Loading...
HomeMy WebLinkAboutFMC 2012MONITORING SYSTEM CERTIFICATION ssF For Use By All Jurisdictions Within the Slate ofCalifornia Authority Cited: Chapter 6 7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems within 30 days of this date. A. General Information Facility Name: Metro Station Site Address: 4600 Stine Road Facility Contact Person: Sam Bassem Make /Model of Monitoring System: Veeder -Root TLS 350 B. Inventory of Equipment Tested /Certified Check the appropriate boxes to indicate specific equipment inspected /serviced: City: Bakersfield Bldg. No.: Zip: 93309 Contact Phone No.: 661 - 496 -0838 Date of Testing/Servicing: 3/26/2012 Tank ID: 12000 gal. Regular 1 Tank ID: 12000 gal. Regular 2 xj In -Tank Gauging Probe. Model: 847390 -107X] In -Tank Gauging Probe. Model: 847390 -107 Lx] Annular Space or Vault Probe. Model: 794390-420 x] Annular Space or Vault Sensor. Model: 794390 -420 x] Piping Sump / Trench Sensor(s). Model: 794380-208 Piping Sump / Trench Sensor(s). Model: 794380 -208 Fill Sump Sensor(s) Model: Fill Sump Sensor(s). Model: J Mechanical Line Leak Detector. Model:FX1y U Mechanical Line Leak Detector. Model: FX1y Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: L] Tank Overfill / High Level Sensor. Model: 847390 -107 X] Tank Overfill / High Leval Sensor. Model: 847390 -107 Other (specify equip. type and model in Sec. E on Pg. 2) Other (specify equip. type and model in Sec. E on Pg. 2) Tank ID: _12000 gal. Super Tank ID: 12000 gal. Diesel x] In -Tank Gauging Probe. Model:847390 -107 Lx] In -Tank Gauging Probe. Model: 847390 -107 x] Annular Space or Vault Sensor. Model:794390 -420 x] Annular Space or Vault Sensor. Model: 794390 -420 X] Piping Sump / Trench Sensor(s). Model: 794380-208 Piping Sump / Trench Sensor(s). Model: 794380 -208 Fill Sump Sensors(s). Model: Fill Sump Sensor(s). Model: x_1 Mechanical Line Leak Detector. Model:FX1y Lx] Mechanical Line Leak Detector. Model: FX1Dy Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: Fx1 Tank Overfill / High Level Sensor. Model: 847390 -107 Lx] Tank Overfill / High Level Sensor. Model: 847390 -107 Other (specify equip. type and model in Sec. E on Pg. 2) Other (specify equip. typs and model in Sec. E on Pg. 2) Dispenser ID: 1 - 2 Dispenser ID: 3 - 4 F] Dispenser Containment Sensor(s). Model: 794380 -208 Dispenser Containment Sensor(s). Model: 794380 -208 X] Shear Valve(s). Lx] Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s) Dispenser ID: 5 - 6 Dispenser ID: 7 - 8 L] Dispenser Containment Sensor(s). Model: 794380 -208 Dispenser Containment Sensor(s). Model: 794380 -208 rx] Shear Valve(s). Shear Valve(s). Dispenser Containment Float(s) and Chains(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID: 9-10 Dispenser ID: xl Dispenser Containment Sensor(s). Model: 794380 -208 Dispenser Containment Sensor(s). Model: z] Shear Valve(s). Shear Valve(s). Dispenser Containment Float(s) and Chain(s) Dispenser Containment Float(s) and Chain(s). If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. C. Certification - I certify that the equipment identified in this document was inspected /services in accordance with the manufacturers' guidlines. Attached to this Certification is information (e.g. manufacturers' checklist) necessary to varify that this information is correct and a plot plan showing the layout of monitoring equipment. For equipment capable of generating such reports, I have attached a copy of the report; (check all that apply) x System Set -up Fx] Alarm history report Technician Name (print): Kristopher Karns Signature:,.i Certification No: 834106 License No: 804904 Testing Company Name: Confidence UST Services, Inc. Phone No: 800 - 339 -9930 Site Address: 4600 Stine Road, Bakersfield CA 93309 Date of Testing/Servicing: 3/26/2012 D. Results of Testing /Servicing Software Version Installed: 331.00 Complete the following checklist: UYes No* Is the audible alarm operational? x Yes No* Is the Visual alarm operational? x Yes No* Were all sensors visually inspected, functionally tested, and confirmed operational? x I Yes No* Were all sensors installed at the lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation? Yes No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) Hx N/A operational? x Yes No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary N/A containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initate positive shut -down? E Sump /Trench Sensors [x] Dispenser Containment Sensors Did you confirm positive shut -down due to leaks and sensor failure /disconnected? Lx] Yes; No; UYes No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visual and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capasity does the alarm trigger? 9p Yes* I_ I No Was any monitoring equipment replaced? If Yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name and model for all replacement parts in Section E, below. Yes* No Was liquid found inside any secondary containment systems designed as dry systems? Product; Water. Ifyes, describe causes in Section E, below. x No* Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable. LxJ Yes I E No* I Is all monitoring equipment operational per manufacturer's specifications? In Section E below, discribe how and when these deficiencies were or will be corrected. E. Comments: F. In -Tank Guaging / SIR Equipment: [X] Check this box if tank guaging is used only for inventory control. Check this box if tank guaging or SIR equipment is installed. This section must be completed if in -tank guaging equipment is used to perform leak detection monitoring. Complete the following checklist: X] Yes No* Has all input wiring been inspected for proper enter and termination, including testing for ground faults? x Yes No* Were all tank guaging probes visually inspected for damage and residue buildup? x Yes No* Was accuracy of system product level readings tested? x Yes No* Was accuracy of system water level readings tested? x Yes 7 No* Were all probes reinstalled properly? Lx] Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? In the Section H, below, describe how and when these deficiencies were or will be corrected. G. Line Leak Detectors (LLD): Check this box if LLD's are not installed. Complete the following checklist: L] Yes No* For equip. start-up or annual equipment certification, was a leak simulated to varify LLD performance? Check all that apply) Simulated leak rate: fx 3 g.p.h.: 00.1 g.p.h.; 00.2 g.p.h.; x Yes No* Were all LLD's confirmed operational and accurate within regulatory requirments? x Yes No* Waste testing apparatus properly calibrated? Yes No For machamca LLD's, does the LLD restrict product ow if it detects a leak? N/A Yes No* For electronic LLD's, does the turbine automatically shut off ifthe LLD detects a leak? Lx] N/A Yes No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is x] N/A disabled or disconnected? Yes No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system X] N/A malfunction or fails a test? Yes No* For electronic LLD's, have all accessible wiring connections been visually inspected? U N/A Lx] Yes I Ej No Were all items on the equipment manufacturer's maintenance checklist completed? In the section H, below, describe how and when these deficiencies were or will be corrected. H. Comments: METRO STATION 4600 STINE ROHD BAKERSFIELD. CA MAR 26, 2012 8:38 AM SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL INVENTORY REPORT T 1:REGULAR VOLUME = 4394 GALS ULLAGE = 7606 GALS 90% ULLAGE= 6406 GALS TC VOLUME — 4358 GALS HEIGHT = 38.03 INCHES WATER VOL = 0 GALS WATER = 0.00 INCHES TEMP = 71.0 DEG F T 2:REGULAR 2 VOLUME = 4342 GALS ULLAGE = 7658 GALS 90% ULLAGE= 6458 GALS TC VOLUME - 4308 GALS HEIGHT = 37.70 INCHES WATER VOL = 0 GALS WATER . 0.00 INCHES TEMP = 70.3 DEG F T 3:SUPER VOLUME = 2333 GALS ULLAGE = 9667 GALS 90% ULLAGE= 8467 GALS TC VOLUME = 2309 GALSHEIGHT = 24.03 INCHES WATER VOL - 0 GALS WATER m 0.00 INCHES TEMP = 73.3 DEG F T 4:DIESEL VOLUME - 2090 GALS ULLAGE = 9910 GALS 90% ULLAGE= 8710 GALS TC VOLUME = 2078 GALS HEIGHT = 22.23 INCHES WATER VOL = 14 GALS WATER = 0.77 INCHES TEMP = 72.0 DEG F MANIFOLDED TANKS INVENTORY TOTALS T I:REGULAR I T 2:REGULAR 2 VOLUME = 8736 GALS TC VOLUME - 8665 GALS x x iO x« END x o x 4 SOFTWARE REVISION LEVEL VERSION 331.00 SOFTWAREit 346331 -100 —A CREATED — 11.0'2.10.12.31 S— MODULE4 330160 -004—a SYSTEM FEATURES: PERIODIC IN —TANK TESTS ANNUAL IN —TANK TESTS ISD /APM SYSTEM SETUP MAR 26. 2012 8 :39 AM SYSTEM UNITS U.S. SYSTEM LANGUAGE ENGLISH SYSTEM DATE. %TIME FORMAT MON DD YYYY HH:MM:SS XM METRO STATION 4600 STINE ROAD BAKERSFIELD• CA SHIFT TIME I DISABLED SHIFT TIME 2 DISABLED SHIFT TIME 3 DISABLED SHIFT TIME 4 : DISABLED TANK PER TST NEEDED WRN DISABLED TANK. ANN TST NEEDED WRN DISABLED LINE RE— ENABLE METHOD PASS LINE TEST LINE PER TST NEEDED WRN DISABLED LINE ANN TST NEEDED WRN DISABLED PRINT TC VOLUMES ENABLED TEMP COMPENSATION VALUE (DEG F ): 60.0 STICK HEIGHT OFFSET DISABLED ULLAGE: 90% H— PROTOCOL DATA FORMAT HEIGHT DAYLIGHT SAVING TIME DISABLED RE— DIRECT LOCAL PRINTOUT DISABLED LUNU PXO'1'0(_:OL PREFIX S SYSTEM SECURITY CODE : 000000 MAINTENANCE HISTORY DISABLED TANK CHART SECURITY DISABLED CUSTOM ALARMS DISABLED SERVICE NOTICE DISABLED ISO 3166 COUNTRY CODE: VAPOR MONITORING TYPE CARD I SD MASS./DENSITY DISABLED COMI °IUI4IC :AT IONS SETUP IN -TANK SETUP T 2:REGULAR 2 PRODUCT CODE 2 THERMAL C:OEFF :.000750 T 1:REGULAR 1 TANK DIAMETER 96.50 PORT SETTINGS: PRODUCT CODE I TANK PROFILE 1 PT THERMAL COEFF :.000750 FULL VOL 12000 COMM BOARD 1 (EUIP1 > TANK DIAMETER 96.50 RS-232 SECURITY TANK PROFILE 1 PT CODE : DISABLED FULL VOL 12000 FLOAT SIZE: 4.0 IN. Comm BOARD 2 (RS -232) WATER WARNING 2.0 BAUD RATE 9600 FLOAT SIZE: 4.0 IN. HIGH WATER LIMIT: 3.0 PARITY : NONE WATER ALARM FILTER: LOW STOP BIT I STOP WATER WARNING 1.5 DATA LENGTH: 8 DATA HIGH WATER LIMIT: 3.0 MAX OR LABEL VOL: 12000 RS -232 SECURITY WATER ALARM FILTER: LOW OVERFILL LIMIT 90°i CODE : DISABLED 10800 MAX OR LABEL VOL: 12000 HIGH PRODUCT 95% OVERFILL LIMIT 900 11400 AUTO TRANSMIT SETTINGS: A 10800 DELIVERY LIMIT 15% HIGH PRODUCT 95`' 1800 AUTO LEAK ALARM LIMIT 11400 DISABLED DELIVERY LIMIT 15e LOW PRODUCT 400 AUTO HIGH WATER LIMIT 1800 LEAK ALARM LIMIT: 99 DISABLED SUDDEN LOSS LIMIT: 99 AUTO OVERFILL LIMIT LOW PRODUCT 400 TANK TILT 0.00 DISABLED LEAK ALARM LIMIT: 99 PROBE OFFSET 0.00 AUTO LOW PRODUCT SUDDEN LOSS LIMIT: 99 DISABLED TANK TILT 0.00 AUTO THEFT LIMIT PROBE OFFSET 0.00 SIPHON MANIFOLDED TANKS DISABLED TO: NONE AUTO DELIVERY START LINE MANIFOLDED TANKS DISABLED SIPHON MANIFOLDED TANKS TO: 01 AUTO DELIVERY END T#: NONE DISABLED LINE MANIFOLDED TANKS AUTO EXTERNAL I Nl ON TO: 02 LEAK 11111 PERIODIC: 014 DISABLED 0 AUTO EXTERNAL INPUT OFF DISABLED LEAK MI14 PERIODIC: ov, LEAK MIN ANNUAL 0 °/. AUTO SENSOR FUEL ALARM 0 0 DISABLED AUTO SENSOR WATER ALARM LEAK MIN ANNUAL 0x DISABLED 0 PERIODIC TEST TYPE AUTO SENSOR. OUT ALARM STANDARD DISABLED PERIODIC TEST TYPE ANNUAL TEST FAIL STANDARD ALARM DISABLED ANNUAL TEST FAIL PERIODIC TEST FAIL ALARM DISABLED ALARM DISABLED PERIODIC: TEST FAIL GROSS TEST FAIL ALARM DISABLED ALARM DISABLED RS -232 END OF MESSAGE DISABLED GROSS TEST FAIL ANN TEST AVERAGING: OFF ALARM DISABLED PER TEST AVERAGING: OFF ANN TEST AVERAGING: OFF TANK TEST NOTIFY: OFF PER TEST AVERAGING: OFF TNK TST SIPHON bREAK:OFF TANK TEST NOTIFY: OFF DELIVERY DELAY 5 MIN TNK TST SIPHON BREAK.:OFF PUMP THRESHOLD 10.00 DELIVERY DELAY 5 MIN PUMP THRESHOLD 10.00% T 3:SUPER PRODUCT CODE 3 THERMAL COEFF 000750 TANK DIAMETER 96.50 TANK PROFILE I PT FULL VOL 12000 FLOAT SIZE: 4.0 IN. WATER WARNING 1.5 HIGH WATER LIMIT: 2.0 WATER ALARM FILTER: LOW MAX OR LABEL VOL: 12000 OVERFILL LIMIT 90: 10800 HIGH PRODUCT 95% 11400 DELIVERY LIMIT 151% 1800 LOW PRODUCT 400 LEAK ALARM LIMIT: 99 SUDDEN LOSS LIMIT: 99 TANK TILT 0.00 PROBE OFFSET 0.00 SIPHON MANIFOLDED TANKS Td: NONE LINE MANIFOLDED TANKS TO: NONE 1 LEAK MIN PERIODIC: LEAK MIN ANNUAL : F 0• 0 PERIODIC TEST TYPE STANDARD ANNUAL TEST FAIL ALARM DISABLED PERIODIC TEST FAIL ALARM DISABLED GROSS TEST FAIL ALARM DISABLED ANN TEST AVERAGING: OFF PER TEST AVERAGING: OFF TANK T1ST NOTIFY: OFF TNK TST SIPHON BREAK:OFF DELIVERY DELAY 5 MIN PUMP THRESHOLD 10.00% T 4:DIESEL PRODUCT CODE 4 THERMAL COEFF 000450 TANK DIAMETER 96.50 TANK PROFILE 1 PT FULL VOL 12000 FLOAT SIZE: 4.0 IN. WATER WARNING 2.0 HIGH WATER LIMIT: 3.0 WATER ALARM FILTER: LOW MAX OR LABEL VOL: 12000 OVERFILL LIMIT 90% 10800 HIGH PRODUCT 95% 11400 DELIVERY LIMIT 15% 1800 LOW PRODUCT 400 LEAK ALARM LIMIT: 99 SUDDEN LOSS LIMIT: 99 TANK TILT 0.00 PROBE OFFSET 0.00 SIPHON MANIFOLDED TANKS Td: NONE LINE MANIFOLDED TANKS TO: NONE LEAK MIN PERIODIC: 0% 0 PERIODIC TEST TYPE STANDARD PERIODIC TEST FAIL ALARM DISABLED GROSS TEST FAIL ALARM DISABLED PER TEST AVERAGING: OFF TANK TEST NOTIFY: OFF TNK TST SIPHON BREAK:OFF DELIVERY DELAY 5 MIN PUMP THRESHOLD 10.00% LEAK TEST METHOD TEST ON DATE : ALL TANK. FEB 10, 2011 START TIME : DISABLED TEST RATE :0.20 GAL /HR DURATION : 2 HOURS TST EARLY STOP:DISABLED LEAK TEST REPORT FORMAT NORMAL LIQUID SENSOR SETUP L 1:DISP 1 -2 TRI -STATE (SINGLE FLOAT) CATEGORY : DISPENSER PAN L 2:DISP 3 -4 TRI -STATE (SINGLE FLOAT) CATEGORY : DISPENSER PAN L 3:D1SP 5 -6 TRI -STATE (SINGLE FLOAT) CATEGORY : DISPENSER FIA14 L 4:DISP 7 -8 TRI -STATE (SINGLE FLOAT) CATEGORY : DISPENSER PAN L 5:DISP 9 -10 TRI -STATE (SINGLE FLOAT) CATEGORY : DISPENSER PAN L 9:REGULAR I STP TRI -STATE (SINGLE FLOAT) CATEGORY : STP SUMP L10:REGULAR I ANN TRI -STATE (SINGLE FLOAT) CATEGORY : AN14ULAR SPACE L11:REGULAR 2 STP TRI -STATE (SINGLE FLOAT) CATEGORY : STP SUMP L12 :REGULAR 2 ANN TRI -STATE (SINGLE FLOAT) CATEGORY : ANNULAR SPACE L13:SUPER STP TRI -STATE (SINGLE FLOAT) CATEGORY : STP SUMP L14:SUPER ANN TRI -STATE (SINGLE FLOAT) CATEGORY : ANNULAR SPACE L15:DIESEL STP TRI -STATE (SINGLE FLOAT) CATEGORY : STP SUMP L16:DIESEL ANN TRI -STATE (SINGLE FLOAT) CATEGORY : ANNULAR SPACE X e: Xh(.xULHK e TYPE: R 3 :SUPER PUMP SENSOR SETUP PUMP CONTROL OUTPUT TYPE: TANK #: 2 STANDARD NORMALLY CLOSED S I:REGULAR i TANK #: 1 DISPENSE MODE: MANIFOLDED: ALTERNATE S 2 :REGULAR 2 TANK #: 2 DISPENSE MODE: MANIFOLDED: ALTERNATE OUTPUT RELAY SETUP R 1:REGULAR I TYPE: PUMP CONTROL OUTPUT TANK #: I IN-TANK ALARMS T I :HIGH WATER ALARM T t:LOW PRODUCT ALARM LIQUID SENSOR ALMS L 2 :FUEL ALARM L 3 :FUEL ALARM L 4 :FUEL ALARM L 5:FUEL ALARM L 9:FUEL ALARM L11:FUEL ALARM L 2:SENSOR OUT ALARM L 3:SENSOR OUT ALARM L 4:SENSOR OUT ALARM L 5:SENSOR OUT ALARM L 9:SENSOR OUT ALARM LII:SENSOR OUT ALARM L 2 :SHORT ALARM L 3:SHORT ALARM L 4:SHORT ALARM L 5:SHORT ALARM L 9:SHORT ALARM L11:SHORT ALARM ISD SITE ALARMS ISD GROSS PRES FAIL ISD DEGRD PRES FAIL ISD VAPOR LEAK FAIL ISD VP PRES FAIL ISD VP STATUS FAIL ISD SETUP FAIL ISD SENSOR OUT FAIL PC -ISD FAILURE ISD HOSE ALARMS ALL :GROSS COLLECT FAIL ALL:DEGRD COLLECT FAIL ALL :FLOW COLLECT FAIL IN -TANK ALARMS T 2:HIGH WATER ALARM T 2:LOW PRODUCT ALARM LIQUID SENSOR ALMS L 2:FUEL ALARM L 3:FUEL ALARM L 4:FUEL ALARM L 5:FUEL ALARM L 9:FUEL ALARM L11:FUEL ALARM L 2:SENSOR OUT ALARM L 3:SENSOR OUT ALARM L 4 :SENSOR OUT ALARM L 5:SENSOR OUT ALARM L 9:SENSOR OUT ALARM LII:SENSOR OUT ALARM L 2:SHORT ALARM L 3:SHORT ALARM L 4:SHORT ALARM L 5:SHORT ALARM L 9:SHORT ALARM LII:SHORT ALARM ISD SITE ALARMS ISD GROSS PRES FAIL ISD DEGRD PRES FAIL ISD VAPOR LEAK FAIL ISD VP PRES FAIL ISD VP STATUS FAIL ISD SETUP FAIL ISD SENSOR OUT FAIL PC -ISD FAILURE ISD HOSE ALARMS ALL:GROSS COLLECT FAIL ALL:DEGRD COLLECT FAIL ALL:FLOW COLLECT FAIL TA14K 0: 3 IN -TANK ALARMS T 3:HIGH WATER ALARM T 3:LOW PRODUCT ALARM LIQUID SENSOR ALMS L 2:FUEL ALARM L 3:FUEL ALARM L 4:FUEL ALARM L 5:FUEL ALARM L13:FUEL ALARM L 2:SENSOR OUT ALARM L 3:SENSOR OUT ALARM L 4:SENSOR OUT ALARM L 5:SENSOR OUT ALARM L13:SENSOR OUT ALARM L 2:SHORT ALARM L 3:SHORT ALARM L 4:SHORT ALARM L 5:SHORT ALARM L13:9HORT ALARM ISD SITE ALARMS ISD GROSS PRES FAIL ISD DEGRD PRES FAIL ISD VAPOR LEAK FAIL ISD VP PRES FAIL ISD VP STATUS FAIL ISD SETUP FAIL ISD SENSOR OUT FAIL PC -ISD FAILURE ISD HOSE ALARMS ALL:GROSS COLLECT FAIL ALL:DEGRD COLLECT FAIL ALL:FLOW COLLECT FAIL R 4:DIEBEL TYPE: STANDARD NORMALLY CLOSED TANK #: 4 IN -TANK ALARMS T 4:HIGH WATER ALARM T 4:LOW PRODUCT ALARM LIQUID SENSOR ALMS L 1:FUEL ALARM L 2:FUEL ALARM L 3:FUEL ALARM L15:FUEL ALARM L I:SENSOR OUT ALARM L 2 :SENSOR OUT ALARM L 3:SENSOR OUT ALARM L15 :SENSOR OUT ALARM L 1:SHORT ALARM L 2:SHORT ALARM L 3:SHORT ALARM L15:SHORT ALARM R 5 :OVERFILL ALARM TYPE: STANDARD NORMALLY OPEN TANK #: NONE IN -TANK ALARMS ALL:OVERFILL ALARM ALL:HIGH PRODUCT ALARM ISD EVR./ISD SETUP METER MAP 1D SERIAL NUM LABEL PMC SETUP ALARM HISTORY REPORT 1 40348 PMC VERSION: 01.04 EVR TYPE: BALANCE 40070 VAPOR PROCESSOR TYPE SENSOR ALARM --- -- BALANCE NOZZLE TYPE FM 7 -8 VEEDER -ROUT POLISHER 4 UST FM 9 -10 DISPENSER PAN SMARTSENSOR SETUP FUEL ALARM VAPOR PROCESSOR TYPE FUEL GRADE HOSE MAP VEEDER -ROOT POLISHER 3 4 SETUP DATA WARNING FP 3 2:FM 3 -4 MHH MHH AA MAY 17, 2011 8:50 AM 01 1 0 0 0 CATEGORY AIR FLOW METER 02 2 0 0 0 U U U U 0 ANALYSIS TIMES 201 101 901 3 U l s 3:FM 5 -6 TIME: 11:59 PM 902 3 U 1 05 CATEGORY AIR FLOW METER DELAY MINUTES: t 06 204 104 904 3 U 2 07 105 905 SOFTWARE REVISION LEVEL s 4:FM 7 -8 08 206 106 906 U U 3 VERSION 331.00 CATEGORY AIR FLOW METER ACCEPT HIGH ORVR: 907 U U 4 SOFTWARE# 346331-100 -A 208 108 DISABLED x END CREATED - 11.02.10.12.31 s 5: FM 9 -10 CATEGORY AIR FLOW METER ISD HOSE TABLE S- MODULE# 330160 -004 -a ID FP FL HL AA RR SYSTEM FEATURES: s 6:VP PRESSURE SEN. PERIODIC IN -TANK TESTS CATEGORY VAPOR PRESSURE 01 03 03 02 01 01 ANNUAL IN -TANK TESTS 02 04 04 02 01 01 ISD /APM s 7 :CANISTER 03 05 05 02 02 Ol CATEGORY VAPOR VALVE 04 06 06 02 02 01 05 07 07 02 03 01 s B:ATM P SENSOR 06 08 08 02 03 01 CATEGORY ATM P SENSOR 07 09 09 02 04 01 08 16 10 02 04 01 ISD AIRFLOW METER MAP 1D SERIAL NUM LABEL ALARM HISTORY REPORT 1 40348 FM 3 -4 2 40070 FM 5 -6 SENSOR ALARM --- -- 3 40350 FM 7 -8 L i:DISP 1 -2 4 40356 FM 9 -10 DISPENSER PAN FUEL ALARM OCT 13, 2011 5 :52 AM ISD FUEL GRADE HOSE MAP 1 2 3 4 SETUP DATA WARNING FP MHH MHH MHH MHH AA MAY 17, 2011 8:50 AM 01 1 0 0 0 U U U U 0 02 2 0 0 0 U U U U 0 03 201 101 901 3 U l 04 202 102 902 3 U 1 05 203 103 903 3 U 2 06 204 104 904 3 U 2 07 105 905 205 U U 3 08 206 106 906 U U 3 09 207 107 907 U U 4 16 208 108 908 U U 4 x END LABEL TABLE 1: UNASSIGNED 2: BLEND3 3: REGULAR 4: MID GRADE 5: PREMIUM 6: GOLD 7: BRONZE 8: SILVER 9: BLEND2 10: BLEND4 ALARM HISTORY REPORT ALARM HISTORY REPORT SENSOR ALARM - - - -- _____ SENSOR ALARM - - - -- L I:DIS 1 L 4:DISP 7 -8DISPENSERRPAAN FUEL ALARM DISPENSER PAN OCT 13. 2011 5 :52 AM SETUP DATA WARNING MAY 17. 2011 5:50 AM SETUP DATA WARNING MAY 17, 2011 5:50 AM x x x* END x x x x x x x x x x END A x* x x ALARM HISTORY REPORT ALARM HISTORY REPORT - - - -- SENSOR ALARM - - - -- L 5:DISP 9 -10 SENSOR ALARM - - - -- DISPENSER PAN L 2:DISP 3 -4 SETUP DATA WARNING DISPENSER PAN MAY 17, 2011 5:50 AM SETUP DATA WARNING MAY 17, 2011 5:50 AM x x x x x END x* x x x x x x x* END x* A x x ALARM HISTORY REPORT ALARM HISTORY REPORT ----- SENSOR ALARM - - - -- L 9:REGULAR 1 STP SENSOR ALARM - - - -- STP SUMP L 3:DISP 5 -6 FUEL ALARM DISPENSER PAN MAR 12, 2012 7:19 PM SETUP DATA WARNING SENSOR OUT ALARMMAY17. 2011 8:50 HM MAR 12. 2012 6:22 PM SENSOR OUT ALARM MAR 12. 2012 12:31 PM x x x ** END * ** x x 0 x 4 x x END **** x ALARM HISTORY REPORT SENSOR ALARM - - - -- LIO:REGULAR 1 ANN ANNULAR SPACE FUEL ALARM MAR 12, 2012 7:23 PM SENSOR OUT ALARM MAR 12. 2012 11:49 AM SENSOR OUT ALARM MAR 12, 2012 11:45 AM x x x* x END * x x x x ALARM HISTORY REPORT SENSOR ALARM - - - -- L12:REGULAR 2 ANN ANNULAR SPACE FUEL ALARM MAR 12, 2012 7:24 PM SENSOR OUT ALARM MAR 12, 2012 11:43 AM SENSOR OUT ALARM MAR 11, 2012 9:35 PM x x x* x END * x* x* ALARM HISTORY REPORT ALARM HISTORY REPORT ALARM HISTORY REPORT SENSOR ALARM - - - -- L11:REGULAR 2 STP STP SUMP FUEL ALARM MAR 12, 2012 7:18 PM SENSOR OUT ALARM MAR 12. 2012 11:44 AM SENSOR OUT ALARM MAR 12. 2012 10:58 AM x x x x x END x x x x x ALARM HISTORY REPORT SENSOR ALARM - - - -- L12:REGULAR 2 ANN ANNULAR SPACE FUEL ALARM MAR 12, 2012 7:24 PM SENSOR OUT ALARM MAR 12, 2012 11:43 AM SENSOR OUT ALARM MAR 11, 2012 9:35 PM SENSOR ALARM - - - -- L13:SUPER STP STP SUMP FUEL ALARM MAR 12, 2012 7:20 PM SENSOR OUT ALARM MAR 12, 2012 10:11 AM SENSOR OUT ALARM FEB 22, 2012 11:16 AI ^1 x x x x x END x x x x x ALARM HISTORY REPORT SENSOR ALARM - - - -- L14:SUPER ANN ANNULAR SPACE FUEL ALARM MAR 12, 2012 7:21 PM SENSOR OUT ALARM MAR 12, 2012 11:43 AM SENSOR OUT ALARM MAR 12, 2012 9:06 AM SENSOR ALARM - - - -- L15:DIESEL STP STP SUMP FUEL ALARM MAR 12, 2012 7:17 PM SENSOR OUT ALARM MAR 12, 2012 11:50 AM FUEL ALARM MAR 12, 2012 10:56 AM x x x x x END x x x x x ALARM HISTORY REPORT SENSOR ALARM - - - -- L16:DIESEL ANN ANNULAR SPACE FUEL ALARM MAR 12. 2012 7:25 PM SENSOR OUT ALARM MAR 12, 2012 12:02 PM SENSOR OUT ALARM MAR 12. 2012 11:49 AM x x x x x END x x x x x x x x x x END x x x x x x x x x x END x x x x x IN -TANK ALARM - - - -- - - -- I14 -TANK ALARM - -- - - - - -- SENSOR ALARM - - - -- T 3:SUPER T 4:DIESEL L 2:DISP 3 -4 DELIVERY NEEDED PROBE OUT DISPENSER PAN MAR 26, 2012 9:11 AM MAR 26, 2012 9:15 AM FUEL ALARM MAR 26, 2012 9:25 AM IN -TANK ALARM - - - -- - - - -- SENSOR ALARM - - - -- T 3:SUPER L13:SUPER STP - - - -- SENSOR ALARM - - - -- PROBE OUT STP SUMP L 3:DISP 5 -6 MAR 26. 2012 9:11 AM FUEL ALARM DISPENSER PAN MAR 26, 2012 9: 21 All FUEL ALARM MAR 26, 2012 9:27 AM IN -TANK ALARM - - - -- T 1:REGULAR I ----- SENSOR ALARM - - - -- SUDDEN LOSS ALARM L 9:REGULAR 1 STP - - - -- SENSOR ALARM - - - -- MAR 26. 2012 9:12 AM STP SUMP L 4:DISP 7 -8 FUEL ALARM DISPENSER PAN MAR 26, 2012 9 :21 All FUEL ALARM MAR 26. 2012 9:2B AM IN -TANK ALARM - - - -- T 1:REGULAR I PROBE OUT --- -- SENSOR ALARM - - - -- MAR 26. 2012 9:12 AI °1 LII:REGULAR 2 STP - - - -- SENSOR ALARM - - - -- STP SUMP' L 5:DISP 9 -10 FUEL ALARM DISPENSER PAN MAR 26, 2012 9:23 AM FUEL ALARM MAR 26, 2012 9:30 AM IN -TANY ALARM - - - -- T 2:REGULAR 2 SUDDEN LOSS ALARM MAR 26. 2012 9:13 AM SENSOR ALARM - - - -- L15:DIESEL STP - - - -- SENSOR ALARM - - - -- STP SUMP L14:SUPER ANN FUEL ALARM ANNULAR SPACE MAR 26, 2012 9:24 AM FUEL ALARM MAR 26. 2012 9:31 A("I IN -TANK: ALARM - - - -- T 2:REGULAR 2 PROBE OUT MAR 26, 2012 9:13 AM SENSOR ALARM - - - -- L I:DISP 1 -2 - - - -- SENSOR ALARM - - - -- DISPENSER PAN L10:REGULAR l ANN FUEL ALARM ANNULAR SPACE MAR 26. 2012 9:25 AM FUEL ALARM MAR 26. 2012 9:32 AM IN -TANX ALARM - - - -- T 4:DIESEL DELIVERY NEEDED MAR 26. 2012 9:15 AM SENSOR ALARM - - - -- - - - -- SENSOR ALARM ----- L12:REGULAR 2 AIVN L S:DISP 9-10 - - --- SENSOR ALARM - - - -- ANNULAR SPACE DISPENS L 4:DISP 7 -8EkFANDISPENSERPANFUELALARMSENSOROUTALARMMAR26, 2012 9:32 AM MAR 26, 2012 9 :41 AM SENSOR OUT ALARM MAR 26, 2012 9:41 AM SENSOR ALARM - - - -- - - - -- SENSOR ALARM - - - -- _____ SENSOR ALARML16:DIESEL ANN L15:DIESEL STP ----- GULAR 2 SAPANNULARSPACESTPSUMPLIISUMPFUELALARMSENSOROUTALARMSENSOROUTALARMMAR6. 2012 9:33 AM MAR 26, 2012 9:41 All MAR 26, 2012 9:41 All IN -TANK ALARM - - - -- - - - -- SENSOR ALARM - - - -- T 4:O1ESEL L16 :DIESEL ANN ----- SENSOR ALARM - - --- PROBE OUT ANNULAR SPACE L12:REGULAR 2 ANN MAR 26. 2012 9:37 AM SENSOR OUT ALARM ANNULAR SPACE LIAR 26, 2012 9:41 All SENSOR OUT ALARM MAR 26, 2012 9:41 AM SENSOR ALARM - - - -- Ll3:SUPER STP - - - -- SENSOR ALARM - - - -- STP SUMP LlO:REGULAR 1 ANN - - - -- SENSOR ALARM - - - -- SENSOR OUT ALARM ANNULAR SPACE L 2 :DISP 3-4 MAR 26. 2012 9:40 AM SENSOR OUT ALARM DISPENSER PAN MAR 26, 2012 9:41 All SENSOR OUT ALARNI MAR 26, 2012 9:41 AM SENSOR ALARM - - - -- L 9:REGULAR I STP - - - -- SENSOR ALARM - - - -- STP SUMP L 1'DI6F' 1 -2 - -~ IN -TANK ALARM - - - -- SENSOR OUT ALARM DISPENSER PAN T 3:SUPER MAR 26. 2012 9:41 All SENSOR OUT ALARM OVERFILL ALARM MAR 26, 2012 9:41 All MAR 26. 2012 9:46 AM SENSOR ALARM - - - -- IN-TANK ALARM - - - -- L14 :SUPER ANN - - - -- SENSOR ALARM - - --- -- T -:SUPERANNULARSPACEL3:DISP 5 -6 PROBE OUTSENSOROUTALARMDISPENSERPANMAR26, 2012 9:47 AllMAR26. 2012 9 :41 All SENSOR OUT ALARI °M MAR 26, 2012 9:41 AM IN-TANK ALARM - - - -- T 4:DIESEL HIGH WATER WARNING MAR 26, 2012 9:47 AM IN -TANK ALARM - - - -- T 1:REGULAR 1 OVERFILL ALARM MAR 26. 2012 9:49 AM 114-TANK ALARM - - - -- T 1:REGULAR 1 PROBE OUT MAR 26. 2012 9:49 All T 3:SUPER INVENTORY INCREASE INCREASE START MAR 26, 2012 9:45 All VOLUME = 8278 GALS HEIGHT - 62.87 INCHES WATER = 0.00 INCHES TEMP = 52.5 DEG F INCREASE END MAR 26, 2012 9:52 All VOLUME - 10865 GALS HEIGHT - 81.97 INCHES WATER = 0.00 INCHES TEMP m 52.5 DEG F GROSS INCREASE= 2587 TO NET INCREASE= 2601 METRO STATION 4600 STINE ROAD BAKERSFIELD. CA MAR 26. 2012 9:53 AM SYSTEM STATUS REPORT T 4:HIGH WATER WARNING IN -TANK ALARM - - - -- T 2:REGULAR 2 SUDDEN LOSS ALARM MAR 26, 2012 9:54 AM T I:REGULAR 1 INVENTORY INCREASE INCREASE START MAR 26, 2012 9:49 AM VOLUME = 0 GALS HEIGHT = 0.00 INCHES WATER = 0.00 INCHES TEMP 0.0 DEG F INCREASE END MAR 26, 2012 9:55 All VOLUME = 10819 GALS HEIGHT = 81.57 INCHES WATER v 0.00 INCHES TEMP = 63.2 DEG F GROSS INCREASE- 10819 TO NET INCREASE= 10793 T 2.:REGULAR 2 INVENTORY INCREASE INCREASE START MAR 26, 2012 9:49 All VOLUME = 8973 GALS HEIGHT = 67.56 INCHES WATER = 0.00 INCHES TEPIP = 63.1 DEC; F INCREASE END MAR 26. 2012 9 :55 All VOLUME = 8973 GALS HEIGHT - 67.56 INCHES WATER = 0.00 INCHES TEMP = 63.0 DEG F GROSS INCREASE= 0 TO NET INCREASE- 0 MANIFOLDED TANKS INVENTORY INCREASE T 1 :REGULAR 1 T 2:REGULAR 2 VOLUME - 10619 GALS METRO STATION 4600 STINE ROAD - --- IN -TANK ALARM - - - -- IN -TANK ALARM - - - -- BAKERSFIELD, CA T 2:REGULAR 2 T 4:DIESEL OVERFILL ALARM OVERFILL ALARM MAR 26. 2012 9:57 All MAR 26, 2012 9:55 All MAR 26. 2012 9:57 AM SYSTEM STATUS REPORT T 2:OVERFILL ALARM INVENTORY REPORT IN -TANK ALARM - - - -- IN -TANK ALARM - - - -- T 2:REGULAR 2 T 4:DIESEL PROBE OUT PROBE OUT T !:REGULAR 1 MAR 26. 2012 9:58 AM MAR 26. 2012 9:55 AM VOLUME = 4390 GALS ULLAGE - 7610 GALS 90 % ULLAGE - 6410 GALS TO VOLUME - 4355 GALS HEIGHT = 38.00 INCHES WATER VOL - 0 GALS WATER - 0.00 INCHES TEMP = 70.5 DEG F METRO STATION IN -TANK ALARM - - - -- T 2 :REt3ULAR 2 4600 STINE ROAD T 4:DIESEL VOLUME 11229 GALS BAKERSFIELD, CA INVALID FUEL LEVEL ULLAGE 771 GALS MAR 26, 2012 9:56 AM 90% ULLAGE- 0 GALS TO VOLUME - 11192 GALS MAR 26, 2012 10:01 AM HEIGHT - 85.36 INCHES WATER VOL - 0 GALS WATER = 0.00 INCHES TEMP = 64.3 DEG F SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL T 3:SUPER VOLUME = 2335 GALS IN -TANK ALARM - - - -- ULLAGE = 9665 GALS T 4:DIESEL 90% ULLAGE= 8465 GALS DELIVERY NEEDED TO VOLUME - 2312 GALS MAR 26, 2012 9:56 AM HEIGHT = 24.05 INCHES WATER VOL = 0 GALS WATER = 0.00 INCHES TEMP - 72.8 DEG F T 4:DIESEL I 14VE14TORY INCREASE T 4:DIESEL VOLUME = 2114 GALS INCREASE START ULLAGE = 9886 GALS MAR 26. 2012 9:54 AM 90% ULLAGE- 8686 GALS METRO STATION Tr_. VOLUME - 2106 GALS VOLUME - 9831 GALS 4600 STINE ROAD HEIGHT = 22.41 INCHES HEIGHT - 73.67 INCHES BAKERSFIELD. CA WATER VOL = 21 GALS WATER = 0.00 INCHES WATER 1.01 INCHES TEMP m 64.4 DEG F TEMP = 67.8 DEG F MAR 26. 2012 9:57 AM INCREASE END MANIFOLDED TANKS MAR 26, 2012 10:01 AM INVENTORY TOTALS SYSTEM STATUS REPORT T I:REGULAP. I VOLUME - 11264 GALS T 2:REGULAR 2 HEIGHT - 85.70 INCHES ALL FUNCTIONS NORMAL VOLUME - 15620 GALS WATER = 0.00 INCHES TO VOLUME - 15548 GALS TEMP = 64.4 DEC; F x END GROSS INCREASE- 1433 TO NET INCREASE- 1430 T I:REGULAR I INVENTORY INCREASE INCREASE START MAR 26. 2012 9 :57 AM VOLUME s 4390 GALS HEIGHT - 38.00 INCHES WATER = 0.00 INCHES TEMP m 70.4 DEC F INCREASE END MAR 26. 2012 10:03 AM VOLUME = 4390 GALS HEIGHT = 38.00 INCHES WATER - 0.00 INCHES TEMP = 70.6 DEG F GROSS INCREASE= 0 TO NET INCREASE= 0 T 2:REGULAR 2 INVENTORY INCREASE INCREASE START MAR 26, 2012 9:57 AM VOLUME e 7234 GALS HEIGHT - 56.08 INCHES WATER - 0.00 INCHES TEMP = 64.6-DEG F INCREASE END MAR 26, 2012 10:03 AM VOLUME = 11231 GALS HEIGHT = 85.38 INCHES WATER = 0.00 INCHES TEMP = 64.3 DEC, F GROSS INCREASE- 3997 TO NET INCREASE- 3985 MANIFOLDED TANKS INVENTORY INCREASE T I :REGULAR 1 T 2:REGULAR 2 VOLUME e 3997 GALS SENSOR ALARM L 9:REGULAR 1 STP STP SUMP FUEL ALARM MAR 26, 2012 10:10 AM SENSOR ALARM - - - -- L11:REGULAR 2 STP STP SUMP FUEL ALARM HAR 26, 2012 10:16 AM PUMP SENSOR SETUP S 1 : REi: ULAR 1 TANK #: I DISPENSE MODE: MANIFOLDED: ALTERNATE S 2 : REGULAR 2 TANK #: 2 DISPENSE MODE: MANIFOLDED: ALTERNATE METRO STATION 4600 STINE ROAD METRO STATION BAKERSFIELD, CA 4600 STINE ROAD BAKERSFIELD, CA MAR 26, 2012 11:46 AM PbaR 26, 2012 3:13 FM SYSTEM STATUS REPORT SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL ALL FUNCTIONS NORMAL INVENTORY REPORT INVENTORY REPORT T I :REGULAR l VOLUME = 4383 GALS T 1:REGULAR 1 ULLAGE - 7617 GALS VOLUME = 4163 GALS 90% ULLAGE= 6417 GALS ULLAGE = 7837 GALS TC VOLUME - 4346 GALS 90 % ULLAGE- 6637 GALS HEIGHT - 37.96 INCHES TO VOLUME - 4128 GALS WATER VOL = 0 GALS HEIGHT - 36.53 1NCHES WATER - 0.00 INCHES WATER VOL - 0 GALS TEMP = 71.0 DEG F WATER e 0.00 INCHES TEMP - 71.0 DEG F T 2:REGULAR 2 VOLUME = 4342 GALS T 2 :REGULAR 2 ULLAGE = 7658 GALS VOLUME - 4180 GALS 90% ULLAGE 6458 GALS ULLAGE = 7820 GALS TO VOLUME - 4306 GALS 90% ULLAGE - 6620 GALS HEIGHT = 37.70 INCHES TC_VOLUME_- 41.47 GALS WATER VOL - 0 GALS HEIGHT = 36.64 INCHES WATER = 0.00 INCHES WATER VOL - 0 GALS TEMP - 70.3 DEG F WATER = 0.00 INCHES TEMP - 70.3 DEG F T 3:SUPER VOLUME = 2335 GALS T 3:SUPER ULLAGE - 9665 GALS VOLUME = 2323 GALS 90% ULLAGE- 8465 GALS ULLAGE - 9677 GALS TO VOLUME = 2311 GALS 90% ULLAGE- 8477 GALS HEIGHT = 24.04 INCHES TC VOLUME = 2299 GALS WATER VOL - 0 GALS HEIGHT = 23.96 INCHES WATER = 0.00 INCHES WATER VOL = 0 GALS TEMP - 73.4 DEG F WATER = 0.00 INCHES TEMP = 73.5 DEG F T 4:DIESEL VOLUME = 2114 GALS T 4:DIESEL ULLAGE = 9886 GALS VOLUME - 1993 GALS 90% ULLAGE= 8686 GALS ULLAGE = 10007 GALS TO VOLUME = 2102 GALS 90% ULLAGE= 8807 GALS HEIGHT - 22.41 INCHES TO VOLUME = 1981 GALS WATER VOL - 21 GALS HEIGHT - 21.50 INCHES WATER = 1.01 INCHES WATER VOL = 21 GALS TEMP v 72.0 DEG F WATER = 1.01 INCHES TEMP - 72.0 DEG F MANIFOLDED TANKS INVENTORY TOTALS MANIFOLDED TANKS T (:REGULAR 1 INVENTORY TOTALS T 2:REGULAR 2 T 1:REGULAR 1 VOLUME = 8725 GALS T 2:REGULAR 2 TO VOLUME - 8654 GALS VOLUME o 8343 GALS TO VOLUME - 8275 GALS x * END h END * * x SWRCB, January 2006 Spill Bucket Testing Report Form Thisform is intendedfor use by contractors performing annual testing of UST spill containment structures. The completedform and printoutsfrom tests (ifapplicable), should be provided to the facility owner /operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Metro Station Date of Testing: 3/26/2012 Facility Address: 4600 Stine Road Facility Contact: Mike Phone: 661 -831 -0836 Date Local Agency Was Notified of Testing : 3/21/2012 Name of Local Agency Inspector (rfpresent during testing): Ernie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services, Inc. Technician Conducting Test: Kristopher Karns Credentials: x CSLB Contractor x ICC Service Tech. x SWRCB Tank Tester Other (Specify) License Number(s): CSLB# 804904 ICC# 5264406 -UT TT# 09 -1743 3. SPILL BUCKET TESTING INFORMATION Test Method Used: x Hydrostatic Vacuum Other Test Equipment Used: Lake Test Equipment Resolution: 0.0625" Identify Spill Bucket (By Tank Number, Stored Product, etc.) 1 Regular #1 Product 2 Regular #2 Product 3 Super (Product) 4 Diesel (Product) Bucket Installation Type: x Direct Bury Contained in Sump x Direct Bury Contained in Sump x Direct Bury Contained in Sum x Direct Bury Contained in Sum Bucket Diameter: 12.00" 12.00" 12.00" 12.00" Bucket Depth: 13.50" 13.75" 13.50" 14.00" Wait time between applying vacuum /water and start of test: 5 min. 5 min. 5 min. 5 min. Test Start Time (Ti): 9:15 AM 9:15 AM 9:15 AM 9:15 AM Initial Reading (111): 9.75" 10.25" 11.001, 11.75" Test End Time (TO: 10:15 AM 10:15 AM 10:15 AM 10:15 AM Final Reading (RF): 9.75" 10.25" 11.001, 11.75" Test Duration (TF — Tj): 1 hour I hour 1 hour 1 hour Change in Reading (RF - Rj): 0.00" 0.00" 0.00" 0.00" Pass /Fail Threshold or Criteria: 0.0625" 0.0625" 0.0625" 0.0625" Test Result: x Pass Fail 9 Pass Fail x Pass Fail x Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, accurate, and infull compliance with legal requirements. Technician's Signature: - ic,t.., Date:_03/26/2012 State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent. SWRCB, January 2006 Spill Bucket Testing Report Form Thisform is intendedfor use by contractors performing annual testing of UST spill containment structures. The completedform and printoutsfrom tests (ifapplicable), should be provided to the facility owner /operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Metro Station Date of Testing: 3/26/2012 Facility Address: 4600 Stine Road Facility Contact: Mike Phone: 661 -831 -0836 Date Local Agency Was Notified ofTesting : 3/21/2012 Name of Local Agency Inspector (rfpresent during testing): Ernie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services, Inc. Technician Conducting Test: Kristopher Karns Credentials: 19 CSLB Contractor x ICC Service Tech. x SWRCB Tank Tester Other (Specify) License Number(s): CSLB# 804904 ICC# 5264406 -UT TT# 09 -1743 3. SPILL BUCKET TESTING INFORMATION Test Method Used: x Hydrostatic Vacuum Other Test Equipment Used: Lake Test Equipment Resolution: 0.0625" Identify Spill Bucket (By Tank Number, Stored Product, etc. 1 Regular #1 (Vapor) 2 Regular #2 (Vapor) 3 Super (Vapor) 4 Diesel Bucket Installation Type: x Direct Bury Contained in Sump x Direct Bury Contained in Sump x Direct Bury Contained in Sump Direct Bury Contained in Sum Bucket Diameter: 12.00" 12.00" 12.00" Bucket Depth: 13.50" 13.75" 13.50" Wait time between applying vacuum /water and start of test: 5 min. 5 min. 5 min. Test Start Time (Ti): 9:15 AM 9:15 AM 9:15 AM Initial Reading (Rj): 9.50" 10.50" 11.001, Test End Time (TO: 10:15 AM 10:15 AM 10:15 AM Final Reading (RF): 9.50" 10.50" 11.00" Test Duration (TF — Tj): 1 hour 1 hour I hour Change in Reading (RF - R,): 0.00" 0.00" 0.00" Pass /Fail Threshold or Criteria: 0.0625" 0.0625" 0.0625" Test Result: 121 Pass Fail 0 Pass Fail x Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. Technician's Signature:ti,. vcn Date:_03/26/2012 State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent. 5,7,11 O 5,7,9 04 13 14 6 5,7,10 0 15 16 O 5,8,12 04 19 0 Metro Station 4600 Stine Road Bakersfield, CA 93309 3/26/2012 1= Veeder Root TLS 350 9 10 2= External Overfill Alarm 3= ESO Switch 4= Veeder Root ATG Probe 5 5= Veeder Root 208 Sump Sensor 6= Veeder Root 420 Annular Sen. 7= FX1V Line Leak Detector 7 8 8= FX1DV Line Leak Detector 9= Regular 1 STP Sump 5 10= Regualr 2 STP Sump 11= Super STP Sump 12= Diesel STP Sump 5 5 6 13= Regular 1 Spill Bucket 14= Regular 1 Vapor Bucket 15= Regular 2 Spill Bucket 16= Regular 2 Vapor Bucket 17= Super Spill Bucket 34 18= Super Vapor Bucket19= Diesel Spill Bucket 5 1 2 5 0 0 U Invoice No.: 28971A Site: Metro Station 4600 Stine Road Bakersfield, CA 93309 Repairs Requested: Monitoring System Certification, Leak Detector Testing, and Spill Bucket Testing. Repairs completed: Monitoring System Certification, Leak Detector Testing, and Spill Bucket Testing. All Test's passed and no repairs were required. Required Repairs, Still Pending: No further repairs are required. Technician Name: Kristopher Karns Signature: -. Date: 3/26/2012