HomeMy WebLinkAbout3601 STOCKDALE HWY (8)11000 N. MoPac Expressway, Suite 500
Austin, Texas 78759
Phone: (512) 451 -6334
Fax: (512) 459 -1459
BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR CRAIG PERKINS
1501 TRUXTUN AVE.
BAKERSFIELD, CA. 93301
Test Date: 01/30/2012
Order Number: 3189556
Dear Regulator,
P255
Date Printed and Mailed: 02/23/2012
Enclosed are the results of recent testing performed at the following facility:
7- ELEVEN #17721, MKT 2368
3601 STOCKDALE HIGHWAY
BAKERSFIELD, CA. 93309
Testing performed:
Leak detector tests
Monitor Certification
Secondary Containment -Spill Container
Sincerely,
Dawn Kohlmeyer
Manager, Field Reporting
PURPOSE: COMPLIANCE
TEST DATE: 01/30/12
TANKNOLOGY CERTIFICATE OF TESTING
8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759
TELEPHONE (512) 451 -6334 FAX (512) 459 -1459
TEST RESULT SUMMARY REPORT
WORK ORDER NUMBER: 3189556
CUSTOMER PO:
CLIENT: 7- ELEVEN, INC. SITE: 7- ELEVEN #17721, MKT 2368
P.O. BOX 711 3601 STOCKDALE HIGHWAY
DALLAS, TX 75221 BAKERSFIELD, CA 93309
Manager
972)828 -7908 (661)834 -3093
TEST TYPE: TLD -1
Prnrhirt Pina Tinhtnacc Tact Rpcultc
LINE LINE` LINE DELIVERY a,
EXISTI
IMPACT
ID PROD" MATERIAL
M EL #,4
TEST, RESULT NAFIL LEAK TE 190 VALVE,
SERI# A RESULT
TYPE DA_.... g C D ;
v_ FUNCTION
UL Tank 1 REGULAR DW FLEX PRESSURE
UL Tank 1 VEEDERROOT
UL Tank 2 REGULAR DW FLEX PRESSURE
3 Premiu 3 PREMIUM DW FLEX PRESSURE
P
FYistinn I inp I Pak nptpr•_tnr Tact
LINE
1EXISTINGILEAK DETECT R41 ';_, EXISTI LEA,, `: T -,. -.
MANUF,ACTURER= M EL #,4 SERA# RESUT MANUFACTURER MOt) SERI# A RESULTID
n ..? a rx
UL Tank 1 VEEDERROOT FX1V 1899 P
UL Tank 2 VEEDERROOT LD2000 04041227 P
3 Premiu 3 VAPORLESS LD2000 04041224 P
New Renlacement I inP I Pak ptpctnr Test
LINE MANUFACTURERSeMODEL}# 3 aSERALA# RESUIT MANUFAC URERYMODEI SERIAL IRESULD,, . n ..? a rx
ror owner oetauea report mtormatton, visit www.tanKnology.com ana select Un -Line Keports -WKAN, or contact your local I anknology otthce.
Tester Name: EDWIN PINEDA
J
Technician Certification Number: 8026748
Printed 02/23/2012 06:57 MTUTTLE
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
J'PP Tank ology
TEST DATE: 01 /30/12 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3189556
CLIENT: 7 -ELEVEN, INC. AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:7- ELEVEN #17721, MKT 2368
Printed 02/23/2012 06:57
4 A FORMATION_ < '
Tank ID: UL Tank 1 Tank manifolded: NO Bottom to top fill in inches: 128.0
Product: REGULAR Vent manifolded: YES Bottom to grade in inches: 134.0
Capacity in gallons: 10,020 Vapor recovery manifolded: YES Fill pipe length in inches: 32.0
Diameter in inches: 92.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 353 Overspill protection: YES Stage I vapor recovery: DUAL
Material: STEEL Installed: ATG and CP Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TE$TRESULT3TesttMethod,;VacuTeatYw; aLEAKDE7ECTORTES,T RESULTS u , "' Te5tmethotl EFTAr .
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Dipped Product Level:
Probe Water Level: Make: VEEDERROOT
Ingress Detected: Water Bubble Ullage Model: Fx1V
Test time: S /N: 1899
Open time in sec: 3.00
Inclinometer reading: Holding psi: 17
VacuTect Test Type: NOT
Resiliency cc: 95 NOT
Entry TESTEDVacuTectProbeEntPoint: Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi: 10
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINE TESIiNESULTS . Test: ype: TLD 1k
Material: DW FLEX
Diameter (in): 1.5
Length (ft): 50.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: RED JACKET
COMMENTS Impact Valves Operational: UNKNOWN
Printed 02/23/2012 06:57
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
Milli, Tanknology
TEST DATE:01 /30/12 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3189556
CLIENT: 7 -ELEVEN, INC. AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:7- ELEVEN #17721, MKT 2368
Printed 02/23/2012 06:57
TANK INFORMATION'"
Tank ID: UL Tank 2 Tank manifolded: No Bottom to top fill in inches: 126.0
Product: REGULAR Vent manifolded: YES Bottom to grade in inches: 132.0
Capacity in gallons: 10,020 Vapor recovery manifolded: YES Fill pipe length in inches: 30.0
Diameter in inches: 92.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 353 Overspill protection: YES Stage I vapor recovery: DUAL
Material: STEEL Installed: ATG and CP Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANIC3TE$T RESUL "TS T5t Method VacuT ®ct ; °' s .,. , ,.. ,.,_.v. _w .,.., s; <,LEAFCdI)ETECTQR'TESTyRESl1L7S Test`mefhod:'FTA
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed replaced
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Dipped Product Level:
Probe Water Level: Make: VEEDERROOT
Ingress Detected: Water Bubble Ullage Model: LD2000
Test time: S /N: 04041227
Open time in sec: 6.00
Inclinometer reading: Holding psi: 25
VacuTect Test Type: NOT
Resiliency cc: 70 NOT
Entry TESTEDVacuTectProbeEntPoint: Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metedng psi: 18
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINE`1.ESTRESWLTS; .' t ` Te &t type:'
LINE A B'.
Material: DW FLEX
Diameter (in): 1.5
Length (ft): 50.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: RED JACKET
COMMENTS Impact Valves Operational: UNKNOWN
Printed 02/23/2012 06:57
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
J'r Tar*nology
TEST DATE:01 /30/12 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER3189556
CLIENT: 7 -ELEVEN, INC. AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:7- ELEVEN #17721, MKT 2368
Printed 02/23/2012 06:57
TANK INFORMATION° "
Tank ID: 3 Premiu 3 Tank manifolded: NO Bottom to top fill in inches: 126.0
Product: PREMIUM Vent manifolded: YES Bottom to grade in inches: 132.0
Capacity in gallons: 10,020 Vapor recovery manifolded: YES Fill pipe length in inches: 30.0
Diameter in inches: 92.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 323 Overspill protection: YES Stage I vapor recovery: DUAL
Material: STEEL Installed: ATC and CP Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK iE3TIRESULTS TBSt NlethOd „VacuTact ti , ` _s , EAK`bETEGTOR,);TEST RESULTS e _ TeSt:method'-FTA
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Dipped Product Level:
Probe Water Level: Make: VAPORLESS
Ingress Detected: Water Bubble Ullage Model: LD2000
Test time: S /N: 04041224
Open time in sec: 7.00
Inclinometer reading: Holding psi: 26
VacuTect Test Type: NOT
Resiliency cc: 60 NOT
VacuTect Probe Entry Point: TESTED Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi: 14
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
z SALINE TESTRESl1ltS'9 fs tst;typeTLnlW. LINE A,g C D. e,
Material: Dw FLEX FLEX
Diameter (in): 2.0 2.0
Length (ft): 25.0 35.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: RED JACKET
COMMENTS Impact Valves Operational: UNKNOwN
Printed 02/23/2012 06:57
MONITORING SYSTEM CERTIFICATION
For Use By All Jurisdictions Within the State of California
Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3 Title 23, California Code of Regulations
This form must be used 10 document testing and servicing of monitoring equipment. If more than one monitoring system control panel is installed at the facility, a separate
certifcation or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank
system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date.
A. General Information
Facility Name: 7- ELEVEN #17721, MKT 2368
Site Address: 3601 STOCKDALE HIGHWAY
City: BAKERSFIELD
Contact Phone No: 834 -3093
Date of Testing /Service: 01/30/2012
Facility Contact Person: Manager
Make /Model of Monitoring System:TLS -350 Work Order Number: 3189556
B. Inventory of Equipment Tested /Certified
Check the appropriate boxes to indicate specific equipment inspected /serviced
CA Zip: 93309
Tank ID: T1 REG 87 1 Tank ID: T2 87 2
X In -Tank Gauging Probe. Model: MAG PROBE X In -Tank Gauging Probe. Model: MAG PROBE
Annular Space or Vault Sensor. Model: Annular Space or Vault Sensor. Model:
X Piping Sump/Trench Sensogs). Model: VR -208 Piping Sump/Trench Sensor(s). Model: VR -208
FIII Sump Sensogs). Model: FIII Sump Sensor(s). Model:
x Mechanical Line Leak Detector. H Model: FX1V X Mechanical Llne Leak Detector. Model: LID 2000
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
X Tank Overfill /High -level Sensor. Model: ATG Tank Overfill /High -Level Sensor. Model: ATG
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model In Section E on page 2).
Tank ID: Tank ID:
In -Tank Gauging Probe. Model: MAG PROBE In -Tank Gauging Probe. Model:
Annular Space or Vault Sensor. Model: Annular Space orVault Sensor. Model:
X Piping Sump/Trench Sensors). Model: VR -208 Piping Sumplrrench Sensor(s). Model:
Fill Sump Sensor(s). Model: Fill Sump Sensogs). Model:
X Mechanical Line Leak Detector. Model: LD 2000 Mechanical Line Leak Detector. Model:
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
Tank Overfill /High -Level Sensor. Model: ATG Tank Overfill /High -Level Sensor. Model:
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2).
Dispenser : 1 -2 Dispenser ID:
Dispenser Containment Sensor(s) Model: VR -208 Dispenser Containment Sensor(s) Model:
X Shear Valve(s). Shear Valve(s)
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chaln(s).
Dispenser ID: 3 -4 Dispenser ID:
X Dispenser Containment Sensor(s) Model: VR -208 Dispenser Containment Sensogs). Model:
X Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
Dispenser ID: Dispenser ID:
Dispenser Containment Sensor(s) Model: Dispenser Containment Sensor(s). Model:
Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility.
C. Certification
I certify that the equipment identified in this document was inspected /serviced in accordance with the manufacturers' guidelines.
Attached to this certification is information (e.g manufacturers' checklists) necessary to verify that this information is correct.
and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached
a copy of the (Check all that apply): EX System set -up X Alarm history report
Technician Name (print): EDWIN PINEDA
lei (i
gSinature: ..s.-
Certification No.: b -37453 License. No.: 743160 (Class'A' General Enginering Contractor License)
Testing Company Name:Tanknology Phone No.: (800) 800 -4633
Site Address: 11000 N. MoPac Expressway, suite 500, Austin, TX 78759 Date of Testing /Servicing: 01/30/2012
Monitoring System Certification Page 1 of 3 Based on CA form dated 03/08
Site Address 3601 STOCKDALE HIGHWAY
D. Results of Testing /Servicing
Software Version Installed: 329.02
Complete the following checklist:
Monitoring System Certification
Date of Testing /Service: 01/30/2012
M Yes No ` Is the audible alarm operational?
O Yes No • Is the visual alarm operational?
Yes No Were all sensors visually inspected, functionally tested, and confirmed operational?
F71 Yes No Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not
interfere with their proper operation?
X Yes I No' N/A I If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational?
a Yes No' N/A For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment
monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive
shut -down? (check all that apply) x Sump/Trench Sensors; x Dispenser Containment Sensors.
Did you confirm positive shut -down due to leaks aIId sensor failure /disconnection? x Yes No
x Yes No' N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanicaloverfillpreventionvalveisinstalled), is the overfill warning alarm visible and audible at the tank fill points(s) and operating
properly? If so, at what percent of tank capacity does the alarm trigger? 90 ]/,
Yes* x No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the
manufacturer name and model for all replacement parts in Section E, below.
Yes' Ox No Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) Product;
Water. if yes, describe causes in Section E, below.
X Yes No ` Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable.
x YesQ No' Is all monitoring equipment operational per manufacturers' specifications?
In Section E below, describe how and when these deficiences were or will be corrected.
E. Comments:
Page 2 of 3 Based on CA form dated 03/08
Monitoring System Certification
Site Address: 3601 STOCKDALE HIGHWAY
F. In -Tank Gauging / SIR Equipment
Check this box if no tank gauging or SIR equipment is installed.
Date of Testing /Service: 01/30/2012
Check this box if tank gauging is used only for inventory control.
Check this box if no tank gauging or SIR equipment is installed.
This section must be completed if in -tank gauging equipment Is used to perform leak detection monitoring.
Complete the following checklist:
Yes No Has all input wiring been inspected for proper entry and termination, including testing for ground faults?
Yes No • Were all tank gauging probes visually inspected for damage and residue buildup?
Yes No' Was accuracy of system product level readings tested?
E]Yes No' Was accuracy of system water level readings tested?
X Yes No ` Were all probes reinstalled properly?
x Yes No • Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
G. Line Leak Detectors (LLD) : Check this box if LLDs are not installed.
Complete the following checklist:
x Yes No' N /A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance?
Check all that apply) Simulated leak rate: x 3 g.p.h 0.1 g.p.h 0.2 g.p.h
x Yes E] No • Were all LLDs confirmed operational and accurate within regulatory requirements?
x Yes No' Was the testing apparatus properly calibrated?
x Yes No' N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak?
Yes No' El N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak?
Yes No ' 0 N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
Yes ONO N/A For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system malfunctions or fails a test?
Yes No' x N/A For electronic LLDs, have all accessible wiring connections been visually inspected?
2 Yes No' Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
H. Comments:
Page 3 of 3 Based on CA form dated 03/08
SWRCB, January 2002
Secondary Containment Testing Report Form
Page 1 .
Thisform is intendedfor use by contractors performing periodic testing of USTsecondary containment systems. Use the
appropriate pages ofthisform to report results for all components tested. The completed form, written test procedures, and
printoutsfrom tests (ifapplicable), should be provided to the facility owner /operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: 7- ELEVEN #17721, MKT 2368 Date of Testing: 01/30/2012
Facility Address: 3601 STOCKDALE HIGHWAY BAKERSFIELD, CA, 93309
Facility Contact: Manager Phone: (661) 834 -3093
Date Local Agency Was Notified of Testing
Name of Local Agency Inspector (if present during testing): Esther Duran
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY, INC.
Technician Conducting Test: EDWIN PINEDA
Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: A -UT License Number: 743160-8026748
Manufacturer
Manufacturer Training
Component(s) Date Training Expires
OPW SPILL BUCKET 02/06/2012
Spill :.
3. SUMMARY OF TEST RESULTS
Component
Spill BOX 1 REG FILL
Spill :.
Spill Box 3 PRE FILL
000 00
0000 00
0000 0
a000 MAoo
Ifhydrostatic testing was performed, describe what was done with the water after completion of tests:
WATER WAS PUT IN FIVE GALLON BUCKET AND PLACE IN TRUCK FOR NEXT SITE
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: n . Date: 01/30/2012
SWRCB, January 2006
9. Spill Bucket Testing Report Form
Thisform is intendedfor use by contractors performing annual testing of USTspill containment structures. The completedform and
printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: 7- ELEVEN #17721, MKT 2368 DateofTesting: 01/30/2012
Facility Address: 3601 STOCKDALE HIGHWAY BAKERSFIELD, CA, 93309
Facility Contact: Manager Phone: (661) 834 -3093
Date Local Agency Was Notified of Testing
Name of Local Agency Inspector (if present during testing): Esther Duran
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY, INC.
Technician Conducting Test: EDWIN PINEDA
Credentials : E CSLB Contractor a ICC Service Tech. SWRCB Tank Tester Other (Specify) A -UT
License Number: 743160-8026748
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: El Hydrostatic Vacuum Other
Test Equipment Used: TAPE MEASURE Equipment Resolution: VISUAL
Identify Spill Bucket By Tank
Number, Stored Product, etc.)
1 1 REG FILL Z 2 REG FILL 3 3 PRE FILL 4
Bucket Installation Type: X Direct Bury
Contained in Sump
X Direct Bury
Contained in Sump
X Direct Bury
Contained in Sump
Direct Bury
Contained in Sump
Bucket Diameter: 12" 12 " 12 "
Bucket Depth: 101, 101, 101,
Wait time between applying
vacuum /water and starting test:
0 0 0
Test Start Time (TI ): 0900 0900 0900
Initial Reading (RI ): 9" 9" 9"
Test End Time (TF ): 1000 1000 1000
Final Reading (R F
9tv
7 J
Test Duration: 1 HR 1 HR 1 HR
Change in Reading (R F - Rt ): 0 0 0
Pass/Fail Threshold or
Criteria:
0 0 0
S.x" -P - .,'° A j'4 ^aY'
Test`>eResult. -
y . i'l C'"' -'' i; X -.Pass tFail S "'S i ' -,, X Passe Fail f X Pass Tail Wass a Fail°
Comments - (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements.
Technician's Signature: n Q Date: In b
01/30/2012
C r..re 1....,,..,., .7 A. --+ --d– ro,+ —, +- 1— ..e.f ....0.7 1.., ., I:F.va ...... M.,.. r... L....,o.,or 1.....,1 e.,...o...e „tom
Work Order: 3189556
ESO) & (ESV) Testing Forth - Version 1- 625/2D07
Emergency Shut Off (ESO) &
Dispenser Emergency Shutoff Valve (ESV)
ANNUAL TEST RECORD LOCATIONS AND TEST DATA
Testing
Company: Date:
Location Name:
Operational?
Store #:
I Maintenance Log #
Stag TD #:
Date Called
Address: X60 j S C ,L City: State:
Emereency Shut (off SO Testinji Results
On in accordance with "ESO Vendor ]Letter (3- 21- 05).doc ", from Valero's Retail
Compliance Department, as a part of annual compliance testing, this representative tested the
Emergency Shut Off ESO switches indicated on this sketch. Findings listed below:
Emergency Shut Off (ESO) IfNo, Provide 7Operational? R/ N I Maintenance Log # Date Called
1 7
Dispenser Emereencv Shutoff Valve (ESV) Testine Results
On d 1 130 ( 17- in. accordance with NFPA 30A this representative tested the automatic - closing feature
of the Dispenser Emergency Shutoff VALVE(S) (ESV) located in the supply lines at the base of each
individual island type dispenser indicated on the diagram below. Each device ( #) L4— in all,
would automatically close. Findings listed below:
Disp. Emergency Shut Off f No, Provide
Valve (ESV) Operational? N Maintenance Log # Date Called : 1 7
Site Map OfLocation and Placement o Devices Tested:
d d V
3 '
e s
ul
Tanknology Inc. 11000 N. MoPac Expressway, Suite 500, Austin, Texas 78759
P- n
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE:01 /30/12 WORK ORDER NUMBER3189556
CLIENT: 7 - ELEVEN, INC. SITE:7- ELEVEN #17721, MKT 2368
COMMENTS
Conducted Witness Annual Monitor Certification Testing with Inspector Ernie Medina Bakersfield
Fire Dept. Testing on 1/23/12 was cancelled by Inspector Esther due to rain. Site contacted
1/26/12 and confirmed testing with "ROG ". All tests passed.
PARTS REPLACED
3 rte F
QUANTITY DESCRIPTION "
HELIUM PINPOINT TEST RESULTS (IF APPLICABLE)
dE} '
m ! y ar _ ' Y' i b _
t A"4'
t = ,
jHELIUM PINPOINT °LEAK TEST RESULTS k -
a { ITEMS TESTED
2
dE} '
m ! y ar _ ' Y' i b _
t A"4'
t = ,
jHELIUM PINPOINT °LEAK TEST RESULTS k -
Printed 02/23/2012 06:57 MTUTTLE
SITE DIAGRAM
r Tanknobgy
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE: 01/30/12 WORK ORDER NUMBER3189556
CLIENT: 7— ELEVEN, INC. SITE:7— ELEVEN #17721, MKT 2368
Printed 02/23/2012 06:57 MTUTTLE
E
3 Direct Bury Fill/Vapor Buckets N S
A O O ®
4 w
4L O
3®
O
O O 9 5
2 T# 2 T# 1
Regular
UL Tank 2
Regular
UL tank 1
7 -11 #17721
3601 Stockdale Hwy
2 L 10K 10K Bakersfield, CA 933091
STP L4 STP L3
661.834.3093
Permit #S- 2123 -1 -10
1 ESO
T3
STP AO
T# 3
Premium O FO10K
PREM
Overfill TLS CP
Alarm VENT
L5
0 #8 7 CAS DUMP-
BREAKERS
Printed 02/23/2012 06:57 MTUTTLE
ATG Information Work Order# 3189556
0
110100
JAN 30, 2012 11:42 AM
235067 7 -11 17721
3601 STOCKDALE HWY
BAKERSFIELD,CA.
80749954505001
SYSTEM STATUS REPORT
D 5:ALARM CLEAR WARNING
0
150301
JAN 30, 2012 11:42 AM
1:235067 7 -11 17721
IJ
0
150302
JAN 30, 2012 11:42 AM
2:3601 STOCKDALE HWY
150303
JAN 30, 2012 11:42 AM
3:BAKERSFIELD,CA.
Q
150304
JAN 30, 2012 11:42 AM
4:80749954505001
Q
151700
JAN 30, 2012 11:42 AM
SYSTEM TYPE AND LANGUAGE FLAG
SYSTEM UNITS
U.S.
SYSTEM LANGUAGE
ENGLISH
SYSTEM DATE/TIME FORMAT
MON DO YYVY HH:MM:SS xM
n
Q
I50F00
JAN 30, 2012 11:42 AM
MON DD YYYY HH:MWSS xM
0
Q
160100
JAN 30, 2012 11:42 AM
TANK CONFIGURATION
DEVICE LABEL CONFIGURED
1 REGULAR UL TANK 1 ON
2 REGULER UL TANK 2 ON
3 PREMIUM ON
4 OFF
n
Q
160200
JAN 30, 2012 11:42 AM
TANK PRODUCT LABEL
TANK PRODUCT LABEL
1 REGULAR UL TANK 1
2 REGULER UL TANK 2
3 PREMIUM
0
Q
160300
JAN 30, 2012 11:42 AM
TANK PRODUCT CODE
TANK PRODUCT LABEL
1 REGULAR UL TANK 1
2 REGULER UL TANK 2
3 PREMIUM 3
4 4
3189556
ATG Information
Work Order# 3189556
Q
Q
160400
JAN 30, 2012 11:43 AM
TANK FULL VOLUME
TANK PRODUCT LABEL GALLONS
1 REGULAR UL TANK 1 10028
2 REGULER ULTANK 2 10028
3 PREMIUM 10020
4 0
Q
160700
JAN 30, 2012 11:43 AM
TANK DIAMETER
TANK PRODUCT LABEL INCHES
1 REGULAR UL TANK 1 94.00
2 REGULER UL TANK 2 94.00
3 PREMIUM 92.00
4 0.00
Q
160900
JAN 30, 2012 11:43 AM
TANK THERMAL COEFFICIENT
TANK PRODUCT LABEL
1 REGULAR UL TANK 1 0.000700
2 REGULER UL TANK 2 0.000700
3 PREMIUM 0.000700
4 0.000000
0
Q
161200
JAN 30, 2012 11:43 AM
TANK MANIFOLDED PARTNERS
TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS
1 REGULAR UL TANK 1 NONE NONE
2 REGULER ULTANK 2 NONE NONE
3 PREMIUM NONE NONE
4 NONE NONE
Q
162100
JAN 30, 2012 11:43 AM
TANK LOW PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 REGULAR UL TANK 1 900
2 REGULER UL TANK 2 900
3 PREMIUM 900
4 0
Q
Q
162200
JAN 30, 2012 11:43 AM
TANK HIGH PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 REGULAR UL TANK 1 9519
2 REGULER UL TANK 2 9519
3 PREMIUM 9519
4 0
Q
0
162300
JAN 30, 2012 11:43 AM
TANK OVERFILL LEVEL LIMIT
TANK PRODUCT LABEL GALLONS
1 REGULAR UL TANK 1 9018
2 REGULER UL TANK 2 9018
3 PREMIUM 9018
4 0
162400
JAN 30, 2012 11:43 AM
TANK HIGH WATER LEVEL LIMIT
3189556
l ATG Information Work Order# 3189556
TANK PRODUCT LABEL INCHES
1 REGULAR UL TANK 1 1.5
2 REGULER UL TANK 2 1.5
3 PREMIUM 1.5
162800
JAN 30, 2012 11:43 AM
TANK MAXIMUM VOLUME LIMIT
TANK PRODUCT LABEL GALLONS
1 REGULAR UL TANK 1 10020
2 REGULER UL TANK 2 10020
3 PREMIUM 10020
4 0
162900
JAN 30, 2012 11:43 AM
TANK DELIVERY REQUIRED LIMIT
TANK PRODUCT LABEL GALLONS
1 REGULAR UL TANK 1 1503
2 REGULER UL TANK 2 1503
3 PREMIUM 1503
170300
JAN 30, 2012 11:43 AM
LIQUID TYPE
SENSOR LOCATION TYPE
1 DISP PAN 1 -2 TRI -STATE (SINGLE FLOAT)
2 DISP PAN 3-4 TRI -STATE (SINGLE FLOAT)
3 RUL 1 TURBINE TRI -STATE (SINGLE FLOAT)
4 RUL 2 TURBINE TRI -STATE (SINGLE FLOAT)
5 PUL TURBINE TRI -STATE (SINGLE FLOAT)
6 TRI -STATE (SINGLE FLOAT)
7 TRI -STATE (SINGLE FLOAT)
8 TRI -STATE (SINGLE FLOAT)
190200
JAN 30, 2012 11:43 AM
SOFTWARE REVISION LEVEL
VERSION 329.02
SOFTWARE# 346329 -100 -C
CREATED - 09.07.01.16.29
S- MODULE# 330160 -162 -A
SYSTEM FEATURES:
PERIODIC IN -TANK TESTS
ANNUAL IN -TANK TESTS
CSLD
BIR
PLLD
0.10 AUTO
0.20 REPETITIV
WPLLD
0.10 AUTO
0.20 REPETITIV
D
120600
JAN 30, 2012 11:43 AM
235067 7 -11 17721
3601 STOCKDALE HWY
BAKERSFIELD,CA.
80749954505001
TANK ALARM HISTORY
TANK 1 REGULAR UL TANK 1
HIGH WATER ALARM JAN 30, 2012 10:57 AM
OVERFILL ALARM JAN 30, 2012 10:50 AM
JAN 30, 2012 10:45 AM
LOW PRODUCT ALARM JAN 30, 2012 10:41 AM
NOV 14, 2011 11:54 AM
HIGH PRODUCT ALARM JAN 30, 2012 10:51 AM
JAN 30, 2012 10:48 AM
3189556
ATG Information
Work Order # 3189556
JAN 30, 2012 10:45 AM
INVALID FUEL LEVEL JAN 30, 2012 10:41 AM
NOV 14, 2011 11:58 AM
PROBE OUT JAN 30, 2012 11:00 AM
JAN 30, 2012 10:40 AM
NOV 16, 2011 10:28 AM
HIGH WATER WARNING JAN 30, 2012 10:57 AM
DELIVERY NEEDED JAN 30, 2012 10:41 AM
NOV 14, 2011 11:49 AM
MAX PRODUCT ALARM JAN 30, 2012 10:51 AM
LOW TEMP WARNING JAN 30. 2012 11:01 AM
TANK 2 REGULER UL TANK 2
HIGH WATER ALARM JAN 30, 2012 10:49 AM
OVERFILL ALARM JAN 30, 2012 10:42 AM
SEP 25, 2011 4:54 AM
LOW PRODUCT ALARM JAN 30, 2012 10:39 AM
NOV 13, 2011 6:24 PM
HIGH PRODUCT ALARM JAN 30, 2012 10:43 AM
INVALID FUEL LEVEL JAN 30, 2012 10:58 AM
JAN 30, 2012 10:40 AM
JAN 30, 2012 10:39 AM
PROBE OUT JAN 30, 2012 10:58 AM
JAN 30, 2012 10:39 AM
NOV 16, 2011 10:47 AM
HIGH WATER WARNING JAN 30, 2012 10:49 AM
DELIVERY NEEDED JAN 30, 2012 10:39 AM
NOV 25, 2011 5:19 PM
NOV 12, 2011 6:23 PM
MAX PRODUCT ALARM JAN 30, 2012 10:43 AM
TANK 3 PREMIUM
HIGH WATER ALARM JAN 30, 2012 10'R5 AM
OVERFILL ALARM JAN 30, 2012 10:53 AM
LOW PRODUCT ALARM JAN 30, 2012 10:57 AM
JAN 30, 2012 10:42 AM
NOV 14, 2011 11:27 AM
HIGH PRODUCT ALARM JAN 30, 2012 10:54 AM
INVALID FUEL LEVEL JAN 30, 2012 10:57 AM
JAN 30, 2012 10:42 AM
NOV 14, 2011 11:30 AM
PROBE OUT JAN 30, 2012 11:34 AM
JAN 30, 2012 10:56 AM
JAN 30, 2012 10:41 AM
HIGH WATER WARNING JAN 30, 2012 10:45 AM
DELIVERY NEEDED JAN 30, 2012 10:57 AM
JAN 30, 2012 10:42 AM
NOV 14, 2011 11:20 AM
MAX PRODUCT ALARM JAN 30, 2012 10:54 AM
LOW TEMP WARNING JAN 28, 2012 3:55 PM
C7
130200
JAN 30, 2012 11:44 AM
235067 7 -11 17721
3601 STOCKDALE HWY
6AKERSFIELD,CA,
80749954505001
LIQUID ALARM HISTORY REPORT
SENSOR LOCATION
1 DISP PAN 1 -2
JAN 30, 2012 9:22 AM SENSOR OUT ALARM
JAN 30, 2012 9:21 AM FUEL ALARM
2 DISP PAN 3-4
JAN 30, 2012 9:22 AM SENSOR OUT ALARM
JAN 30, 2012 9:21 AM FUEL ALARM
3 RUL 1 TURBINE
JAN 30, 2012 9:22 AM SENSOR OUT ALARM
JAN 30, 2012 9:19 AM FUEL ALARM
4 RUL 2 TURBINE
JAN 30, 2012 9:22 AM SENSOR OUT ALARM
JAN 30, 2012 9:18 AM FUEL ALARM
5 PUL TURBINE
JAN 30, 2012 9:22 AM SENSOR OUT ALARM
JAN 30, 2012 9:20 AM FUEL ALARM
NP-M IS
ATG Information
Work Order# 3189556
110100
IAN 30, 2012 11:45 AM
235067 7 -11 17721
3601 STOCKDALE HWY
13AKERSFIELD.CA.
80749954505001
SYSTEM STATUS REPORT
D 5:ALARM CLEAR WARNING
3189556