HomeMy WebLinkAboutUST-MONITORING SYSTEM PG 2 4/10/201314
Pass
SWRCB, January 2002 Page -L— of IC
Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages ofthisform to report resultsfor all components tested The completedform, written test procedures, and
printouts from tests (tfapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: C &M SHELL I Date of Testing: 5/8/12
Facility Address: 3605 ROSEDALE HWY, BAKERSFIELD
Facility Contact: I Phone:
Date Local Agency Was Notified ofTesting: 3/28/12
Name of Local Agency Inspector (ifpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: RICH ENVIRONMENTAL
Pass
Technician Conducting Test: RICH PHILLIPS
Not
Tested
Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: C61/1340 A HAZ License Number: 809850
Manufacturer Training
Manufacturer Component(s) ) Date Training Expires
INCON TS -STS 6/11/2012
X V/R SEC PIPE X I
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not
Tested
Repairs
Made Component Pass I Fail Not
Tested
Repairs
Made
L NL87 ANNULAR X V/R SEC PIPE X I
PREM91 ANNULAR X TANK MANIFOLD SEC PIPE X
DIESEL ANNULAR X UNL87 STP X 1
UNL87 SEC PIPE 41 X PREM91 STP X
UNL87 SEC PIPE #2 X DIESEL STP X
PREM91 SEC PIPE #1 X UDC #1/2 X
PREM 91 SEC PIPE #2 X UDC #3/4 X 0 0
DIESEL SEC PIPE #1 X UDC #5/6 xi 1
DIESEL SEC PIPE #2 X UDC #7/8 X 1
UNL87 VENT SEC PIPE X UDC #9/10 X 0
PREM91 VENT SEC PIPE X1 UDC #11/12 X 0
DIESEL VENT SEC PIPE X 1
Ifhydrostatic testing was performed, describe what was done with the water after completion of tests:
CERTIFICATION OF TEC ICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, thefacts d in this document are accurate and infull compliance with legal requirements
Technician's Signature: Date: 05/08/12
G 4o3 Alk
5WRCB, January 2002 Page z of
Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performing periodic testing ofUST secondary containment systems. Use the
appropriatepages ofthisform to report resultsfor all components tested The completedform, written test procedures, and
printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: C&M SHELL I Date of Testing: 5/8/12
Fail
Facility Address: 3605 ROSEDALE HWY, BAKERSFIELD
Repairs
Made
Facility Contact: I Phone:
Fail
Date Local Agency Was Notified of Testing: 3/28/.12
Repairs
Made
Name of Local Agency Inspector (ifpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Rich Environmental
Technician Conducting Test: RICH PHILLIPS
Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: C61/D40 A HAZ License Number: 809850
Manufacturer Training
Manufacturer Component(s) Date Training Expires
INCON TS -STS 6/11/2012
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not
Tested
Repairs
Made Component Pass Fail Not
Tested
Repairs
Made
UNL87 FILL SUMP X
PREM91 FILL SUMP X 0 0
DIESEL FILL SUMP X
UNL87 VAPOR BUCKET X 0
PREM91 VAPOR BKT X
VENT BOX X
0
0 0
0
01 0
Ifhydrostatic testing was performed, describe what was done with the water after completion oftests:
CERTIFICATION OF TECH CIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, thefacts sta in this document are accurate and infull compliance with legal requirements
Technician's Signature: Date: 5/8/12
SWRCB, January 2002
4. TANK ANNULAR TESTING
qG sqo
Page 3 of
Test Method Developed By: Tank Manufacturer X Industry Standard Professional Engineer
0 Other (Spec)
Test Method Used: Pressure X Vacuum 0 Hydrostatic
Other (Specify)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution.
Tank #87 Tank #91 Tank #DSL Tank #
Is Tank Exempt From Testing ?' X Yes No X Yes No X Yes No 0 Yes No
Tank Capacity:
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure/vacuum/water and
starting test:
30MIN 30MIN 30MIN 30MIN
Test Start Time:
Initial Reading (Rj):
Test End Time:
Final Reading (RF):
Test Duration: 60 MIN 60 MIN 60 MIN 60MIN
Change in Reading (RF -IQ:
Pass/Fail Threshold or Criteria:
Test Result: Pass Fait 0 Pass 0 Fail Pass Fail Pass Fail
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA
Comment's — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
TANKS HAVE WET ANNULARS
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment
testing. {California Code ofRegulations, Title 2' ), Section 2637(a)(6))
11-1
SWRCB, January 2002
5. SECONDARY PIPE TESTING
7 0 5yo
Page q of
Test Method Developed By: 0 Piping Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: X Pressure Vacuum Hydrostatic
Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Run #87 #1
Piping Material: FIBERGLASS
Piping Run #87 #2 Piping Run #91 #1 Piping Run 491 #2
FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer. SMITH SMITH SMITH SMITH
Piping Diameter: 3" 3" 3" 3"
Length of Piping Run: 200' 100' 200' 100'
Product Stored: UNL87 UNL87 PREM91 PREM91
Method and location of
piping-run isolation: BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP
Wait time between applying
pressure/vacuum/water and
starting test:
30 MIN 30 MIN 30 MIN 30 MIN
Test Start Time: 7:45 7:45 7:45 8:30
Initial Reading (Rj): 6.0 6.5 6.0 5.5
Test End Time: 8:45 8:45 8:45 9:30
Final Reading (RF): 6.0 6.5 6.0 5.5
Test Duration: 60 MIN 60 MIN 60 MIN 60 MIN
Change in Reading (RF -Ri): 0 0 0 0
Pass/Fail Threshold or
Criteria: 0 0 0 0
Test Result: X Pass Fail X Pass Fail X Pass Fail X Pass Fail
Comments — (include information on repairs made prior to testing, andrecommendedfollow -upfarfailed tests)
SWRCB, January 2002
S. SECONDARY PIPE TESTING
1 6 3V
Page Z ofIL
Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: X Pressure Vacuum Hydrostatic
Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Material:
Piping Run #DSL #1 Piping Run #DSL #2 Piping Run #87
VENT
Piping Run #91
VENT
FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer: SMITH SMITH SMTH SMITH
Piping Diameter: 3" 3" 3" 3"
Length ofPiping Run: 75' 50' 25' 25'
Product Stored: DIESEL DIESEL UNL87 PREM91
Method and location of
piping-run isolation: BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP
Wait time between applying
pressure /vacuum/water and
starting test:
30 MIN 30 MIN 30 MIN 30 MIN
Test Start Time: 8:30 8:30 9:45 9:45
Initial Reading (Ri): 6.0 6.0 6.5 6.0
Test End Time: 9:30 9:30 1 0:45 10:45
Final Reading (RF): 6.0 6.0 6.5 6.0
Test Duration: 60 MIN 60 MIN 60 MIN 60 MIN
Change in Reading (RF -Rj): 0 0 0 0
Pass/Fail Threshold or
Criteria: 0 0 0 0
Test Result: X Pass Fail X Pass Fail X Pass []Fail X Pass Fail
Comments — (include information on repairs made prior to testing, andrecommendedfollow -upforfailedtests)
SWRCB, January 2002
5_ SECONDARY PIPE TESTING
YG 34o
IPage4ofit
Test Method Developed By: 0 Piping Manufacturer X Industry Standard 0 Professional Engineer
0 Other (Spec)
Test Method Used: X Pressure 0 Vacuum Hydrostatic
0 Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Run #DSL
VENT Piping Run #VR #1 Piping Run #TANK
MANIFOLD Piping Run #
Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer. SMITH SMITH SMITH
Piping Diameter. 3" 4" 3"
Length ofPiping Run: 25' 300' 50'
Product Stored: DIESEL GASOLINE GASOLINE
Method and location of
piping-run isolation: BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP
Wait time between applying
pressure /vacuum/water and
test:
30 MIN 30 MIN 30 MIN
starting
Test Start Time: 9:45 11:00 7:45
Initial Reading (R): 5.0 5.0 6.0
Test End Time: 10:45 12:00 8:45
Final Reading (RF): 5.0 5.0 6.0
Test Duration: 60 MIN 60 MIN 60 MIN
Change in Reading (RF -Rt): 0 0 0
Pass/Fail Threshold or
Criteria: 0 0 0
Test Result: X Pass 0 Fail. i X Pass 0 Fail X Pass 0 Fail 1 Pass 0 Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
Y(9 Mo
SWRCB, January 2002 Page 7 of 2
6. PIPING SUMP TESTING
Test Method Developed By: D Sump Manufacturer X Industry Standard D Professional Engineer
Other (Spec)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS-STS Equipment Resolution:
Sump #87 Sump #91 Sump #DSL Sump #VENT BOX7S7ump!Diaw!neter: 42" 42" 42" 48"
51" 49" 49" 27"
p Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
Height from Tank Top to Top of
Highest Piping Penetration:
22" 18" 18" 8"
Height from Tank Top to Lowest
Electrical Penetration: 22" 19" 19" 15"
Condition of sump prior to testing: GOOD GOOD GOOD GOOD
Portion of Sump Tested' 24" 20" 20" 20"
Does turbine shut down when
sump sensor detects liquid (both
product and water)?*
D Yes No X NA Yes No X NA Yes No X NA Yes No X NA
Turbine shutdown response time
Is system programmed for fail -safe
shutdown ?* Dyes D No X NA Yes No X NA D Yes O No X NA Yes No XNA
Was fail -safe verified to be
operational?* Yes No X NA Yes No X NA Yes DNo X NA D Yes No XNA
Wait time between applying
pressure /vacuum/water and starting
test:
30 MIN 30 MIN 30 MIN 30 MIN
Test Start Time: 11:38 11:59 9:25 9:44 10 :18 10:38 9:25 10:01
Initial Reading (R,): 2.730 2.730 4.117 4.117 3.060 3.061 5.757 5.788
Test End Time: 11:53 12:14 9:40 9:59 10:34 10:53 9:40 10:16
Final Reading (RF): 2.730 2.730 4.117 4.117 3.061 3.060 5.758 5.788
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -R,): 000 000 000 000 001 001 001 000
Pass/Fail Threshold or Criteria: 002 002 002 002 002 002 002 002
Test Result: X Pass Fail X Pass Fail X Pass Fail X Pass Fail
Was sensor removed for testing? X Yes No NA X Yes No DNA X Yes No NA X Yes No NA
Was sensor properly replaced an
verified functional after testin ? XYes No NA X Yes No NA X Yes D No NA X Yes No NA
Comments -(include information on repairs madeprior to testing', and recommendedfollow -upforfailed tests)
Ifthe entire depth ofthe sump is not tested, specify how much was tested. If the answer to Any of the questions indicated with an
asterisk(*) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)
SWRCB, January 2002
7. UNDER- DISPENSER CONTAINMENT (UDCI TESTING
q(3Y0
Page - of lif
Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer
0 Other (Spec)
Test Method Used: Pressure 0 Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC #3/4
UNKNOWN
UDC #5/6 UDC #7/8UDC #1/2
UDC Manufacturer: UNKNOWN UNKNOWN UNKNOWN
UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
UDC De th: 27 27 27" 27"
Height from UDC Bottom to Top
of Highest Piping Penetration:
8" 8" 8" 8"
Height from UDC Bottom to
Lowest Electrical Penetration:
4" 4" 4" 4"
Condition of UDC prior to
testing:
GOOD GOOD GOOD GOOD
Portion of UDC Tested 10" 10" 10" 10"
Does turbine shut down when
UDC sensor detects liquid (both
and water)?*
0 Yes 0 No X NA Yes No X NA Yes No X NA Yes No X NA
product
Turbine shutdown response time
Is system programmed for fail-
safe shutdown ?*
Yes No X NA Yes No X NA Yes No X NA Yes No XNA
Was fail -safe verified to be
operational?* Yes No X NA Yes No XNA Yes No X NA 0 Yes No XNA
Wait time between applying
pressure/vacuum/water and
starting test
30MIN 30MIN 30MIN 30MIN
Test Start Time: 2:05 2:22 1:10 1:28 2:05 2:22 1:10 1:28
Initial Reading (R,): 3.067 3.067 1.244 1.243 3.785 3.785 5.338 5.338
Test End Time: 2:20 2:37 1:25 1:43 2:20 2:37 1:25 1:43
Final Reading (RF): 3.067 3.067 1.243 1.242 3.785 3.785 1 5.338 5.338
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading F-R,): 000 000 001 001 000 000 000 000
Pass/Fail Threshold or Criteria: 002 002 002 1 -.002 002 002 002
Test Result: X Pass Fail X Pass Fail X Pass Fail X Pass Fail
Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No 0 NA X Yes No NA
Was sensor properly replaced and
verified functional after testing? X Yes No DNA X Yes No NA X Yes No NA X Yes 0 No NA
Comments - (include information on repairs made prior to testing, andrecommended ollow -upforfailed tests)
1 Ifthe entire depth of the UDC is not tested, specify how much was tested. Ifthe answer to M of the questions indicated with an
asterisk(*) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
7. UNDER- DISPENSER CONTAINMENT (UDO TESTING
Page q of
Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer
0 Other (Spec)
Test Method Used: C Pressure 0 Vacuum X Hydrostatic
0 Other (Specify)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC #9/10
anapsyme
UDC #11/12 UDC # UDC #
UDC Manufacturer. UNKNOWN UNKNOWN
UDC Material: FIBERGLASS FIBERGLASS
UDC Depth: 27" 27"
Height from UDC Bottom to Top
ofHighest Piping Penetration:
8" 8"
Height from UDC Bottom to
Lowest Electrical Penetration:
4" 4"
Condition ofUDC prior to
testing-.
GOOD GOOD
Portion ofUDC Tested 10" 10"
Does turbine shut down when
UDC sensor detects liquid (both
roduct and water)?*
Yes 0 No X NA Yes No X NA Yes 0No NA 0 Yes 0 No 0NA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown ?* 0 Yes No X NA Yes No XNA 0 Yes 0 No NA 0 Yes 0 No 0 NA
Was fail -safe verified to be
o final ?' Yes 0 No X NA 0 Yes No XNA Yes D No NA 0 Yes No NA
Waittime between applying
pressute/vacuum/water and
starting test
30MIN 30MIN
Test Start Time: 3:21 3:50 3:21 3:50
Initial Reading (Ri): 4.315 4.315 5.377 5.378
Test End Time: 3:36 4:05 3:36 4:05
Final Reading (RF): 4.315 4.315 5.378 5.378
Test Duration: 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF-R,): 000 000 001 000
Pass/Fail Threshold or Criteria: 002 002 002 002
Test Result: X Pass Fail X Pass Fail 0 Pass Fail 0 Pass Fail
Was sensor removed for testing? X Yes No 0 NA X Yes No NA 0 Yes D No 0 NA Yes No NA
Was sensor properly replaced and
verified functional after testing? X Yes 0 No DNA X Yes 0 No DNA Yes No 0 NA 0 Yes No 0 NA
Comnnents — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
If the ,-ntire depth ofthe UDC is not tested, specify how much was tested. Ifthe answer to My ofthe questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
R_ 1PH,i, RTSF,R CONTAiNIVIENT SUMP TESTING
V
Page-?p of l
Facifity is Not Equipped With Fill Riser Containment Sums
Fill Riser Containment Sumps are Present, but were Not Tested 0
Test Method Developed By: 0 Sump Manufacturer X Industry Standard Professional Engineer
Other (Spec)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Fil! Sump # Fill Sump # Fill Sump Fill Sump #
Sump Diameter.
Sump Depth:
Height from Tank Top to Top of
Highest Piping Penetration:
Height from Tank Top to Lowest
Electrical Penetration:
Condition of sump prior to
testing:
Portion of Sump Tested
Sump Material:
Wait time between applying
pressure /vacuum/water and
starting test:
NOT TESTED
Test Start Time:
Initial Reading (R,
Test End Time:
Final Reading
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -R,):
Pass/Fail Threshold or Criteria:
Test Result: Pass Fail Pass Fail Pass Fail Pass Fail
Is there a sensor in the sump? Yes No Yes No Yes No Yes No
Does the sensor alarm when
either product or water is
detected?
Yes No NA Yes No NA Yes No NA Yes No 0 NA
Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA
Was sensor properly replaced and
verified functional after testing. Yes No NA Yes No NA Yes No NA Yes No NA
Comments — (include information on repairs made prior to testing and recommendedfollow -up forfailedtests)
NO FILL SUMPS
SWRCB, January 2002
9_ SPTT,iJOVF.RFTi.T, CONTAINMENT BOXES
cl 30
Page It of
Facility is Not Equipped With S ilUOverfill Containment Boxes
Spill /Overfill Containment Boxes are Present, but were Not Tested
Test Method Developed By: Spill Bucket Manufacturer X Industry Standard 0 Professional Engineer
Other (Specie)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Spill Box #87 VPR Spill Box 491 VPR Spill Box # Spill Box #
Bucket Diameter: 12" 12"
Bucket Depth: 16" 16"
Wait time between applying
pressure/vacuum /water and
starting test:
30MIN 30MIN
Test Start Time: 9:25 9:44 9:25 9:44
Initial Reading (R): 3.737 3.736 3.394 3.393
Test End Time: 9:40 9:59 9:40 9:59
Final Reading (RF): 3.736 3.736 3.393 3.393
Test Duration: 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -R,): 001 000 001 000
Pass/Fail Threshold or
Criteria: 002 002 002 002
Test Result: X Pass Fail X Pass Fail Pass Fail Pass Fail
Comments — (include information on repairs made prior to testing, andrecommendedfollow -upfor failed tests)
SHELL
3605 RGSEDALE HWY
8AKE.RSF I ELD CA
05/08!2012 9:40 AN
SUMP LEAK TEST REPORT
87VPR
TEST STARTED 9,25 M
TEST STARTED 05/08/2012
aEGIN LEVEL 3.7371 iN
END TIME 9:46 AM
END DATE 05/08/2612
END L.EUEL , 3.7366 IN
LEAK THRESHOLD 0.002 IN
TE,T RESULT PASSED
91VPR
TEST STARTED 9:25 AM
TEST STARTED 05/08/2012
BEGIN LEVEL 3.3945 IN
END TIME 9'40 AM
END DATE 05/08/2012
END LEVEL 3.3936 IN
t -EAR THRESHOLD 0.4302 IN
TEST RESULT PASSED
VENTGX
TEST STARTED 9 :25 AM
TEST STARTED 05/08/2012
P,EGIN LEVEL 5.7575 IN
END TIME 9:40 AM
END DATE 05/08/2012
END LEUEL 5.7585 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91S'TP
TEST STARTED 9:25 AM
TEST STARTED 05/08/2012
BEGIN LEVEL 4.1170 IN
END TIME 9:40 AM
END DATE 05/08 {2012
END LEVEL 4.1175 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
uSL T?
TEST STARTED
9600
2012
tt.ST STAEDRT 05/08 %
D
BEGIN LEVEL
3. KI4
END TI.ME 9,x,/08/2012
EtiD DATE 4 0617 IN
E-
E
LFQEL -,"COLD 0, PA LEAK THRE '
I
TESZ RESULT
HELL 3605 RGSEDALE ?IWY
RGSEDALE HWY 6'AKERSFiELD CA05
YAKEkSFIELD LA
4 1175 IN5:59 At4aADTIME.
0;:08/2012 ] 1::J3• Art
05/08/ 201'2 9:59 Att
4.1174 IN
END LEVEL . b.Oat,IN
LEAK
THRESHOLD PASSED
Ot9P L;--'AK TEST REPORT
SUMP LEAK TEST REPORT 87STP
87UPR
TEST STARTED 11:38 AM
TEST STARTED 9:44 AM TEST STARTED 05/08/2012
TEST STARTED 05/08/'[0 + {12 BEGIN LEVEL 2.7302 IN
BEGIN LEUEL 3.7366 IN END TIME 11:53 AM
END TIME 9:59 AM END DATE 05/08/2012
END VATE 05/08/2012 ENO LEUEL 2.7303 IN
END LEVEL 3.7362 IN LE.X THRESHOLD 0.002 IN
LEAK THRESHOLD `-002 N TEST RESULT PASSED
TEST RESULT PASSED
9i,JPR
TEST STARTED 9:44 AM HkLL
3605 RGSEDALE HWY
TEST STARTED 05/x/20123.3935 IN BAKERSFI.ELD CA
BEGIN LEVEL
END TIME 9:59 AM
05/08/2012 05,r0B/20] 12:14 Pt',
END DATE
END LEVEL 3.1932 IN SUMP LEAK 'TEST REPORT
LEAK THRESHOLD 0.005EDTESTRESULT 87 ^;TP
VENT5k;
TEST STARTED 10:01 AM
TEST STARTED 05/08/2012
BEGIN LEVEL 5.7885 IN
END TIME 10'16 AM
END DATE 05/082 INENDLEVELLEAKTHRESHOLD0.002 N
TEST RESULT PASSED
91ST?
TES-r STARTED
9;44 At9
O 08/2012TESTSTAREED41175IN5:59 At4aADTIME. 05/0872012
END DATE 4.1174 IN
END LEVEL . b.Oat,IN
LEAK
THRESHOLD PASSED
TEST RESULT
OE'LSTP
TEST TARTED
YQ. X012.
05108.16 IN
I6.53LtJF-LgErITIME 05/05720/2ANDDATE8,0607 IINO'?ASSEDEGAD - * CvQLD
LEcti.
TEJZ RESUL t
7EST STARTED 11:59 Art
TEST STARTED 05/08/2012
BEGIN LEVEL 2.7303 IN
END TIME 12:14 PM
tND DATE 05/08/2Oi2
END LEVEL 2.7303 IN
LEMK THRESHOLD 0.002 IN
TEST RESULT PASSED
rJDC3 -4
TEST STARTED ]:28 PP)
TEST STARTED 05/08/2012
BEGIN LEVEL 1.2436 IN
END TIME 1:43 PM
END DATE 05/08/2012
END LEVEL 1.2420 IN
LEAK THRESHOLD 0.052 IN
TEST RESULT PASSED
C Cpr,3 -4
TEST STARTED 1:10 Pt!
TEST STARTED 05/08/'2012
BEGIN LEVEL i.2442 IN
tND TIME 1:25 PM
ENC, DATE 05'087 -E 1L
Ei4D LEVEL 1.X433 IN
LEAK THRESHOLD 0.002 1ETESTRESULT
7'0 341 1
S L
36P R EDk.EHWY
3h 4.;'[LD CH
05/08/2012 2;20 Pn
SunP LEAK TE$T /REPORT
uDCl-2
ESr STHHTED 2`05 Pm
TE-5T STARTED 05/08/20!2
yEGIN LEVEL 3.0678 IN
END TIME 2;20 PM
wD ')HT[ 05/08/2012
END LEVEL 3.0678 IN
LEAK THRESHOLD
8) TES7
STARTED
2 :0b Pn
BFC,j LEVEL
05/08/2012
BEGIN LEVEL 3.7855 IN
PASSED
2:37 PM
END N2.TE
my
2:38 Pn
SL P -EHK TEST REPORT
UDC!-2
TEST STARTED 2'?2Pn
7EST STARTED 05/08/20!2
E:ESIN LEVEL 1'0677 IN
END TlnE 2:37 PM
WwV DATE 05/e8/2012
EwD LEVEL 3.0677 IN
LEAK THRESHOLD 0.802 IN
TEST RESULT PASSED
TEST STARTED 2:22 PM
TEST STARTED 05/08/2012
BEGIN LEVEL 3.7855 IN
END TIME 2:37 PM
END N2.TE 05/08/2012
N0 L-EVEL 3.7853 1
LEAK THRESHOLD 0.002 16
TEST RESULT PASSED
uDC7-8
TEST STARTED 1'10 Pm
TEST STARTED 05/08/2012
BEGIN iEUEL 5.3380 IN
END TIME 1:25 PM
END DATE 05/08/2012
END LEVEL 5.3386 lN
LEAK THRESHOLD 0.002 Ir
TEST RESULT PASSED
EST _.~'
UDC9,
END -rjfjF
LEA '-
EQE1
ASSED
u&Czzz2
T STARTED
TEST STow/Eu
1: n28
05/08/2012
J:21 Pn
D(iTE7 3.
N0 DATE
S6
202THp
I-E87 RESULT IN
1402
LEAK-THRESHOLO 0.002 IN
jr4
T STARTED
TEST STow/Eu
1: n28
05/08/2012
9EGIw L.EuEL 5,3388 IN
E#D TIME 1;43 pn
N0 DATE 05/08/2012
F-N0 EVB- 5,33B4 IN
LEAK-THRESHOLO 0.002 IN
TEST RESULT i,HSSE0
SHELL
3 05 ROSE0ALE wWY
8AKER8FIEL0 CH
85/88/2012 4`15 Pn
SUMP LEAK TEST REPORT
UDC9-10
TEST STARTED 3:50 PM
TEST STARTED 05/08/2012
8EGIN LEVEL +.3156 IN
END TIME +'05 PM
END DATE 05/88/2012
END LEVEL 4.3155 IN
EHK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC z112
TEST STARTED 3^50 Pn
TEST STARTED 05/08/2012
BEGIN LEVEL 5.3782 IN
END TIME 4:05 PM
END DATE 05/08/2012
END I-EVEL 5,3784 IN
LEAK THRESHOLD 0.002 Ih
TEST RESULT PASSED
L11
yd 34a
SB989 TESTING FAILURE REPORT
SITE NAME: C &M SHELL DATE: 518/12
THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE
TESTING.
REPAIRS: ilie/%
LABOR: /-0 /y<-
PARTS INSTALLED:
NAME: TITLE:
SIGNATURE:
THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING
THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR
THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR
ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF
ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE.
A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR
CONVIENENCE.