Loading...
HomeMy WebLinkAboutFMC RESULTS 201111000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451 -6334 Fax: (512) 459 -1459 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR CRAIG PERKINS 1501 TRUXTUN AVE. BAKERSFIELD, CA. 93301 Test Date: 12/05/2011 Order Number: 3188364 Dear Regulator, Pis s Date Printed and Mailed: 12/22/2011 Enclosed are the results of recent testing performed at the following facility: 7- ELEVEN #32241, MKT 2368 4101 CALLOWAY DRIVE BAKERSFIELD, CA. 93312 Testing performed: Leak detector tests Monitor Certification Secondary Containment -Spill Container Sincerely, apnr A"r_ Dawn Kohlmeyer Manager, Field Reporting i I X17 TANKNOLOGY CERTIFICATE OF TESTING 8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759 TELEPHONE (512) 451 -6334 FAX (512) 459 -1459 PURPOSE: COMPLIANCE TEST RESULT SUMMARY REPORT TEST DATE: 12/05/11 WORK ORDER NUMBER: 3188364 CUSTOMER PO: CLIENT: 7- ELEVEN, INC. SITE: 7- ELEVEN #32241, MKT 2368 P.O. BOX 711 4101 CALLOWAY DRIVE DALLAS, TX 75221 BAKERSFIELD, CA 93312 MANAGER 972)828 -7908 (661)587 -8826 TEST TYPE: TLD -1 Prnrlurt Pinn Tinhtnacc Tact Racnitc LINE ID LINE PRODUCT LINE MATERIAL DELIVERY TYPE TEST RESULT A B C D FINAL LEAK RATE (gph) A B C D IMPACT VALVE FUNCTION T4 87 4 REG UNLEAD DW FIBERG PRESSURE RESULT T4 87 4 VAPORLESS T5 91 5 PREMIUM DW FIBERG PRESSURE Frictinn I inn I aalr natartnr Tact LINE ID EXISTING LEAK DETECTOR #1 EXISTING LEAK DETECTOR MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT T4 87 4 VAPORLESS LD2000 10061087 P T5 91 5 VAPORLESS LD2000 07081386 P Nnw RRn1arArnont I inn 1 aak natartnr Tact LINE ID REP ACED LEAK DE1 ECTOR #1 REP D LEAK DETECTOR 2 MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT Nor owner detailed report mtormation, visit www.tanknoiogy.com and select Un -Line Keports- W KAY, orcontact your local Ianknology ottice. Tester Name: EDWIN PINEDA i Technician Certification Number:8026748 Printed 12/22/2011 07:51 PBICKHAM INDIVIDUAL TANK INFORMATION AND TEST DATE: 12 /05/11 8501 N MOPAC EXPRESSWAY, SUITE 400 CLIENT: 7 -ELEVEN, INC. AUSTIN, TEXAS 78759 (512) 451 -6334 TEST RESULTS WORK ORDER NUMBER3188364 SITE:7- ELEVEN #32241, MXT 2368 Printed 12/22/2011 07:51 TANK INFORMATION Tank ID: T4 87 4 Tank manifolded: No Bottom to top fill in inches: 164.0 Product: REG UNLEAD Vent manifolded: YES Bottom to grade in inches: 168.0 Capacity in gallons: 14,544 Vapor recovery manifolded: YES Fill pipe length in inches: 68.0 Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 Length in inches: 484 Overspill protection: YES Stage I vapor recovery: DUAL Material: Dw FIBERG Installed: ATG Stage II vapor recovery: ASSIST CP installed on: COMMENTS TANK TEST RESULTS Test Method:vacuTect LEAK DETECTOR TEST RESULTS Test method: PTA Start (in) End (in) Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced Dipped Product Level: L.D. #1 L.D. #1 L.D. #2 L.D. #2 Probe Water Level: Make: vAPoRLEss Ingress Detected: water Bubble Ullage Model: LD2000 Test time: S /N: 10061087 Open time in sec: 9.99 Inclinometer reading: Holding psi: 28 VacuTect Test Type: NOT Resiliency cc: 135 NOT VacuTect Probe Entry Point: TESTED Test leak rate ml /m: 189.0 TESTED Pressure Set Point: Metering psi: 16 Tank water level in inches: Calib. leak in gph: 3.00 Water table depth in inches: Results: PASS Determined by (method): Result: COMMENTS COMMENTS LINE TEST RESULTS Test type: TLD -1 LINE A B C D Material: Dw FIBERG Diameter (in): 2.0 Length (ft): 125.0 Test psi: Bleedback cc: Test time (min): NOT NOT NOT NOT Start time: TESTED TESTED TESTED TESTED End time: Final gph: Result: Pump type: PRESSURE Pump make: FE PETRO COMMENTS Impact Valves Operational: UMWOWN Printed 12/22/2011 07:51 INDIVIDUAL TANK INFORMATION AND TEST RESULTS Mop Tanknobgy TEST DATE: 12 /05/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3188364 CLIENT: 7 -ELEVEN, INC. AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:7- ELEVEN #32241, bUM 2368 Printed 12/22/2011 07:51 TANK INFORMATION Tank ID: T5 91 5 Tank manifolded: No Bottom to top fill in inches: 164.0 Product: PR=UM Vent manifolded: YES Bottom to grade in inches: 168.0 Capacity in gallons: 9,695 Vapor recovery manifolded: YES Fill pipe length in inches: 68.0 Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 Length in inches: 323 Overspill protection: YES Stage I vapor recovery: DUAL Material: Dw FIBERG Installed: ATG Stage II vapor recovery: ASSIST CP installed on: COMMENTS TANK TEST RESULTS Test Method :vacuTect LEAK DETECTOR TEST RESULTS Test method: PTA Start (in) End (in) Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced Dipped Product Level: L.D. #1 L.D. #1 L.D. #2 L.D. #2 Probe Water Level: Make: vAPoRLEss Ingress Detected: Water Bubble Ullage Model: LD2000 Test time: S /N: 07081386 Open time in sec: 9.99 Inclinometer reading: Holding psi: 27 VacuTect Test Type: NOT Resiliency cc: 145 NOT VacuTect Probe Entry Point: TESTED Test leak rate ml /m: 189.0 TESTED Pressure Set Point: Metering psi: 17 Tank water level in inches: Calib. leak in gph: 3.00 Water table depth in inches: Results: PASS Determined by (method): Result: COMMENTS COMMENTS LINE TEST RESULTS Test type: TLD -1 LINE A B C D Material: Dw FIBERG Diameter (in): 2.0 Length (ft): 175.0 Test psi: Bleedback cc: Test time (min): NOT NOT NOT NOT Start time: TESTED TESTED TESTED TESTED End time: Final gph: Result: Pump type: PRESSURE Pump make: FE PETRO COMMENTS Impact Valves Operational: UNKNOWN Printed 12/22/2011 07:51 MONITORING SYSTEM CERTIFICATION For Use By All Jurisdictions Within the State of California Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3 Title 23, California Code of Regulations This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is installed at the facility, a separate certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. A. General Information Facility Name: 7- ELEVEN #32241, MKT 2368 Site Address: 4101 CALLOWAY DRIVE Facility Contact Person: MANAGER Make /Model of Monitoring System:TLS 350 B. Inventory of Equipment Tested /Certified Check the appropriate boxes to indicate specific equipment inspected /serviced City: BAKERSFIELD Contact Phone No: 587 -8826 Date of Testing /Service: 12/05/2011 Work Order Number: 3188364 CA Zip: 93312 Tank ID: T4 REGULAR Tank ID: T5 SUPREME 71 In -Tank Gauging Probe. Model: MAG PLUS In -Tank Gauging Probe. Model: MAG PLUS X Annular Space or Vault Sensor. Model: VR -303 Annular Space or Vault Sensor. Model: VR -303 X Piping Sump/Trench Sensor(s). Model: VR -208 Piping Sump/Trench Sensogs). Model: VR -208 X Fill Sump Sensogs). Model: VR -208 Fill Sump Sensor(s). Model: VR -208 Mechanical Line Leak Detector. Model: LID -2000 Mechanical Line Leak Detector. Model: LD -2000 Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: X Tank Overfill /High -Level Sensor. Model: PROBE /FLAPPER Tank Overfill /High -Level Sensor. Model: PROBE /FLAPPER Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2). Tank D: Tank ID: In -Tank Gauging Probe. Model: In -Tank Gauging Probe. Model: Annular Space orVault Sensor. Model: Annular Space or Vault Sensor. Model: Piping Sump/Trench Sensorss). Model: Piping Sump/Trench Sensorss). Model: Fill Sump Sensorss). Model: 7 Fill Sump Sensogs). Model: Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model: Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: Tank Overfill /High -Level Sensor. Model: Tank Overfill/High-Level Sensor. Model: Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2). ispenser : 1 -2 Dispenser ID: 7 -8 Dispenser Containment Sensors) Model: VR -208 X Dispenser Containment Sensors) Model: VR -208 Shear Valve(s). X Shear Valve(s) Dispenser Containment Floats) and Chain(s). 7 Dispenser Containment Float(s) and Chain(s). Dispenser ID: 3 -4 Dispenser lD: X Dispenser Containment Sensors) Model: VR -208 Dispenser Containment Sensor(s). Model: X Shear Valve(s). Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s). Dispenser ID: 5 -6 Dispenser ID: 0 Dispenser Containment Sensor(s) Model: VR -208 Dispenser Containment Sensor(s). Model: X Shear Valve(s). Shear Valve(s). IEJ Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s). If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. C. Certification I certify that the equipment identified in this document was inspected /serviced in accordance with the manufacturers' guidelines. Attached to this certification is information (e.g manufacturers' checklists) necessary to verify that this information is correct. and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a copy of the (Check all that apply): 0 System set -up X Alarm history report Technician Name (print): EDWIN PINEDA Signature: Certification No.: 8026748 -UT License. No.: 743160 (Class 'A' General Enginering Contractor License) Testing Company Name:Tanknology Phone No.: (800) 800 -4633 Site Address: 11000 N. MoPac Expressway, suite 500, Austin, TX 78759 Date of Testing/Servicing: 12/05/2011 Monitoring System Certification Page 1 of 3 Based on CA form dated 03/08 Monitoring System Certification Site Address 4101 CALLOWAY DRIVE Date of Testing /Service: D. Results of Testing /Servicing Software Version Installed: 329.02 Complete the following checklist: 12/05/2011 El Yes No Is the audible alarm operational? 0 Yes No • Is the visual alarm operational? 0 Yes No ` Were all sensors visually inspected, functionally tested, and confirmed operational? Yes No Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation? El Yes No If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? x Yes No' r[]N/A For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (check all that apply) Sump/Trench Sensors; [Z] Dispenser Containment Sensors. Did you confirm positive shut -down due to leaks and sensor failure /disconnection? x Yes No Yes No' N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanicaloverfillpreventionvalveisinstalled), is the overfill warning alarm visible and audible at the tank fill points(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? 90 Yes• No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name and model for all replacement parts in Section E, below. Yes' O No Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) Product; Water. If yes, describe causes in Section E, below. Yes No ` Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable. Q Yes No • Is all monitoring equipment operational per manufacturers' specifications? In Section E below, describe how and when these deficiences were or will be corrected. E. Comments: REPLACED SYPHON JET LIST LEAK ON T5-91 Page 2 of 3 Based on CA form dated 03/08 Monitoring System Certification Site Address: 4101 CALLOWAY DRIVE Date of Testing /Service: F. In -Tank Gauging / SIR Equipment Check this box if no tank gauging or SIR equipment is installed. 12/05/2011 Check this box if tank gauging is used only for inventory control. Check this box if no tank gauging or SIR equipment is installed. This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. Complete the following checklist: M Yes No • Has all input wiring been inspected for proper entry and termination, including testing for ground faults? 0 Yes No • Were all tank gauging probes visually inspected for damage and residue buildup? X Yes No Was accuracy of system product level readings tested? aYes I F-1 No Was accuracy of system water level readings tested? X yes No • Were all probes reinstalled properly? 0 Yes No • Were all items on the equipment manufacturers' maintenance checklist completed? In the Section H, below, describe how and when these deficiencies were or will be corrected. G. Line Leak Detectors (LLD) : Check this box if LLDs are not installed. Complete the following checklist: 171 Yes No • N/A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? Check all that apply) Simulated leak rate: X 3 g.p.h 0.1 g.p.h []0.2 g.p.h x Yes No • Were all LLDs confirmed operational and accurate within regulatory requirements? X Yes No' Was the testing apparatus properly calibrated? X Yes No' N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? Yes No' N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? Yes No • N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? Yes F-1No • X N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? Yes No' X N/A For electronic LLDs, have all accessible wiring connections been visually inspected? Yes No' Were all items on the equipment manufacturers' maintenance checklist completed? In the Section H, below, describe how and when these deficiencies were or will be corrected. H. Comments: Page 3 of 3 Based on CA form dated 03/08 SWRCB, January 2002 Secondary Containment Testing Report Form Page 1 . Thisform is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages ofthisform to report resultsfor all components tested. The completedform, written test procedures, and printoutsfrom tests (if applicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: 7-ELEVEN # 3 2 2 41, MKT 2368 Date ofTesting: 12/05/2011 Facility Address: 4101 CALLOWAY DRIVE , BAKERSFIELD, CA, 93312 Facility Contact: MANAGER Phone: (6 61) 587-8826 Date Local Agency Was Notified of Testing: 11/15/2011 Name ofLocal Agency Inspector (if present during testing): Ernie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY , INC. Technician Conducting Test: EDWIN PINEDA Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: A -UT I License Number: 743160 - 8026748 Manufacturer Manufacturer Training Component(s) Date Training Expires OPW SPILL BUCKET 02/03/2013 3. SUMMARY OF TEST RESULTS If hydrostatic testing was performed, describe what was done with the water after completion of tests: WATER WAS PLACE IN FIVE GALLON BUCKETS AND PUT IN TRUCK FOR NEXT SITE CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: i n +, + Date: 12/05/2011rd , Spill Box 4 REG FILL Spill Box 5 PRE FILL 000 00 a000 0000 0000 0000. 0000 0000 0000 0000 0000 0000 0000 a000 If hydrostatic testing was performed, describe what was done with the water after completion of tests: WATER WAS PLACE IN FIVE GALLON BUCKETS AND PUT IN TRUCK FOR NEXT SITE CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: i n +, + Date: 12/05/2011rd , SWRCB, January 2006 9e Spill Bucket 'Testing Report Form Thisform is intendedfor use by contractors performing annual testing of UST spill containment structures. The completedform and printouts from tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: 7-ELEVEN #32241, MKT 2368 Date ofTesting: 12/05/2011 Facility Address: 4101 CALLOWAY DRIVE , BAKERSFIELD, CA, 93312 Facility Contact: MANAGER Phone: (661) 587 -8826 Date Local Agency Was Notified of Testing: 11/15/2011 Name of Local Agency Inspector (if present during testing): Ernie Medina 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY , INC. Technician Conducting Test: EDWIN PINEDA Credentials I : X CSLB Contractor E ICC Service Tech. SWRCB Tank Tester E Other (Specify) A -UT License Number: 743160-8026748 3. SPILL BUCKET TESTING INFORMATION Test Method Used: El Hydrostatic Vacuum Other Test Equipment Used: TAPE MEASURE Equipment Resolution: VISUAL Identify Spill Bucke0y Tank Number, Stored Product, etc.) 4 REG FILL Z 5 PRE FILL 3 4 Bucket Installation Type: E] Direct Bury g Contained in Sump Direct Bury Contained in Sump Direct Bury Contained in Sump Direct Bury El Contained in Sump Bucket Diameter: 121, 1211 Bucket Depth: 141, 141- Wait time between applying vacuum/water and starting test: 10 MIN 10 MIN Test Start Time (TI ): 0930 0930 Initial Reading (Ri ): 10.5 0 ,, 10.751, Test End Time (TF ): 1030 1030 Final Reading (R F ): 10.501, 10.751, Test Duration: 1 HR 1 HR Change in Reading (R F - R1 ): 0 0 Pass/Fail Threshold or Criteria: 0 0 Test Result: Pass Fail X Pass Fail Pass Fail Pass Fail Comments - (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. Technician's Signature: c0( ,—v +? . - Date: 12/05/2011 State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements Work Order: 3188364 M) & (ESV) Testing Form - Vaeion I- fiMf2 7 Emergency Shut Off (ESO) & Dispenser Emergency Shutoff Valve (ESV) ANNUAL TEST RECORD LOCATIONS AND TEST DATA Testing Company: q } Date: I S 1 Location Name: wL Store #: 1z 7,q Stah, ® M Address: Q Mewq City: State: CA Emergency Shut Off SO Testing Results On 2- in accordance with "ESO Vendor Letter (3- 21 -05).doc ", from Valero's Retail Compliance Department, as a part ofannual compliance testing, this representative tested the Emergency Shut Off (ESO) switches indicated on this sketch. Findings listed below: Emergency Shut Off (ESO) I IfNo, Provide If No, Provide Operational? I GY / N I Maintenance Log # Y Date Called: On 1-7,10sh, in. accordance with NFPA 30A this representative tested the automatic - closing feature ofthe Dispenser Emergency Shutoff VALVE(S) (ESV) located in the supply lines at the base of each individual island type dispenser indicated on the diagram below. Each device ( #) in all, would automatically close. Findings listed below: Disp. Emergency Shut Off If No, Provide Valve (ESV) Operational? Y Maintenance Log # Date Called Site Map Of Location and Ptm=ncnt ofDevices Tested: Q o ail o CY (z' d\ d 2 ° e Shmatnre Of Representative: E AAJ ' Tanknology Inc. 11000N. MoPac Expressway, Suite 500, Austin, Texas 78759 SITE DIAGRAM Tankmokygy 8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759 512) 451 -6334 FAX (512) 459 -1459 TEST DATE: 12/05/11 WORK ORDER NUMBER3188364 CLIENT: 7 —ELEVEN, INC. SITE:7— ELEVEN #32241, MKT 2368 VPH site. - s S- o A 1 3,14 AIR/ FNT L -11 A 9,1 0 p H2O VENT 11 PAN P L -3 8 AS #2 5 #8 L -6 FlCE L -1 CL -4 0 5 • 1 ' 7 2 7 -11 #32241 #3 4101 Calloway Dr. Bakersfield, CA 93312 E 661.587.8826 ESOTLS] APCD #S- 3256 -1 -2 1 Printed 12/22/2011 07:51 PBICKHAM ATG Information Work Order# 3188364 110100 DEC 5, 2011 1:53 PM 235421 7 -11 32241 4101 CALLOWAY DR BAKESFIELD, CA 93312 SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL 150301 DEC 5, 2011 1:53 PM 1:235421 7 -11 32241 150302 DEC 5, 2011 1:53 PM 2:4101 CALLOWAY DR 150303 DEC 5, 2011 1:53 PM 3:BAKESFIELD, CA 93312 150304 DEC 5, 2011 1:53 PM 4: 151700 DEC 5, 2011 1:53 PM SYSTEM TYPE AND LANGUAGE FLAG SYSTEM UNITS U.S. SYSTEM LANGUAGE ENGLISH SYSTEM DATFJTIME FORMAT MON DD YYYY HH:MM:SS xM I50F00 DEC 5, 2011 1:53 PM MON DD YYYY HH:MM:SS xM 160100 DEC 5, 2011 1:53 PM TANK CONFIGURATION DEVICE LABEL CONFIGURED 1 OFF 2 OFF 3 OFF 4 RUL ON 5 PUL ON 6 OFF 7 OFF 8 OFF 160200 DEC 5, 2011 1:53 PM TANK PRODUCT LABEL TANK PRODUCT LABEL 1 2 3 4 RUL 5 PUL 6 7 8 160300 DEC 5, 2011 1:53 PM 3188364 ATG Information Work Order# 3188364 TANK PRODUCT CODE TANK PRODUCT LABEL 1 1 2 2 3 3 4 RUL 4 5 PUL 5 162100 DEC 5, 2011 1:53 PM TANK LOW PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 800 5 PUL 800 3188364 160400 DEC 5, 2011 1:53 PM TANK FULL VOLUME TANK THERMAL COEFFICIENT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 14544 5 PUL 9695 6 0 7 0 8 0 El 160700 161200 DEC 5, 2011 1:53 PM TANK DIAMETER TANK PRODUCT LABEL INCHES 1 0.00 2 0.00 3 0.00 4 RUL 91.63 5 PUL 91.63 6 0.00 7 0.00 8 0.00 162100 DEC 5, 2011 1:53 PM TANK LOW PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 800 5 PUL 800 3188364 160900 DEC 5, 2011 1:53 PM TANK THERMAL COEFFICIENT TANK PRODUCT LABEL 1 0.000000 2 0.000000 3 0.000000 4 RUL 0.000700 5 PUL 0.000700 6 0.000000 7 0.000000 8 0.000000 El 161200 DEC 5, 2011 1:53 PM TANK MANIFOLDED PARTNERS TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS 1 NONE NONE 2 NONE NONE 3 NONE NONE 4 RUL NONE NONE 5 PUL NONE NONE 6 NONE NONE 7 NONE NONE 8 NONE NONE 162100 DEC 5, 2011 1:53 PM TANK LOW PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 800 5 PUL 800 3188364 ATG Information Work Order# 3188364 162200 DEC 5, 2011 1:53 PM TANK HIGH PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 14250 5 PUL 9500 6 0 7 0 8 0 TRI -STATE (SINGLE FLOAT) 5 87 ANNULAR SPACE DUAL POINT HYDROSTATIC 6 87 FILL SUMP TRI -STATE (SINGLE FLOAT) 162300 DEC 5, 2011 1:53 PM TANK OVERFILL LEVEL LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 13500 5 PUL 9000 6 0 7 0 8 0 El cl 162400 DEC 5, 2011 1:53 PM 4 RUL 1.5 5 PUL 1.5 162800 DEC 5, 2011 1:53 PM TANK MAXIMUM VOLUME LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 15000 5 PUL 10000 6 0 7 0 8 0 TRI -STATE (SINGLE FLOAT) 5 87 ANNULAR SPACE DUAL POINT HYDROSTATIC 6 87 FILL SUMP TRI -STATE (SINGLE FLOAT) 162900 DEC 5, 2011 1:53 PM TANK DELIVERY REQUIRED LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 0 3 0 4 RUL 2250 5 PUL 1500 6 0 7 0 8 0 3188364 170300 DEC 5, 2011 1:53 PM LIQUID TYPE SENSOR LOCATION TYPE 1 DISP 1 -2 PAN TRI -STATE (SINGLE FLOAT) 2 DISP 3-4 PAN TRI -STATE (SINGLE FLOAT) 3 DISP PAN 5 -6 TRI -STATE (SINGLE FLOAT) 4 DISP PAN 7-8 TRI -STATE (SINGLE FLOAT) 5 87 ANNULAR SPACE DUAL POINT HYDROSTATIC 6 87 FILL SUMP TRI -STATE (SINGLE FLOAT) 3188364 ATG Information Work Order# 3188364 7 87 STP SUMP TRI -STATE (SINGLE FLOAT) 8 91 ANNULAR SPACE DUAL POINT HYDROSTATIC 9 91 FILL SUMP TRI -STATE (SINGLE FLOAT) 10 91 STP SUMP TRI -STATE (SINGLE FLOAT) 11 VAPOR PIPING PAN TRI -STATE (SINGLE FLOAT) 12 TRI -STATE (SINGLE FLOAT) 13 TRI -STATE (SINGLE FLOAT) 14 TRI -STATE (SINGLE FLOAT) 15 TRI -STATE (SINGLE FLOAT) 16 TRI -STATE (SINGLE FLOAT) 172100 DEC 5, 2011 1:53 PM SMART SENSOR CONFIGURATION DEVICE LABEL CONFIGURED 1 1 -2 FLOW METER ON 2 3-4 FLOW METER ON 3 5-6 FLOW METER ON 4 7-8 FLOW METER ON 5 OFF 6 OFF 7 OFF 8 ISO PRESSURE SENSOR ON 9 87 FILLVRL UDC VAC ON 10 87 PRODUT LINE VAC ON 11 87 STPSUMP - FILLCNCT ON 12 91FILL- VENT'CONTSUMP ON 13 91 PRODUCT LINEVAC ON 14 91 STPSUMP - FILLCNCT ON 15 OFF 16 ATM P SENSOR 5-6 ON 172200 DEC 5, 2011 1:53 PM SMART SENSOR LABEL DEVICE LABEL 1 1 -2 FLOW METER 2 3-4 FLOW METER 3 5 -6 FLOW METER 4 7-8 FLOW METER 5 6 7 8 ISO PRESSURE SENSOR 9 87 FILL VRL UDC VAC 10 87 PRODUT LINE VAC 11 87 STPSUMP - FILLCNCT 12 91FILL- VENT'CONTSUMP 13 91 PRODUCT LINE VAC 14 91 STPSUMP - FILLCNCT 15 16 ATM P SENSOR 5-6 172900 DEC 5, 2011 1:53 PM VACUUM SENSOR PUMP NUMBER DEVICE LABEL PUMP NUMBER 9 87 FILL VRL UDC VAC R 5:87 REGULAR STP 10 87 PRODUT LINE VAC R 5:87 REGULAR STP 11 87 STPSUMP - FILLCNCT R 5:87 REGULAR STP 12 91 FILL- VENT'CONTSUMP R 6:91 PREMIUM STP 13 91 PRODUCT LINE VAC R 6:91 PREMIUM STP 14 91 STPSUMP - FILLCNCT R 6:91 PREMIUM STP 15 NONE 172A00 DEC 5, 2011 1:53 PM VACUUM SENSOR VOLUME DEVICE LABEL VOLUME 9 87 FILL VRL UDC VAC 36.0 GALLONS 10 87 PRODUT LINE VAC 36.0 GALLONS 11 87 STPSUMP - FILLCNCT 36.0 GALLONS 3188364 ATG Information Work Order# 3188364 12 91FILL- VENT'CONTSUMP 36.0 GALLONS 13 91 PRODUCT LINE VAC 36.0 GALLONS 14 91 STPSUMP - FILLCNCT 36.0 GALLONS 15 501.0 GALLONS 172800 DEC 5, 2011 1:53 PM VACUUM SENSOR RELIEF VALVE PRESENT DEVICE LABEL RELIEF VALVE 9 87 FILL VRL UDC VAC NO 10 87 PRODUT LINE VAC NO 11 87 STPSUMP - FILLCNCT NO 12 91FILL- VENT'CONTSUMP NO 13 91 PRODUCT LINE VAC NO 14 91 STPSUMP - FILLCNCT NO 15 NO El 172C00 DEC 5, 2011 1:53 PM VACUUM SENSOR RELIEF VALVE PRESSURE DEVICE LABEL RELIEF VALVE PRESSURE 9 87 FILL VRL UDC VAC -9.0 PSI 10 87 PRODUT LINE VAC -9.0 PSI 11 87 STPSUMP - FILLCNCT -9.0 PSI 12 91FILL- VENT'CONTSUMP -9.0 PSI 13 91 PRODUCT LINE VAC -9.0 PSI 14 91 STPSUMP - FILLCNCT -9.0 PSI 15 -9.0 PSI 190200 DEC 5, 2011 1:53 PM SOFTWARE REVISION LEVEL VERSION 329.02 SOFTWARE# 346329 -100 -C CREATED - 09.07.01.16.29 S- MODULE# 330160 -104 -a SYSTEM FEATURES: PERIODIC IN -TANK TESTS ANNUAL IN -TANK TESTS BIR ISD 120600 DEC 5, 2011 1:54 PM 235421 7 -11 32241 4101 CALLOWAY DR BAKESFIELD, CA 93312 TANKALARM HISTORY TANK4 RUL HIGH WATERALARM DEC 5, 2011 12:22 PM DEC 14, 2010 9:33 AM OVERFILL ALARM DEC 5, 2011 12:22 PM NOV 19, 2011 10:19 PM NOV 12, 2011 5:50 AM LOW PRODUCT ALARM DEC 5, 2011 12:19 PM JUL 7, 2011 7:24 AM JUN 22, 2011 5:06 PM SUDDEN LOSS ALARM DEC 5, 2011 12:18 PM DEC 14, 2010 9:20 AM HIGH PRODUCT ALARM DEC 5, 2011 12:22 PM SEP 9, 2011 12:03 AM AUG 25, 2011 9:22 PM INVALID FUEL LEVEL DEC 5, 2011 12:28 PM DEC 5, 2011 12:18 PM DEC 14, 2010 9:21 AM PROBE OUT DEC 5, 2011 12:27 PM DEC 5, 2011 12:18 PM AUG 22, 2011 9:53 AM HIGH WATER WARNING DEC 5, 2011 12:22 PM DEC 14, 2010 9:33 AM DELIVERY NEEDED DEC 5, 2011 12:18 PM SEP 26, 2011 8:39 PM 3188364 I . ATG Information Work Order# 3188364 JUL 11, 2011 9:20 PM MAX PRODUCT ALARM DEC 5, 2011 12:22 PM DEC 14, 2010 9:40 AM LOW TEMP WARNING AUG 22, 2011 9:54 AM TANK 5 PUL HIGH WATER ALARM DEC 5, 2011 12:28 PM DEC 14, 2010 9:29 AM OVERFILL ALARM DEC 5, 2011 12:21 PM DEC 14, 2010 9:35 AM LOW PRODUCT ALARM DEC 5, 2011 12:19 PM AUG 22, 2011 9:52 AM AUG 22, 2011 9:12 AM SUDDEN LOSS ALARM DEC 5, 2011 12:19 PM DEC 14, 2010 9:19 AM HIGH PRODUCT ALARM DEC 5, 2011 12:21 PM DEC 14, 2010 9:37 AM INVALID FUEL LEVEL DEC 5, 2011 12:20 PM AUG 22, 2011 9:13 AM DEC 14, 2010 9:20 AM PROBE OUT DEC 5, 2011 12:45 PM DEC 5, 2011 12:19 PM AUG 22, 2011 9:52 AM HIGH WATER WARNING DEC 5, 2011 12:28 PM AUG 22, 2011 9:16 AM DEC 14, 2010 9:29 AM DELIVERY NEEDED DEC 5, 2011 12:19 PM SEP 16, 2011 6:27 PM AUG 22, 2011 9:52 AM MAX PRODUCT ALARM DEC 5, 2011 12:22 PM DEC 14, 2010 9:37 AM LOW TEMP WARNING DEC 5, 2011 12:45 PM 130200 DEC 5, 2011 1:54 PM 235421 7 -11 32241 4101 CALLOWAY DR BAKESFIELD, CA 93312 LIQUID ALARM HISTORY REPORT SENSOR LOCATION 1 DISP 1 -2 PAN DEC 5, 2011 9:36 AM FUEL ALARM DEC 5, 2011 9:21 AM SENSOR OUT ALARM DEC 14, 2010 10:06 AM SENSOR OUT ALARM 2 DISP 3-4 PAN DEC 5, 2011 9:37 AM FUEL ALARM DEC 5, 2011 9:21 AM SENSOR OUT ALARM DEC 14, 2010 10:06 AM SENSOR OUT ALARM 3 DISP PAN 5-6 DEC 5, 2011 9:35 AM FUEL ALARM DEC 5, 2011 9:21 AM SENSOR OUT ALARM DEC 14, 2010 10:06AM SENSOR OUT ALARM 4 DISP PAN 7-8 DEC 5, 2011 9:35 AM FUEL ALARM DEC 5, 2011 9:21 AM SENSOR OUT ALARM DEC 14, 2010 10:06 AM SENSOR OUT ALARM 5 87 ANNULAR SPACE DEC 5, 2011 9:28 AM LOW LIQUID ALARM DEC 5, 2011 9:28 AM HIGH LIQUID ALARM DEC 5, 2011 9:28 AM LOW LIQUID ALARM 6 87 FILL SUMP DEC 5, 2011 9:27 AM FUEL ALARM DEC 5, 2011 9:21 AM SENSOR OUT ALARM JUL 3, 2011 3:39 PM FUEL ALARM 7 87 STP SUMP DEC 5, 2011 9:25 AM FUEL ALARM DEC 5, 2011 9:25 AM FUEL ALARM DEC 5, 2011 9:21 AM SENSOR OUT ALARM 8 91 ANNULAR SPACE DEC 5, 2011 9:31 AM LOW LIQUID ALARM DEC 5, 2011 9:31 AM HIGH LIQUID ALARM DEC 5, 2011 9:31 AM LOW LIQUID ALARM 9 91 FILL SUMP DEC 5, 2011 9:30 AM FUEL ALARM DEC 5, 2011 9:21 AM SENSOR OUT ALARM DEC 14, 2010 10:06 AM SENSOR OUT ALARM 3188364 ATG Information Work Order# 3188364 10 91 STP SUMP DEC 5, 2011 9:29 AM DEC 5, 2011 9:21 AM DEC 14, 2010 10:06 AM 11 VAPOR PIPING PAN DEC 5, 2011 10:44 AM DEC 5, 2011 9:21 AM DEC 14, 2010 10:06 AM El 131600 DEC 5, 2011 1:54 PM 235421 7 -11 32241 4101 CALLOWAY DR BAKESFIELD, CA 93312 FUEL ALARM SENSOR OUTALARM SENSOR OUT ALARM FUEL ALARM SENSOR OUTALARM SENSOR OUT ALARM SMART SENSOR ALARM HISTORY REPORT SENSOR LOCATION 1 1 -2 FLOW METER 2 3-4 FLOW METER 3 5-6 FLOW METER 4 7-8 FLOW METER 8 ISO PRESSURE SENSOR AUG 11, 2010 1:46 PM COMMUNICATION ALARM AUG 7, 2010 11:06 AM COMMUNICATION ALARM 9 87 FILL VRL UDC VAC DEC 5, 2011 9:50 AM HIGH LIQUID ALARM DEC 5, 2011 9:46 AM HIGH LIQUID ALARM DEC 5, 2011 9:46 AM NO VACUUM ALARM 10 87 PRODUT LINE VAC DEC 5, 2011 9:50 AM HIGH LIQUID ALARM DEC 5, 2011 9:49 AM NO VACUUM ALARM DEC 5, 2011 9:46 AM HIGH LIQUID ALARM 11 87 STPSUMP - FILLCNCT DEC 5, 2011 9:50 AM HIGH LIQUID ALARM DEC 5, 2011 9:46 AM HIGH LIQUID ALARM DEC 5, 2011 9:46 AM NO VACUUM ALARM 12 91FILL- VENT'CONTSUMP DEC 5, 2011 10:12 AM NO VACUUM ALARM DEC 5, 2011 10:10 AM HIGH LIQUID ALARM DEC 5, 2011 10:10 AM NO VACUUM ALARM 13 91 PRODUCT LINE VAC DEC 5, 2011 10:12 AM NO VACUUM ALARM DEC 5, 2011 10:11 AM HIGH LIQUID ALARM DEC 5, 2011 10:10 AM NO VACUUM ALARM 14 91 STPSUMP - FILLCNCT DEC 5, 2011 10:12 AM NO VACUUM ALARM DEC 5, 2011 10:11 AM HIGH LIQUID ALARM DEC 5, 2011 10:10 AM NO VACUUM ALARM 16 ATM P SENSOR 5-6 110100 DEC 5, 2011 1:56 PM 235421 7 -11 32241 4101 CALLOWAY DR BAKESFIELD, CA 93312 SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL 3188364