Loading...
HomeMy WebLinkAbout1.2-6448 11 Record DrawingsSUMMARY QF IMPROVEMENTS 5EMR, IMPR0ffMEbj IS 4" LATERALS TO BE CAPPED & REMOVED STORM DRAIN IMPROVEMENTS NEW 18" STORM DRAIN TO BE INSTALLED EXISTING 18" STORM DRAIN TO BE REMOVED TYPE "A* CATCH BASINS JOINT UTILITY TRENCH 71 TYP. jJ 4.5" MIN. BO" TO 7' MAX. 0 0 TYP. 0 1001 17- MIN. ON DEEP SEWER, SLOPE LATERALS TO LOT LINE SO THAT THE END OF LATERAL IS WITHIN REQUIRED TOLERANCE. 3 EA (111 If) 24 LF 24 LF 3 EA BENCHMARK: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT THE CENTERLINE INTERSECTION OF SOUTH RENFRO ROAD AND CULIACAN AVENUE. ELEVATION - 356.34 PER CITY BENCHMARK BOOK FOR TRACT 4708 BASIS OF BEARINGS. THE BEARING OF N 89*27*59" W SHOWN FOR THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 3, T.30 S.j R.26 E. AS SHOWN ON RECORD OF SURVEY, BOOK 17, PAGES 97 & 98 WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. (L SEWER M AIN Q 5 TYP. ��a WATERLINE FINISHED STREET GRADE 36" TYP. 1% MIN, III I I I I I I I I I I I I III I I I I I I I I I I I I ... INI 11 -1 S - SET LATERAL PROVIDING PROPER CLEARANCE UNDER WATERLINE AND UTILITY TRENCHES I N.T.S. I?_ p 1 4 m TYPICAL SEWER LATERAL INSTALLATION FOR SHALLOW INSTALLATION OF SEWER LATERALS FROM SHALLOW SEWER MAINS, THE SEWER LATERALS MUST CROSS OVER THE WATER OR UTILITY TRENCH. THESE INSTALLATIONS MUST RECEIVE SPECIAL TREATMENT FOR LATERALS WHEN CROSSING OVER THE WATERMAIN. A SEWER LATERAL CROSSING ABOVE A WATER MAIN SHALL BE CONSTRUCTED OF A CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC PIPE OR EQUIVALENT, CENTERED ON THE PIPE BEING CROSSED. 4.5" MIN. TO 7$ M AX. STGGKDALE- _mmw_qmff__1W1� Wit. mft_� w*_m IIIm Mvi 1w UMII� Rim-wo-m t 7 1 6 5 4 8 3 2 9 10 I /f3741 35 36 37 12 6*W iR U N I T 13 33 32 31 30 14 15 16 17 18 191 20 21 22 'm a- awn vommam-wo j 42 41 40 39 38 3 4 5 11 fF';�,df .34 35 16 37 6 1A] C(DOIFF)RIWAME 6448 pjjlll�1111��jj :�� ! r r imi ANMAL 4TH Qr-%UB!"���`iT4 CON FORMANCE on TRACT 6448 mommIIII. y jsLy GRADED F 8 u 3 1 4 5 6 7 2 1 9 9 r( RAIPT No. 6448-UNT 3%. 10 28 15 i 14 12 29 24 .23 22 21 20 19 18 1 1 7 1 10 13 ir 30 1 L —.1 7 28 27 26 1 2 3 4 5 b 8 1 31 9 32 AmtvL 3 24 25 36 35 34 33 32 1 j I I ICL i I 1 33 0)1 1 I TRACT N16. 64M-U co mm-m *-am am-IN 0 mm ; _Q T2 'i-mAp*. J'A PGSL 1 11 1 < 9w 5 26 27 1 1 28 29 30 31 T3 0 34 CL ZA L 14 35k' 15 TRLWfMF_ — LACE� M L 16 36F -(<Ll 1 24 23 22 21 20 19 18 17 2 37 7 6 5 4 3 3 2 1 1 1 CT Ng. 10 q I 1 38 IT I 13K. 54, 7 1 39 ............ 6 r /40 MACT No. 6448 )1 .1 __T 8 9 4 11 48 47 kp %54, 0 kisL 104-105 4— -CMACAtt _D -AWNUE- 12 -al 9-m- owo 49 13 =a 14 1 L4 15 UNFT MAP'BK 59, T 3 CGS, 11 -M 5 6 1 16 17 18 19 1 20 1 21 22 4 10 ji 5 4 3 2 1 15 14 1 13 1 12 1 5 ems- go loom I- d 6 Z low -ORI CT _uNrr 1 -BR' 132-4 m_ MAP Ms. 7 7 8 9 Z4 10 11 12 13 14 15 16 ISM go" -maw 8 I modsmi"400" Offlow 6 4 3 '2' LS TRACT Not -UNIT 9 1-0 T - SMH 131� AP B. lAe-146 cis g z ASTER DR_1WExSMH 4 EX SMH 5 tH 1 10 ol 151. 14 1 16 17 18 19 20 21 2 2 LOT :31 Go 1114 74 /23/ 14 1 ML'01 2 -7 a i 2 5 8 4 6 9 10 LS. CCU LOT ACT No. 6448-UW 2 L z ME I - I 441 EX sm 8 EX H 9 EX SMH 10 "'T 6448 SOW LUPINE 0/ L-S-1 im @5 24 23 22 21 2 0 10 18 !7 16 15 14 13 12 LOT CL 1 4 4 CROSS VALLEY CANAL �3KEY AP DENOTES SHEET NUMBER FOR SEWER SCALE: 1 " M 100' CITY 1= BAKERSFIELD KERN COUNTY CALIFORNIA SEWER AND STORM DRAIN CONSTRUCTION PLAN PER 5TH SUBSTANTIAL CONFORMANCE VEST, TENT. TR. 6448 -UNITS 11 E D: CL INV SD MH CB JB SMH sco SDMH EXIST ELEV R/W s IS NOTE-ow 1 PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE, TELEPHONE 326-3049 2* ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS &STANDARDS SET FORTH BY THE CITY OF BAKERSFIELD HAVE BEEN MET. ENGINEER'S STATEMENT THESE PLANS.- AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA, AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS AND DESIGN CRITERIA SHALL BE CORRECTED DURING CONSTRUCTION. EXP. 6-30-14 IN ACCORDANCE WITH THE CONDITIONS OF THE VESTING TENTATIVE MAP, THE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT, APPROVED BY: RAUL M. ROJAS PUBLIC WORKS DIRECT DATE R.C.E. 39880 EXP. 12-31-13 � r t3 REVIEWED BY: ASSISTANT PUBLIC WORKS DIRECTOR DATE A15BREM61ION5 CENTERLINE INVERT STORM DRAIN MANHOLE CATCH BASIN JUNCTION BOX SEWER MANHOLE SEWER CLEANOUT STORM DRAIN MANHOLE EXISTING ELEVATION RIGHT OF WAY TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION PROPOSED SEWER PER CITY STANDARDS EXISTING SEWER PER CITY STANDARDS EXISTING SEWER MANHOLE TYPE *Am PER C.O.8. STD. SI. EXISTING SEWER CLEANOUT PER C.O.B. STD. SW-8. PROPOSED SEWER MANHOLE TYPE *A* PER C.O.B. STD. SW-4. 7 -i7 -Id DIG T Call: TOLL FREE 1-800-227-m-2600 AT LEAST M DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT L OF SOUTHERN CALIFORNIA 0') 0 to 0 z 00 0 z u- uj ui (D 0 C:) U- 0 (.0 W Y. m 0 co to 0 45 4 J wj n roe) > 0 `' cx" w 191� wjg z 0 V) 5; W` w co cd VICINITY MAP INDEX OF SHEETS SHEET THE LORDS AVENUE 1, 'W 2* NOTES & SPECIFlCAiIONS AEARRAL ON DRIVE S 4. YELLOW LUPINE DRIVE 5* WHIiE ADLER AVENUE AVENU AVENUE VEST VE VE NNYBANK AVENUE U c4"W♦ low AVENUE-- A 07 W co Z cz Lu 0 > cww� fj z W a- JOHNSON ROAD C3 w BLACK m 0 > O L AVENUE < -nATA AVENUE 04 00 Z p z w z low -.STOCK ALE HWY Ix PROJEC SITE BENCHMARK: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT THE CENTERLINE INTERSECTION OF SOUTH RENFRO ROAD AND CULIACAN AVENUE. ELEVATION - 356.34 PER CITY BENCHMARK BOOK FOR TRACT 4708 BASIS OF BEARINGS. THE BEARING OF N 89*27*59" W SHOWN FOR THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 3, T.30 S.j R.26 E. AS SHOWN ON RECORD OF SURVEY, BOOK 17, PAGES 97 & 98 WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. (L SEWER M AIN Q 5 TYP. ��a WATERLINE FINISHED STREET GRADE 36" TYP. 1% MIN, III I I I I I I I I I I I I III I I I I I I I I I I I I ... INI 11 -1 S - SET LATERAL PROVIDING PROPER CLEARANCE UNDER WATERLINE AND UTILITY TRENCHES I N.T.S. I?_ p 1 4 m TYPICAL SEWER LATERAL INSTALLATION FOR SHALLOW INSTALLATION OF SEWER LATERALS FROM SHALLOW SEWER MAINS, THE SEWER LATERALS MUST CROSS OVER THE WATER OR UTILITY TRENCH. THESE INSTALLATIONS MUST RECEIVE SPECIAL TREATMENT FOR LATERALS WHEN CROSSING OVER THE WATERMAIN. A SEWER LATERAL CROSSING ABOVE A WATER MAIN SHALL BE CONSTRUCTED OF A CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC PIPE OR EQUIVALENT, CENTERED ON THE PIPE BEING CROSSED. 4.5" MIN. TO 7$ M AX. STGGKDALE- _mmw_qmff__1W1� Wit. mft_� w*_m IIIm Mvi 1w UMII� Rim-wo-m t 7 1 6 5 4 8 3 2 9 10 I /f3741 35 36 37 12 6*W iR U N I T 13 33 32 31 30 14 15 16 17 18 191 20 21 22 'm a- awn vommam-wo j 42 41 40 39 38 3 4 5 11 fF';�,df .34 35 16 37 6 1A] C(DOIFF)RIWAME 6448 pjjlll�1111��jj :�� ! r r imi ANMAL 4TH Qr-%UB!"���`iT4 CON FORMANCE on TRACT 6448 mommIIII. y jsLy GRADED F 8 u 3 1 4 5 6 7 2 1 9 9 r( RAIPT No. 6448-UNT 3%. 10 28 15 i 14 12 29 24 .23 22 21 20 19 18 1 1 7 1 10 13 ir 30 1 L —.1 7 28 27 26 1 2 3 4 5 b 8 1 31 9 32 AmtvL 3 24 25 36 35 34 33 32 1 j I I ICL i I 1 33 0)1 1 I TRACT N16. 64M-U co mm-m *-am am-IN 0 mm ; _Q T2 'i-mAp*. J'A PGSL 1 11 1 < 9w 5 26 27 1 1 28 29 30 31 T3 0 34 CL ZA L 14 35k' 15 TRLWfMF_ — LACE� M L 16 36F -(<Ll 1 24 23 22 21 20 19 18 17 2 37 7 6 5 4 3 3 2 1 1 1 CT Ng. 10 q I 1 38 IT I 13K. 54, 7 1 39 ............ 6 r /40 MACT No. 6448 )1 .1 __T 8 9 4 11 48 47 kp %54, 0 kisL 104-105 4— -CMACAtt _D -AWNUE- 12 -al 9-m- owo 49 13 =a 14 1 L4 15 UNFT MAP'BK 59, T 3 CGS, 11 -M 5 6 1 16 17 18 19 1 20 1 21 22 4 10 ji 5 4 3 2 1 15 14 1 13 1 12 1 5 ems- go loom I- d 6 Z low -ORI CT _uNrr 1 -BR' 132-4 m_ MAP Ms. 7 7 8 9 Z4 10 11 12 13 14 15 16 ISM go" -maw 8 I modsmi"400" Offlow 6 4 3 '2' LS TRACT Not -UNIT 9 1-0 T - SMH 131� AP B. lAe-146 cis g z ASTER DR_1WExSMH 4 EX SMH 5 tH 1 10 ol 151. 14 1 16 17 18 19 20 21 2 2 LOT :31 Go 1114 74 /23/ 14 1 ML'01 2 -7 a i 2 5 8 4 6 9 10 LS. CCU LOT ACT No. 6448-UW 2 L z ME I - I 441 EX sm 8 EX H 9 EX SMH 10 "'T 6448 SOW LUPINE 0/ L-S-1 im @5 24 23 22 21 2 0 10 18 !7 16 15 14 13 12 LOT CL 1 4 4 CROSS VALLEY CANAL �3KEY AP DENOTES SHEET NUMBER FOR SEWER SCALE: 1 " M 100' CITY 1= BAKERSFIELD KERN COUNTY CALIFORNIA SEWER AND STORM DRAIN CONSTRUCTION PLAN PER 5TH SUBSTANTIAL CONFORMANCE VEST, TENT. TR. 6448 -UNITS 11 E D: CL INV SD MH CB JB SMH sco SDMH EXIST ELEV R/W s IS NOTE-ow 1 PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE, TELEPHONE 326-3049 2* ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS &STANDARDS SET FORTH BY THE CITY OF BAKERSFIELD HAVE BEEN MET. ENGINEER'S STATEMENT THESE PLANS.- AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA, AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS AND DESIGN CRITERIA SHALL BE CORRECTED DURING CONSTRUCTION. EXP. 6-30-14 IN ACCORDANCE WITH THE CONDITIONS OF THE VESTING TENTATIVE MAP, THE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT, APPROVED BY: RAUL M. ROJAS PUBLIC WORKS DIRECT DATE R.C.E. 39880 EXP. 12-31-13 � r t3 REVIEWED BY: ASSISTANT PUBLIC WORKS DIRECTOR DATE A15BREM61ION5 CENTERLINE INVERT STORM DRAIN MANHOLE CATCH BASIN JUNCTION BOX SEWER MANHOLE SEWER CLEANOUT STORM DRAIN MANHOLE EXISTING ELEVATION RIGHT OF WAY TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION PROPOSED SEWER PER CITY STANDARDS EXISTING SEWER PER CITY STANDARDS EXISTING SEWER MANHOLE TYPE *Am PER C.O.8. STD. SI. EXISTING SEWER CLEANOUT PER C.O.B. STD. SW-8. PROPOSED SEWER MANHOLE TYPE *A* PER C.O.B. STD. SW-4. 7 -i7 -Id DIG T Call: TOLL FREE 1-800-227-m-2600 AT LEAST M DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT L OF SOUTHERN CALIFORNIA 0') 0 to 0 z 00 0 z u- uj ui (D 0 C:) U- 0 (.0 W Y. m 0 co to 0 45 4 J wj n roe) > 0 `' cx" w 191� wjg z 0 V) 5; W` w co cd VICINITY MAP INDEX OF SHEETS SHEET 13M, 1, T1TLE SHEET 2* NOTES & SPECIFlCAiIONS 3, BEACH ASTER DRIVE 4. YELLOW LUPINE DRIVE 5* WHIiE ADLER AVENUE BENCHMARK: TOP OF CONCRETE MONUMENT IN LAMPHOLE AT THE CENTERLINE INTERSECTION OF SOUTH RENFRO ROAD AND CULIACAN AVENUE. ELEVATION - 356.34 PER CITY BENCHMARK BOOK FOR TRACT 4708 BASIS OF BEARINGS. THE BEARING OF N 89*27*59" W SHOWN FOR THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 3, T.30 S.j R.26 E. AS SHOWN ON RECORD OF SURVEY, BOOK 17, PAGES 97 & 98 WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. (L SEWER M AIN Q 5 TYP. ��a WATERLINE FINISHED STREET GRADE 36" TYP. 1% MIN, III I I I I I I I I I I I I III I I I I I I I I I I I I ... INI 11 -1 S - SET LATERAL PROVIDING PROPER CLEARANCE UNDER WATERLINE AND UTILITY TRENCHES I N.T.S. I?_ p 1 4 m TYPICAL SEWER LATERAL INSTALLATION FOR SHALLOW INSTALLATION OF SEWER LATERALS FROM SHALLOW SEWER MAINS, THE SEWER LATERALS MUST CROSS OVER THE WATER OR UTILITY TRENCH. THESE INSTALLATIONS MUST RECEIVE SPECIAL TREATMENT FOR LATERALS WHEN CROSSING OVER THE WATERMAIN. A SEWER LATERAL CROSSING ABOVE A WATER MAIN SHALL BE CONSTRUCTED OF A CONTINUOUS 20' SECTION OF CLASS 200 (DR 14 PER AWWA C900) PLASTIC PIPE OR EQUIVALENT, CENTERED ON THE PIPE BEING CROSSED. 4.5" MIN. TO 7$ M AX. STGGKDALE- _mmw_qmff__1W1� Wit. mft_� w*_m IIIm Mvi 1w UMII� Rim-wo-m t 7 1 6 5 4 8 3 2 9 10 I /f3741 35 36 37 12 6*W iR U N I T 13 33 32 31 30 14 15 16 17 18 191 20 21 22 'm a- awn vommam-wo j 42 41 40 39 38 3 4 5 11 fF';�,df .34 35 16 37 6 1A] C(DOIFF)RIWAME 6448 pjjlll�1111��jj :�� ! r r imi ANMAL 4TH Qr-%UB!"���`iT4 CON FORMANCE on TRACT 6448 mommIIII. y jsLy GRADED F 8 u 3 1 4 5 6 7 2 1 9 9 r( RAIPT No. 6448-UNT 3%. 10 28 15 i 14 12 29 24 .23 22 21 20 19 18 1 1 7 1 10 13 ir 30 1 L —.1 7 28 27 26 1 2 3 4 5 b 8 1 31 9 32 AmtvL 3 24 25 36 35 34 33 32 1 j I I ICL i I 1 33 0)1 1 I TRACT N16. 64M-U co mm-m *-am am-IN 0 mm ; _Q T2 'i-mAp*. J'A PGSL 1 11 1 < 9w 5 26 27 1 1 28 29 30 31 T3 0 34 CL ZA L 14 35k' 15 TRLWfMF_ — LACE� M L 16 36F -(<Ll 1 24 23 22 21 20 19 18 17 2 37 7 6 5 4 3 3 2 1 1 1 CT Ng. 10 q I 1 38 IT I 13K. 54, 7 1 39 ............ 6 r /40 MACT No. 6448 )1 .1 __T 8 9 4 11 48 47 kp %54, 0 kisL 104-105 4— -CMACAtt _D -AWNUE- 12 -al 9-m- owo 49 13 =a 14 1 L4 15 UNFT MAP'BK 59, T 3 CGS, 11 -M 5 6 1 16 17 18 19 1 20 1 21 22 4 10 ji 5 4 3 2 1 15 14 1 13 1 12 1 5 ems- go loom I- d 6 Z low -ORI CT _uNrr 1 -BR' 132-4 m_ MAP Ms. 7 7 8 9 Z4 10 11 12 13 14 15 16 ISM go" -maw 8 I modsmi"400" Offlow 6 4 3 '2' LS TRACT Not -UNIT 9 1-0 T - SMH 131� AP B. lAe-146 cis g z ASTER DR_1WExSMH 4 EX SMH 5 tH 1 10 ol 151. 14 1 16 17 18 19 20 21 2 2 LOT :31 Go 1114 74 /23/ 14 1 ML'01 2 -7 a i 2 5 8 4 6 9 10 LS. CCU LOT ACT No. 6448-UW 2 L z ME I - I 441 EX sm 8 EX H 9 EX SMH 10 "'T 6448 SOW LUPINE 0/ L-S-1 im @5 24 23 22 21 2 0 10 18 !7 16 15 14 13 12 LOT CL 1 4 4 CROSS VALLEY CANAL �3KEY AP DENOTES SHEET NUMBER FOR SEWER SCALE: 1 " M 100' CITY 1= BAKERSFIELD KERN COUNTY CALIFORNIA SEWER AND STORM DRAIN CONSTRUCTION PLAN PER 5TH SUBSTANTIAL CONFORMANCE VEST, TENT. TR. 6448 -UNITS 11 E D: CL INV SD MH CB JB SMH sco SDMH EXIST ELEV R/W s IS NOTE-ow 1 PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION DEPARTMENT SHALL BE GIVEN 24 HOURS NOTICE, TELEPHONE 326-3049 2* ALL MATERIALS SUPPLIED FOR THIS PROJECT WILL REQUIRE A CERTIFICATE OF COMPLIANCE STATING THAT THE REQUIREMENTS &STANDARDS SET FORTH BY THE CITY OF BAKERSFIELD HAVE BEEN MET. ENGINEER'S STATEMENT THESE PLANS.- AND SPECIFICATIONS WERE PREPARED BY ME OR UNDER MY DIRECTION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF COMPLY WITH CITY OF BAKERSFIELD ORDINANCES, STANDARDS, AND DESIGN CRITERIA, AND INCLUDE ALL IMPROVEMENT REQUIREMENTS OF THE ADVISORY AGENCY OR OTHER REVIEW BOARD. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS AND DESIGN CRITERIA SHALL BE CORRECTED DURING CONSTRUCTION. EXP. 6-30-14 IN ACCORDANCE WITH THE CONDITIONS OF THE VESTING TENTATIVE MAP, THE IMPROVEMENT PLANS HAVE BEEN REVIEWED BY THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT, APPROVED BY: RAUL M. ROJAS PUBLIC WORKS DIRECT DATE R.C.E. 39880 EXP. 12-31-13 � r t3 REVIEWED BY: ASSISTANT PUBLIC WORKS DIRECTOR DATE A15BREM61ION5 CENTERLINE INVERT STORM DRAIN MANHOLE CATCH BASIN JUNCTION BOX SEWER MANHOLE SEWER CLEANOUT STORM DRAIN MANHOLE EXISTING ELEVATION RIGHT OF WAY TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION PROPOSED SEWER PER CITY STANDARDS EXISTING SEWER PER CITY STANDARDS EXISTING SEWER MANHOLE TYPE *Am PER C.O.8. STD. SI. EXISTING SEWER CLEANOUT PER C.O.B. STD. SW-8. PROPOSED SEWER MANHOLE TYPE *A* PER C.O.B. STD. SW-4. 7 -i7 -Id DIG T Call: TOLL FREE 1-800-227-m-2600 AT LEAST M DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT L OF SOUTHERN CALIFORNIA 0') 0 to 0 z 00 0 z u- uj ui (D 0 C:) U- 0 (.0 W Y. m 0 co to 0 45 4 J wj n roe) > 0 `' cx" w 191� wjg z 0 V) 5; W` w co cd V� VMS N Cw) co Z 0 Amm'4 z w c4"W♦ low • Pow=4 "MONO 07 W co Z cz Lu 0 > cww� fj cc w 0 0 > L 0 00 Z p z w low STANDARD NOTES T rt Z V � 11. WYE FITTINGS SHALL BE INJECTION MOLDED IN- -LINE TYPE AND SHALL BE USED FOR ALL 1. GENERAL IMPORTED BEDDING AND BACKFILL MATERIAL SHALL BE OBTAINED, AND ANY EXCESS LATERAL CONNEC11ONS AND SHALL BE ROTATED A MINIMUM OF 23 DEGREES ABOVE THE C� F- 0 Q` BEDDING AND BACKFILL MATERIAL SHALL BE DISPOSED, BY ANY LEGAL MEANS AT THE low 0 HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN. } um CONTRACTOR WILL FURNISH ALL MATERIALS, TOOLS, LABOR, EQUIPMENT AND DISPOSAL OF THE CONTRACTOR. �aW SUPERVISION NECESSARY TO COMPLETE INSTALLATION. ALL LATERALS SHALL BE 4" IN DIAMETER EXCEPT AS NOTED ON PLANS, EXTENDING, A 01% o THE CONTRACTOR MAY SUBMIT TO THE ENGINEER SIEVE ANALYSIS FOR UTILIZATION OF MINIMUM OF 4' BEYOND THE PROPERTY LINE WITH 30" OF COVER AT FLOW LINE. UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS IN --SITU MATERIALS. ZWa < 3: Z Ims W � BEFORE CONSTRUCTION. TELEPHONE 1- -$00- 227 -2500 co M Como;) SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY LINE r•� �s �� ACHtEVII�IG FIRM , BEDDING BELQWN, PtPE SPRINGLIN CONTRACTOR SHALL PROVIDE "FIRM V v O r AS SHOWN IN THE "SEWER LATERAL MARKER" DETAIL, C.O.B. STD. DET. SW -1. 7 a CONTRACTOR TO CALL FOR USA LOCATE AND POTHOLE ALL MARKED UTILITIES THAT CROSS BEDDING" SUPPORT FOR THE PIPE BELOW THE SPRINGLINE. FIRM BEDDING MEANS THAT OR ARE WITHIN 5' HORIZONTAL DISTANCE OF SEWER AND STORM DRAIN LINES. VERTICAL. THE PIPE MUST REST ON THE GRANULAR MATERIAL SPECIFIED PREVIOUSLY IN THE LATERALS SHALL BE A MINIMUM OF 4.5' DEEP AND A MAXIMUM OF 7' DEEP AT PROPERTY AND HORIZONTAL LOCATION SHALL BE ASCERTAINED BY THE CONTRACTOR AHEAD OF ANY SPECIFICATIONS. LINE AND A MINIMUM OF 2.5' DEEP AT FLOWLINE. REFER TO SEWER LATERAL DETAIL ON SHEET 1. EXCAVATIONS TO VERIFY THAT THE PROPOSED DESIGN DOES NOT CONFLICT WITH ANY UTILITIES. IN THE EVENT A CONFLICT EXISTS THE ENGINEER SHALL BE NOTIFIED IN ORDER BELL OR COUPLING HOLES SHALL BE CAREFULLY EXCAVATED AT PROPER INTERVALS, SO 12. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG. SOLVENT WELDED. TO REDESIGN THE ALIGNMENT. IF RELOCATION OF EXISTING UTILITIES IS DEEMED NECESSARY THAT NO PART OF THE LOAD IS SUPPORTED BY THE BELLS OR COUPLINGS. DURING THE CONTRACTOR SHALL BE COMPENSATED FOR INSTRUCTED RELOCATION. IF REDESIGN OF BEDDING AND BACKFILLING, CONSOLIDATION OF MATERIAL AROUND AND UNDER BELLS 13. ALL MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD THE ALIGNMENT REQUIRES ADDITIONAL FITTINGS, PIPE OR EXCAVATION THE CONTRACTOR AND COUPLINGS SHALL BE AVOIDED. STANDARD DRAWINGS SIN --4, SW -5, AND D-18 AND SECTIONS 70-1.02H AND 71 -1.07 OF THE SHALL BE COMPENSATED FOR REVISION. IN THE EVENT A UTILITY IS DAMAGED THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ITS REPAIR. R AL CONTRACTOR SHALL SHOVEL-SLICE OR HAND TAMP BEDDING IN THE HAUNCH AREAS, AS CURRENT EDITION. ALL CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY THIS WILL MINIMIZE VOIDS BENEATH THE PIPE AND IN THE HAUNCH AREAS. OF BAKERSFIELD STANDARD DRAWING SW --63. SHOVEL - -SLICING OR HAND TAMPING SHALL BE DONE BEFORE THE BEDDING IS BROUGHT CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING SEWER AND STORM UP TO THE QUARTER PAINT OF THE PIPE. MANHOLES SHALL BE TYPE "A" FOR PIPES UNDER 4$" IN DIAMETER AND TYPE "B" FOR DRAIN LINES THAT NEW SYSTEM TIES INTO PRIOR TO TRENCHING. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER SO THAT ANY NECESSARY ADJUSTMENTS MAY BE INITIAL. BACKF{L.1.. BEDDING MATERIAL AS SPECIFIED BY ASTM 2321 -8 SHALL BE USED PIPES 48" IN (DIAMETER OR LARGER. UNLESS NOTED OTHERWISE. THE BOTTOM MANHOLE MADE. UTILITIES SHALL BE THOROUGHLY RESEARCHED AND LOCATED BY CONTRACTOR IN THE PIPE ZONE FOR INITIAL BACKFILL. AFTER THE PIPE HAS BEEN PROPERLY LAID BARREL AT THE MANHOLE FOUNDATION SHALL BE SET ON A 2" MORTAR BED OR SET ON KENT -SEAL, IN A GROOVED FOUNDATION. PRIOR TO TRENCHING. CROSSING UTILITIES SHALL BE DAYLIGHTED AND CHECKED FOR GRADE, AND INSPECTED, INITIAL BACKFILL SHALL BE PLACED ON BOTH SIDES ,AND OVER THE BY CONTRACTOR PRIOR TO TRENCHING. PIPE TO SUCH A DEPTH THAT, AFTER THOROUGH CONSOLIDATION, THE FINAL DEPTH 14. STORM DIN PIPS SHALL BE AT LEAST TO THE ELEVATION SHOWN ON THE PLANS. THE MATERIAL SHALL ALL EXISTING IMPROVEMENTS, (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES, ETC.) THAT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED BE CONSOLIDATED BY VIBRATORY OR MECHANICAL TAMPING AND THE EQUIPMENT AND STORM DRAIN PIPE. CONTRACTOR SHALL UTILIZE RCP PIPE, CLASS Ili WITH RUBBER MANNER OF TAMPING MUST BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO GASKET JOINTS, UNLESS OTHERWISE NOTED ON THE CONTRACT PLANS. AS DIRECTED BY THE CITY ENGINEER:. COMMENCING OPERATION. IMPACT EQUIPMENT MAY BE ALLOWED UNDER THE DIRECTION OF THE ENGINEER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE REINFORCED CONCRETE PIPE. REINFORCED CONCRETE PIPE SHALL CONFORM TO THE ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE RESULTING FROM THE USE OF THIS EQUIPMENT. HYDRA -- HAMMER WILL NOT BE PROVISIONS IN SECTION 65, "REINFORCED CONCRETE PIPE ", OF THE STANDARD REPLACED IN ACCORDANCE WITH THE CITY OF BAKERSFIELD STANDARD DRAWING ST -6, PERMITTED. SPECIFICATIONS AND THESE SPECIAL PROVISIONS. EXCEPT AS NOTED ON PLANS. SUj35EQUENNOACKEILL. ABOVE THE LEVEL OF INITIAL BACKFILL, THE TRENCH MAY BE EXCEPT AS OTHERWISE DESIGNATED BY CLASSIFICATION ON THE PLANS OR IN THE 2. STANQARD.,[ TAI S BACKFILLED NTH NATIVE MATERIAL RESULTING FROM TRENCH EXCAVATION, OR AT THE SPECIFICATIONS, JOINTS FOR CULVERT AND DRAINAGE PIPES SHALL CONFORM TO THE THE FOLLOWING CITY OF BAKERSFIELD STANDARDS OPTION OF THE CONTRACTOR, SELECT IMPORTED MATERIALS MAY BE USED. NATIVE PLANS OR SPECIFICATIONS FOR STANDARD JOINTS. MATERIAL OR IMPORTED MATERIAL MAY BE COMPACTED BY TAMPING AND/OR ROLLING, SHALL BE CONSIDERED PART OF THESE PLANS: SW-1, SW -4, SW-5, D -14, D---1 f> USING EQUIPMENT AND METHODS APPROVED BY THE ENGINEER. " HYDROSTATIC TESTS SPECIFIED BY SECTION 55- -1.08 LAYING SIPHON AND PRESSURE D -18, ST -6, ST -22, WHEN THE CONTRACTOR COMPACTS BY TAMPING ROLLING, AND/OR BACKFILL TH % L E PIPE", OF THE STANDARD SPECIFICATIONS WILL NOT BE REQUIRED. 3. VCP INSTALLATION MATERIAL SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES IN LOOSE REINFORCED CONCRETE PIPE SHALL HAVE RUBBER GASKETED JOINTS CONFORMING TO DEPTH, EACH LAYER BEING THOROUGHLY COMPACTED BY TAMPING AND/OR ROLLING SECTION 55- 1.068, "RUBBER GASKETED JOINTS ", OF THE , STANDARD SPECIFICATIONS. MATERIALS THE PIPE AND FITTINGS SHALL BE EXTRA STRENGTH VITRIFIED CLAY BEFORE SUCCEEDING LAYERS ARE PLACED. CONFORMING TO CURRENT ASTM SPECIFICATION C -700 AND SHALL BE INSTALLED IN HANDLING OF MATERIALS. ALL PIPE, FITTINGS, SPECIALS AND CASTINGS MUST BE CONFORMANCE WITH THE PROVISIONS OF SECTION 71 OF THE STANDARD SPECIFICATIONS COMPACTION OF SUBSEQUENT BACKFILL WITHIN TWO AND ONE -HALF (2-1/2) FEET OF CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, CURRENT EDITION FINISHED PERMANENT SURFACING GRADE SHALL BE ACCOMPLISHED BY TAMPING AND/OR APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING AND THE CURRENT ASTM SPECIFICATIONS C -12. ROLLING AS SPECIFIED ABOVE. WHERE THE TRENCH IS WITHIN THE PAVEMENT ON AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED STREETS, THE BACKFILL WITHIN TWO AND ONE -HALF (2-1/2) FEET OF FINISHED RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING JOINTS THE PIPE AND FITTINGS SHALL HAVE A SOCKET END AND A SPIGOT END PERMANENT GRADE SHALL BE COMPACTED TO NINETY PERCENT (905ro) RELATIVE WITH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE WITH COMPRESSION JOINTS CONFORMING WITH THE CURRENT ASTM SPECIFICATION COMPACTION. REJECTED. C -425, SUBSEQUENT BACKFILL PLACED BY TAMPING AND /OR ROLLING SHALL BE FREE FROM LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES FITTINGS " " ,�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t, AND II! EMBEDMENT THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO MATERIALS WILL BE CONSIDERED SUITABLE. 9. SEWER PIPE IN5TALLATIQN ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED OR INCORRECTLY CUT. 5. PVC PIPE INSTALLATION SEWER PIPE SHALL CONFORM TO THE PLANS, AND THESE SPECIAL PROVISIONS. THE PRICE PER LINEAL FOOT SHALL INCLUDE BUT NOT BE LIMITED TO EXCAVATION, BEDDING 15. BGR /JACKED EIRE MATERIALS : PIPE AND FITTINGS SHALL MEET THE REQUIREMENTS OF THE CURRENT AND BACKFILL. ASTM SPECIFICATION D -3034 FOR SDR35. PIPE AND FITTINGS SHALL BE HOMOGENEOUS CASING OR SMOOTH OUTSIDE WALLED PIPE FOR BORED/JACKED PIPE SHALL BE THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS (� OTHER HANDLING OF MATERIALS. A PIP FITTINGS, SPECIALS L ALL E, I NGS, S EC ALS AND CASTINGS MUST BE INSTALLED. IT SHALL HAVE EVEN BEARING THROUGHOUT ITS LENGTH AND SHALL SLOPE INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED CAREFULLY HANDLED AT ALL TIMES. ONLY SUITABLE AND PROPER EQUIPMENT AND TOWARD ONE END. SPACE BETWEEN CASING AND PIPELINE SHALL BE BACKFILLED WITH IN LINE ON NEW PIPELINES; CUT -1N FITT'INGS ARE NOT PERMITTED. APPLIANCES SHALL BE USED FOR THE SAFE LOADING, HAULING, UNLOADING, HANDLING SAND. IF THE PIPE AND CASING ARE INSTALLED BY BORING, THE SPACE AROUND THE JOINTS : USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL AND PLACING OF MATERIALS, SPECIAL CARE SHALL BE EXERCISED SO THAT PREFORMED CASING ALSO SHALL BE BACKFILLED WITH GROUT OR SAND. THE ENDS OF SPACE BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS WHERE PVC PIPE RESILIENT JOINTS ON PIPE AND FITTINGS WILL NOT BE DAMAGED. ANY PIPE OR FITTING BETWEEN THE CASING AND THE PIPE SHALL BE SEALED WITH GROUT. THE STRENGTH CONNECTS TO VCP PIPE, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. NTH A JOINT DAMAGED OR FLATTENED WILL CAUSE THAT PIPE OR FITTING TO BE OF PIPE. DESIGNATED IN THE PLANS OR SPECIFICATIONS IS DETERMINED FOR VERTICAL REJECTED. REJECTED. LOAD ONLY ANY ADDITIONAL STRENGTH REQUIRED BY BORING /JACKING OPERATIONS INSTALLATION : PIPE AND FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH PIPE LAYING. NO PIPE SHALL BE LAID UNTIL THE ENGINEER INSPECTS AND APPROVES SHALL BE FURNISHED AT THE CONTRACTOR'S EXPENSE. THE CURRENT ASTM SPECIFICATION D -2321. ONLY CLASS 1, lit AND {II EMBEDMENT THE CONDITION OF THE BOTTOM OF THE TRENCH. PIPE SHALL BE INSTALLED IN STRICT MATERIALS WILL BE CONSIDERED SUITABLE. ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PIPE LAYING SHALL BEGIN THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL ALL PLANS OF 6. TRENt�_H E,XCAVAT� FROM THE DOWNSTREAM END OF THE TRUNK SEWER OR AS DIRECTED BY THE ENGINEER. BORING /JACKING JACKING OPERATIONS PRIOR TO BORING OR JACKING. PIPE LAYING SHALL PROCEED WITH EACH PIECE LAID TRUE TO LINE AND GRADE, AND IN SUCH A MANNER AS TO FORM A CLOSE CONCENTRIC JOINT WITH THE ADJOINING PIPE BORING /JACKING OPERATIONS SHALL BE CONDUCTED IN A SAFE AND EFFICIENT MANNER, THE EXCAVATION OF TRENCHES FOR PIPING LAID IN THE GROUND SHALL BE IN AND TO PREVENT SUDDEN OFFSETS IN THE FLOW LINE. AS THE WORK PROGRESSES, THE CONSISTENT WITH CURRENT ACCEPTED PROCEDURES. WATER BORING SHALL NOT BE OPEN --CUT FROM THE SURFACE OF THE GROUND EXCEPT WHERE BORING IS REQUIRED. INTERIOR OF THE PIPE SHALL BE CLEARED OF ALL DIRT AND DEBRIS OF EVERY PERMITTED. THE CASING PIPE SHALL BE JACKED WITH SUCH PRECISION THAT WILL THE TRENCHES SHALL BE OF WIDTH AS SHOWN ON STANDARD S -39 AND DETAILED SECTIONS ON THE PLANS FOR PROPER PIPE INSTALLATION. DESCRIPTION. PIPE SHALL NOT BE LAID WHEN THE CONDITION OF THE TRENCH OR THE ALLOW TIME REPLACEMENT OF THE PIPELINE TO THE LINE AND GRADE AS INDICATED ON WEATHER IS UNSUITABLE, AT TIMES WHEN WORK IS NOT IN PROGRESS, OPEN ENDS OF THE PLANS. THE HOLES FOR BELLS AND FITTINGS SHALL BE EXCAVATED BY HAND, TO A WIDTH PIPE AND FITTINGS SHALL BE CLOSED. UPON COMPLETION OF THE INSTALLATION OF THE CASING AND INSTALLATION OF THE PROVIDING UNIFORM BEARING ALONG THE LENGTH OF THE PIPE. IT IS THE INTENTION OF THESE REQUIREMENTS TO PROVIDE FIRM, UNIFORM BEARING FOR THE PIPE. WITH BELLED END PIPE, BELL HOLES SHALL THEN BE EXCAVATED AT EACH JOINT TO PIPELINE TO GRADE, THE VOID BETWEEN THE CASING OR RC PIPE AND THE EXCAVATION SHALL BE COMPLETELY FILLED WITH SAND, COMPACTED BY THE USE OF AIR- BLOWING FACILITATE THE JOINT OPERATIONS, AND SHALL BE ONLY OF SUFFICIENT SIZE FOR THAT PURPOSE. IN ORDER THAT BELL HOLES MAY BE PROPERLY LOCATED, NOT MORE THAN SAND EQUIPMENT OR ANY OTHER MEANS ACCEPTABLE TO THE ENGINEER UPON HIS CONTRACTOR SHALL PROVIDE TRENCHING IN ACCORDANCE WITH THE DETAILED SECTIONS PROVIDED IN THE PLANS. SELECTION OF TRENCH TYPES WILL BE AS REQUIRED BY THE SIX (5} HOLES SHALL BE EXCAVATED AHEAD OF ACTUAL PIPE LAYING, ON ACCOUNT OF APPROVAL. TYPES OF PIPE SELECTED FOR CONSTRUCTION. STORM DRAIN AND UTILITY CONDUIT THE VARIATIONS 1N JOINT CONSTRUCTION OPERATIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN A SAFE OPERATION AT ALL TIMES. INSTALLATIONS SHALL MEET CITY STANDARD ST -22. PIPE INSTALLATION FOR THE BUENA VISTA TRUNK SEWER, PHASE I SHALL MEET REQUIREMENTS AS OUTLINED IN THE PIPE CUTTING PIPE. THE CONTRACTOR SHALL PERFORM ALL WORK OF CUTTING PIPE AND SHOULD THE TUNNEL HEADING OPERATIONS RESULT IN DANGEROUS OR UNREASONABLE OPTIONS, BUT IN NO CASE SHALL BE LESS THAN ASTM CLASS D TRENCH REQUIREMENTS. SPECIAL CASTING NECESSARY TO THE ASSEMBLY, ERECTION, AND COMPLETION OF THE SLOUGHING OF EACH MATERIAL WHICH MAY JEOPARDIZE THE SAFETY OF WORKERS OR THE STABILITY OF THE SOIL AND ROADWAY ABOVE, THE CONTRACTOR SHALL FURNISH WORK. ALL PIPE SHALL BE CUT TO FIT ACCURATELY WITH SMOOTH EDGES AND FACES. TRENCH LINES SHALL MEET ALL FEDERAL AND STATE SAFETY REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF CUTTING AND NO ANb INSTALL BREASTBOARDING AND /QR FACE CLOSURE WITH SUFFICIENT JACKS TO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ANY MATERIALS WHICH ARE DAMAGED INHIBIT THE SLOUGHING AND /OR CLOSING THE WORK FACE. THE CONTRACTOR, BEFORE 7, BEACINQ AND SjjQRING OR INCORRECTLY CUT. RESUMING WORK, SHALL FURNISH THE ENGINEER. WITH A DETAILED PLAN OF PRECEDING WITH THE WORK., FOR HIS REVIEW AND APPROVAL. ANY AND ALL EXPENSES THEREFORE EXCAVATION SHALL BE SUPPORTED AS SET FORTH IN THE RULES, ORDERS, AND PIPELINE TESTING. ALL SEWERS SHALL BE TESTED FOR TIGHTNESS WHEN COMPLETED WILL BE CONSIDERED AS INCLUDED IN THE BID PRICE AND NO ADDITIONAL COMPENSATION REGULATIONS OF THE STATE DIVISION OF INDUSTRIAL SAFETY. IF THE CONTRACTOR AND READY FOR SERVICE. TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE WILL BE MADE THEREFORE. DESIRES TO DEVIATE FROM THE SAFETY ORDERS, HE SHALL SUBMIT DATA BY A UNIFORM PLUMBING CODE AIR TEST METHOD UPC SEC. 318- -6(4 ), OR THE WATER "TESTING 16. MINOR STRUCTURES REGISTERED CIVIL ENGINEER TO THE STATE DIVISION OF INDUSTRIAL SAFETY, JUSTIFYING EXFILTRATION TEST OR AIR PRESSURE TEST PER SECTION 306-1.4;, PIPELINES" THE ALTERNATE PROCEDURES TO BE USED. FAILURE TO COMPLY WITH ANY OF THESE OF THE 1994 EDITIONS, "STANDARD SPECIFICATIONS" FOR PUBLIC WORKS CONSTRUCTION, MINOR STRUCTURES. PORTLAND EVENT C CONCRETE M {NOR STRUCTURES SHALL RULES, ORDERS AND REGULATIONS SHALL BE SUFFICIENT CAUSE FOR THE STATE DIVISION AND CHAPTER 1.3 OF THE CITY OF BAKERSFIELD SUBDIVISION DESIGN MANUAL, AND THE CONFORM, IN DESIGN MATERIALS, AND CONSTRUCTION, TO THE PROVISIONS OF TO IMMEDIATELY SUSPEND ALL WORK. COMPENSATION FOR LOSSES INCURRED BY THE PIPE SUPPLIER'S REQUIREMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 24 , SECTIONS 70 -1.02 H OF THE STANDARD SPECIFICATIONS AND THESE SPECIAL CONTRACTOR BY SUCH AN EMERGENCY SUSPENSION SHALL NOT BE ALLOWED. DURING BACKFILLING, THE BOTTOM OF THE SHORING SHALL BE KEPT ABOVE THE LEVEL OF THE HOURS PRIOR TO ANY TESTING. PROVISIONS. MANHOLES SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARDS BACKFILL AT ALL TIMES. CLEANING PIPE LINES. CARE SHALL BE EXERCISED IN LAYING OF PIPE LINES TO SW -4 AND SW -5, DROP INLETS SHALL CONFORM TO THE CITY OF BAKERSFIELD STANDARD D ---14. TEMPORARY INLETS GRATED SHALL CONFORM TO DETAILS ON THE EXCLUDE DIRT` AND ANY OTHER FOREIGN MATERIAL. WHEN PIPE LAYING IS INTERRUPTED, PLANS. SECTION 6422 OF THE CALIFORNIA LABOR CODE REQUIRED THE CONTRACTOR TO SUBMIT AS AT NIGHT, THE PIPE ENDS SHALL BE SUITABLY CLOSED. UPON COMPLETION, AND TO THE ENGINEER A DETAILED PLAN, DRAWING THE DESIGN OF SHORING, BRACING, BEFORE PLACING INTO SERVICE, ALL LINES SHALL BE FLUSHED AND MANDRELLED TO THE PRECAST CYLINDER, TAPER, AND ECCENTRIC FLAT TOP SECTIONS SHALL MEET THE SLOPING OR OTHER PROVISIONS TO BE MADE BY THE CONTRACTOR FOR THE PURPOSE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE REMOVE ANY DIRT OR FOREIGN MATERIALS WHICH WOULD CLOG PUMPS, EQUIPMENT, SPRAY HEADS, ETC. THE CONTRACTOR SHALL MAKE PROVISIONS FOR PREVENTING STRENGTH REQUIREMENT OF ASST. C-478. EACH SUCCESSIVE MANHOLE SECTION SHALL "KENT EXCAVATION OF TRENCHES NECESSARY FOR THE CONSTRUCTION OF THE PROJECT. IF FOREIGN MATERIAL FROM BEING FLUSHED INTO AN EXISTING SEWER LINE. BE SET ON A BED OF PORTLAND CEMENT GROUT OR SEAL" TO MAKE A SUCH PLAN VARIES FROM THE SHORING SYSTEM STANDARD ESTABLISHED BY THE WATERTIGHT JOINT, SHALL BE NEATLY POINTED ON THE INSIDE AND SHALL BE SET CONSTRUCTION SAFETY ORDERS, THE PLANS SHALL BE PREPARED AND CERTIFIED BY A SEWER LATERALS. SEWER LATERALS SHALL CONFORM TO THIS IN EVERY REGARD. PLUMB, REGISTERED CIVIL OR STRUCTURAL ENGINEER; HOWEVER, USE OF SYSTEMS THAT ARE EXISTING SEWER LATERALS SHALL BE LOCATED BY THE CONTRACTOR AND CONNECTED TO 17. A LESS EFFECTIVE THEN THOSE REQUIRED BY THE CONSTRUCTION SAFETY ORDERS IS AND EXTENDED OR RECONSTRUCTED ACCORDING TO THE PLANS. COMPRESSION PROHIBITED ON THIS PROJECT. COUPLINGS MAY BE UTILIZED FOR CONNECTING TO EXISTING LATERALS. POSITIVE GRADE SURVEY MONUMENT AND FRAME AND COVER WITH ENCASEMENTS SHALL BE ADJUSTED OR 8. TRENCH BACKFILL TO THE TRUNK SEWER SHALL BE MAINTAINED AND INVERT GRADES SET AS CALLED ON INSTALLED NEW TO FINISH GRADE AT THE LOCATIONS SHOWN ON THE PLANS IN THE PLANS. SEWER WYES SHALL BE INSTALLED ON THE TRUNK IN ACCORDANCE WITH ACCORDANCE WITH THESE SPECIAL PROVISIONS AND CITY STANDARD S -29. THE PIPE MANUFACTURERS RECOMMENDATIONS. PAYMENT FOR SEWER LATERALS WILL BE TRENCHES SHALL NOT BE LEFT OPEN FARTHER THAN THREE HUNDRED (300) FEET IN PAID AS SEWER FOR THE APPROPRIATE DIAMETERS. THE SURFACE OF THE CONCRETE SHALL BE PROTECTED FROM PUBLIC TRAFFIC FOR A ADVANCE OF PIPE LAYING OPERATIONS OR TWO HUNDRED (200) FEET TO THE REAR MINIMUM OF THREE DAYS. THEREOF, UNLESS OTHERWISE PERMITTED BY THE ENGINEER. 10. SYSTEM TESTING A MANDREL TEST AND PRESSURE TEST SHALL BE PERFORMED ON INSTALLED PIPE AT THE OPTION OF THE CONTRACTOR, MINOR CONCRETE CONTAINING A MINIMUM OF ALL WORK SHALL CONFORM TO THE APPLICABLE SECTIONS OF THE STANDARD IN ACCORDANCE WITH THE CITY OF BAKERSFIELD SUBDIVISION MANUAL AND THE SEVEN SACKS OF CEMENT PER CUBIC YARD MAY BE USED AND TIME' TIME REQUIRED FOR SPECIFICATIONS, DATED JULY, 1992. BEDDING CLASS SHALL BE AS SPECIFIED IN THE RECQMMENDATi0N5 OF THE MANUFACTURER. PROTECTION OF THE CONCRETE SURFACE FROM PUBLIC TRAFFIC SHALL BE REDUCED TO PIPE OPTIONS. STORM DRAIN AND UTILITY CONDUIT INSTALLATIONS SHALL BE IN A MINIMUM OF ONE DAY. ACCORDANCE WITH CITY STANDARD ST -22, EXCEPT THAT COMPACTION SHALL BE NO LESS PRIOR TO FINAL ACCEPTANCE, ALL SEWER LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT THAN NINETY PERCENT (907") UP TO THIRTY INCHES (301*) FROM FINISHED GRADE. DESIGNED FOR THIS PURPOSE. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING TIME MONUMENT WILL BE SET BY THE OTHERS. THE OWNER WILL PROVIDE SURVEYS. 360 °, IN ORDER TO VIEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO CONTRACTOR SHALL GIVE THE OWNER 24 HOURS NOTICE WHEN SURVEYS ARE REQUIRED. BACKFILL MATERIAL IN S THE PIPE SHALL 8E PLACED IN LAYERS NOT TO EXCEED INSPECTION SHALL BE WITNESSED BY THE CITY'S CONSTRUCTION INSPECTOR, WHO WILL ALSO INITIAL TWELVE (12) INCHES SIMULTANEOUSLY, ON EACH SIDE OF THE PIPE, IN SUCH A MANNER AND DATE THE "CHAIN OF CUSTODY" FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF ANY MONUMENT FRAME OR COVER DAMAGED BY THE CONTRACTOR OR HIS OPERATIONS AS NOT TO DAMAGE OR DISTURB THE PIPE OR ITS ALIGNMENT AND GRADE. ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. VIDEO CASSETTE, THE COMPLETED "CHAIN OF CUSTODY" FORM AND A WRITTEN LOG (WHICH INCLUDES BACKFILL MATERIAL ABOVE THE PIPE ZONE SHALL BE FREE OF DELETERIOUS MATERIALS LETE S THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS) AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD AND LUMPS OR STONES EXCEEDING THREE (3) INCHES IN GREATEST DIMENSION AND OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING, AND SHALL BE APPROVED BY THE CITY ENGINEER PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN ACCEPTED STREET SHALL BE PLACED IN LAYERS NOT EXCEEDING EIGHTEEN (18) INCHES. EACH LAYER PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE, THE VIDEO CASSETTE SHALL BECOME THE PROPERTY OF RIGHT -OF-WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, A► .DEPOSIT SHALL BE THOROUGHLY COMPACTED BY VIBRATORY OR MECHANICAL TAMPING, OR BY A THE CITY. BASED ON APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE COMBINATION OF THESE METHODS. FLOODING AND JETTING SHALL NOT BE ALLOWED. RIGHT- OF- -WAY AND INSURANCE SHALL BE POSTED PRIOR TO ISSUANCE OF THE THERE MUST BE AT LEAST ONE FOOT OF COVER OVER THE PIPE BEFORE COMPACTION PERMIT. ABOVE THE PIPE ZONE WILL BE ALLOWED. 7"Wl 7 40 / q DIG ALERT Call: TOLL FREE 1 -$00 -227 -2600 At LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA 0 �.. Cy) <�- 0 Z 00 0 - I < Ld Ld 00 .._j r- �.... W (Q0 w �C m %N V_ �F o� M z� W tAj oigc> wv CA (A a ,, � ca 85 W 0-10- �M M Gl `z co 0 2 •. MONO V) co "N 1 r ` s s { rj T rt Z V � co q* z 4D cl) jr e z 1� o C� F- 0 Q` low 0 GCS } um �aW oa cf) 01% o o� 00 J Z w ZWa < 3: Z Ims W � co M Como;) V_ O r•� �s V v O r 7 a 6 INSTALL NEW 18" DRAIN 7 SEE PROFILE NEW t CATCH BASIN NO. 3 STA. 9+82.12 C.L. 16.33LT. NORMAL F.L. ELEV=349.87 POV DEPRESSED F.L. ELEV•349.70 8 EX 18" DRAIN TO BE REMOVED EXIST. SEWER MANHOLE NO. 1 STA. 9+95.04, C.L. 5.00LT.= STA. 9+95.04, SEWER q INTERSECTION STA. 10 +00.00, C.L. BEACH ASTER DR.= STA. 12+80.47, C.L. MITE ALDER AVE. 9 10 WHITE AMER AVENUE SEE SHEET 5 3011130 X CN 0 01 ME IQ Of En 1-: En X w 0 TRQ u'4Q UNIT 11 0: 10 LuO TRW 6" UNff 9 �;86_ 0— 0 c>;;c- C:) < cnj C:� c; �_: C) =0 X 0 ca: 0;M z __j ci 0 cw_- Mtn c4w 8 SKY LUPINE LANE z _j Z C%i.* cc w C4 ce Lu 0 0 Z n>; CC. 0 30' 30' 1 LS cn -4 _j 0 *w cn -1 1 2 UJI w 12 11 _j -1 W 6 5 3 V) < 18 18 X w_j - 7 u>;-Ej I < 0 _j 1 #6 1 10 9 8 uj LOT LO m cn cn< Q z 4 3 to 2 0- w a:: M cq-u-jj-4 c" CC. X 0DC0 cc, + U- LOW cr_ Coco U-)w Of t6 !g 8co C> r.,w W * < r-- F= r--C:) Coco cn 0 .< % 0 . m 0)(n LA irl --A n "i (0c> w 4 * w u") _j 0--i 0)cn Ii uj Coco EXISTING FLO INE ++ W)n c> cc 0 V_ r*-- cunj ++ 04 Z In Coco EN ++ + + :> + V) ++ SEE SEPAR TE M .0-" CNI ++ --<U.JV) z c4z Z 0 n w c1q SIX J Coco EXISTING FLOWLINE MCC La ca w APPROVED PLANS cn .cn V) F= 3:: Cord: Lu -in An X R SEE SEPARATE 1 1 22 w w 1�c_ X X En X w cncn C:) Z uj cntn ;�5<_ 2 APPROVEb PLANS LLJ LjLj LLJ w 0 LLI V)V) PA cn It— M LAJ V)V) PA P A awl mi ..s .�.... �....�,. s .,....,.,. ....�.,. ...n....a_. ..,...,,..,; ..._..._. - �-'—•- - -- - ° --�-�- �-�- - »--- -- mod... ..,.,....,_ ...,,...,... .�.._.. � � � '•,.,, � � „.....a.. ...,_..,.,, _.....,,« �. ....,..�. ' _.w,. �...:.�... ._..,... :._.�..., .,..,...». ��,�...� �....... ..�..,�. _.,....,.,, ....�. ar...... s ........... ...~.. f .. ........,«. .�., -... � ,:,...,.... ,�...._ ,,....._ ,.�„_. .,.,._.� ....a...,.. ....w,., .. � .�,._:... ..»...._ .w..,..., .... EX. 8 SEWER A`FLOWLINE Ex. 8 SEWER ............. ......... . . . . . .. . E X, 8o SEWER s EX. 8" SEWER. 1186.5 s 35, Fsa 557.1�49 21+00 S89"29"4frE 1T+)O 353.731 13 00 S89*29148*E '14+00 112.97 15--00 S89729*48*1� 162. _f _6_7 00 1 D7 FLOWLINE S89"29 48*E 0+00 b ca PA *LLI 1P)L. m;e mm W_ Z C4 0:: DD- LAN M C�m m PFIROV" Lma E E E P A R wo C) cnz m <a- t LS 19 13 14 1 15 1 16 17 1 1 23 twn <-j 18 cn< cn 20 21 Q 18 19 20 ?1 22, <>_ LO IT 18' 18' T K C) C> C> mcn cr) __j C>f 14- _j 30 30 J LJ + + Ivy In r-= V-#:= 0 "C> .cn SCOTCH fl*-C:) An An An IX 0 coo 8RO0M WAY w "a En ++ M IRe 6AM w (CC> — Mw . . UNrr 9 g< CA Mm a TR. o^448 IVINIT 11 BEACH ASTER DRIVE (PRIVATE STREET) SCALE: 1" = 50' HORIZONTAL 1" = 5' VERTICAL CENTERLINE OF 20* WIDE PUBLIC UTILITY EASEMENT TO BE DEDICATED BY SEPARATE INSTRUMENT PALE LILAC LANE SEE SEPARATE APPROVED PLANS INSTALL NEW 23.48 LF OF 364 364 EXISTING 32.17 _F OF 18" RGJ-RCP @ 0.19 :z 362 362 C..3 < ALL EXISTING SEWER MANHOLES ARE TO J, I --4 360 ----BE ADJUSTED TO FINISH GRADE UNLESS 1360 SEE <EPARA I E APPROVED PLANS OTHERWISE NOTED. 00 cn cn C>39 c" m M CN 0 C-31 0 nnln � % 356 3, U- _T_ 31: re, 2:1 Z PPROXIM TE FINIS ED cy) uj w ca UJ F- > RAGE @ ENTERLI E cc —L I A _j 354 3m, -<UJ < uj UJI X. uj ji . W CL cn ncg Lu APPROBATE F1' ISHED z 4-- ti '352 352' GRAI)E4*tEIq - - - - - - - - - - - .r__ — - - - -- - - - - } �'d/ , t [ i - ....�..... ,..».... .."_..... .,_,....�. f 1-_04� + C t 30 L_. -41 ,.,•..,........�........ -. ..,..,....... a._...,...-.....,.,.• w., 6+...... ,:,,.....,...,.,.,..- .__...._.. ....,_.,.,•,•. -. ,-.,•, ,.W; ..vw..- w.,_.. .. 348 — ---------- t SEWER LINMERT EXIS 8" SE*R _, ^.L �; , -• w ._ ._ «.wa.,er» .. ....w,w. f I t _ _ , ,•uwa , rav_ _ ,..r, r � fj _ f a,rr• w � _ _nm++_ •_ �- �•¢� -- - °- �_ � + _,wK n 1 ! [ k i '346 346 �NVERT N 3" N 4 aft r%n I IVERT EXI11ST. 181SL RAI f VER T E� 3" IST. 8" S_ ER ------------------- I Ln ro 4-- If %o42 -,all- ILI% SEW z :z 342 z Z I d 1, L-Li LLJ LLJ __j It i LLJ .......... :z . ......... :--- z I z < urn 0 30 0 0000 u c-3 z < _j C4Lr c4b6aj Coco c -rn J,q t 4, < . . 0:: 110 ce q- in 338 338 t 00 a UJ + uj w uj 1; uj +: > + + cn Ii Jj LJ LO CA, 00 La CN C%14 --j -j :> > uj I.A.1 aj Ljj LAJ LjLj Li c 1 '336 W6 uj X I-- >< X :z uj En >< of i t I r-%') n -7 n w) a/- J Li ryic-rifm 90A F i t' A& v 111i AV. A Ir"FAW P_ 334 334 It . ..................... 332 -'-332 10 11 12 13 14 15 16 17 18 19 20 21 22 364 362 360 358 356 354 352 350 348 346 34 342 340 RlJ 0 0& 58979"48*E 1+00. LAJ EX. 18 '* Moro m cr)oi y+ C) PO 44 DRAIN Ut3 >W � _j Ucj >W � 0c.> C.> 00 0 U) wz(n F� X _< CY W cr) CN4 q* uj upi w + WRA zf5c:> OcnLL- < M cr_ U-i OV z �2,cl Q t8 _j 17 (n ce 13- :3 ]10' W_ z tr)>. (n _j II.Lq ui 3 0' < m C4 06uj--j U- + C-D WHITE ALDER -4c:j < " _ Lj UJI "U En 0z AVENUE u + cn w 0-j (n f!5 x SEE SHEET 5 C-0 uj V) w w V)%%-.f 06 ;�wo. w W O UJ w M cnmocn LS 6 O LOT .�.... �....�,. s .,....,.,. ....�.,. ...n....a_. ..,...,,..,; ..._..._. - �-'—•- - -- - ° --�-�- �-�- - »--- -- mod... ..,.,....,_ ...,,...,... .�.._.. � � � '•,.,, � � „.....a.. ...,_..,.,, _.....,,« �. ....,..�. ' _.w,. �...:.�... ._..,... :._.�..., .,..,...». ��,�...� �....... ..�..,�. _.,....,.,, ....�. ar...... s ........... ...~.. f .. ........,«. .�., -... � ,:,...,.... ,�...._ ,,....._ ,.�„_. .,.,._.� ....a...,.. ....w,., .. � .�,._:... ..»...._ .w..,..., .... EX. 8 SEWER A`FLOWLINE Ex. 8 SEWER ............. ......... . . . . . .. . E X, 8o SEWER s EX. 8" SEWER. 1186.5 s 35, Fsa 557.1�49 21+00 S89"29"4frE 1T+)O 353.731 13 00 S89*29148*E '14+00 112.97 15--00 S89729*48*1� 162. _f _6_7 00 1 D7 FLOWLINE S89"29 48*E 0+00 b ca PA *LLI 1P)L. m;e mm W_ Z C4 0:: DD- LAN M C�m m PFIROV" Lma E E E P A R wo C) cnz m <a- t LS 19 13 14 1 15 1 16 17 1 1 23 twn <-j 18 cn< cn 20 21 Q 18 19 20 ?1 22, <>_ LO IT 18' 18' T K C) C> C> mcn cr) __j C>f 14- _j 30 30 J LJ + + Ivy In r-= V-#:= 0 "C> .cn SCOTCH fl*-C:) An An An IX 0 coo 8RO0M WAY w "a En ++ M IRe 6AM w (CC> — Mw . . UNrr 9 g< CA Mm a TR. o^448 IVINIT 11 BEACH ASTER DRIVE (PRIVATE STREET) SCALE: 1" = 50' HORIZONTAL 1" = 5' VERTICAL CENTERLINE OF 20* WIDE PUBLIC UTILITY EASEMENT TO BE DEDICATED BY SEPARATE INSTRUMENT PALE LILAC LANE SEE SEPARATE APPROVED PLANS INSTALL NEW 23.48 LF OF 364 364 EXISTING 32.17 _F OF 18" RGJ-RCP @ 0.19 :z 362 362 C..3 < ALL EXISTING SEWER MANHOLES ARE TO J, I --4 360 ----BE ADJUSTED TO FINISH GRADE UNLESS 1360 SEE <EPARA I E APPROVED PLANS OTHERWISE NOTED. 00 cn cn C>39 c" m M CN 0 C-31 0 nnln � % 356 3, U- _T_ 31: re, 2:1 Z PPROXIM TE FINIS ED cy) uj w ca UJ F- > RAGE @ ENTERLI E cc —L I A _j 354 3m, -<UJ < uj UJI X. uj ji . W CL cn ncg Lu APPROBATE F1' ISHED z 4-- ti '352 352' GRAI)E4*tEIq - - - - - - - - - - - .r__ — - - - -- - - - - } �'d/ , t [ i - ....�..... ,..».... .."_..... .,_,....�. f 1-_04� + C t 30 L_. -41 ,.,•..,........�........ -. ..,..,....... a._...,...-.....,.,.• w., 6+...... ,:,,.....,...,.,.,..- .__...._.. ....,_.,.,•,•. -. ,-.,•, ,.W; ..vw..- w.,_.. .. 348 — ---------- t SEWER LINMERT EXIS 8" SE*R _, ^.L �; , -• w ._ ._ «.wa.,er» .. ....w,w. f I t _ _ , ,•uwa , rav_ _ ,..r, r � fj _ f a,rr• w � _ _nm++_ •_ �- �•¢� -- - °- �_ � + _,wK n 1 ! [ k i '346 346 �NVERT N 3" N 4 aft r%n I IVERT EXI11ST. 181SL RAI f VER T E� 3" IST. 8" S_ ER ------------------- I Ln ro 4-- If %o42 -,all- ILI% SEW z :z 342 z Z I d 1, L-Li LLJ LLJ __j It i LLJ .......... :z . ......... :--- z I z < urn 0 30 0 0000 u c-3 z < _j C4Lr c4b6aj Coco c -rn J,q t 4, < . . 0:: 110 ce q- in 338 338 t 00 a UJ + uj w uj 1; uj +: > + + cn Ii Jj LJ LO CA, 00 La CN C%14 --j -j :> > uj I.A.1 aj Ljj LAJ LjLj Li c 1 '336 W6 uj X I-- >< X :z uj En >< of i t I r-%') n -7 n w) a/- J Li ryic-rifm 90A F i t' A& v 111i AV. A Ir"FAW P_ 334 334 It . ..................... 332 -'-332 10 11 12 13 14 15 16 17 18 19 20 21 22 364 362 360 358 356 354 352 350 348 346 34 342 340 SECTION A SCALE.- 1" = 56 HORIZ. 1' = 5' PERT. 3 364 362 360 3,58 356 354 352 350 348 346 344 342 340 LEGEN.Q. 41 CL IN SD MH CB J13 SMH SCO SDMH EXIST El EV R/W �9T� .O.M. S 0 ABBREVIATIONS CENTERLINE INVERT STORM DRAIN MANHOLE CATCH BASIN JUNCTION BOX SEWER MANHOLE SEWER CLEANOUT STORM DRAIN MANHOLE EXISTING ELEVATION RIGHT OF WAY TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION EXISTING SEWER PER CITY STANDARDS EXISTING SEWER MANHOLE TYPE "A" PER C.O.B. STD. SW-4. EXISTING SEWER CLEANOUT PER C.O.B. STD. SW-6. EXISTING STORM DRAIN PER CITY STANDARDS EXISTING STORM DRAIN MANHOLE TYPE *A* PER C.O.B. STD. SW-4 CONSTRUCT CATCH BASIN TYPE "'e PER C.O.B. STD. D-14. SECTION DESIGNATION: SEC11ON LETTER L. son nomemommmouna � lallllim SHEET WHERE SECTION IS SHOWN NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "An WITH 3.5" OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. we cn 9 CDC> -c;j— CD 0000 ++ n v)v) F- M 10 T 1. RAT O. 5444 M. BK.39, PG,, 98 1 VI 0 rn D — < °W co W- 0 z u- < r w � co 0 G: 0 U) cn 0 0 0 L RlJ 0 0& LAJ cn m cr)oi y+ in 44 Ut3 >W � _j Ucj >W � 0c.> C.> C) L_ • U) W w 0; _< CY M Pq U-10 _T_ m .yC6�/ + 5c6 LLJ < M cr_ U-i w (n ce 13- m W_ I-- Ow :z zm Ow C4 En Ln SECTION A SCALE.- 1" = 56 HORIZ. 1' = 5' PERT. 3 364 362 360 3,58 356 354 352 350 348 346 344 342 340 LEGEN.Q. 41 CL IN SD MH CB J13 SMH SCO SDMH EXIST El EV R/W �9T� .O.M. S 0 ABBREVIATIONS CENTERLINE INVERT STORM DRAIN MANHOLE CATCH BASIN JUNCTION BOX SEWER MANHOLE SEWER CLEANOUT STORM DRAIN MANHOLE EXISTING ELEVATION RIGHT OF WAY TOP OF MANHOLE/TOP OF CLEANOUT ELEVATION EXISTING SEWER PER CITY STANDARDS EXISTING SEWER MANHOLE TYPE "A" PER C.O.B. STD. SW-4. EXISTING SEWER CLEANOUT PER C.O.B. STD. SW-6. EXISTING STORM DRAIN PER CITY STANDARDS EXISTING STORM DRAIN MANHOLE TYPE *A* PER C.O.B. STD. SW-4 CONSTRUCT CATCH BASIN TYPE "'e PER C.O.B. STD. D-14. SECTION DESIGNATION: SEC11ON LETTER L. son nomemommmouna � lallllim SHEET WHERE SECTION IS SHOWN NOTES 1) ALL CATCH BASINS ARE TO BE TYPE "An WITH 3.5" OPENINGS PER C.O.B. STD. D-14. 2) ALL PIPE ELEVATIONS SHOWN ARE INVERT ELEVATIONS UNLESS OTHERWISE NOTED. we cn 9 CDC> -c;j— CD 0000 ++ n v)v) F- M 10 T 1. RAT O. 5444 M. BK.39, PG,, 98 1 VI 0 rn D — < °W co W- 0 z u- < r w � co 0 G: 0 U) cn 0 0 0 L DIG T Call: TOLL FREE I AT LEAST M DAYS BEFORE YOU DIG I UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA LAJ 44 0c.> C.> W 6 �lle p CY X w 01 5; w 5c6 LLJ DIG T Call: TOLL FREE I AT LEAST M DAYS BEFORE YOU DIG I UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA vlllllllllllll` %On N z co Z 4D < O ac p z w 0 z A'.04 uj cc CO > w U�~ a„� z�� C> cc a u. 0 z 00 0 2 J w ca � ~ W z w Cow al VJ 0 W W W 0) IL 0 LAJ Z 0c.> C.> W 6 �lle p 5; w 5c6 LLJ CC C4 En Ln 06 6 O cj LLJ J CA- 0- cl In LtJ to vlllllllllllll` %On N z co Z 4D < O ac p z w 0 z A'.04 uj cc CO > w U�~ a„� z�� C> cc a u. 0 z 00 0 2 J w ca � ~ W z w Cow al VJ 0 W W W 0) IL 0