HomeMy WebLinkAboutFMC 201111000 N. MoPac Expressway, Suite 500
Austin, Texas 78759
Phone: (512) 451 -6334
Fax: (512) 459 -1459
BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR CRAIG PERKINS
1501 TRUXTUN AVE.
BAKERSFIELD, CA. 93301
Test Date: 12/12/2011
Order Number: 3188524
Dear Regulator,
5s
Date Printed and Mailed: 01/10/2012
Enclosed are the results of recent testing performed at the following facility:
CIRCLE K #2708606
1030 OAK ST.
BAKERSFIELD, CA. 93304
Testing performed:
Leak detector tests
Monitor Certification
Secondary Containment -Spill Container
Sincerely,
bowx' KA '`
Dawn Kohlmeyer
Manager, Field Reporting
A TANKNOLOGY CERTIFICATE OF TESTING
8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759
TELEPHONE (512) 451 -6334 FAX (512) 459 -1459
PURPOSE: COMPLIANCE TEST RESULT SUMMARY REPORT
TEST DATE: 12/12111 WORK ORDER NUMBER: 3188524
CUSTOMER PO: Joel Lindquist
CLIENT: CIRCLE K STORES SITE: CIRCLE K #2708606
495 E. RINCON, STE. 150 1030 OAK ST.
CORONA, CA 92879 BAKERSFIELD, CA 93304
TRISHA YAHNER MANAGER-DONNA
951)270 -5108 (661)861 -1042
TEST TYPE: TLD -1
Prnrlurt Pina Tinhtnacc Tact Racirltc
LINE LINE LINE DELIVERY
LINE
ID MANUFACTURER
IMPACT
SERIAL # MANUFACTURER isMODEL #
NEST RESULT FINAL.LEAK RATE (gph) VALVEIDPRODUCTMATERIALTYpE" A B C; = D Ar B C D
T3 -89 2 VAPORLESS LD2000 07111268
FUNCTION
T1 -87 1 REG UNLEAD DW FIBERG PRESSURE
VAPORLESS LD2000
Y
T3 -89 2 PLUS DW FIBERG PRESSURE Y
T2 -91 3 SUPER DW FIBERG PRESSURE Y
FYictinn I inp I Pak nptprtnr Tpct
LINE , , MANIJFiID
New Replacement Line Leak Detector T
AK°•DETECTOR4111?
L# rySERIAL # " ; RESULT m.MAN,UFACTURER
owner detailed report information, visit www.tanknology.com and select On -Lin e
Tester Name: EDWIN PINEDA
t AV
I ''SERIAL # J RESULTIII
Reports -WRAP, or contact your local Tanknology
Technician Certification Number: 8026748
Printed 01/10/2012 07:28 MTUTTLE
EXISTING LEAK DifTEUTOR #1 ISTING'LEAK DETECTOR *2 '
LINE
ID MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER isMODEL # SERIAL # RESULT
T1 -87 1 VAPORLESS LD2000 16476 P
T3 -89 2 VAPORLESS LD2000 07111268 P
T2 -91 3 VAPORLESS LD2000 16478 P
LINE , , MANIJFiID
New Replacement Line Leak Detector T
AK°•DETECTOR4111?
L# rySERIAL # " ; RESULT m.MAN,UFACTURER
owner detailed report information, visit www.tanknology.com and select On -Lin e
Tester Name: EDWIN PINEDA
t AV
I ''SERIAL # J RESULTIII
Reports -WRAP, or contact your local Tanknology
Technician Certification Number: 8026748
Printed 01/10/2012 07:28 MTUTTLE
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
Tanlmy
TEST DATE: 12 /12/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3188524
CLIENT:CIRCLE K STORES AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:CIRCLE K #2708606
Printed 01/10/2012 07:28
5 TANK,INFORMATION
Tank ID: T1 -87 1 Tank manifolded: NO Bottom to top fill in inches:
Product: REG UNLEAD Vent manifolded: YES Bottom to grade in inches:
Capacity in gallons: 9,684 Vapor recovery manifolded: YES Fill pipe length in inches:
Diameter in inches: 92.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 353 Overspill protection: YES Stage I vapor recovery: DUAL
Material: Dw FIBERG Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TEST RESULTS Test Method:,VacuTect ° ° LEAK DETECTOR TEST RESULTS Test method: -FTA
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Dipped Product Level:
Probe Water Level: Make: VAPORLESS
Ingress Detected: Water Bubble Ullage Model: LD2000
Test time: S /N: 16476
Open time in sec: 3.20
Inclinometer reading: Holding psi: si: zz
VacuTect Test Type: NOT
Resiliency 6o NOT
V8CUT8Ct Probe Entry Point: TESTED Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi: 1e
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINE;TESTRESULTS TesttyperTLD.1
A B C" D
Material: Dw FIBERG
Diameter (in): 2.0
Length (ft): 120.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 01/10/2012 07:28
INDIVIDUAL TANK INFORMATION AND
r Ten*ry
TEST DATE: 12 /12/11 8501 N MOPAC EXPRESSWAY, SUITE 400
CLIENT:CIRCLE K STORES AUSTIN, TEXAS 78759 (512) 451 -6334
TEST RESPLTS
WORK ORDER NUMBER3188524
SITE:CIRCLE K #2708606
Printed 01/10/2012 07:28
TANK INFORMATION
Tank ID: T3 -89 2 Tank manifolded: NO Bottom to top fill in inches:
Product: PLUS Vent manifolded: YES Bottom to grade in inches:
Capacity in gallons: 9,684 Vapor recovery manifolded: YES Fill pipe length in inches:
Diameter in inches: 92.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 345 Overspill protection: YES Stage I vapor recovery: DUAL
Material: DW FIBERG Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TEST RESUQTS,Test Method:vacuTe' t s ., LEAK.DETECTOR TEST RESULTS Test method: FTA
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Dipped Product Level:
Probe Water Level: Make: VAPORLESS
Ingress Detected: Water Bubble Ullage Model: LD2000
Test time: S /N: 07111268
Open time in sec: 4.52
Inclinometer reading: Holding psi: psi: 3030
VacuTect Test Type: NOT
Resiliency NOT
VacuTect Probe Entry Point: TESTED Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi: 18
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINESTEST RESULTS ` °. ., Test type:,, TLD- I
LINE`s A gip, g;W aC D'
Material: DW FIBERG
Diameter (in): 2.0
Length (ft): 120.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 01/10/2012 07:28
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
r Tangy
TEST DATE:12 /12/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3188524
CLIENT:CIRCLE K STORES AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:CIRCLE K #2708606
Printed 01/10/2012 07:28
TANK INFORMATION
Tank ID: T2 -91 3 Tank manifolded: NO Bottom to top fill in inches:
Product: SUPER Vent manifolded: YES Bottom to grade in inches:
Capacity in gallons: 9,684 Vapor recovery manifolded: YES Fill pipe length in inches:
Diameter in inches: 92.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 345 Overspill protection: YES Stage I vapor recovery: DUAL
Material: Dw FIBERG Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TEST RESULTS Test Method:vacuTeot LEAK DETECTOR TEST RESUL'TS', - $ ' Test'me'th "odFTA'
Start (in) End (in)
Dipped Water Level: New passed Failed /replaced New /passed Failed /replaced
L.D. #1 L.D. #1 L.D. #2 L.D. #2DippedProductLevel:
Probe Water Level: Make: VAPORLESS
Ingress Detected: water Bubble Ullage Model: LD2000
Test time: S /N: 16479
Open time in sec: 4.00
Inclinometer reading: Holding psi: 20
VacuTect Test Type: NOT
Resiliency cc: so NOT
V8CUT0Ct Probe Entry Point: TESTED Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi: 1e
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINE TE$TiRESULTS ;'` TesV pe TIM i
LINE A B C " D
Material: Dw FIBERG
Diameter (in): 2.0
Length (ft): 120.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 01/10/2012 07:28
MONITORING SYSTEM CERTIFICATION
For Use By All Jurisdictions Within the State of California
Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3 Title 23, California Code of Regulations
This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is installed at the facility, a separate
certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank
system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date.
A. General Information
Facility Name: CIRCLE K #2708606
Site Address: 1030 OAK ST.
Facility Contact Person: MANAGER - DONNA
Make /Model of Monitoring System:TLS 350
B. Inventory of Equipment Tested /Certified
Check the appropriate boxes to indicate specific equipment inspected /serviced
City: BAKERSFIELD
Contact Phone No: 861 -1042
Date of Testing /Service: 12/12/2011
Work Order Number: 3188524
CA Zip: 93304
Tank ID: T1 REGULAR Tank ID: T2 PREMIUM
X In -Tank Gauging Probe. Model: MAG PROBE X In -Tank Gauging Probe. Model: MAG PROBE
X Annular Space or Vault Sensor. Model: VR -409 Annular Space or Vault Sensor. Model: VR -409
71 Piping SumplTrench Sensor(s). Model: VR -MAG 102 Piping SumplTrench Sensor(s). Model: VR -MAG 102
X Fill Sump Sensor(s). Model: VR -208 Fill Sump Sensor(s). Model: VR -208
X Mechanical Line Leak Detector, Model: LD 2000 X Mechanical Line Leak Detector. Model: LD 2000
Electronic Line Leak Detector, Model: Electronic Line Leak Detector. Model:
X Tank Overfill /High -Level Sensor. Model: PROBE /FLAPPER Tank Overfill /High -Level Sensor. Model: PROBE /FLAPPER
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2).
Tank ID: Tank ID:
In -Tank Gauging Probe. Model: MAG PROBE In -Tank Gauging Probe. Model:
X Annular Space or Vault Sensor. Model: VR-409 Annular Space or Vault Sensor. Model:
X Piping Sump/Trench Sensor(s). Model: VR -MAG 112 Piping Sumprrrench Sensor(s). Model:
X Fill Sump Sensor(s). Model: VR -208 Fill Sump Sensor(s). Model:
X Mechanical Line Leak Detector, Model: LD 2000 Mechanical Line Leak Detector, Model:
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
Tank Overfill /High -Level Sensor. Model: PROBE /FLAPPER Tank Overfill /High -Level Sensor. Model:
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2).
Dispenser : 1 -2 Dispenser ID:
Dispenser Containment Sensor(s) Model: BRAVO FLOATS Dispenser Containment Sensor(s) Model:
Shear Valve(s). Shear Valve(s)
X Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chaln(s).
Dispenser ID: 3 -4 Dispenser ID:
Dispenser Containment Sensor(s) Model: BRAVO FLOAT Dispenser Containment Sensogs). Model:
F1Shear Valve(s). Shear Valve(s).
7XI Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
Dispenser ID: Dispenser ID:
Dispenser Containment Sensor(s) Model: Dispenser Containment Sensor(s). Model:
Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility.
C. Certification
I certify that the equipment identified in this document was inspected /serviced in accordance with the manufacturers' guidelines.
Attached to this certification is information (e.g manufacturers' checklists) necessary to verify that this information is correct.
and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached
a copy of the (Check all that apply): X System set -up X Alarm history report
Technician Name (print): EDWIN PINEDA 1Signature:
Certification No.: 8026748 License. No.: 743160 (Class 'A' General Enginering Contractor License)
Testing Company Name:Tanknology Phone No.: (800) 800 -4633
Site Address: 11000 N. MoPac Expressway, suite 500, Austin, TX 78759 Date of Testing /Servicing: 12/12/2011
Monitoring System Certification Page 1 of 3 Based on CA form dated 03/08
Site Address 1030 OAK ST.
D. Results of Testing /Servicing
Software Version Installed: 329.01
Complete the following checklist:
Monitoring System Certification
Date of Testing /Service: 12/12/2011
X Yes No Is the audible alarm operational?
Yes No Is the visual alarm operational?
Q Yes No Were all sensors visually inspected, functionally tested, and confirmed operational?
a Yes No Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not
interfere with their proper operation?
Ye No' x N/A If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? rYes No N/A
For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment
monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive
shut -down? (check all that apply) X Sump/Trench Sensors; Dispenser Containment Sensors.
Did you confirm positive shut -down due to leaks and sensor failure /disconnection? x Yes 0 No
X Yes No' N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanicaloverfillpreventionvalveisinstalled), is the overfill warning alarm visible and audible at the tank fill points(s) and operating
properly? If so, at what percent of tank capacity does the alarm trigger? 90
X Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the
manufacturer name and model for all replacement parts in Section E, below.
El Yes' X No Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) Product;
Water. If yes, describe causes in Section E, below.
x Yes No Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable.
17-A11 Yes No Is all monitoring equipment operational per manufacturers' specifications?
In Section E below, describe how and when these deficiences were or will be corrected.
E. Comments:
T3 LEAK D7ECTOR WAS ADJUSTED IN ORDER TO PASS
Page 2 of 3 Based on CA form dated 03/08
Monitoring System Certification
Site Address: 1030 OAK ST.
F. In -Tank Gauging / SIR Equipment
Check this box if no tank gauging or SIR equipment is installed.
Date of Testing /Service: 12/12/2011
Check this box if tank gauging is used only for inventory control.
Check this box if no tank gauging or SIR equipment is installed.
This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring.
Complete the following checklist:
EYes No Has all input wiring been inspected for proper entry and termination, including testing for ground faults?
EYes No' Were all tank gauging probes visually inspected for damage and residue buildup?
Yes No' Was accuracy of system product level readings tested?
QYes No Was accuracy of system water level readings tested?
X Yes No Were all probes reinstalled properly?
x Yes No Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deticiencies were or unit be corrected.
G. Line Leak Detectors (LLD) : Check this box if LLDs are not installed.
Complete the following checklist:
Yes No' E] N/A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance?
Check all that apply) Simulated leak rate: x 3 h 0.1 h 0.2 hPPY) 9•P• 9•P• 9•P•
M Yes No Were all LLDs confirmed operational and accurate within regulatory requirements?
Fxj Yes No' Was the testing apparatus properly calibrated?
X Yes No N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak?
Yes No' 1!1 N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak?
Yes No' 0 N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
Yes No' 0 N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test?
Yes No ' x N/A For electronic LLDs, have all accessible wiring connections been visually inspected?
Yes I No' Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
H. Comments:
Page 3 of 3 Based on CA form dated 03/08
SWR ,CB, January 2002
Secondary Containment Testing Report Form
Page 1 .
Thisform is intendedfor use by contractors performing periodic testing ofUSTsecondary containment systems. Use the
appropriate pages ofthis .form to report resultsfor all components tested. The completedform, written test procedures, and
printouts F-om tests ( {fapplicable), should be provided to thefacility owner /operator,for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: CIRCLE K #2708606 DateofTesting: 12/12/2011
Facility Address: 1030 OAK ST. , BAKERSFIELD, CA, 93304
Facility Contact: MANAGER - DONNA Phone: (661) 861 -1042
Date Local Agency Was Notified of Testing: 11/15/2011
Name of Local Agency Inspector (if present during testing): BAKERSFIELD FD
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY, INC.
Pass
Technician Conducting Test: EDWIN PINEDA
Repairs
Made
Credentials: El CSLB Licensed Contractor
Not
Tested
SWRCB Licensed Tank Tester
Spill Box 1 REG FILL
License Type: A —UT License Number: 743160
Manufacturer
Manufacturer Training
Component(s) Date Training Expires
OPW SPILL BUCKET 02/03/2013
Spill Box 2 PLU FILL X
3. SUMMARY OF TEST RESULTS
Component Pass Fail
Not
Tested
Repairs
Made Component Pass Fail
Not
Tested
Repair,
Made
Spill Box 1 REG FILL E
Spill Box 2 PLU FILL X
Spill Box 3 SUP FILL X E
E 1:1 E E 1:1 D
0 El-
F7 0 0 7
D 1:1 1:1 El F7 F] El-
El El E-1 E E] 1:1 E E
F] El 1:1 El El 7 F1 El-
El El El El E E] El
El 0
If hydrostatic testing was perfonned, describe what was done with the water after completion of tests:
WATER WAS PLACE IN FIVE GALLON BUCKETS AND PUT IN TRUCK FOR NEXT SITE
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: r' Date: 12/12/2011
b '. " ,
SWRCB, January 2006
9. Spill Bucket Vesting Deport Form
This form is intendedfor use by contractors performing annual testing of USTspill containment structures. The completed, form and
printoutsfrom tests (ifapplicable), should be provided to the facility owner /operator,for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: CIRCLE K42708606 DateofTesting: 12/12/2011
Facility Address: 1030 OAK ST. , BAKERSFIELD, CA, 93304
Facility Contact: MANAGER - DONNA Phone: (661) 861 -1042
Date Local Agency Was Notified of Testing: 11/15/2011
Name of Local Agency Inspector (if present during testing): BAKERSFIELD FD
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY, INC.
Technician Conducting Test: EDWIN PINEDA
Credentials I : CSLB Contractor ICC Service Tech. SWRCB Tank Tester x Other (Specify) A- UT
License Number: 743160
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: X Hydrostatic Vacuum Other
Test Equipment Used: TAPE MEASURE Equipment Resolution: V I S UAL
Identify Spill Bucket(By Tank
Number, Stored Product, etc.)
1 1 REG FILL Z 2 PLU FILL 3 3 SUP FILL 4
Bucket Installation Type:
Direct Bury
Contained in Sump
Direct Bury
XD Contained in Sump
Direct Bury
X Contained in Sump
E] Direct Bury
Contained in Sump
Bucket Diameter: 12 " 12 " 12 "
Bucket Depth: 12 " 12 " 12 "
Wait time between applying
vacuum /water and starting test:
10 MIN 10 MIN 10 MIN
Test Start Time (TI ): 0900 0900 0900
Initial Reading (RI ): 8 " 81, 7 . 3 / 8 "
Test End Time (TF ): 1000 1000 1000
Final Reading (RF ):
81, 8 " 7. 3 / 8 "
Test Duration: 1 hr 1 hr 1 hr
Change in Reading (R I: - RI ): 0 0 0
Pass/Fail Threshold or
Criteria:
0 0 0
Test Result: X Pass Fail F Pass Fail... X Pass Fail Pass Fail
Comments - (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements.
Technician's Signature: - .; , , r, :. ? Date: 12/12/2011
cf,. . 1.,....- —A --I..+;— A, --f --;— +—f;— +- t— .. ..F...... A 1.., ., .,..,.17471o.7 ---- LJ....,o.— I......1 .n..••7........,..t
Work Order: 3188524
ESO) & (ESV) Tegling Fnrm - Vernion 1- 12/8/2010
Emergency Shut Off (ESO) &
Dispenser Emergency Shutoff Valve (ESV)
ANNUAL TEST RECORD LOCATIONS AND TEST DATA
Testing
if No, Provide
Company: TANKNOLOGY
Date:
7Y
Location Name: 99 rC E Z- 0 OQ 6 Store #: State ID #:
Address: SOT City: State:
Emergency Shut Off ES® Testing Results
On \Z Z I I in accordance with "ESO Vendor Letter (3- 21- 05).doc ", from Retail Compliance
Departmen , as a part ofannual compliance testing, this representative tested the Emergency Shut Off
ESO) switches indicated on this sketch. Findings listed below:
Emcrgcncy Shut Off (ESO) if No, Provide
Operational'? 7Y Maintenance Log # Date Called:
On l m accordance with NFPA 30A this representative tested the automatic - closing feature
of the ispenser Emergency Shutoff VALVE(S) (ESV) located in the supply lines at the base of each
individual island type dispenser indicated on the diagram below. Each device ( #) in all,
would automatically close. Findings listed below:
Disp. Emcrgency Shut Off If No, Provide
Valve (ESV) Operational! Maintenance Log # Date Called:
Site Map 0i" Location and PlaccmcM of Devices Tested:
o
Signature Of Representative E L 1, -o '(1 J1
Tanknology Inc. 11000 N. MoPac Expressway, Suite 500, Austin, Texas 78759
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE:12 /12/11 WORK ORDER NUMBEF3188524
CLIENT:CIRCLE K STORES SITE:CIRCLE K #2708606
COMMENTS
Conducted Witness Annual Monitor Certification Testing with Inspector Ernie Medina Bakersfield
Fire Dept confirmed on 11/15/11. Site contacted and e- mailed regarding testing with "ALEX ".
Replaced 93) Veeder -root light bulbs. Tank# 3 Leak detector had to be adjusted to pass. All tests
passed. Cleared a ISD gross pressure warning per the CARB advisory.
PARTS REPLACED
QUANTITY DESCRIPTION m r
3 LAMP- TLS350
HF- LIUIVI PINPOINT TEST RE5ULT5 (IF APPLICABLE)
W ITEMS TESTED
s
L . F fr .t^, , . 'a „+
r ,,K 7S vs gsR a'e. —
HELIUM PINPOINT LEAK RESULTS,
Printed 01/10/2012 07:28 MTUTTLE
TE DIAGRAM
ar'IrnokVy
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE: 12/12/11 WORK ORDER NUMBER3188524
CLIENT:CIRCLE K STORES SITE: CIRCLE K #2708606
PROPANE
breaker
ESO 0 TLS
Nei Circle K #2708606 RI S
0
V pv zero
0 cas
T
2 #1 s
s
AIR/
H2O s
Printed 01/10/2012 07:28 MTUTTLE
ATG Information
Work Order# 3188524
110100
DEC 12, 2011 12:49 PM
CIRCL K
1030 OAK ST
661 - 861 -8048
BA KERSFIELD, CA.93304
SYSTEM STATUS REPORT
ALL FUNCTIONS NORMAL
150301
DEC 12, 2011 12:49 PM
1:CIRCL K
II
150302
DEC 12, 2011 12:49 PM
2:1030 OAK ST
150303
DEC 12, 2011 12:49 PM
4 3:661 - 861 -8048
150304
DEC 12, 2011 12:49 PM
4:BAKERSFIELD,CA.93304
f1
151700
DEC 12, 2011 12:49 PM
SYSTEM TYPE AND LANGUAGE FLAG
SYSTEM UNITS
U.S.
SYSTEM LANGUAGE
ENGLISH
SYSTEM DATE/TIME FORMAT
MON DD YYYY HH:MM:SS xM
t
II
150F00
DEC 12, 2011 12:49 PM
MON DD YYYY HH:MM:SS xM
160100
DEC 12, 2011 12:49 PM
TANK CONFIGURATION
DEVICE LABEL CONFIGURED
1 UNL -REG ON
2 UNL -PREM ON
3 UNL -MID ON
4 OFF
160200
DEC 12, 2011 12:49 PM
TANK PRODUCT LABEL
TANK PRODUCT LABEL
1 UNL -REG
2 UNL -PREM
3 UNL -MID
160300
DEC 12, 2011 12:49 PM
TANK PRODUCT CODE
TANK PRODUCT LABEL
1 UNL -REG !
2 UNL -PREM
3 UNL -MID B
3188524
ATG Information Work Order# 3188529
160400
DEC 12, 2011 12:49 PM
TANK FULL VOLUME
TANK PRODUCT LABEL GALLONS
1 UNL -REG 9684
2 UNL -PREM 9684
3 UNL -MID 9684
4 0
160700
DEC 12, 2011 12:49 PM
TANK DIAMETER
TANK PRODUCT LABEL INCHES
1 UNL -REG 89.75
2 UNL -PREM 98.75
3 UNL -MID 8935
4 0.00
160900
DEC 12, 2011 12:49 PM
TANK THERMAL COEFFICIENT
TANK PRODUCT LABEL
1 UNL -REG 0.000700
2 UNL -PREM 0.000700
3 UNL -MID 0.000700
4 0.000000
161200
DEC 12. 2011 12:49 PM
TANK MANIFOLDED PARTNERS
TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS
1 UNL -REG NONE NONE
2 UNL -PREM NONE NONE
3 UNL -MID NONE NONE
4 NONE NONE
162100
DEC 12, 2011 12:49 PM
TANK LOW PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 UNL -REG 1000
2 UNL -PREM 1000
3 UNL -MID 490
4 0
11
162200
DEC 12, 2011 12:49 PM
TANK HIGH PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 UNL -REG 9325
2 UNL -PREM 9325
3 UNL -MID 9325
4 0
162300
DEC 12, 2011 12:49 PM
TANK OVERFILL LEVEL LIMIT
TANK PRODUCT LABEL GALLONS
1 UNL -REG 8834
2 UNL -PREM 8834
3 UNL -MID 8834
4 0
162400
DEC 12, 2011 12:49 PM
3188524
ATG Information
Work Order# 3188529
TANK HIGH WATER LEVEL LIMIT
TANK PRODUCT LABEL INCHES
1 UNL -REG 3.0
2 UNL -PREM 3.0
3 UNL -MID 10
162800
DEC 12, 2011 12:49 PM
TANK MAXIMUM VOLUME LIMIT
TANK PRODUCT LABEL GALLONS
1 UNL -REG 9684
2 UNL -PREM 9684
3 UNL -MID 9684
4 0
162900
DEC 12, 2011 12:49 PM
TANK DELIVERY REQUIRED LIMIT
TANK PRODUCT LABEL GALLONS
1 UNL -REG 490
2 UNL -PREM 490
3 UNL -MID 490
4 0
170300
DEC 12, 2011 12:49 PM
LIQUID TYPE
SMART SENSOR CONFIGURATION
SENSOR LOCATION TYPE
1 87 ANNULAR TRI -STATE (SINGLE FLOAT)
2 91 ANNULAR TRI -STATE (SINGLE FLOAT)
3 89 ANNULAR TRI -STATE (SINGLE FLOAT)
4 TRI -STATE (SINGLE FLOAT)
5 TRI -STATE (SINGLE FLOAT)
6 TRI -STATE (SINGLE FLOAT)
7 87 FILL TRI -STATE (SINGLE FLOAT)
8 91 FILL TRI -STATE (SINGLE FLOAT)
9 89 FILL TRI -STATE (SINGLE FLOAT)
10 TRI -STATE (SINGLE FLOAT)
11 TRI -STATE (SINGLE FLOAT)
12 TRI -STATE (SINGLE FLOAT)
13 TRI -STATE (SINGLE FLOAT)
14 TRI -STATE (SINGLE FLOAT)
15 TRI -STATE (SINGLE FLOAT)
16 TRI -STATE (SINGLE FLOAT)
172100
DEC 12, 2011 12:49 PM
SMART SENSOR CONFIGURATION
DEVICE LABEL CONFIGURED
1 87 TURBINE ON
2 91 TURBINE ON
3 89 TURBINE ON
4 OFF
5 OFF
6 OFF
7 OFF
8 OFF
9 UDC 3-4 ON
10 UDC 1 -2 ON
11 UDC 1 -2 PRESS SENSOR ON
12 OFF
13 OFF
14 OFF
15 OFF
16 OFF
r1
172200
DEC 12, 2011 12:49 PM
SMART SENSOR LABEL
DEVICE LABEL
3188524
ATG Information
1 87 TURBINE
2 91 TURBINE
3 89 TURBINE
4
5
6
7
8
9 UDC 3-4
10 UDC 1 -2
11 UDC 1 -2 PRESS SENSOR
12
13
14
15
16
120600
DEC 12, 2011 12:50 PM
CIRCL K
1030 OAK ST
661- 861 -8048
BAKERSFIELD,CA.93304
TANK ALARM HISTORY
TANK 1 UNL -REG
HIGH WATER ALARM DEC 12, 2011 11:38 AM
DEC 21, 2010 10:28 AM
OVERFILL ALARM DEC 12, 2011 11:30 AM
DEC 4, 2011 8:22 AM
NOV 5, 2011 9:09 AM
LOW PRODUCT ALARM DEC 12, 2011 11:27 AM
OCT 15, 2011 12:23 PM
MAY 2, 2011 10:30 AM
HIGH PRODUCT ALARM DEC 12, 2011 11:30 AM
MAY 3, 2011 8:53 PM
INVALID FUEL LEVEL DEC 12, 2011 11:27 AM
DEC 21, 2010 10:13 AM
PROBE OUT DEC 12, 2011 11:40 AM
DEC 12, 2011 11:26 AM
DEC 21, 2010 10:36 AM
HIGH WATER WARNING DEC 12, 2011 11:38 AM
DEC 21, 2010 10:17 AM
DELIVERY NEEDED DEC 21, 2010 10:13 AM
MAX PRODUCT ALARM DEC 12, 2011 11:30 AM
LOW TEMP WARNING DEC 12, 2011 11:41 AM
DEC 21, 2010 10:37 AM
TANK 2 UNL -PREM
HIGH WATER ALARM DEC 12. 2011 11:32 AM
DEC 21, 2010 10:23 AM
OVERFILL ALARM DEC 12, 2011 11:37 AM
DEC 21, 2010 10:56 AM
LOW PRODUCT ALARM DEC 12, 2011 11:29 AM
DEC 21, 2010 10:11 AM
HIGH PRODUCT ALARM DEC 12, 2011 11:38 AM
DEC 12, 2011 11:35 AM
INVALID FUEL LEVEL DEC 12, 2011 11:44 AM
DEC 12, 2011 11:29 AM
DEC 21, 2010 10:12 AM
PROBE OUT DEC 12, 2011 11:44 AM
DEC 12, 2011 11:28 AM
SEP 5, 2011 6:56 PM
HIGH WATER WARNING DEC 12, 2011 11:32 AM
DEC 21, 2010 10:23 AM
DELIVERY NEEDED DEC 21, 2010 10:12 AM
TANK 3 UNL -MID
HIGH WATER ALARM DEC 12, 2011 11:31 AM
DEC 21, 2010 10:28 AM
OVERFILL ALARM DEC 12, 2011 11:32 AM
DEC 21, 2010 10:30 AM
3188524
Work Order# 3188524
ATG Information
Work Order# 3188529
LOW PRODUCT ALARM DEC 7, 2010 10:45 AM
DEC 7, 2010 10:32 AM
HIGH PRODUCT ALARM DEC 12, 2011 11:32 AM
INVALID FUEL LEVEL DEC 12, 2011 11:43 AM
DEC 12. 2011 11:28 AM
DEC 21, 2010 10:32 AM
PROBE OUT DEC 12, 2011 11:42 AM
DEC 12, 2011 11:27 AM
DEC 21, 2010 10:32 AM
HIGH WATER WARNING DEC 12. 2011 11:31 AM
DEC 21, 2010 10:28 AM
DELIVERY NEEDED DEC 7, 2010 10:45 AM
DEC 7, 2010 10:32 AM
MAX PRODUCT ALARM DEC 12, 2011 11:32 AM
130200
DEC 12, 2011 12:50 PM
CIRCL K
1030 OAK ST
661 - 861 -8048
BAKERSFIELD, CA.93304
LIQUID ALARM HISTORY REPORT
SENSOR LOCATION
1 87 ANNULAR
DEC 12, 2011 9:28 AM SENSOR OUT ALARM
DEC 12, 2011 9:20 AM FUEL ALARM
DEC 21, 2010 9:11 AM FUEL ALARM
2 91 ANNULAR
DEC 12, 2011 9:28 AM SENSOR OUT ALARM
DEC 12, 2011 9:26 AM FUEL ALARM
DEC 21, 2010 9:38 AM FUEL ALARM
3 89 ANNULAR
DEC 12, 2011 9:28 AM SENSOR OUT ALARM
DEC 12, 2011 9:23 AM FUEL ALARM
DEC 21, 2010 9:30 AM FUEL ALARM
7 87 FILL
DEC 12, 2011 9:28 AM SENSOR OUT ALARM
DEC 12, 2011 9:18 AM FUEL ALARM
DEC 21, 2010 9:09 AM FUEL ALARM
8 91 FILL
DEC 12. 2011 9:28 AM SENSOR OUT ALARM
DEC 12, 2011 9:25 AM FUEL ALARM
DEC 21, 2010 9:36 AM FUEL ALARM
9 89 FILL
DEC 12, 2011 9:27 AM SENSOR OUT ALARM
DEC 12. 2011 9:22 AM FUEL ALARM
MAR 23. 2011 7:04 PM FUEL ALARM
Ii
131600
DEC 12, 2011 12:50 PM
CIRCL K
1030 OAK ST
661- 861 -8048
BAKERSFIELD, CA.93304
SMART SENSOR ALARM HISTORY REPORT
SENSOR LOCATION
1 87 TURBINE
DEC 12, 2011 12:01 PM INSTALL ALARM
DEC 12, 2011 9:17 AM WATER ALARM
DEC 12, 2011 9:16 AM WATER ALARM
2 91 TURBINE
DEC 12, 2011 11:51 AM INSTALL ALARM
DEC 12, 2011 9:24 AM WATER ALARM
DEC 12, 2011 9:24 AM INSTALL ALARM
3 89 TURBINE
DEC 12, 2011 9:21 AM WATER ALARM
DEC 12, 2011 9:20 AM INSTALL ALARM
DEC 21, 2010 9:34 AM INSTALL ALARM
9 UDC 3-4
10 UDC 1 -2
11 UDC 1 -2 PRESS SENSOR
3188529
ATG Information
IA0100
DEC 12. 2011 12:51 PM
TYPE CODE LENGTH SERIAL N0, DICODE
TANK 1 UNL -REG MAG C000 96.00 243412 1984
TANK 2 UNL -PREM MAG C000 96.00 244273 2084
TANK 3 UNL -MID MAG C000 96.00 244272 2084
IA0200
DEC 12, 2011 12:51 PM
TANK 1 UNL -REG MAG GRADIENT= 351.0000
TANK 2 UNL -PREM MAG GRADIENT= 350.3400
TANK 3 UNL -MID MAG GRADIENT= 350.3100
190200
DEC 12. 2011 12:52 PM
SOFTWARE REVISION LEVEL
VERSION 329.01
SOFTWARE# 346329 -100 -B
CREATED - 09.01.29.15.44
S- MODULE# 330160 -004 -a
SYSTEM FEATURES:
PERIODIC IN -TANK TESTS
ANNUAL IN -TANK TESTS
ISD
110100
DEC 12. 2011 12:53 PM
CIRCL K
1030 OAK ST
661- 861 -8048
BAKERSFIELD,CA.93304
SYSTEM STATUS REPORT
ALL FUNCTIONS NORMAL
3188524
Work Order# 3188524