HomeMy WebLinkAboutFMC RESULTS 201111000 N. MoPac Expressway, Suite 500
Austin, Texas 78759
Phone: (512) 451 -6334
Fax: (512) 459 -1459
BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR CRAIG PERKINS
1501 TRUXTUN AVE.
BAKERSFIELD, CA. 93301
Test Date: 12/05/2011
Order Number: 3188364
Dear Regulator,
Pis s
Date Printed and Mailed: 12/22/2011
Enclosed are the results of recent testing performed at the following facility:
7- ELEVEN #32241, MKT 2368
4101 CALLOWAY DRIVE
BAKERSFIELD, CA. 93312
Testing performed:
Leak detector tests
Monitor Certification
Secondary Containment -Spill Container
Sincerely,
apnr A"r_
Dawn Kohlmeyer
Manager, Field Reporting
i I
X17 TANKNOLOGY CERTIFICATE OF TESTING
8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759
TELEPHONE (512) 451 -6334 FAX (512) 459 -1459
PURPOSE: COMPLIANCE TEST RESULT SUMMARY REPORT
TEST DATE: 12/05/11 WORK ORDER NUMBER: 3188364
CUSTOMER PO:
CLIENT: 7- ELEVEN, INC. SITE: 7- ELEVEN #32241, MKT 2368
P.O. BOX 711 4101 CALLOWAY DRIVE
DALLAS, TX 75221 BAKERSFIELD, CA 93312
MANAGER
972)828 -7908 (661)587 -8826
TEST TYPE: TLD -1
Prnrlurt Pinn Tinhtnacc Tact Racnitc
LINE
ID
LINE
PRODUCT
LINE
MATERIAL
DELIVERY
TYPE
TEST RESULT
A B C D
FINAL LEAK RATE (gph)
A B C D
IMPACT
VALVE
FUNCTION
T4 87 4 REG UNLEAD DW FIBERG PRESSURE
RESULT
T4 87 4 VAPORLESS
T5 91 5 PREMIUM DW FIBERG PRESSURE
Frictinn I inn I aalr natartnr Tact
LINE
ID
EXISTING LEAK DETECTOR #1 EXISTING LEAK DETECTOR
MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT
T4 87 4 VAPORLESS LD2000 10061087 P
T5 91 5 VAPORLESS LD2000 07081386 P
Nnw RRn1arArnont I inn 1 aak natartnr Tact
LINE
ID
REP ACED LEAK DE1 ECTOR #1 REP D LEAK DETECTOR 2
MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT
Nor owner detailed report mtormation, visit www.tanknoiogy.com and select Un -Line Keports- W KAY, orcontact your local Ianknology ottice.
Tester Name: EDWIN PINEDA
i
Technician Certification Number:8026748
Printed 12/22/2011 07:51 PBICKHAM
INDIVIDUAL TANK INFORMATION AND
TEST DATE: 12 /05/11 8501 N MOPAC EXPRESSWAY, SUITE 400
CLIENT: 7 -ELEVEN, INC. AUSTIN, TEXAS 78759 (512) 451 -6334
TEST RESULTS
WORK ORDER NUMBER3188364
SITE:7- ELEVEN #32241, MXT 2368
Printed 12/22/2011 07:51
TANK INFORMATION
Tank ID: T4 87 4 Tank manifolded: No Bottom to top fill in inches: 164.0
Product: REG UNLEAD Vent manifolded: YES Bottom to grade in inches: 168.0
Capacity in gallons: 14,544 Vapor recovery manifolded: YES Fill pipe length in inches: 68.0
Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 484 Overspill protection: YES Stage I vapor recovery: DUAL
Material: Dw FIBERG Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TEST RESULTS Test Method:vacuTect LEAK DETECTOR TEST RESULTS Test method: PTA
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
Dipped Product Level: L.D. #1 L.D. #1 L.D. #2 L.D. #2
Probe Water Level: Make: vAPoRLEss
Ingress Detected: water Bubble Ullage Model: LD2000
Test time: S /N: 10061087
Open time in sec: 9.99
Inclinometer reading: Holding psi: 28
VacuTect Test Type: NOT
Resiliency cc: 135 NOT
VacuTect Probe Entry Point: TESTED
Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi: 16
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINE TEST RESULTS Test type: TLD -1
LINE A B C D
Material: Dw FIBERG
Diameter (in): 2.0
Length (ft): 125.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: FE PETRO
COMMENTS Impact Valves Operational: UMWOWN
Printed 12/22/2011 07:51
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
Mop Tanknobgy
TEST DATE: 12 /05/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3188364
CLIENT: 7 -ELEVEN, INC. AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:7- ELEVEN #32241, bUM 2368
Printed 12/22/2011 07:51
TANK INFORMATION
Tank ID: T5 91 5 Tank manifolded: No Bottom to top fill in inches: 164.0
Product: PR=UM Vent manifolded: YES Bottom to grade in inches: 168.0
Capacity in gallons: 9,695 Vapor recovery manifolded: YES Fill pipe length in inches: 68.0
Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 323 Overspill protection: YES Stage I vapor recovery: DUAL
Material: Dw FIBERG Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TEST RESULTS Test Method :vacuTect LEAK DETECTOR TEST RESULTS Test method: PTA
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
Dipped Product Level: L.D. #1 L.D. #1 L.D. #2 L.D. #2
Probe Water Level: Make: vAPoRLEss
Ingress Detected: Water Bubble Ullage Model: LD2000
Test time: S /N: 07081386
Open time in sec: 9.99
Inclinometer reading: Holding psi: 27
VacuTect Test Type: NOT
Resiliency cc: 145 NOT
VacuTect Probe Entry Point: TESTED
Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi: 17
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINE TEST RESULTS Test type: TLD -1
LINE A B C D
Material: Dw FIBERG
Diameter (in): 2.0
Length (ft): 175.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: FE PETRO
COMMENTS Impact Valves Operational: UNKNOWN
Printed 12/22/2011 07:51
MONITORING SYSTEM CERTIFICATION
For Use By All Jurisdictions Within the State of California
Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3 Title 23, California Code of Regulations
This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is installed at the facility, a separate
certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank
system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date.
A. General Information
Facility Name: 7- ELEVEN #32241, MKT 2368
Site Address: 4101 CALLOWAY DRIVE
Facility Contact Person: MANAGER
Make /Model of Monitoring System:TLS 350
B. Inventory of Equipment Tested /Certified
Check the appropriate boxes to indicate specific equipment inspected /serviced
City: BAKERSFIELD
Contact Phone No: 587 -8826
Date of Testing /Service: 12/05/2011
Work Order Number: 3188364
CA Zip: 93312
Tank ID: T4 REGULAR Tank ID: T5 SUPREME
71 In -Tank Gauging Probe. Model: MAG PLUS In -Tank Gauging Probe. Model: MAG PLUS
X Annular Space or Vault Sensor. Model: VR -303 Annular Space or Vault Sensor. Model: VR -303
X Piping Sump/Trench Sensor(s). Model: VR -208 Piping Sump/Trench Sensogs). Model: VR -208
X Fill Sump Sensogs). Model: VR -208 Fill Sump Sensor(s). Model: VR -208
Mechanical Line Leak Detector. Model: LID -2000 Mechanical Line Leak Detector. Model: LD -2000
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
X Tank Overfill /High -Level Sensor. Model: PROBE /FLAPPER Tank Overfill /High -Level Sensor. Model: PROBE /FLAPPER
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2).
Tank D: Tank ID:
In -Tank Gauging Probe. Model: In -Tank Gauging Probe. Model:
Annular Space orVault Sensor. Model: Annular Space or Vault Sensor. Model:
Piping Sump/Trench Sensorss). Model: Piping Sump/Trench Sensorss). Model:
Fill Sump Sensorss). Model: 7 Fill Sump Sensogs). Model:
Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model:
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
Tank Overfill /High -Level Sensor. Model: Tank Overfill/High-Level Sensor. Model:
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2).
ispenser : 1 -2 Dispenser ID: 7 -8
Dispenser Containment Sensors) Model: VR -208 X Dispenser Containment Sensors) Model: VR -208
Shear Valve(s). X Shear Valve(s)
Dispenser Containment Floats) and Chain(s). 7 Dispenser Containment Float(s) and Chain(s).
Dispenser ID: 3 -4 Dispenser lD:
X Dispenser Containment Sensors) Model: VR -208 Dispenser Containment Sensor(s). Model:
X Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
Dispenser ID: 5 -6 Dispenser ID:
0 Dispenser Containment Sensor(s) Model: VR -208 Dispenser Containment Sensor(s). Model:
X Shear Valve(s). Shear Valve(s).
IEJ Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility.
C. Certification
I certify that the equipment identified in this document was inspected /serviced in accordance with the manufacturers' guidelines.
Attached to this certification is information (e.g manufacturers' checklists) necessary to verify that this information is correct.
and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached
a copy of the (Check all that apply): 0 System set -up X Alarm history report
Technician Name (print): EDWIN PINEDA Signature:
Certification No.: 8026748 -UT License. No.: 743160 (Class 'A' General Enginering Contractor License)
Testing Company Name:Tanknology Phone No.: (800) 800 -4633
Site Address: 11000 N. MoPac Expressway, suite 500, Austin, TX 78759 Date of Testing/Servicing: 12/05/2011
Monitoring System Certification Page 1 of 3 Based on CA form dated 03/08
Monitoring System Certification
Site Address 4101 CALLOWAY DRIVE Date of Testing /Service:
D. Results of Testing /Servicing
Software Version Installed: 329.02
Complete the following checklist:
12/05/2011
El Yes No Is the audible alarm operational?
0 Yes No • Is the visual alarm operational?
0 Yes No ` Were all sensors visually inspected, functionally tested, and confirmed operational?
Yes No Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not
interfere with their proper operation?
El Yes No If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational?
x Yes No' r[]N/A
For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment
monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive
shut -down? (check all that apply) Sump/Trench Sensors; [Z] Dispenser Containment Sensors.
Did you confirm positive shut -down due to leaks and sensor failure /disconnection? x Yes No
Yes No' N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanicaloverfillpreventionvalveisinstalled), is the overfill warning alarm visible and audible at the tank fill points(s) and operating
properly? If so, at what percent of tank capacity does the alarm trigger? 90
Yes• No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the
manufacturer name and model for all replacement parts in Section E, below.
Yes' O No Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) Product;
Water. If yes, describe causes in Section E, below.
Yes No ` Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable.
Q Yes No • Is all monitoring equipment operational per manufacturers' specifications?
In Section E below, describe how and when these deficiences were or will be corrected.
E. Comments:
REPLACED SYPHON JET LIST LEAK ON T5-91
Page 2 of 3 Based on CA form dated 03/08
Monitoring System Certification
Site Address: 4101 CALLOWAY DRIVE Date of Testing /Service:
F. In -Tank Gauging / SIR Equipment
Check this box if no tank gauging or SIR equipment is installed.
12/05/2011
Check this box if tank gauging is used only for inventory control.
Check this box if no tank gauging or SIR equipment is installed.
This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring.
Complete the following checklist:
M Yes No • Has all input wiring been inspected for proper entry and termination, including testing for ground faults?
0 Yes No • Were all tank gauging probes visually inspected for damage and residue buildup?
X Yes No Was accuracy of system product level readings tested?
aYes I F-1 No Was accuracy of system water level readings tested?
X yes No • Were all probes reinstalled properly?
0 Yes No • Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
G. Line Leak Detectors (LLD) : Check this box if LLDs are not installed.
Complete the following checklist:
171 Yes No • N/A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance?
Check all that apply) Simulated leak rate: X 3 g.p.h 0.1 g.p.h []0.2 g.p.h
x Yes No • Were all LLDs confirmed operational and accurate within regulatory requirements?
X Yes No' Was the testing apparatus properly calibrated?
X Yes No' N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak?
Yes No' N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak?
Yes No • N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
Yes F-1No • X N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test?
Yes No' X N/A For electronic LLDs, have all accessible wiring connections been visually inspected?
Yes No' Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
H. Comments:
Page 3 of 3 Based on CA form dated 03/08
SWRCB, January 2002
Secondary Containment Testing Report Form
Page 1 .
Thisform is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages ofthisform to report resultsfor all components tested. The completedform, written test procedures, and
printoutsfrom tests (if applicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: 7-ELEVEN # 3 2 2 41, MKT 2368 Date ofTesting: 12/05/2011
Facility Address: 4101 CALLOWAY DRIVE , BAKERSFIELD, CA, 93312
Facility Contact: MANAGER Phone: (6 61) 587-8826
Date Local Agency Was Notified of Testing: 11/15/2011
Name ofLocal Agency Inspector (if present during testing): Ernie Medina
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY , INC.
Technician Conducting Test: EDWIN PINEDA
Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: A -UT I License Number: 743160 - 8026748
Manufacturer
Manufacturer Training
Component(s) Date Training Expires
OPW SPILL BUCKET 02/03/2013
3. SUMMARY OF TEST RESULTS
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
WATER WAS PLACE IN FIVE GALLON BUCKETS AND PUT IN TRUCK FOR NEXT SITE
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: i n +, + Date: 12/05/2011rd ,
Spill Box 4 REG FILL
Spill Box 5 PRE FILL
000 00
a000 0000
0000 0000.
0000 0000
0000 0000
0000 0000
0000 a000
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
WATER WAS PLACE IN FIVE GALLON BUCKETS AND PUT IN TRUCK FOR NEXT SITE
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: i n +, + Date: 12/05/2011rd ,
SWRCB, January 2006
9e Spill Bucket 'Testing Report Form
Thisform is intendedfor use by contractors performing annual testing of UST spill containment structures. The completedform and
printouts from tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: 7-ELEVEN #32241, MKT 2368 Date ofTesting: 12/05/2011
Facility Address: 4101 CALLOWAY DRIVE , BAKERSFIELD, CA, 93312
Facility Contact: MANAGER Phone: (661) 587 -8826
Date Local Agency Was Notified of Testing: 11/15/2011
Name of Local Agency Inspector (if present during testing): Ernie Medina
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY , INC.
Technician Conducting Test: EDWIN PINEDA
Credentials I : X CSLB Contractor E ICC Service Tech. SWRCB Tank Tester E Other (Specify) A -UT
License Number: 743160-8026748
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: El Hydrostatic Vacuum Other
Test Equipment Used: TAPE MEASURE Equipment Resolution: VISUAL
Identify Spill Bucke0y Tank
Number, Stored Product, etc.)
4 REG FILL Z 5 PRE FILL 3 4
Bucket Installation Type: E] Direct Bury
g Contained in Sump
Direct Bury
Contained in Sump
Direct Bury
Contained in Sump
Direct Bury
El Contained in Sump
Bucket Diameter: 121, 1211
Bucket Depth: 141, 141-
Wait time between applying
vacuum/water and starting test:
10 MIN 10 MIN
Test Start Time (TI ): 0930 0930
Initial Reading (Ri ): 10.5 0 ,, 10.751,
Test End Time (TF ): 1030 1030
Final Reading (R F ): 10.501, 10.751,
Test Duration: 1 HR 1 HR
Change in Reading (R F - R1 ): 0 0
Pass/Fail Threshold or
Criteria:
0 0
Test Result: Pass Fail X Pass Fail Pass Fail Pass Fail
Comments - (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements.
Technician's Signature:
c0( ,—v +? . - Date: 12/05/2011
State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements
Work Order: 3188364
M) & (ESV) Testing Form - Vaeion I- fiMf2 7
Emergency Shut Off (ESO) &
Dispenser Emergency Shutoff Valve (ESV)
ANNUAL TEST RECORD LOCATIONS AND TEST DATA
Testing
Company: q } Date: I S 1
Location Name: wL Store #: 1z 7,q Stah, ® M
Address: Q Mewq City: State: CA
Emergency Shut Off SO Testing Results
On 2- in accordance with "ESO Vendor Letter (3- 21 -05).doc ", from Valero's Retail
Compliance Department, as a part ofannual compliance testing, this representative tested the
Emergency Shut Off (ESO) switches indicated on this sketch. Findings listed below:
Emergency Shut Off (ESO) I IfNo, Provide
If No, Provide
Operational? I GY / N I Maintenance Log #
Y
Date Called:
On 1-7,10sh, in. accordance with NFPA 30A this representative tested the automatic - closing feature
ofthe Dispenser Emergency Shutoff VALVE(S) (ESV) located in the supply lines at the base of each
individual island type dispenser indicated on the diagram below. Each device ( #) in all,
would automatically close. Findings listed below:
Disp. Emergency Shut Off If No, Provide
Valve (ESV) Operational? Y Maintenance Log # Date Called
Site Map Of Location and Ptm=ncnt ofDevices Tested:
Q
o
ail
o
CY (z' d\ d 2 °
e
Shmatnre Of Representative: E AAJ '
Tanknology Inc. 11000N. MoPac Expressway, Suite 500, Austin, Texas 78759
SITE DIAGRAM
Tankmokygy
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE: 12/05/11 WORK ORDER NUMBER3188364
CLIENT: 7 —ELEVEN, INC. SITE:7— ELEVEN #32241, MKT 2368
VPH site. - s S-
o A 1 3,14 AIR/
FNT L -11
A
9,1 0 p H2O
VENT 11
PAN P L -3 8
AS #2
5 #8
L -6
FlCE L -1 CL -4 0 5 •
1 '
7
2
7 -11 #32241 #3
4101 Calloway Dr.
Bakersfield, CA 93312
E 661.587.8826 ESOTLS] APCD #S- 3256 -1 -2
1
Printed 12/22/2011 07:51 PBICKHAM
ATG Information Work Order# 3188364
110100
DEC 5, 2011 1:53 PM
235421 7 -11 32241
4101 CALLOWAY DR
BAKESFIELD, CA 93312
SYSTEM STATUS REPORT
ALL FUNCTIONS NORMAL
150301
DEC 5, 2011 1:53 PM
1:235421 7 -11 32241
150302
DEC 5, 2011 1:53 PM
2:4101 CALLOWAY DR
150303
DEC 5, 2011 1:53 PM
3:BAKESFIELD, CA 93312
150304
DEC 5, 2011 1:53 PM
4:
151700
DEC 5, 2011 1:53 PM
SYSTEM TYPE AND LANGUAGE FLAG
SYSTEM UNITS
U.S.
SYSTEM LANGUAGE
ENGLISH
SYSTEM DATFJTIME FORMAT
MON DD YYYY HH:MM:SS xM
I50F00
DEC 5, 2011 1:53 PM
MON DD YYYY HH:MM:SS xM
160100
DEC 5, 2011 1:53 PM
TANK CONFIGURATION
DEVICE LABEL CONFIGURED
1 OFF
2 OFF
3 OFF
4 RUL ON
5 PUL ON
6 OFF
7 OFF
8 OFF
160200
DEC 5, 2011 1:53 PM
TANK PRODUCT LABEL
TANK PRODUCT LABEL
1
2
3
4 RUL
5 PUL
6
7
8
160300
DEC 5, 2011 1:53 PM
3188364
ATG Information
Work Order# 3188364
TANK PRODUCT CODE
TANK PRODUCT LABEL
1 1
2 2
3 3
4 RUL 4
5 PUL 5
162100
DEC 5, 2011 1:53 PM
TANK LOW PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 0
3 0
4 RUL 800
5 PUL 800
3188364
160400
DEC 5, 2011 1:53 PM
TANK FULL VOLUME
TANK THERMAL COEFFICIENT
TANK PRODUCT LABEL GALLONS
1 0
2 0
3 0
4 RUL 14544
5 PUL 9695
6 0
7 0
8 0
El
160700
161200
DEC 5, 2011 1:53 PM
TANK DIAMETER
TANK PRODUCT LABEL INCHES
1 0.00
2 0.00
3 0.00
4 RUL 91.63
5 PUL 91.63
6 0.00
7 0.00
8 0.00
162100
DEC 5, 2011 1:53 PM
TANK LOW PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 0
3 0
4 RUL 800
5 PUL 800
3188364
160900
DEC 5, 2011 1:53 PM
TANK THERMAL COEFFICIENT
TANK PRODUCT LABEL
1 0.000000
2 0.000000
3 0.000000
4 RUL 0.000700
5 PUL 0.000700
6 0.000000
7 0.000000
8 0.000000
El
161200
DEC 5, 2011 1:53 PM
TANK MANIFOLDED PARTNERS
TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS
1 NONE NONE
2 NONE NONE
3 NONE NONE
4 RUL NONE NONE
5 PUL NONE NONE
6 NONE NONE
7 NONE NONE
8 NONE NONE
162100
DEC 5, 2011 1:53 PM
TANK LOW PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 0
3 0
4 RUL 800
5 PUL 800
3188364
ATG Information
Work Order# 3188364
162200
DEC 5, 2011 1:53 PM
TANK HIGH PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 0
3 0
4 RUL 14250
5 PUL 9500
6 0
7 0
8 0
TRI -STATE (SINGLE FLOAT)
5 87 ANNULAR SPACE DUAL POINT HYDROSTATIC
6 87 FILL SUMP TRI -STATE (SINGLE FLOAT)
162300
DEC 5, 2011 1:53 PM
TANK OVERFILL LEVEL LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 0
3 0
4 RUL 13500
5 PUL 9000
6 0
7 0
8 0
El
cl
162400
DEC 5, 2011 1:53 PM
4 RUL 1.5
5 PUL 1.5
162800
DEC 5, 2011 1:53 PM
TANK MAXIMUM VOLUME LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 0
3 0
4 RUL 15000
5 PUL 10000
6 0
7 0
8 0
TRI -STATE (SINGLE FLOAT)
5 87 ANNULAR SPACE DUAL POINT HYDROSTATIC
6 87 FILL SUMP TRI -STATE (SINGLE FLOAT)
162900
DEC 5, 2011 1:53 PM
TANK DELIVERY REQUIRED LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 0
3 0
4 RUL 2250
5 PUL 1500
6 0
7 0
8 0
3188364
170300
DEC 5, 2011 1:53 PM
LIQUID TYPE
SENSOR LOCATION TYPE
1 DISP 1 -2 PAN TRI -STATE (SINGLE FLOAT)
2 DISP 3-4 PAN TRI -STATE (SINGLE FLOAT)
3 DISP PAN 5 -6 TRI -STATE (SINGLE FLOAT)
4 DISP PAN 7-8 TRI -STATE (SINGLE FLOAT)
5 87 ANNULAR SPACE DUAL POINT HYDROSTATIC
6 87 FILL SUMP TRI -STATE (SINGLE FLOAT)
3188364
ATG Information Work Order# 3188364
7 87 STP SUMP TRI -STATE (SINGLE FLOAT)
8 91 ANNULAR SPACE DUAL POINT HYDROSTATIC
9 91 FILL SUMP TRI -STATE (SINGLE FLOAT)
10 91 STP SUMP TRI -STATE (SINGLE FLOAT)
11 VAPOR PIPING PAN TRI -STATE (SINGLE FLOAT)
12 TRI -STATE (SINGLE FLOAT)
13 TRI -STATE (SINGLE FLOAT)
14 TRI -STATE (SINGLE FLOAT)
15 TRI -STATE (SINGLE FLOAT)
16 TRI -STATE (SINGLE FLOAT)
172100
DEC 5, 2011 1:53 PM
SMART SENSOR CONFIGURATION
DEVICE LABEL CONFIGURED
1 1 -2 FLOW METER ON
2 3-4 FLOW METER ON
3 5-6 FLOW METER ON
4 7-8 FLOW METER ON
5 OFF
6 OFF
7 OFF
8 ISO PRESSURE SENSOR ON
9 87 FILLVRL UDC VAC ON
10 87 PRODUT LINE VAC ON
11 87 STPSUMP - FILLCNCT ON
12 91FILL- VENT'CONTSUMP ON
13 91 PRODUCT LINEVAC ON
14 91 STPSUMP - FILLCNCT ON
15 OFF
16 ATM P SENSOR 5-6 ON
172200
DEC 5, 2011 1:53 PM
SMART SENSOR LABEL
DEVICE LABEL
1 1 -2 FLOW METER
2 3-4 FLOW METER
3 5 -6 FLOW METER
4 7-8 FLOW METER
5
6
7
8 ISO PRESSURE SENSOR
9 87 FILL VRL UDC VAC
10 87 PRODUT LINE VAC
11 87 STPSUMP - FILLCNCT
12 91FILL- VENT'CONTSUMP
13 91 PRODUCT LINE VAC
14 91 STPSUMP - FILLCNCT
15
16 ATM P SENSOR 5-6
172900
DEC 5, 2011 1:53 PM
VACUUM SENSOR PUMP NUMBER
DEVICE LABEL PUMP NUMBER
9 87 FILL VRL UDC VAC R 5:87 REGULAR STP
10 87 PRODUT LINE VAC R 5:87 REGULAR STP
11 87 STPSUMP - FILLCNCT R 5:87 REGULAR STP
12 91 FILL- VENT'CONTSUMP R 6:91 PREMIUM STP
13 91 PRODUCT LINE VAC R 6:91 PREMIUM STP
14 91 STPSUMP - FILLCNCT R 6:91 PREMIUM STP
15 NONE
172A00
DEC 5, 2011 1:53 PM
VACUUM SENSOR VOLUME
DEVICE LABEL VOLUME
9 87 FILL VRL UDC VAC 36.0 GALLONS
10 87 PRODUT LINE VAC 36.0 GALLONS
11 87 STPSUMP - FILLCNCT 36.0 GALLONS
3188364
ATG Information Work Order# 3188364
12 91FILL- VENT'CONTSUMP 36.0 GALLONS
13 91 PRODUCT LINE VAC 36.0 GALLONS
14 91 STPSUMP - FILLCNCT 36.0 GALLONS
15 501.0 GALLONS
172800
DEC 5, 2011 1:53 PM
VACUUM SENSOR RELIEF VALVE PRESENT
DEVICE LABEL RELIEF VALVE
9 87 FILL VRL UDC VAC NO
10 87 PRODUT LINE VAC NO
11 87 STPSUMP - FILLCNCT NO
12 91FILL- VENT'CONTSUMP NO
13 91 PRODUCT LINE VAC NO
14 91 STPSUMP - FILLCNCT NO
15 NO
El
172C00
DEC 5, 2011 1:53 PM
VACUUM SENSOR RELIEF VALVE PRESSURE
DEVICE LABEL RELIEF VALVE PRESSURE
9 87 FILL VRL UDC VAC -9.0 PSI
10 87 PRODUT LINE VAC -9.0 PSI
11 87 STPSUMP - FILLCNCT -9.0 PSI
12 91FILL- VENT'CONTSUMP -9.0 PSI
13 91 PRODUCT LINE VAC -9.0 PSI
14 91 STPSUMP - FILLCNCT -9.0 PSI
15 -9.0 PSI
190200
DEC 5, 2011 1:53 PM
SOFTWARE REVISION LEVEL
VERSION 329.02
SOFTWARE# 346329 -100 -C
CREATED - 09.07.01.16.29
S- MODULE# 330160 -104 -a
SYSTEM FEATURES:
PERIODIC IN -TANK TESTS
ANNUAL IN -TANK TESTS
BIR
ISD
120600
DEC 5, 2011 1:54 PM
235421 7 -11 32241
4101 CALLOWAY DR
BAKESFIELD, CA 93312
TANKALARM HISTORY
TANK4 RUL
HIGH WATERALARM DEC 5, 2011 12:22 PM
DEC 14, 2010 9:33 AM
OVERFILL ALARM DEC 5, 2011 12:22 PM
NOV 19, 2011 10:19 PM
NOV 12, 2011 5:50 AM
LOW PRODUCT ALARM DEC 5, 2011 12:19 PM
JUL 7, 2011 7:24 AM
JUN 22, 2011 5:06 PM
SUDDEN LOSS ALARM DEC 5, 2011 12:18 PM
DEC 14, 2010 9:20 AM
HIGH PRODUCT ALARM DEC 5, 2011 12:22 PM
SEP 9, 2011 12:03 AM
AUG 25, 2011 9:22 PM
INVALID FUEL LEVEL DEC 5, 2011 12:28 PM
DEC 5, 2011 12:18 PM
DEC 14, 2010 9:21 AM
PROBE OUT DEC 5, 2011 12:27 PM
DEC 5, 2011 12:18 PM
AUG 22, 2011 9:53 AM
HIGH WATER WARNING DEC 5, 2011 12:22 PM
DEC 14, 2010 9:33 AM
DELIVERY NEEDED DEC 5, 2011 12:18 PM
SEP 26, 2011 8:39 PM
3188364
I .
ATG Information Work Order# 3188364
JUL 11, 2011 9:20 PM
MAX PRODUCT ALARM DEC 5, 2011 12:22 PM
DEC 14, 2010 9:40 AM
LOW TEMP WARNING AUG 22, 2011 9:54 AM
TANK 5 PUL
HIGH WATER ALARM DEC 5, 2011 12:28 PM
DEC 14, 2010 9:29 AM
OVERFILL ALARM DEC 5, 2011 12:21 PM
DEC 14, 2010 9:35 AM
LOW PRODUCT ALARM DEC 5, 2011 12:19 PM
AUG 22, 2011 9:52 AM
AUG 22, 2011 9:12 AM
SUDDEN LOSS ALARM DEC 5, 2011 12:19 PM
DEC 14, 2010 9:19 AM
HIGH PRODUCT ALARM DEC 5, 2011 12:21 PM
DEC 14, 2010 9:37 AM
INVALID FUEL LEVEL DEC 5, 2011 12:20 PM
AUG 22, 2011 9:13 AM
DEC 14, 2010 9:20 AM
PROBE OUT DEC 5, 2011 12:45 PM
DEC 5, 2011 12:19 PM
AUG 22, 2011 9:52 AM
HIGH WATER WARNING DEC 5, 2011 12:28 PM
AUG 22, 2011 9:16 AM
DEC 14, 2010 9:29 AM
DELIVERY NEEDED DEC 5, 2011 12:19 PM
SEP 16, 2011 6:27 PM
AUG 22, 2011 9:52 AM
MAX PRODUCT ALARM DEC 5, 2011 12:22 PM
DEC 14, 2010 9:37 AM
LOW TEMP WARNING DEC 5, 2011 12:45 PM
130200
DEC 5, 2011 1:54 PM
235421 7 -11 32241
4101 CALLOWAY DR
BAKESFIELD, CA 93312
LIQUID ALARM HISTORY REPORT
SENSOR LOCATION
1 DISP 1 -2 PAN
DEC 5, 2011 9:36 AM FUEL ALARM
DEC 5, 2011 9:21 AM SENSOR OUT ALARM
DEC 14, 2010 10:06 AM SENSOR OUT ALARM
2 DISP 3-4 PAN
DEC 5, 2011 9:37 AM FUEL ALARM
DEC 5, 2011 9:21 AM SENSOR OUT ALARM
DEC 14, 2010 10:06 AM SENSOR OUT ALARM
3 DISP PAN 5-6
DEC 5, 2011 9:35 AM FUEL ALARM
DEC 5, 2011 9:21 AM SENSOR OUT ALARM
DEC 14, 2010 10:06AM SENSOR OUT ALARM
4 DISP PAN 7-8
DEC 5, 2011 9:35 AM FUEL ALARM
DEC 5, 2011 9:21 AM SENSOR OUT ALARM
DEC 14, 2010 10:06 AM SENSOR OUT ALARM
5 87 ANNULAR SPACE
DEC 5, 2011 9:28 AM LOW LIQUID ALARM
DEC 5, 2011 9:28 AM HIGH LIQUID ALARM
DEC 5, 2011 9:28 AM LOW LIQUID ALARM
6 87 FILL SUMP
DEC 5, 2011 9:27 AM FUEL ALARM
DEC 5, 2011 9:21 AM SENSOR OUT ALARM
JUL 3, 2011 3:39 PM FUEL ALARM
7 87 STP SUMP
DEC 5, 2011 9:25 AM FUEL ALARM
DEC 5, 2011 9:25 AM FUEL ALARM
DEC 5, 2011 9:21 AM SENSOR OUT ALARM
8 91 ANNULAR SPACE
DEC 5, 2011 9:31 AM LOW LIQUID ALARM
DEC 5, 2011 9:31 AM HIGH LIQUID ALARM
DEC 5, 2011 9:31 AM LOW LIQUID ALARM
9 91 FILL SUMP
DEC 5, 2011 9:30 AM FUEL ALARM
DEC 5, 2011 9:21 AM SENSOR OUT ALARM
DEC 14, 2010 10:06 AM SENSOR OUT ALARM
3188364
ATG Information Work Order# 3188364
10 91 STP SUMP
DEC 5, 2011 9:29 AM
DEC 5, 2011 9:21 AM
DEC 14, 2010 10:06 AM
11 VAPOR PIPING PAN
DEC 5, 2011 10:44 AM
DEC 5, 2011 9:21 AM
DEC 14, 2010 10:06 AM
El
131600
DEC 5, 2011 1:54 PM
235421 7 -11 32241
4101 CALLOWAY DR
BAKESFIELD, CA 93312
FUEL ALARM
SENSOR OUTALARM
SENSOR OUT ALARM
FUEL ALARM
SENSOR OUTALARM
SENSOR OUT ALARM
SMART SENSOR ALARM HISTORY REPORT
SENSOR LOCATION
1 1 -2 FLOW METER
2 3-4 FLOW METER
3 5-6 FLOW METER
4 7-8 FLOW METER
8 ISO PRESSURE SENSOR
AUG 11, 2010 1:46 PM COMMUNICATION ALARM
AUG 7, 2010 11:06 AM COMMUNICATION ALARM
9 87 FILL VRL UDC VAC
DEC 5, 2011 9:50 AM HIGH LIQUID ALARM
DEC 5, 2011 9:46 AM HIGH LIQUID ALARM
DEC 5, 2011 9:46 AM NO VACUUM ALARM
10 87 PRODUT LINE VAC
DEC 5, 2011 9:50 AM HIGH LIQUID ALARM
DEC 5, 2011 9:49 AM NO VACUUM ALARM
DEC 5, 2011 9:46 AM HIGH LIQUID ALARM
11 87 STPSUMP - FILLCNCT
DEC 5, 2011 9:50 AM HIGH LIQUID ALARM
DEC 5, 2011 9:46 AM HIGH LIQUID ALARM
DEC 5, 2011 9:46 AM NO VACUUM ALARM
12 91FILL- VENT'CONTSUMP
DEC 5, 2011 10:12 AM NO VACUUM ALARM
DEC 5, 2011 10:10 AM HIGH LIQUID ALARM
DEC 5, 2011 10:10 AM NO VACUUM ALARM
13 91 PRODUCT LINE VAC
DEC 5, 2011 10:12 AM NO VACUUM ALARM
DEC 5, 2011 10:11 AM HIGH LIQUID ALARM
DEC 5, 2011 10:10 AM NO VACUUM ALARM
14 91 STPSUMP - FILLCNCT
DEC 5, 2011 10:12 AM NO VACUUM ALARM
DEC 5, 2011 10:11 AM HIGH LIQUID ALARM
DEC 5, 2011 10:10 AM NO VACUUM ALARM
16 ATM P SENSOR 5-6
110100
DEC 5, 2011 1:56 PM
235421 7 -11 32241
4101 CALLOWAY DR
BAKESFIELD, CA 93312
SYSTEM STATUS REPORT
ALL FUNCTIONS NORMAL
3188364