Secondary Containment Testing Report Form
This form is intended for use by contractors petforming periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completedform, written test procedures, and
printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: #3346 Fastrip #621 I Date ofTesting: 6111/2014
Facility Address: 805 34th Street, Bakersfield, CA 9330 I
Facility Contact: Omero Garcia I Phone: (661)393-7000
Date Local Agency Was Notified ofTesting: 6/6114
Name of Local Agency Inspector (if present during testing): Shane Gardeneer
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services
Teclmician Conducting Test: Bryan A Self
Credentials: x CSLB Licensed Contractor X SWRCB Licensed Tank Tester
License Type: CSLB I License Number:804904 ICC# 8022804-UT TT#ll-1756
Manufacturer Training
Manufacturer Component(s) Date Training Expires
UST 10/2112015
Installaton/Retro fit
UST Service ICC 1-28-2015
technician
Star. Smith. Fibercast Fiber Glass Systems N.A.
3 SUMMARY OF TEST RESULTS .
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
87 Secondary Line X 0 0 0 Trans East X 0 0 0
87-2 Secondary Line X 0 0 0 0 0 0 0
91 Secondary Line X 0 0 0 0 0 0 0
Diesel Secondary Line X 0 0 0 0 0 0 0
87-2 STP Sump X 0 0 0 0 0 0 0
91 STP Sump X 0 0 0 0 0 0 0
Diesel STP Sump X 0 0 0 0 0 0 0
UDC 1-2 X 0 0 0 0 0 0 0
UDC 3-4 X 0 0 0 0 0 0 0
UDC 5-6 X 0 0 0 0 0 0 0
UDC 7-8 X 0 0 0 0 0 0 0
Trans West X 0 0 0 0 0 0 0
If hydrostatic testing was performed, describe what was done with the water after completion oftests:
Water was put back into test trailer and waste drum
CONDUCTING THIS TESTING
To the best of my knowledg and in full compliance with legal requirements
Technician's Signature:..,L,,L.,L......,L...Y~4JL._ __ _,.~"-?-"""""'sr--¥~-__).D""a...,t""'e:'--___,6"-'/ 1,_,1""'/2"-"0'-!....!.1 4
SWRCB, January 2002 Page __ of __
5 SECONDARY PIPE TESTING
Test Method Developed By: D Piping Manufacturer x Industry Standard D Professional Engineer
D Other (SpecifY)
Test Method Used: x Pressure D Vacuum 0 Hydrostatic
D Other (SpecifY)
Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625"
Piping Run #87 Piping Run # 87-2 Piping Run# 91 Piping Run # Diesel
Piping Material: FRP FRP FRP FRP
Piping Manufacturer: Smith Smith Smith Smith
Piping Diameter: 3.00" 3.00" 3.00" 3.00"
Length of Piping Run: 150' 160' 170' 180'
Product Stored: Regular Regular Super Diesel
Method and location of Test Boot piping-run isolation: Test Boot Test Boot Test Boot
Wait time between applying
pressure/vacuum/water and 5 Min 5 Min 5 Min 5 Min
starting test:
Test Start Time: 9:45AM 9:45AM 9:45AM 9:45AM
Initial Reading (R1): 5.00" PSI 5.00" PSI 5.00" PSI 5.00" PSI
Test End Time: 10:45 AM 10:45 AM 10:45 AM 10:45 AM
Final Reading (RF): 5.00" PSI 5.00" PSI 5.00" PSI 5.00" PSI
Test Duration: 1 Hour I Hour 1 Hour I Hour
Change in Reading (RF-RJ): 0.00" 0.00" 0.00" 0.00"
Pass/Fail Threshold or 0.00" 0.00" 0.00" 0.00" Criteria:
Test Result: X Pass 0 Fail X Pass OFail X Pass 0 Fail X Pass 0 FaiJ
Comments -(include information on repairs made prior to testing, and recommended follow-up for .failed tests)
SWRCB, January 2002 Page __ of __
6 PIPING SUMP TESTING .
Test Method Developed By: D Sump Manufacturer x Industry Standard D Professional Engineer
D Other (Specify)
Test Method Used: D Pressure D Vacuum x Hydrostatic
D Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
S ump # 87-2 Sump # 91 Sump # Diesel Sump#
Sump Diameter: 36.00" 36.00" 36.00"
Sump Depth: 57.00" 57.00" 57.00"
Sump Material: FRP FRP FRP
Height from Tank Top to Top of 18.00" 15.00" 22.00" Highest Piping Penetration:
Height from Tank Top to Lowest 16.00" 20.00" 14.00" Electrical Penetration:
Condition of sump prior to testing: Clean& Dry Clean & Dry Clean & Dry
Portion of Sump Tested1 Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
sump sensor detects liquid (both D Yes D NoX NA DYes
product and water)?•
D NoXNA D Yes D NoXNA D Yes DNo DNA
Turbine shutdown response time NA NA NA NA
Is system programmed for fail-safe
shutdown?• D Yes D NoXNA DYes DNoXNA D Yes D NoXNA D Yes D NoD NA
Was fail-safe verified to be DYes D NoXNA D Yes operational?• D NoXNA D Yes D NoXNA D Yes D No D NA
Wait time between applying
pressure/vacuum/water and starting SMin SMin SMin
test:
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass D Fail X Pass D Fail X Pass D Fail D Pass D Fail
Was sensor removed for testing? X Yes D No D NA X Yes D No D NA X Yes DNo D NA D Yes DNo D NA
Was sensor properly replaced and X Yes D No D NA XYes D No D NA X Yes DNo D NA D Yes DNo D NA verified functional after testing?
Comments -(include information on repairs made prior to testing, and recommended.fol/ow-upfor failed tests)
1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to ill}Y of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page __ of __
7 UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: D UDC Manufacturer x Industry Standard D Professional Engineer
D Other (Specify)
Test Method Used: D Pressure D Vacuum x Hydrostatic
D Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
UDC # 1-2 UDC#3-4 UDC#S-6 UDC#7-8
UDC Manufacturer: Western Western Western Western
UDC Material: FRP FRP FRP FRP
UDC Depth: 31.00" 31.00" 31.00" 31.00"
Height from UDC Bottom to Top 9.50" 9.50" 9.50" 9.50"
of Highest Piping Penetration:
Height from UDC Bottom to 3.00" 3.00" 3.00" 3.00"
Lowest Electrical Penetration:
Condition ofUDC prior to Clean & Dry
testing:
Clean & Dry Clean & Dry Clean & Dry
Portion of UDC Tested Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?'
D Yes D No XNA D Yes D NoXNA D Yes DNo XNA DYes DNo XNA
Turbine shutdown response time NA NA NA NA
Is system programmed for fail-
safe shutdown?' D Yes D No XNA D Yes D NoXNA D Yes DNo XNA DYes DNo XNA
Was fail-safe verified to be D Yes D No XNA D Yes DNoXNA D Yes DNo XNA DYes DNo XNA operational?'
Wait time between applying 5 Min 5 Min 5 Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (Rr-R1):
Pass/Fail Threshold or Criteria:
Test Result: X Pass DFail X Pass D Fail X Pass DFail X Pass DFail
Was sensor removed for testing? X Yes D No DNA X Yes DNo D NA X Yes D No D NA X Yes D No D NA
Was sensor properly replaced and XYes D No DNA X Yes DNo D NA X Yes D No D NA X Yes D No D NA verified functional after testing?
Comments -(include information on repairs made prior to testing, and recommended follow-up forfailed tests)
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to illlY of the questions indicated with an
asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG-160)
SWRCB, January 2002 Page __ of __
7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING
Test Method Developed By: 0 UDC Manufacturer x Industry Standard D Professional Engineer
D Other (Specify)
Test Method Used: D Pressure D Vacuum x Hydrostatic
0 Other (Specify)
Test Equipment Used: Ts-sts Equipment Resolution:
UDC # Tans East UDC #Trans West UDC# UDC#
UDC Manufacturer: Western Western
UDC Material: FRP FRP
UDC Depth: 31 .00" 31 .00"
Height from UDC Bottom to Top 9.50" 9.50"
of Highest Piping Penetration:
Height from UDC Bottom to 3.00" 3.00"
Lowest Electrical Penetration:
Condition ofUDC prior to Clean & Dry Clean & Dry
testing:
Portion ofUDC Tested' Pipe Penetration Pipe Penetration
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?•
D Yes D No XNA D Yes D NoXNA DYes DNo DNA D Yes DNo DNA
Turbine shutdown response time NA NA
Is system programmed for fail-
safe shutdown?· D Yes D No XNA D Yes D NoXNA D Yes DNo DNA DYes DNo DNA
Was fail -safe verified to be D Yes D No XNA D Yes operational?• D NoXNA D Yes DNo DNA DYes DNo DNA
Wait time between applying 5Min 5 Min
pressure/vacuum/water and
starting test
Test Start Time:
Initial Reading (R1):
Test End Time:
Final Reading (RF):
Test Duration:
Change in Reading (RF-RJ):
Pass/Fail Threshold or Criteria:
Test Result: X Pass 0 Fail X Pass D Fail 0 Pass D Fail 0 Pass D Fail
Was sensor removed for testing? X Yes D No D NA X Yes D No D NA D Yes D No D NA D Yes DNo D NA
Was sensor properly replaced and XYes D No D NA X Yes D No DNA D Yes D No D NA DYes D No DNA verified functional after testing?
Comments -(include information on repairs made prior to testing, and recommendedfo/low-up.forfailed tests)
1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to~ of the questions indicated with an
asterisk(*) is "NO" or ''NA", the entire UDC must be tested. (See SWRCB LG-1 60)
-----·-·-----
FASTRIP 3346
805 3QTH ST
BAKERSFiaO CA
06/11/2014 9:33 AH
SUliP LEVEL kEPORJ
S1JlP 872 STP a. 259 Ill
SlJ1P 91 STP 3.897 Ill
FASTRIP 3346
805 34TH ST
BAKERSFIELD CA
06/11/2014 9:49 AH
SUMP LEAK TEST REPORT
872 STP
TEST STARTED 9:33 AH
TEST STARTED 06/11/2014
BEG Ill LEVEL 4, 2596 Ill
EtlO TIHE 9:48 AH
E/() DATE 06/11/2014
E/10 LEVEL 4, 2692 Ill
LEAK THRESHOLD 0. 002 W
TEST RESULT PASSEO
91 STP
TEST STARTED 9:33 Al1
TEST STARTED 06/11/2014
BEGJJt LEVEl: ?, 8976 Ill
E/10 Tli'.E 9:48 Ali
E/10 DATE 06/11/2014
Elll LEVEL 3, 8975 Ill
lEAK THRESHOLD 0,002 Ill
TEST RESUlT PASSED
FASTRIP 3346
805 34TH ST
BAJ<ERSFIELD CA
06/11/20111 10:05 Al1
SUMP LEAK TEST kEPORT
872 STP
TEST STARTED-' g:so AH
TEST STARTED 06/11/20111
BEGIU LEVR 11,2691 IU
END TINE 10:05 Ali
EtlO DATE 06/11/201~
EtlO LEVEL a, 2690 Itl
LEAK THRESHOLD 0,002 Ill
TEST RESULT PASSED
91 STP
TEST STARTED 9:50 Al1
TEST STARTED 06/11/20111
BEGIU LEVEL 3, 8974 Ill
80 TINE 10:05 Al1
EtC DATE 06/11/20111
810 LEVa 3, 89711 Ill
LEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
FASTRIP 3346
805 34TH ST
BAKERSFiaO CA
06/11/2014 10:30 Al1
SIJtiP LEVa REPORT
SUMP DSL STP 4. 269 Ill
FASTRIP 3346
SOS 34TH ST
BAKERSFIElD CA
06/11/2014 10:116 Al1
SUMP LEAK TEST REPORT
OSL STP
TEST STARTED 10:31 A11
TEST STARTED Oe/11/2014
BEGIIILEVR 2. 53C.~ IU
EJIO TINE 10:46 Att
EJIO DATE 06/11/2014
EtiO LEVR 2. 5336 ltl
LEAK THRES!iOLO 0. 002 W
TEST RESULT PASSED
FASTRIP 3346
805 34TH ST
BAKERSFIELD CA
06/11/2014 11:04 Al1
SUMP LEAK TEST REPORT
DSl STP
TEST STARTED 10:49 Att
TEST STARTED 06/11/2014
BEGIIILEVR 2. 5323 JU
Et ID TI tiE 11 :Oil A11
EJIO DATE 06/11/2014
EJIO LEVEl 2. 5322 W
LEAK THRESHOLD 0, 002 W
TEST RESULT PASSED
FASTRIP 3346
805 34TH ST
BAKERSFIELD CA
06/11/2014 1:53 Pl1
SimP LEAK TEST REPORT
TtlS EST
TEST STARTED 1:38 Pl1
TEST STARTED 06/11/2014
BEGIU LEVEL 7, 2499 Ill
EllO TitlE 1:53 PH
EIIO DATE 06/11/2014
EIIO LE\'El 7, 2500 IU
LEAK THRESHOLD 0,002 lU
TEST RESULT PASSED
ms vsr
TEST STARTED 1:38 Pl1
TEST STARTED 06/11/2014
BEGIU LEVa 7,3216 Ill
EIIO TitlE 1:53 PH
EJD DATE 06!11/2014
EJlOLEVa 7,3216 m
LEAK THR~SHOLD 0.002 HI
TEST RESULT PASSED
FASTRIP 3345
so5 34TH sT
BAKERSFIELD CA
06/11/2014 2!27 P11
SU.".P LEAK TEST REPORT
TtlS EST
TEST STARTED 2:11 PH
TEST STARTED 06/11/2014
BEGIU LEVa 7. 2502 Jtl
EIIO TitlE 2:27 PH
EJIO DATE 06/t1/20ta
EJIO LEVa 1.2so2 m
LEAK THRESHOLD 0. 002 Ill
TEST RESULT PASSED
Ttl$ \1ST
TEST STARTED 2:11 PH
TEST STARTED 06/11/2014
BEGUILEVEL 7, 3220 IU
Etll TitlE 2:27 PH
EIIO DATE 06/11/2014
Elll LEVEL 7, 3222 Ill
lEAK THRESHOLD 0,002 W
TEST RESULT PASSED
FASTRIP 33n6
805 34TH ST
BAKERSFIElD CA
06/11/201/l 12:110 PM
SUMP LEVEL REPORT
SU1P uoc 1-2
SU1P uoc 3-4
SlN UOC 5·6
SUt1P uoc 7-8
6, 511 Ill
6,801 Ill
6,731 m
6,526 Ill
FASTRIP 3346
805 34TH ST
BAKERSFIELD CA
06/11/201Q 12:56 Ptl
SIR'.? LEAK TEST REPORT
uoc 1-2
TEST STARTED 12:40 Ptl
TEST STARTED 06/11/2014
BEGIIILEVa 6, 5172 Ill
810 TIHE 12:55 r11
810 DATE 06/11/2014
EllO LEVa 6.5171 Ill
LEA'< TmmD o. 002 111
TEST RESULT PASSED
UDC 3-4
TEST STARTED 12:40 Ptl
TEST STARTED 06/11/2014
BEG Ill LEVEL 6, 8010 Ill
81> TillE 12:55 Ptl
EJil OAT£ 06/11/2014 aro LEva 6, so1o 111
LEAK THRESHOLD 0, 002 Ill
TEST RESULT PASSED
ooc 5·6
TEST STARTED 12:40 PH
TEST STARTED 06/11/2014
BEGJIILEVR 6. 7312 Ill
8l0 TIHE 12:55 PH
84> DATE 06/11/2014
El.tl LEVa 6, 7313 Ill
LEAK Tl!RES!JOLD 0, 002 Ill
TEST RESULT PASSED
UDC 7-8
TEST STARTED 12:f0 PH
TEST STARTED 06/11/2014
BEG Ill LEVEL 6. 525/l Ill
8ID TIHE 12:55 PH
EIIO DATE 06/11/2014
810 LEVEL 6, 5252 Ill
LEAK THRESHOlD 0, 002 Ill
TEST RESULT PASSED