HomeMy WebLinkAbout1125 COFFEE ROAD FMC 2011 Test ResultsI,- -PPTanknology
11000 N. MoPac Expressway, Suite 500
Austin, Texas 78759
Phone: (512) 451 -6334
Fax: (512) 459 -1459
BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR CRAIG PERKINS
1501 TRUXTUN AVE.
BAKERSFIELD, CA. 93301
Test Date: 10/18/2011
Order Number: 3187188
Dear Regulator,
Date Printed and Mailed: 11/04/2011
Enclosed are the results of recent testing performed at the following facility:
CHEVRON 203576
1125 COFFEE RD.
BAKERSFIELD, CA. 93308
Testing performed:
Impact Valve
Leak detector tests
Monitor Certification
Secondary Containment -Spill Container
Sincerely,
Dawn Kohlmeyer
Manager, Field Reporting
1
Work Order: 3187188
PERMIT #
ENHANCED LEAK DETECTION LINE TESTING SB-989 SECONDARY CONTAINMENT
TANK TIGHTNESS 1(_PUEL MONITORING CERTIFICATION
SITE INFORMATION
BAKERSFIELD FIRE DEPARTMENT
UNDERGROUND STORAGE TANKS
ME NE NSF ONT
tA
Prevention Services
e w.,.b .,,: , ,•. -,,, ,v. 11 .r 2101 H Street
APPLICATION EIRE
A` r
Bakersfield, CA 93301
TO PERFORM ELD /LINE TESTING/ Phone: 661 - 326 -3979 . Fax: 661-852-2171
SB989 SECONDARY CONTAINMENT T Page I of 1
TESTING/TANK TIGHTNESS TEST AND
YES NO
TANK #
FUEL MONITORING CERTIFICATION
VOLUME
Please note that these are separate
individual tests and will be charged per
separate type test accordingly.)
PERMIT #
ENHANCED LEAK DETECTION LINE TESTING SB-989 SECONDARY CONTAINMENT
TANK TIGHTNESS 1(_PUEL MONITORING CERTIFICATION
FD209S(Rev 03/08)
Tanknology Inc. 11000N. MoPac Expressway, Suite 500, Austin, Texas 78759
SITE INFORMATION
FAC
C.n .-* go 3 ,51 t
ME NE NSF ONT
tA
ADDRESS c } (. S l-,V 1 i ee_
OWry g AME
1 atzly%
OPERA? R NAME
Uro"
PERMIT TO OPERATE
A OF TANKS TO BE TESTED: IS PIPING GOING TO BE TESTED? YES NO
TANK # VOLUME CONTENTS
3 a IL fie u1
TANK TESTING COMPANY
TESTING C NPAN NAME & PHONE # OF CONTACT PER ON
c lIp
MAILING ADDR SS.
t35 ULWrlse l r(__ &,ti, #]> h IeCu a C F4 oi5 0
E 8 PHON OFT STER O SPECI L INSPECTOR
ei oa a
CERTIFICATION •
DATE 6 TIM
0
TEST TO BE C NDUCTED W et-me 1/IA. ICC TEST METHOD
APPLICANT SIGNATURE 94Wn DATE
T S APPLICATION BECOMES A PERMIT WHEN APPROVED
APPROVED BY DATE
FD209S(Rev 03/08)
Tanknology Inc. 11000N. MoPac Expressway, Suite 500, Austin, Texas 78759
Tan
PURPOSE: COMPLIANCE
TEST DATE: 10/18/11
CLIENT: CHEVRON PRODUCTS COMPANY
145 S. STATE COLLEGE BLVD
SUITE 400
BREA, CA 92821
TINA SCOLARO
714)671 -3356
TANKNOLOGY CERTIFICATE OF TESTING
8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759
TELEPHONE (512) 451 -6334 FAX (512) 459 -1459
TEST RESULT SUMMARY REPORT
WORK ORDER NUMBER: 3187188
CUSTOMER PO: 15071518
SITE: CHEVRON 203576
1125 COFFEE RD.
BAKERSFIELD, CA 93308
PATTY
661)588 -9066
TEST TYPE: TLD -1
Product Pine Tinhtness Test Results
LINE
ID
LINE
PRODUCT
LINE
MATERIAL
DELIVERY
TYPE
TEST RESULT
A B C D
FINAL LEAK RATE (gph)
A B C D
IMPACT
VALVE
FUNCTION
12k 1 SUPREME DW FIBERG PRESSURE
SERIAL #
ID
Y
12k 2 PLUS DW FIBERG PRESSURE
MODEL # SERIAL #
Y
12k 3 REGULAR DW FIBERG PRESSURE
P
Y
Fxicfinn I ina I aair natartnr Tacf
LINE
EXISTING LEAK DETECTOR #1 EXISTING LEAK DETECTOR #2
MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL #
ID MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT
12k 1 VEEDERROOT ELECTRONI 011505 P
12k 2 VEEDERROOT ELECTRONI 013652 P
12k 3 VEEDERROOT ELECTRONI 013649 P
Npw Rnnlar_ampnt I inp I Pak nefer_tnr TP_Stf
LINE
ID
REP AGE LEAK DE ECTOR #1 REP ED LEAK DET ECTOR #2
MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT
ror owner Qetaded report mtormauon, visit www.tanicnoiogy.com ana select un -Line Keports -wKAr, or contact your iocai t amcnoiogy omce.
Tester Name: EDWIN PINEDA Technician Certification Number: 8026748
Printed 11/04/2011 08:06 MTUTTLE
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
op Tanlvio cW
TEST DATE: 10 /18/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3187188
CLIENT:CHEVRON PRODUCTS AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:CHEVRON 203576
TANK INFORMATION
Tank ID: 12k 1 Tank manifolded: NO Bottom to top fill in inches: 165.0
Product: SUPREME Vent manifolded: YES Bottom to grade in inches: 170.0
Capacity in gallons: 12,068 Vapor recovery manifolded: YES Fill pipe length in inches: 54.0
Diameter in inches: 111.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 292 Overspill protection: YES Stage 1 vapor recovery: DUAL
Material: Dw STEEL Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TEST RESULTS Test Method:VacuTect LEAK DETECTOR TEST RESULTS Test method: FTA
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
Dipped Product Level:
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Probe Water Level: Make: VEEDERROOT
Ingress Detected: Water Bubble Ullage Model: ELECTRONIC
Test time: S /N: 011505
Open time in sec:
Inclinometer reading: Holding psi:
VacuTect Test Type: NOT
Resiliency c s NOT
VacuTect Probe Entry Point: TESTED
Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi: Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: Pass
Determined by (method):
Result: COMMENTS
COMMENTS
LINE TEST RESULTS Test type: TLD -1
LINE A B C D
Material: Dw FIBERG
Diameter (in): 2.0
Length (ft): 225.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 11/04/2011 08:06
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
r Tan
TEST DATE: 10 /18/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3187188
CLIENT:CHEVRON PRODUCTS AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:CHEVRON 203576
TANK INFORMATION
Tank ID: 12k 2 Tank manifolded: NO Bottom to top fill in inches: 166.0
Product: PLUS Vent manifolded: YES Bottom to grade in inches: 171.0
Capacity in gallons: 12,068 Vapor recovery manifolded: YES Fill pipe length in inches: 55.0
Diameter in inches: 111.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 292 Overspill protection: YES Stage I vapor recovery: DUAL
Material: Dw STEEL Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TEST RESULTS Test Method:VacuTect LEAK DETECTOR TEST RESULTS Test method: FTA
Start (In) End (in)
Dipped Water Level: New /passed Failed/replaced New /passed Failed /replaced
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Dipped Product Level:
Probe Water Level: Make: VEEDERROOT
Ingress Detected: Water Bubble Ullage Model: ELECTRONIC
Test time: S /N: 013652
Open time in sec:
Inclinometer reading: Holding psi: psi:
VacuTect Test Type: NOT
Resiliency NOT
VacuTect Probe Entry Point: TESTED
Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi:
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result: COMMENTS
COMMENTS
LINE TEST RESULTS Test type: TLD -1
LINE A B C D
Material: Dw FIBERG
Diameter (in): 2.0
Length (ft): 225.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 11/04/2011 08:06
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
i 713nimol cW
TEST DATE: 10 /18/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3187188
CLIENT:CHEVRON PRODUCTS AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:CHEVRON 203576
TANK INFORMATION
Tank ID: 12k 3 Tank manifolded: No Bottom to top fill in inches: 165.0
Product: REGULAR Vent manifolded: YES Bottom to grade in inches: 170.0
Capacity in gallons: 12,068 Vapor recovery manifolded: YES Fill pipe length in inches: 54.0
Diameter in inches: 111.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 292 Overspill protection: YES Stage I vapor recovery: DUAL
Material: Dw STEEL Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TEST RESULTS Test Method:VaCUTeat LEAK DETECTOR TEST RESULTS Test method: FTA
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
Dipped Product Level:
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Probe Water Level: Make: VEEDERROOT
Ingress Detected: Water Bubble Ullage Model: ELECTRONIC
Test time: S /N: 013649
Open time in sec:
Inclinometer reading: Holding psi: VacuTect Test Type: NOT
Resiliency c s NOT
VacuTect Probe Entry Point: TESTED
Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi:
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result: COMMENTS
COMMENTS
LINE TEST RESULTS Test type: TLD -1
LINE A B C D
Material: Dw FIaERG
Diameter (in): 2.0
Length (ft): 225.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 11/04/2011 08:06
MONITORING SYSTEM CERTIFICATION
For Use By All Jurisdictions Within the State of Califomia
Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3 Title 23, California Code of Regulations
This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is installed at the facility, a separate
certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank
system owner /operator. The owner /operator must submit a copy ofthis form to the local agency regulating UST systems within 30 days of test date.
A. General Information
Facility Name: CHEVRON 203576
Site Address: 1125 COFFEE RD.
Facility Contact Person: PATTY
Make /Model of Monitoring System:
B. Inventory of Equipment Tested /Certified
Check the appropriate boxes to indicate specific equipment inspected /serviced
City: BAKERSFIELD
Contact Phone No: 588 -9066
Date of Testing /Service: 10/18/2011
Work Order Number: 3187188
CA Zip: 93308
Tank ID: T1 SUPREME Tank ID: T2 PLUS
X In -Tank Gauging Probe. Model: MAG PROBE X In -Tank Gauging Probe. Model: MAG PROBE
X Annular Space or Vault Sensor. Model: VR-420 Annular Space or Vault Sensor. Model: VR-420
X Piping Sump/Trench Sensor(s). Model: VR208 Piping Sumprfrench Sensor(s). Model: VR -208
Fill Sump Sensor(s). Model: Fill Sump Sensor(s). Model:
Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model:
Electronic Line Leak Detector. Model: ELECTRONIC X Electronic Line Leak Detector. Model: ELECTRONIC
X Tank Overfill/High -Level Sensor. Model: PROBE /FLAPPER Tank Overfill /High -Level Sensor. Model: PROBE /FLAPPER
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2).
Tank ID: Tank ID:
In -Tank Gauging Probe. Model: MAG PROBE In -Tank Gauging Probe. Model:
X Annular Space or Vault Sensor. Model: VR-420 Annular Space or Vault Sensor. Model:
X Piping Sumprrrench Sensor(s). Model: VR -208 Piping Sumprrrench Sensor(s). Model:
Fill Sump Sensor(s). Model: Fill Sump Sensor(s). Model:
Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model:
X Electronic Line Leak Detector. Model: ELECTRONIC Electronic Line Leak Detector. Model:
Tank Overfill /High -Level Sensor. Model: PROBE/FLAPPER Tank Overfill /High -Level Sensor. Model:
Other (specify equipment type and model in Section E on page 2). Other eci equipmentsptymentqp type and model in Section E on page 2).
Dispenser : 1 -2 Dispenser ID: 7 -8
Dispenser Containment Sensor(s) Model: BE[ -406 X Dispenser Containment Sensor(s) Model: BEI -406
Shear Valve(s). X] Shear Valve(s)
Dispenser Containment Float(s) and Chain(s). 7 Dispenser Containment Float(s) and Chain(s).
Dispenser ID: 3-4 DispenserlD: 9 -10
X Dispenser Containment Sensor(s) Model: BEI -406 X Dispenser Containment Sensor(s). Model: BEI -406
FRI Shear Valve(s). Pq Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). 0 Dispenser Containment Float(s) and Chain(s).
Dispenser ID: 5-6 Dispenser ID:
RI Dispenser Containment Sensor(s) Model: BEI -406 Dispenser Containment Sensor(s). Model:
Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility.
C. Certification
I certify that the equipment identified in this document was inspected /serviced in accordance with the manufacturers' guidelines.
Attached to this certification is information (e.g manufacturers' checklists) necessary to verify that this information is correct.
and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached
a copy of the (Check all that apply): System set -up Alarm history report
Technician Name (print): EDWIN PINEDA Signature: l,j i 1) AV
Certification No.: License. No.: 743160 (Class 'A' General Enginering Contractor License)
Testing Company Name:Tanknology Phone No.: (800) 800 -4633
Site Address: 11000 N. MoPac Expressway, suite 500, Austin, TX 78759 Date of Testing /Servicing: 10/18/2011
Monitoring System Certification Page 1 of 3 Based on CA form dated 03/08
Site,Address 1125 COFFEE RD.
D. Results of Testing /Servicing
Software Version Installed: 327.04
Complete the following checklist:
Monitoring System Certification
Date of Testing /Service: 10/18/2011
El Yes No' Is the audible alarm operational?
0 Yes No' Is the visual alarm operational?
x Yes No' Were all sensors visually inspected, functionally tested, and confirmed operational?
x Yes No • Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not
interfere with their proper operation?
x Yes No' N/A If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational?
x Yes No N/A
For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment
monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive
shut -down? (check all that apply) x Sump/Trench Sensors; Dispenser Containment Sensors.
Did you confirm positive shut -down due to leaks and sensor failure /disconnection? Yes No
x Yes No' N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanicaloverfillpreventionvalveisinstalled), is the overfill warning alarm visible and audible at the tank fill points(s) and operating
properly? If so, at what percent of tank capacity does the alarm trigger? so
No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the
manufacturer name and model for all re lacement arts in Section E, below.
R x No Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) Product;
x Water. If yes, describe causes in Section E, below.
No' Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable.
No' Is all monitoring equipment operational per manufacturers' specifications?
In Section E below, describe how and when these deficiences were or will be corrected.
E. Comments:
7EPI_T ESTP.UP•111 r9_1LVE i7aids'SiMIKD11ETO yi11LrI.G Lffl, & DETECTOR TES
Page 2 of 3 Based on CA form dated 03/08
Monitoring System Certification
Site Address: 1125 COFFEE RD.
F. In -Tank Gauging / SIR Equipment
Check this box if no tank gauging or SIR equipment is installed.
Date of Testing /Service: 10/18/2011
Check this box if tank gauging is used only for inventory control.
Check this box if no tank gauging or SIR equipment is installed.
This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring.
Complete the following checklist:
0 Yes No' Has all input wiring been inspected for proper entry and termination, including testing for ground faults?
0 Yes No - Were all tank gauging probes visually inspected for damage and residue buildup?
X Yes No * Was accuracy of system product level readings tested?
X Yes No * Was accuracy of system water level readings tested?
El Yes NO * Were all probes reinstalled properly?
X Yes No. Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
G. Line Leak Detectors (LLD) : Check this box if LLDs are not installed.
Complete the following checklist:
Yes No * N/A
For equipment start -up or annual equipment certification, was a leak simulated to verify LLD performance?
Check all that apply) Simulated leak rate: 0 3 g.p.h 0.1 g.p.h 0.2 g.p.h
x Yes No * Were all LLDs confirmed operational and accurate within regulatory requirements?
X Yes No " Was the testing apparatus properly calibrated?
Yes No * Q N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak?
a Yes No * N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak?
M Yes No * N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
M Yes No * N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test?
M Yes No * N/A For electronic LLDs, have all accessible wiring connections been visually inspected?
rull
L^J Yes No * Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
H. Comments:
Page 3 of 3 Based on CA form dated 03/08
SWRCB, January 2002 Page 1.
Secondary Containment Testing Report Form
This form is intendedfor use by contractors performing periodic testing ofUST secondary containment systems. Use the
appropriate pages ofthis form to report results for all components tested. The completedform, written test procedures, and
printouts from tests (ifapplicable), should beprovided to the facility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: CHEVRON 203576 Date of Testing: 10/18/2011
Facility Address: 1125 COFFEE RD. , BAKERSFIELD, CA, 93308
Facility Contact: PATTY Phone: ( 661) 588 -9066
Date Local Agency Was Notified of Testing:
Name of Local Agency Inspector (if present during testing): ERNIE MEDINA
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY, INC.
Technician Conducting Test: EDWIN PINEDA
Component Imm
Credentials: X CSLB Licensed Contractor
RIM
SWRCB Licensed Tank Tester
Spill Box I SUP FILL
License Type: A -UT I License Number: 743160 - 8026748
Manufacturer
Manufacturer Trainine
Component(s) Date Training Expires
PHILTITE SPILL BUCKET 08/02/2012
Spill Box 2 PLU FILL 000
3. SUMMARY OF TEST RESULTS
Component Component Imm RIM
Spill Box I SUP FILL 000 00
Spill Box 2 PLU FILL 000 00
Spill Box 3 REG FILL 0000 00
0000 00
0000 00
000 00
0000 00
0000 00
0000 00
000 00
0000 00
D00 001
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
WATER WAS PLACE IN DRUMS FROM SITE AFTER TESTING
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: e Date: 10/18/2011
SWRCB, January 2006
9. Spill Bucket Testing Report Form
Thisform is intendedfor use by contractors performing annual testing ofUST spill containment structures. The completedform and
printouts from tests (ifapplicable), should be provided to the facility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: CHEVRON 203576 DateofTesting: 10/18/2011
Facility Address: 1125 COFFEE RD. , BAKERSFIELD, CA, 93308
Facility Contact: PATTY Phone: ( 661) 588 -9066
Date Local Agency Was Notified of Testing:
Name of Local Agency Inspector (ifpresent during testing): ERNIE MEDINA
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY, INC.
Technician Conducting Test: EDWIN PINEDA
Credentials I : E CSLB Contractor ICC Service Tech. SWRCB Tank Tester 1fl Other (Specify) A -UT
License Number: 743160-8026748
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: X Hydrostatic Vacuum Other
Test Equipment Used: TAPE MEASURE Equipment Resolution: VISUAL
Identify Spill Bucket(By Tank
Number, Stored Product, etc.
1 1 SUP FILL 2 2 PLU FILL 3 3 REG FILL 4
Bucket Installation Type: X Direct Bury
Contained in Sump
X Direct Bury
Contained in Sump
X Direct Bury
Contained in Sump
Direct Bury
Contained in Sump
Bucket Diameter: lift illy 11 "
Bucket Depth: loll 10 " 1011
Wait time between applying
vacuum/water and starting test:
10 MIN 10 MIN 10 MIN
Test Start Time (TI ): 0930 0930 0930
Initial Reading (RI ): 9.75" 9.75" 9.75"
Test End Time (TF ); 1030 1030 1030
Final Readin (RF ); 9.75" 9. 75" 9. 75"
Test Duration: 1 HR 1 HR 1 HR
Change in Reading (R F - RI ): 0 0 0
Pass/Fail Threshold or
Criteria:
0 0 0
Test Result: El Pass Fail 0 Pass Fail 0 Pass Fail Pass Fail
Comments - (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is true, accurate, and infull compliance with legal requirements.
Technician's Signature: n :: . Date: l-- v
10/18/2011
I
State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements
Work Order: 3187188
ESo) & (ESV) Testing Form - Manion 1- 625)2007
Emergency Shut Off (ESO) &
Dispenser Emergency Shutoff Valve (ESV)
Test ANNUAL TEST RECORD LOCATIONS AND TEST DATATesting -
n U dComan ; Date. b ,
Location Name: 5 Store #• State 1D #-
Address: 1' City: state:
Emer enc Shut Off SO Testin Results11 _ in accordance with "ESO Vendor Letter (3- 21- 05).doc "; from Valero's RetailComplianceDepartment, as a part of annual compliance testing, this representative tested theEmerencShutOffSOswitchesindicatedonthissketch. Findin s listed below: Emergency Shut Off (ESO) If No, ProvideOperational) Y N M tenance Log # Date Called :
L•, „ac, r.mer enc shutoff valve ES Testin ResultsOninaccordancewithNFPA30Athisrepresentativetestedtheautomatic- closing featureoftheispenserEmergencyShutoffVALVE(S) (ESV) located in the supply lines at the base ofeachindividualislandtypedispenserindicatedonthediagrambelow. Each device ( #) _ 1$ in allwouldautomaticallclose. Findin s listed below: , Disp. Emergency Shut Off IfNo, ProvideValve (ESV) Operational? Y N Maintenance Log # Date Called
rJ
Tanknology Inc. 11000 N. MoPac Expressway, Suite 500, Austin, Texas 78759
0p 7J3nkwkPgy
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE:10 /18/11 WORK ORDER NUMBER3187188
CLIENT:CHEVRON PRODUCTS COMPANY SITE:CHEVRON 203576
COMMENTS
COCO SITE, Conducted Witness Annual Monitor Certification Testing with Inspector Ernie Medina
Bakersfield Fire Department. site contacted 10 /11 /11 and confirmed testing with "KATHY ".
Technician checked in with 2ndSite and WO # 111018 -146 was given. Replaced (1) Siphon jet
assembly, (1/2) hour for labor for parts replaced and troubleshooting. The sensor for Disp# 7/8
failed. All other tests passed.
PARTS REPLACED
QUANTITY DESCRIPTION
1 SIPHON JET ASSEMBLIES
HELIUM PINPOINT TEST KE5ULT5 (IF APPLICABLE)
ITEMS TESTED
HELIUM PINPOINT LEAK TEST RESULTS
Printed 11/04/2011 08:06 MTUTTLE
SITE DIAGRAM
i Tan
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE: 10/18/11 WORK ORDER NUMBER3187188
CLIENT:CHEVRON PRODUCTS COMPANY SITE: CHEVRON 203576
L2coLSTPAI
89 O O O OVF
3 #4 #5Q 1>#6 #1 l< 1>#1 2
m
Cn 12K
ZmpC
L3 87 L6
CANOPY cn cn STP (: ) O O O
Z D 12K U)
C Z z
1 #2 #7 #8 #9 10 0 r L4 91 L5 cAz
m STP
12 O O O ( s
ESO
DUMP -
STER
C -STORE
AIR/ breakers TLS ICE a S
H2O R WASHHS
Printed 11/04/2011 08:06 MTUTTLE
ATG Information Work Order # 3187188
110100
OCT 18, 2011 1:53 PM
C.S.I.CHEVRON 1842
1125 COFFEE RD.
BAKERSFIELD,CA 93312
661- 588 -9066 203576
SYSTEM STATUS REPORT
ALL FUNCTIONS NORMAL
150301
OCT 18, 2011 1:54 PM
1:C.S.I.CHEVRON 11542
150302
OCT 18, 2011 1:54 PM
2:1125 COFFEE RD.
150303
OCT 18, 2011 1:54 PM
3:BAKERSFIELD,CA.93312
cl
150304
OCT 18, 2011 1:54 PM
4:661 - 588 -9066 203576
151700
OCT 18, 2011 1:54 PM
SYSTEM TYPE AND LANGUAGE FLAG
SYSTEM UNITS
U.S.
SYSTEM LANGUAGE
ENGLISH
SYSTEM DATE/TIME FORMAT
MON DD YYYY HH:MM:SS xM
O
I50F00
OCT 18, 2011 1:54 PM
MON DD YYYY HH:MM:SS xM
160100
OCT 18, 2011 1:54 PM
TANK CONFIGURATION
DEVICE LABEL CONFIGURED
1 SUPREME ON
2 PLUS ON
3 REGULAR ON
4 OFF
160200
OCT 18, 2011 1:54 PM
TANK PRODUCT LABEL
TANK PRODUCT LABEL
1 SUPREME
2 PLUS
3 REGULAR
4
160300
OCT 18, 2011 1:54 PM
TANKPRODUCTCODE
TANK PRODUCT LABEL
1 SUPREME
2 PLUS 2
3 REGULAR
4 4
3187188
ATG Information
160400
OCT 18, 2011 1:54 PM
TANK FULL VOLUME
TANK PRODUCT LABEL GALLONS
1 SUPREME 12068
2 PLUS 12068
3 REGULAR 12068
4 0
160700
OCT 18, 2011 1:54 PM
TANK DIAMETER
TANK PRODUCT LABEL INCHES
1 SUPREME 111.50
2 PLUS 111.50
3 REGULAR 111.50
4 0.00
160900
OCT 18, 2011 1:54 PM
TANKTHERMAL COEFFICIENT
TANK PRODUCT LABEL
1 SUPREME 0.000700
2 PLUS 0.000700
3 REGULAR 0.000700
4 0.000000
Q
161200
OCT 18, 2011 1:54 PM
TANK MANIFOLDED PARTNERS
TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINEMANIFOLDED TANKS
1 SUPREME NONE NONE
2 PLUS NONE NONE
3 REGULAR NONE NONE
4 NONE NONE
162100
OCT 18, 2011 1:54 PM
TANK LOW PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 SUPREME 500
2 PLUS 500
3 REGULAR 500
4 0
162200
OCT 18, 2011 1:54 PM
TANK HIGH PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 SUPREME 11464
2 PLUS 11464
3 REGULAR 11464
4 0
162300
OCT 18, 2011 1:54 PM
TANK OVERFILL LEVEL LIMIT
TANK PRODUCT LABEL GALLONS
1 SUPREME 10861
2 PLUS 10861
3 REGULAR 10861
4 0
162400
OCT 18, 2011 1:54 PM
TANK HIGH WATER LEVEL LIMIT
TANK PRODUCT LABEL INCHES
1 SUPREME 3.0
3187188
Work Order# 3187188
ATG Information
Work Order # 3187188
2 PLUS 3.0
3 REGULAR 3.0
162800
OCT 18, 2011 1:54 PM
TANK MAXIMUM VOLUME LIMIT
TANK PRODUCT LABEL GALLONS
1 SUPREME 12068
2 PLUS 12068
3 REGULAR 12068
4 0
162900
OCT 18, 2011 1:54 PM
TANK DELIVERY REQUIRED LIMIT
TANK PRODUCT LABEL GALLONS
1 SUPREME 1209
2 PLUS 1209
3 REGULAR 1209
4 0
170300
OCT 18, 2011 1:54 PM
LIQUID TYPE
SENSOR LOCATION TYPE
1 SUPREME TURBINE SUMP TRI -STATE (SINGLE FLOAT)
2 SUPREME ANNULAR TRI -STATE (SINGLE FLOAT)
3 REG TURBINE SUMP TRI -STATE (SINGLE FLOAT)
4 PLUS ANNULAR TRI -STATE (SINGLE FLOAT)
5 PLUS TURBINE SUMP TRI -STATE (SINGLE FLOAT)
6 REGULAR ANNULAR TRI -STATE (SINGLE FLOAT)
7 TRI -STATE (SINGLE FLOAT)
8 TRI -STATE (SINGLE FLOAT)
178500
OCT 18, 2011 1:54 PM
PRESSURE LINE LEAK TANK NUMBER
LINE TANK NUMBER
Q 1:SUPREME 1
Q 2:PLUS NONE
Q 3: REGULAR 3
190200
OCT 18, 2011 1:54 PM
SOFTWARE REVISION LEVEL
VERSION 327.04
SOFTWARE# 346327 -100 -E
CREATED - 07.02.06.10.28
S- MODULE# 330160-004 -a
SYSTEM FEATURES:
PERIODIC IN -TANK TESTS
ANNUAL IN -TANK TESTS
ISO
PMC
120600
OCT 18, 2011 1:55 PM
C.S.I.CHEVRON 1842
1125 COFFEE RD.
BAKERSFIELD, CA.93312
661 -58B -9066 203576
TANK ALARM HISTORY
TANK 1 SUPREME
HIGH WATER ALARM OCT 18, 201112:14 PM
OCT 27, 2010 11:00 AM
NOV 6, 2009 10:20AM
OVERFILL ALARM OCT 18, 2011 12:08 PM
JUN 17, 2011 2:59 PM
OCT27, 2010 11:16 AM
3187188
ATG Information
SUDDEN LOSS ALARM OCT 18, 2011 12:24 PM
OCT 18, 2011 12:04 PM
APR 7, 2011 8:41 AM
HIGH PRODUCTALARM OCT 18, 2011 12:08 PM
OCT 18, 2011 12:06 PM
JUN 17, 2011 3:02 PM
INVALID FUEL LEVEL JUN 17, 2011 3:03 PM
JUN 15, 2011 9:19 AM
MAR 1, 2011 1:01 PM
PROBE OUT OCT 18, 2011 1:23 PM
OCT 18, 2011 12:50 PM
OCT 18, 2011 12:46 PM
HIGH WATER WARNING OCT 18, 2011 12:14 PM
OCT 27, 2010 11:00 AM
NOV 6, 2009 10:20 AM
DELIVERY NEEDED OCT 18, 2011 1:28 PM
OCT 18, 2011 12:06 PM
MAY 9, 2011 8:18 AM
MAX PRODUCT ALARM OCT 18, 2011 12:08 PM
OCT 18, 2011 12:06 PM
JUN 17, 2011 3:02 PM
LOW TEMP WARNING OCT 18, 2011 1:24 PM
OCT 18, 2011 12:55 PM
OCT 18, 2011 12:47 PM
TANK 2 PLUS
HIGH WATER ALARM OCT 18, 2011 12:15 PM
OCT 27, 2010 10:58 AM
NOV 6, 2009 10:14 AM
OVERFILL ALARM OCT 27, 201011:24 AM
NOV 6, 2009 10:56 AM
NOV 17, 2008 10:50 AM
LOW PRODUCTALARM NOV 6, 200910:10AM
HIGH PRODUCT ALARM OCT 18, 2011 12:12 PM
OCT 27, 201011:24 AM
NOV 6, 2009 10:56 AM
INVALID FUEL LEVEL OCT 27, 2010 10:55 AM
NOV 6, 200910:57 AM
NOV 6, 2009 10:09 AM
PROBE OUT OCT 18, 2011 12:30 PM
OCT 18, 2011 12:10 PM
OCT 27, 201011:25 AM
HIGH WATER WARNING OCT 18, 2011 12:15 PM
OCT 27, 2010 10:58 AM
NOV 6, 2009 10:14 AM
DELIVERY NEEDED OCT 6, 2011 2:59 PM
SEP 26, 2011 7:48 PM
SEP 17, 2011 7:34 PM
MAX PRODUCT ALARM OCT 18, 2011 12:12 PM
OCT 27, 2010 11:25 AM
NOV 6, 2009 10:56 AM
LOW TEMP WARNING OCT 18, 2011 12:11 PM
OCT 27, 2010 11:25 AM
NOV 6, 2009 10:11 AM
TANK REGULAR
HIGH WATER ALARM OCT 18, 2011 12:22 PM
OCT 27, 2010 10:59AM
NOV 6, 2009 10:13AM
OVERFILL ALARM OCT 18, 2011 12:13 PM
OCT 27, 2010 11:19 AM
NOV 29, 2009 8:28AM
SUDDEN LOSS ALARM OCT 18, 2011 12:08 PM
OCT 27, 2010 10:55 AM
OCT 1, 201010:16AM
HIGH PRODUCT ALARM OCT 18, 2011 12:14 PM
OCT 18, 2011 12:09 PM
OCT 27, 2010 11:19 AM
INVALID FUEL LEVEL OCT 18, 2011 12:09 PM
OCT 27, 2010 10:56 AM
JUL 20, 2010 6:14 PM
PROBE OUT OCT 18, 2011 12:31 PM
OCT 18, 2011 12:09 PM
OCT 27, 2010 11:21 AM
HIGH WATER WARNING OCT 18, 2011 12:22 PM
OCT 27, 201010:59 AM
NOV 6, 2009 10:13 AM
DELIVERY NEEDED JUN 4, 2011 10:49 AM
3187188
Work Order# 3187188
ATG Information
T Work Order # 3187188
DEC 20, 2010 2:43 PM
OCT 27, 2010 10:56 AM
MAX PRODUCT ALARM OCT 18, 2011 12:14 PM
OCT 18, 2011 12:09 PM
OCT 27, 2010 11:21 AM
LOW TEMP WARNING OCT 18, 2011 12:32 PM
NOV 6, 2009 11:04 AM
3187188
130200
OCT 18, 2011 1:55 PM
C.S.I.CHEVRON 1842
1125 COFFEE RD.
BAKERSFIELD, CA.93312
661 -588 -9066 203576
LIQUID ALARM HISTORY REPORT
SENSOR LOCATION
1 SUPREME TURBINE SUMP
OCT 18, 2011 9:41 AM FUEL ALARM
OCT 18, 2011 9:35 AM SENSOR OUT ALARM
OCT 27, 2010 10:22 AM FUEL ALARM
2 SUPREME ANNULAR
OCT 18, 2011 9:42 AM FUEL ALARM
OCT 18, 2011 9:35 AM SENSOR OUT ALARM
OCT 27, 2010 10:37 AM FUEL ALARM
3 REG TURBINE SUMP
OCT 18, 2011 9:43 AM FUEL ALARM
OCT 18, 2011 9:35 AM SENSOR OUT ALARM
OCT 27, 2010 10:18 AM FUEL ALARM
4 PLUS ANNULAR
OCT 18, 2011 12:22 PM FUEL ALARM
OCT 18, 2011 9:47 AM FUEL ALARM
OCT 18, 2011 9:35 AM SENSOR OUT ALARM
5 PLUS TURBINE SUMP
OCT 18, 2011 9:46 AM FUEL ALARM
OCT 18, 2011 9:35 AM SENSOR OUT ALARM
OCT 27, 2010 9:54 AM FUEL ALARM
6 REGULAR ANNULAR
OCT 18, 2011 9:45 AM FUEL ALARM
OCT 18, 2011 9:35 AM SENSOR OUT ALARM
OCT 27, 2010 10:12 AM FUEL ALARM
138200
OCT 18, 2011 1:55 PM
C.S.LCHEVRON 1842
1125 COFFEE RD.
BAKERSFIELD, CA.93312
661 -588 -9066 203576
PRESSURE LINE LEAK ALARM HISTORY REPORT
O 1:SUPREME
OCT 18, 2011 12:14 PM PLLD SHUTDOWN ALARM
OCT 18, 2011 11:30 AM PLLD SHUTDOWN ALARM
OCT 18, 2011 11:30 AM GROSS LINE FAIL
OCT 18, 2011 9:42 AM PLLD SHUTDOWN ALARM
OCT 18, 2011 9:41 AM PLLD SHUTDOWN ALARM
OCT 18, 2011 9:35 AM PLLD SHUTDOWN ALARM
OCT 27, 2010 10:51 AM PLLD SHUTDOWN ALARM
OCT 27, 2010 10:51 AM GROSS LINE FAIL
OCT 27, 2010 10:37 AM PLLD SHUTDOWN ALARM
OCT 27, 2010 10:22 AM PLLD SHUTDOWN ALARM
O 2:PLUS
OCT 18, 2011 12:15 PM PLLD SHUTDOWN ALARM
OCT 18, 2011 10:59 AM PLLD SHUTDOWN ALARM
OCT 18, 2011 10:59 AM GROSS LINE FAIL
OCT 18, 2011 9:47 AM PLLD SHUTDOWN ALARM
OCT 18, 2011 9:46 AM PLLD SHUTDOWN ALARM
OCT 18, 2011 9:35 AM PLLD SHUTDOWN ALARM
OCT 27, 2010 10:40 AM PLLD SHUTDOWN ALARM
OCT 27, 2010 10:40 AM GROSS LINE FAIL
OCT 27, 2010 9:54 AM PLLD SHUTDOWN ALARM
OCT 27, 2010 9:54 AM PLLD SHUTDOWNALARM
O 3:REGULAR
OCT 18, 2011 12:22 PM PLLD SHUTDOWN ALARM
OCT 18, 2011 11:02 AM PLLD SHUTDOWN ALARM
OCT 18, 2011 11:02 AM GROSS LINE FAIL
3187188
ATG Information
OCT 18, 2011 9:45 AM
OCT 18, 2011 9:43 AM
OCT 18, 2011 9:35 AM
OCT 27, 2010 10:44 AM
OCT 27, 2010 10:44 AM
OCT 27, 2010 10:18 AM
OCT 27, 2010 10:12 AM
110100
OCT 18, 2011 1:56 PM
C.S.I.CHEVRON 1842
1125 COFFEE RD.
BAKERSFIELD, CA.93312
661- 588 -9066 203576
SYSTEM STATUS REPORT
ALL FUNCTIONS NORMAL
3187188
PLLD SHUTDOWN ALARM
PLLD SHUTDOWN ALARM
PLLD SHUTDOWN ALARM
PLLD SHUTDOWN ALARM
GROSS LINE FAIL
PLLD SHUTDOWN ALARM
PLLD SHUTDOWN ALARM
Work Order # 3187188