 1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to~ of the questions indicated with an asterisk(*) is "NO" or ''NA", the entire UDC must be tested. (See SWRCB LG-1 60) -----·-·----- FASTRIP 3346 805 3QTH ST BAKERSFiaO CA 06/11/2014 9:33 AH SUliP LEVEL kEPORJ S1JlP 872 STP a. 259 Ill SlJ1P 91 STP 3.897 Ill FASTRIP 3346 805 34TH ST BAKERSFIELD CA 06/11/2014 9:49 AH SUMP LEAK TEST REPORT 872 STP TEST STARTED 9:33 AH TEST STARTED 06/11/2014 BEG Ill LEVEL 4, 2596 Ill EtlO TIHE 9:48 AH E/() DATE 06/11/2014 E/10 LEVEL 4, 2692 Ill LEAK THRESHOLD 0. 002 W TEST RESULT PASSEO 91 STP TEST STARTED 9:33 Al1 TEST STARTED 06/11/2014 BEGJJt LEVEl: ?, 8976 Ill E/10 Tli'.E 9:48 Ali E/10 DATE 06/11/2014 Elll LEVEL 3, 8975 Ill lEAK THRESHOLD 0,002 Ill TEST RESUlT PASSED FASTRIP 3346 805 34TH ST BAJ<ERSFIELD CA 06/11/20111 10:05 Al1 SUMP LEAK TEST kEPORT 872 STP TEST STARTED-' g:so AH TEST STARTED 06/11/20111 BEGIU LEVR 11,2691 IU END TINE 10:05 Ali EtlO DATE 06/11/201~ EtlO LEVEL a, 2690 Itl LEAK THRESHOLD 0,002 Ill TEST RESULT PASSED 91 STP TEST STARTED 9:50 Al1 TEST STARTED 06/11/20111 BEGIU LEVEL 3, 8974 Ill 80 TINE 10:05 Al1 EtC DATE 06/11/20111 810 LEVa 3, 89711 Ill LEAK THRESHOLD 0, 002 Ill TEST RESULT PASSED FASTRIP 3346 805 34TH ST BAKERSFiaO CA 06/11/2014 10:30 Al1 SIJtiP LEVa REPORT SUMP DSL STP 4. 269 Ill FASTRIP 3346 SOS 34TH ST BAKERSFIElD CA 06/11/2014 10:116 Al1 SUMP LEAK TEST REPORT OSL STP TEST STARTED 10:31 A11 TEST STARTED Oe/11/2014 BEGIIILEVR 2. 53C.~ IU EJIO TINE 10:46 Att EJIO DATE 06/11/2014 EtiO LEVR 2. 5336 ltl LEAK THRES!iOLO 0. 002 W TEST RESULT PASSED FASTRIP 3346 805 34TH ST BAKERSFIELD CA 06/11/2014 11:04 Al1 SUMP LEAK TEST REPORT DSl STP TEST STARTED 10:49 Att TEST STARTED 06/11/2014 BEGIIILEVR 2. 5323 JU Et ID TI tiE 11 :Oil A11 EJIO DATE 06/11/2014 EJIO LEVEl 2. 5322 W LEAK THRESHOLD 0, 002 W TEST RESULT PASSED FASTRIP 3346 805 34TH ST BAKERSFIELD CA 06/11/2014 1:53 Pl1 SimP LEAK TEST REPORT TtlS EST TEST STARTED 1:38 Pl1 TEST STARTED 06/11/2014 BEGIU LEVEL 7, 2499 Ill EllO TitlE 1:53 PH EIIO DATE 06/11/2014 EIIO LE\'El 7, 2500 IU LEAK THRESHOLD 0,002 lU TEST RESULT PASSED ms vsr TEST STARTED 1:38 Pl1 TEST STARTED 06/11/2014 BEGIU LEVa 7,3216 Ill EIIO TitlE 1:53 PH EJD DATE 06!11/2014 EJlOLEVa 7,3216 m LEAK THR~SHOLD 0.002 HI TEST RESULT PASSED FASTRIP 3345 so5 34TH sT BAKERSFIELD CA 06/11/2014 2!27 P11 SU.".P LEAK TEST REPORT TtlS EST TEST STARTED 2:11 PH TEST STARTED 06/11/2014 BEGIU LEVa 7. 2502 Jtl EIIO TitlE 2:27 PH EJIO DATE 06/t1/20ta EJIO LEVa 1.2so2 m LEAK THRESHOLD 0. 002 Ill TEST RESULT PASSED Ttl$ \1ST TEST STARTED 2:11 PH TEST STARTED 06/11/2014 BEGUILEVEL 7, 3220 IU Etll TitlE 2:27 PH EIIO DATE 06/11/2014 Elll LEVEL 7, 3222 Ill lEAK THRESHOLD 0,002 W TEST RESULT PASSED FASTRIP 33n6 805 34TH ST BAKERSFIElD CA 06/11/201/l 12:110 PM SUMP LEVEL REPORT SU1P uoc 1-2 SU1P uoc 3-4 SlN UOC 5·6 SUt1P uoc 7-8 6, 511 Ill 6,801 Ill 6,731 m 6,526 Ill FASTRIP 3346 805 34TH ST BAKERSFIELD CA 06/11/201Q 12:56 Ptl SIR'.? LEAK TEST REPORT uoc 1-2 TEST STARTED 12:40 Ptl TEST STARTED 06/11/2014 BEGIIILEVa 6, 5172 Ill 810 TIHE 12:55 r11 810 DATE 06/11/2014 EllO LEVa 6.5171 Ill LEA'< TmmD o. 002 111 TEST RESULT PASSED UDC 3-4 TEST STARTED 12:40 Ptl TEST STARTED 06/11/2014 BEG Ill LEVEL 6, 8010 Ill 81> TillE 12:55 Ptl EJil OAT£ 06/11/2014 aro LEva 6, so1o 111 LEAK THRESHOLD 0, 002 Ill TEST RESULT PASSED ooc 5·6 TEST STARTED 12:40 PH TEST STARTED 06/11/2014 BEGJIILEVR 6. 7312 Ill 8l0 TIHE 12:55 PH 84> DATE 06/11/2014 El.tl LEVa 6, 7313 Ill LEAK Tl!RES!JOLD 0, 002 Ill TEST RESULT PASSED UDC 7-8 TEST STARTED 12:f0 PH TEST STARTED 06/11/2014 BEG Ill LEVEL 6. 525/l Ill 8ID TIHE 12:55 PH EIIO DATE 06/11/2014 810 LEVEL 6, 5252 Ill LEAK THRESHOlD 0, 002 Ill TEST RESULT PASSED