HomeMy WebLinkAbout2525 WHITE LANE (6)2s5
MONITORING SYSTEM CERTIFICATION
For Use ByAll Jurisdictions Within the State ofCalifornia
Authority Cited.• Chapter 6 7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code ofRegulations
This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be
prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided
to the tank system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems
within 30 days of this date.
A. General Information
Facility Name: Chevron
Site Address: 2525 White Lane City: Bakersfield
Bldg. No.:
Zip: 93304
Facility Contact Person: Gaby Jabbour Contact Phone No.: 805 - 4444229
Make/Model of Monitoring System: Veeder -Root TLS 350
B. Inventory of Equipment Tested/Certified
appropriateCheektheappropre bo to to to specific egtdpmmt hupft- tWservteed:
Date of Testing/Servicing: 10/24/2011
Tank ID: 12000 gal. Regular Tank ID: 12000 gal. Super
x] In -Tank Gauging Probe. Model: 847390-107 x] In -Tank Gauging Probe. Model: 847390 -107
x] Annular Space or Vault Probe. Model:Ronan O Annular Space or Vault Sensor. Model: Ronan
x] Piping Sump / Trench Sensor(s). Model: 794380-208 x] Piping Sump / Trench Sensor(s). Model: 794380-208
Fill Sump Sensor(s) Model: Fill Sump Sensor(s). Model:
Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model:
U Electronic Line Leak Detector. Model: PLLD L] Electronic Line Leak Detector. Model: PLLD
x] Tank Overfill / High Level Sensor. Model: OPW -81-80 x] Tank Overfill / High Leval Sensor. Model: OPW -61-30
Other (specify equip. type and model in Sec. E on Pg. 2) Other (specify equip. type and model in Sec. E on Pg. 2)
Tank ID: 12000 gal. Diesel Tank ID:
x] In -Tank Gauging Probe. Mode1:847390 -107 In -Tank Gauging Probe. Model:
x] Annular Space or Vault Sensor. Model:Ronan Annular Space or Vault Sensor. Model:
X] Piping Sump / Trench Sensor(s). Model:794380-20 Piping Sump / Trench Sensor(s). Model:
Fill Sump Sensors(s). Model: Fill Sump Sensor(s). Model:
Mechanical Line Leak Decector. Model: Mechanical Line Leak Detector. Model:
x] Electronic Line Leak Detector. Model: PLLD Electronic Line Leak Detector. Model:
x] Tank Overfill / High Level Sensor. Model: OPW -61-SO Tank Overfill / High Level Sensor. Model:
Other (specify equip. type and model in Sec. E on Pg. 2) Other (specify equip. typs and model in Sec. E on Pg. 2)
Dispenser ID: 1 & 2 Dispenser ID: 3 & 4
Dispenser Containment Sensor(s). Model: Dispenser Containment Sensor(s). Model:
X] Shear Valve(s). x] Shear Valve(s).
x] Dispenser Containment Float(s) and Chain(s). x] Dispenser Containment Float(s) and Chain(s)
Dispenser ID: 6 8t 6 Dispenser ID: 7 & 8
Dispenser Containment Sensor(s). Model: Dispenser Containment Sensor(s). Model:
x] Shear Valve(s). X] Shear Valve(s).
U Dispenser Containment Float(s) and Chains(s). x] Dispenser Containment Float(s) and Chain(s).
Dispenser ID: Dispenser ID:
Dispenser Containment Sensor(s). Model: Dispenser Containment Sensor(s). Model:
Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chain(s) Dispenser Containment Float(s) and Chain(s).
If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility.
C. Certification - I certify that the equipment identified in this document was inspected/services in accordance with the
manufacturers' guidlines. Attached to this Certification is information (e.g. manufacturers' checklist) necessary to varify that
this information is correct and a plot plan showing the layout of monitoring equipment. For equipment capable of generating
such reports,l have attached a copy of the report; (check all that apply) x S st Set -up Alarm story port
Technician Name (print): Bryan A Self Signature: 9=
Certification No: 837601 License No: 804904
Testing Company Name: CoMidence UST Services, Inc. Phone No: 800 -339 -9930
Site Address: 2526 White Lane, Bakersfield, CA 93304 Date of Testing/Servicing: 10/24/2011
D. Results of Testing/Servicing
Software Version Installed: 329.01
Complete the following checklist:
x] Yes No* Is the audible alarm operational?
x Yes M No* Is the Visual alarm operational?
xj Yes No+ Were all sensors visually inspected, functionally tested, and confirmed operational?
x Yes No* Were all sensors installed at the lowest point of secondary containment and positioned so that other
equipment will not interfere with their proper operation?
Yes No* Ifalarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem)
x N/A operational?
x Yes No* For pressurized piping systems, does the turbine automatically shut down ifthe piping secondary
N/A containment monitoring system detects a leak, fails to operate, or is electrically disconnected? Ifyes:
which sensors initate positive shut -down? U Sump/Trench Sensors Dispenser Co tainment ensors
Did you confirm positive shut -down due to leaks and sensor failure /disconnected? E Yes; [ No;'
Yes No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no
U N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visual and audible at
the tank fill point(s) and operating properly? Ifso, at what percent oftank capasity does the alarm
trigger? %
Yes* U No Was any monitoring equipment replaced? If Yes, identify specific sensors, probes, or other equipment
replaced and list the manufacturer name and model for all replacement parts in Section E, below.
Yes* x] No Was liquid found inside any secondary containment systems designed as dry systems?
Product; Water. If yes, describe causes in Section E, below.
x Was monitoring system set-up reviewed to ensure proper settings? Attach set-up reports, if a pl ca le.
x yeS No* Is all monitoring equipment operational per manufacturer's specifications?
In Section E below, discribe bow and when these deficiencies were or will be corrected.
E. Comments:
F. In -Tank Guaging / SIR Equipment: Ex] Check this box if tank guaging is used only for inventory control.
Check this box if tank guaging or SIR equipment is installed.
This section must be completed if in -tank guaging equipment is used to perform leak detection monitoring.
Complete the following checklist:
In the Section H, below, describe how and when these deficiencies were or will be corrected.
G. Line Leak Detectors (LLD): Check this box if LLD's are not installed.
Complete the followine checklist:
xj Yes
x Yes No* Has all input whin been inspected for proper enter and termination,including testing for pond faults?
x Yes
X Yes No* Were all tank guaging probes visually inspected for damage and residue buildup?
x Yes
Yes
No* Was accuracy of stem product level readings tested?
For mac anica LLD's, does the LLD restrict product flow if it detects a leak?
x Yes
N/A
No* Was accuracy of system water level readings tested?
X Yes No*1 Were all probes reinstalled properly?
x Yes No* I Were all items on the equipment manufacturer's maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
G. Line Leak Detectors (LLD): Check this box if LLD's are not installed.
Complete the followine checklist:
xj Yes No* For equip. start-up or annual equipment certification, was a leak simulated to varify LLD performance?
Check all that apply) Simulated leak rate: E3 g.p.h.: 0.1 g.p.h.; 0.2 g.p.h.;
x Yes No* Were all LLD's confirmed operational and accurate within regulatory requirments?
x Yes No Was the testing apparatus properly calibrated?
Yes No For mac anica LLD's, does the LLD restrict product flow if it detects a leak?
x N/A
x] Yes No* For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak?
N/A
x] Yes No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is
N/A disabled or disconnected?
x Yes No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system
N/A malfunction or fails a test?
x Yes No* For electronic LLD's, have all accessible wiring connections been visually inspected?
N/A
x Yes No Were all items on the equipment manufacturer's maintenance checklist completed?
In the section H, below, describe how and when these deficiencies were or will be corrected.
H. Comments:
WHITE LIir1E i;HEVR+;rI
252'5 wii I TE LHNE
l%EkSF 1 ELD CA 93:304
661-832-9761
OCT 24, 2011 10:03 AM
S'I'STEM STHTUS REPORT
ALL F'Uh- j(TION3 hIC:Rh1r L
I NVENI'ORY PCPORT
T 1:DIESEL
VOLUME = 20=15 (;HLS
ULLAC: ;E - 9977 GALS
90N UILLI•+C ;En 8774 GALS
TC: VOLUME = 2024 GHLS
HE 1 C;HT - 25.10 1 Igr;HES
WATER VOL - U GALS
WATER = 0. 00 1 NCHE;S
TEMP = 93.0 DE13 F
T 2 : SUPRErIE
VOLUME = 2693 0-;LS
ULLAGE = 9:329 GAL:=
90 % UL1..A+3E= 812E GALS
TC VOLWE = 2651 GALS
HE I iBHT = 30.52 11101,1ES
WATER VOL = 1= '.GALS
WATER = 0.80 1 NC:HES
TEMP = 62.5 DEG F
T 3 : REGULfAR
VOLUME = 5857 GALS
ULLAGE = 6165 C:ALS
904 ULL)iC ;E= 4962 GALS
TC VOLUME - 5769 Gml-S
HEIGHT = 54.38 1 NC'HES
WHTTR VOL = U GALS
LATER a 0.00 INCHES
TEMP = 81.2 DEf3 F
i t A w) END f R 0 r. A
SOFTa+aRE P.E'tl1:= 1,7h1 LEL +EL
VERSION 3'29.01
SOFT1,11AREtt
C'REATECI - 09.1) 1 . '21:1. 15.44
S- HODULEit ;330160 UU•I-a
SYSTF.11 FEIiTURE.S :
PhM. I C D I C: 1 IV -TAANK TESTS
rNIT)AL l iV -' ,ow TE- T:;
ISD
SYSTEM UNITS
U.S.
SYSTEM LANGIIHGE
EN" ;L I :SH
SYSTEM DA'I'S, '1' 11,1E FORMAT
MON DD Y''iYY HH : MIN : SS phi
WHITE LANE CHrVF:ON
2525 WHITE LANE
BAKERSF I ELD CA 93"7104
661 -532 -9761
SHIFT TIME 1 5 :0D All
SHIFT TIME 2 DISHBLED
SHIFT TIME 3 D 1:S(18LED
SHIFT TIME •1 DISABLED
TANK PER TST NEEDED WRIV
DISABLED
TANK ANN TST NEEDED WRIV
DISABLED
LINE FE-ENABLE METHOD
PASS LINE TEST
LINE PER T27T NEEDED WRIV
DISABLED
L 1 IVE ANN TST NEEDED 6)RIV
DISABLED
PRINT TC VOLUMES
ENABLED
TEMP COMPENSHTION
VALUE (DEC F ): 60.0
STICK HEIGHT OFFSET
DISHBLED
ULLAGE: 9W.
p
14-PROTOCOL DATA FORMAT
HE 1 GHT
PRECISION TEST DURATION
HOURS: 12
DAYLIGHT SAVING TIME
ENABLED
START DATE
MAR WEEK 2 SUN
START TIME
2:00 AM
END DATE
NOV WEEK Y SUN
END TIME
2:00 AM
RE -D I REu LOi_r L PR 1 I•ITOUT
DISABLED
EUP.O F'ROTO('OL PREFIX
S
SYSTEM SEC UR I TY
CODE : 000000
11A I NTENANCE H I S'I'i)RY
DISABLED
TANK CHART SE,.I.IR I T`!
DISHBLED
CUSTOM ALARM:
DISABLED
SERVICE NOT I ,:E
D 12ABLED
ISO 3166 ! :OUNTRY
CODE:
I-IASS -, DENS 1 TY
DISHBLED
f t hll lUh; I isiAT t Oft SETUP
I Uk'r SETT I NC;S
G'+;1411 B'Ji F.'I+ 1 0 %,S-23'2+
pl:0.1111 ROTE
T'Y EVEN
STOP BIT I STOP
1'4;T6 LENt:TH: 7 IlHTH
CODE : DiSHHLED
i::(if9l`I BOARD : 3 1 F:D I r1 >
R:2 -232 SE(J)PITY
1,011E : D 15HLf1.ED
rc ru'1 BOiAk1! 5 tR-465)
NAIID kAT'L" : 24gCi
PARITY N < >NE
STOP BIT. 'I STOP
DHTH LE1,1'rH : 7 11, iTA
R -232 SE-. UY. I TY
i'ODE D I :;HBLED
01.1M BOARD 6 t R,
D+AUL RATE 960Gt
I -mPITY NONE
S'rOP B 1 r 2 STOP
OATH LENGTH: 8 DtiTA
F,;-232 SECURITY
COIJE I? I SAt I_ED
f4ff 't7 TRHI.ISM i T t:E'171 NCS
iAUTO I_EmK rAl : %R11 LIMIT
D I iSABLEl I
AUTO} H1C:11 wji 1'EY. L1M1'r
D I SHNL.ED
AUTO OVERF I i_i_ 1-1111T
LiSABLED
1.11'o LOW 1'PGL,i1!`T
it I SHBLEI I
mu'ro THEi''r L I r1 IT
D I S BLED
AUTO DELIVERY PAPT
ti 1 SHEfLEr+
AUTO DELIVDrl' END
DISAHLEr,
rAUTGJ EXTERNAL INPUT ON
D 15NljLED
AUTO E'•''rmmi. I NPUT OFF
D l F;I-;BLED
iAUTO SENSOp. I I.iEI. A1.AE 11
L1 I SABLLD
HUTO SEN:Ok I.li rL R i1Lf;RM
DiSHB..ED
AUTO SENSOR OUT ALARM
D 1SABL.Ei.,
RS- -'3:.' END OF ME:SSASE
I., I.,
I N-TAN); SETUP
1' i:DIESEL
2.0
PRODUCT CODE I
THERMAL COE17F :.000450
12i3c2
1'H NK DI Ai'11 'ER I 1 1.40
TANK PROFLELE 4 PT'i
FULL. VOL 1202 Q_
63.3 1 Nf'lj VOL 9677
55.5 INCH VOL 6011
27.8 1 NC:H VOL 2357
FLOAT :SIZE: 4.0
WATER WARN I NG; 2.0
HIi H WATER LIMIT: 3.0
MH:A OR LA131_i. VOL: 12i3c2
OVERFILL LIMIT 9Ct:6
TO-INK PROFILE
IQ@19
H I GH PRODUCT 95 ":
83.3 i N1 H VOL
11421
DELI VERY L 1 111 T 12%
27.13 1NOH VOL
1442
LOW PRODUCT 500
LEA); ALARM LIMIT: 32
SUDDEN LOS:- LIMIT: 25
TANY TILT O.70
PROBE OFFSET 0.00
SIPHON MArJ I FOLDED TANKS
Tit: NONE
LINE MANIFOLDED TANKS
TO: NONE
T 2:SUPREME
PRODUCT CODE
THERMHL COEF17 000,11-10 -
TANK OlAMETER III.00
TO-INK PROFILE 4 PTS
FULL VuL 12022
83.3 i N1 H VOL 9677
55.5 INCH VOL 6011
27.13 1NOH VOL 2357
FLOAT SiZE: 4.13
WATER WAR141NG
HIGH WATER LIMIT: 3.0
MAX OR LABEL VOL: 12022
OVERFILL LIMIT 90 %t
Itl@19
HIGH PRODU( :T 95%
11421
DELIVERY LIMIT 12:
1442
LOW PRODUCT 500
LEAK ALARM LIMIT: 32
SUDDEN LOS'S LIMIT: 25
TANK TILT 2.00
PROBE OFFSET 0.00
SIPHON MAN I FOLDEL, TANKS
Ta: NONE
L 1 NE MAN 1 FOLD1.1) 'rArn;5
TO: NONE
LEAK MIN PERIODIC: ++
LEAK M114 (41111LI 1L 0%
I..EA)C MIN PER l OD I C• : Or 0
u
LEAK MIN ANNUAL : 0: PERIODIC TEST TYPE
0 S'I ANDHRD
PERIODIC TEST TYPE
STANDARD
ANNUAL TEST FAiL
ALWk11 DISABLED
PERIODIC T'E.yT FAlI
ALi•1R11 DISABLED
GROSS TEST FA l L
i1L /4.11 D I SABLED
ANN TEST AVERAGI3 : OFF
PER TEST AVEP.H(; l hlr, : OFF
T(AriF TEST 1,10T I FY : OFF
T1,11'. 'rST SIPHON BREH); :OFF
DELIVERY DELAY 1 MIN
PUMP THRESHOLD 117.06%
ANNUAL TEST FAIL
ALARM DISABLED
PERIODD' TEST FAIL
AI_NRM DlSHBLED
i:;ROSS TEST FAIL
ALARi•1 D I SHBLED
ANN "fEST AVER. iC.'Ii,IG: OFF
PER TEST OFF
TANK TEST NOTIFY: OFF
TINY, TST SIPHON I3Rb,1::OFF
DELIVERY DELAY 3 M114
PUMP THRESHOLD 10.UO'.
ULHP'.
I'I tFkh1A1. L'i.ILI I= Up0'7011
7 HrIK L' I iVrlLT1 'I•: I I I .00
TANK PROF I LL
F'ULI. V11- 1202- -2
x13.3 1 N01 VOL 91.77
55.5 1 Nt' tl VOL 6011
27.8 I N1:'Lt VOL 2J57
FLOC+ T 'SIZE: •t . 0 IN.
WATER Wi-iRtl I No :: 0
HIi:H LIfirER LIMIT: 3.0
OF LNHFI, VOL: I-u;:.
OVERF I LL L 1111'I 9IJ'.
10819
HIGH PRODIJi:'T f 5 =.
I 1 •1'? I
DELIVERY LIMIT 12'.
I X1.12
LOW PPOLnp,T 500
LFmK. 1ALARt•1 I_ 1 P5 I T : Z2
SUDD01 LOSS L I m rr : 5
TAN): T I LT 2.00
PROBE OFFSET O.OG
S I PHON K N i TANKS
Tv: NONE
LINE I°IAN I F'01.14:L l'ti171:13
Tu: NONE
LEAK MIN PEN'IvDIC: u -.
0
LEAK M114 ANNUil. 4'-
u
PERIUU[; TEST TYPE
STAND+tRU
Hr71'lUfiL TEST FA I I .
HI_f \FiI") GI::iiliil,f•:f1
PER 1 OL I TEST Fm I i..
ob-iRM UI:HIiI.GD
ROS3 TE:_ T FH I L
r;LHRI °t Ul:ialll.E:f
wNN TEST F- +vEKAC I NG : OFT
PER TEST 01 -F
TAN). TENT NOTIFY: OFF
rNY TAT SIPHON BkGa); :OFF
r,EL I VERY 5FL AY :+ 111 N
PUI1P THRF,'SHOLD : 10.00::
LEAK TEST NETHOD
E-ST ON DATE : ALL TtaHV
JAN 2191 2009
START TIME : DISABLED
TEST RATE :0.20 GAL HR
DURHTION : 2 HOURS
EARLY STOP : D l f1RDLED
LEAK. TEST REPORT FORMAT
NORVIAL
PPE :SURE LINE LEAl, SETUP
0 I:DIESEL
TVP : 2.0- 3.01 m F I BEK;I.HSS
2. 01 Id 0 1H LEN: 100 FEET
3.01 N DIA LEVI : 0 FEET
SHUTDOWN RATE: 3.0 GPH
LOW PRESSURE SliUTOFF:NO
LOW PRESSURE : U PSI
T ):DIESEL
DISPENSE MODE:
hTANDARD
SENSOR: H 1 t:H PRESSURE
PRESSURE OFFtitT: IJ.OPSI
0 2 : SUPREI.IE
TIP : 2 .0: s. O1 N F I BIERCL.ASS
DIN DIA LEN: 160 FEET
3.0114 DIA LEN: U FEET
SHUTDOWN RATL: :3.0 OPH
L061 PRESSURE SHUTVFF:NO
LOW PRESSURE 0 PSI
T 2:SUPREI•IE
DISPENSE MODE:
SThNDARD
SENSOR: HIGH PRESSURE
PRESSURE OFFftET : O.OPS I
G 3:kEi:Ul..i•Ik
TYP : 2.0. 3.0I N F I BERGLoS '
2.01N DIA LEN: 180 FEET
3.iillV DIA LEN: 0 FEET
SHUTDOWN RATE: 3.0 GPH
LOW PRESSURE SHUTOFI :: rlo
LOW PRESSURE U PSI
T 3:REGULAR
DISPENSE MODE:
STANDARD
SENSOR: H I i:H PRESSURE
PRESSURE OFFSET: 0.0F Sl
LINE LEAK LO,,K,OIJT SE'I'UL•
LOCKOUT SCHEDULE
DAILY
START TIME: DISABLED
STOP TIME : DISABLED
L 1 CAJ I D SEhI:-,*OR ::3E'I'IJP
I_ I :D I ESEL will
NORMALLY' MOSED
CATEGORY : ANNULAR SPt;CE
L 2:DIESEL STP
TRI - STATE (SIrx :LE FLOAT)
C rEGoRY : STP SLUIP
L 3:31.1PREME ANN
NORMALLY CLOSED
CATEGORY : ANNULAR S'PHCE
L d:SUPREtyE STP
TRI -STATE (SINGLE FLOAT)
CATEGORY : STP SUMP
L 5 : REi:UI_AR wol
NORI"ViLLY CLOSED
CATEGORY : ANNULAR, SPru:E
L 6: REC.ULAR sTp
1'R I -:STATE t. S l NGL.E Fl-UHT)
CATEWR`! : OTHER jFNSORs
PLLD L I IJE D I S tRLE SETUP
0 1 :DIL• iEI-
T I :H 1 GH WATER HLtiP.I-I
T I : LOW PRUDi.n_"I' ALAH'I
LIQUID SENSOR ALMS
L, I :FUEL ALARM
L 2 : FUfiL ALARM
L I :SENSOR OUT ALARM
L 2:SENSOR OUT HI_HI2t °I
L I :SHORT ml-ARM
L 2:SHORT ALARM
L 2:1-110H 1-101.111) ALARM
C: -2:2UPRENE
1 N -TAN}' HI_I- iRf°ISi
T 2: H I C:H WATER HLAPI•I
T 2 :LOW PRODUCT of -mRI•I
L 101.11 D P:EITSOR ALMS
L 3: FLIEL ALAkhI
L 4 : FUE:L ALARM
L 3 :SE1'ISUR OUT ALARM
L i:SENSOR OUT ALARM
L 3:51•tOR'f ALARM
L 4:SHORT ALARM
ISD SITE ALoPMS
ISD GROSS PRES FAIL
ISD DECP.D PPES FAIL
ISD VAPOR LEA}! FAIL
ISD VP PRES FAIL
ISD HOSE ALARMS
ALL : GROSS i ,,)LLECT FAIL
ALl_ : DEC:RD COLLECTf FAIL
ALL:FLOW COLLECT FAIL
0 3: REGULAR
I N -TAM): ALARMS
T 3:HIGH wmTER ALARM
T 3:0U1 PRODUCT ALHRI°I
LIQUID ;EWSGR ALMS
L 5: FUEL ALAkt•I
L 6: FUEL ALPtRM
I- S' SENSOR OUT AI-4 -t I
L 6 :SENSOR' OUT ALARM
L 5:SHORT ALARM
L 6:SHORT ALARM
L 6:1111',11 I_ I OU I D ALARM
ISD SITE ALARI IS
ISD GFOSS PRES FAIL EVR.ISD SETUP
ISD DEGRD PRES FAIL
ISD VAPOR LEAK FAIL
ISD VP PRES FAIL
EVR TYPE; BALANCE
15D HOSE ALARMS
ALL : GROSS COLL.E(;T FAIL BALANCE NOZZLE TYPE
ALL : DECRD COLL.EC T F;)1 l_ VST
0-1LL : FLOW COLLECT FAIL
VAPOR PP.00ESSOK TYPE
VEEDER -ROUT POLISHER
ANALYS I S TI 11E!
TIME: 10:00 AM
DELAY 111 NU'1'LS : I
ISD FUEL GRADE" HOSE MAP
1 3 4
FP 11HH MHH (`IHII llIHH AA
OU 401 501 901 U IJ 1
01 402 502 902 U U 1
02 403 503 9013 0 U
03 404 504 904 0 U 2
04 405 505 905 U U 3
05 406 506 906 U U 3
06 407 507 907 0 U it
07 408 508 900 0 U 4
LABEL TABLE
A0,*EPT HIGH ORVR:
2:
DISABLED
3: REGULAR.
Si APTSENF:GR SETUP
M I D GRADE
5: PREMIUM
ISD HOSE TABLE
DRONZE
1 D FP FL HL HI.1 RP
s 1:PRESS SENSOR
BLEND4
CATEGORY VAPOR PRESSURE Ci 1 00 01 01 Li 1 UU
02 01 02 0' 01 UU
s 2 : GAIV I STEP 03 02 03 02 02 UU
CATEGORY VAPOR VALVE 04 03 04 02 02 UU
05 04 05 02 03 UU
s 4:FM I - 06 05 06 02 03 uU
CATEGORY AIR FLOW METER 07 06 07 04 UU
Ott 07 08 02 04 UU
t 5:FM 3 -4
Cr TEGOPY AIR FLOW PIETER
ISD AIRFLOW METER NAP
s 6 :Fhl 5 -6 ID SERIAL NUM LABEL
CATEGORY AIR FLOW METER
1 36974 FIJI I -2
s 7:FM 7 -8 2 36687 F19 3 -4
0A CEGC >RY AIR FLOW METER 3 36611 I"11 5 -6
4 36598 FM 7 -8
s 8 : ATMP PRESSURE
CATEGORY ATM P SENSOP
ISD FUEL GRADE" HOSE MAP
1 3 4
FP 11HH MHH (`IHII llIHH AA
OU 401 501 901 U IJ 1
01 402 502 902 U U 1
02 403 503 9013 0 U
03 404 504 904 0 U 2
04 405 505 905 U U 3
05 406 506 906 U U 3
06 407 507 907 0 U it
07 408 508 900 0 U 4
LABEL TABLE
I: UNASSIGNED
2: BLEND3
3: REGULAR.
4: M I D GRADE
5: PREMIUM
6: GOLD
7: DRONZE
8: SILVER
9: BLEND2
10: BLEND4
PMr. SETUP
PH(: VEP.S I UIV : 01 .02
VAPOR PROCESSOR 'TYPE
VEEDER- ROOT POLISHER
H1-ARM HISTORY kEPiiF'T
SYSTEN
PAPER OUT
OC'T 7. 2011 12:02 Pl,l
PRILATER ERROR
0C °1' 7. 201 1 12: ri2 PI"I
REMO'T'E U I S'PI -we' ERROR
SEP B. '2011 4:3G Pit
ti .. .. r. rNp .. ..
ALARM H l :;:TORY REPORT
T I : [' I ESEL
SUDDEN LOSS +,LARM
mur, 217. 2,010 B: 05 Pr•l
I NVI•IL I D FUEL. LEVEL
OCT 17. 2010 1:35 AM
SEP 29, ?010 2:50 PI °1
DELIVERY NEEDED
OCT 2t. 2011 8:08 A;'I
OCT 14. 2011 8:5G All
OC:T 7, 201 1 1 : 0F PM
r 's EI`JB 3t r r. : x
ALARM H 1 S'I'tjR` REPOR'r
114-THNY•. ALARM - - - --
T '3 : SUPREME
DELIVERY NEEDED
SEP 26. 20111 12:43 F'M
AUG 26. 2011 4:09 Pill
AUG 19. 2011 5:36 PM
r,; A n END t w A.
HLARM HISTORY REPORT
1N —TANK ALARM —
T 3: REGULt4R
OVERFILL ALARM
JUN 29. 2011 2:11 HM
MAR 17, 2011 3:52' ALAI
FEB 7, 2011 4:17 All
HIGH PRODUCT ALARM
AUG 29. 2010 8 :3? PM
PROBE OUT
APR 29. 2011 9::36 AM
APR 29. 2011 9:24 HM
DELIVERY NEEDED
U:T 8, 20iI 8:3? PM
SEP 16. 2011 6:37 PM
JI.IL 1, '2011 9:21 PN
LOW TEMP WARNING
APR 29. '2011 9:38 AM
y, r x x END x< A v ..
a
ALHRfl HISTORY REPO >RT
SENSOR )LmRrl - - - --
L 1 : 01 ESEL AN111
A14NULAR SPACE
FUEL ALARM
OCT 5. 2010 9:21 AM
FUEL HLHRl,I
OCT 5, 2010 9:20 t;l•l
FUEL ALARM
OC:T 5. 2010 9:14 AM
x 'A X X .. END ; .. f
ALARM HISTORY REPORT
SENSOR ALARM - - - --
L 2: D I ESEL STP
STP SUMP
FUEL ALARM
APR 8. 2011 9:16 AM
FUEL HLr RI•I
MAR, 28, 2011 2 :02 PM
FUEL ALARM
MAR 28. 2011 2:02 P11
i, x x x '% END x
ALARII H I STORY PEPOPT
SENSOR wLl•1Fr1 -- - --
L 2:DIESEL STP
arF' :,'UMP
FUEL ALARM
APR B. 2011 9:16 AM
FUEL AL-iRM
hVAP, tB. 2011 2:0:: PH
FUEI. Al -f4Ri1
MHR 26. 2011 2:1 2 Phl
s; x x x i END « '0 r: 4
AI..F1Rhl H I STORY RL•:PUkT
SENSOR F;LmRri - - - --
L 3:SUPP.EME >4NII
HIVNULo-)R SPHCE
SETUP DATH WI;RIV I Plr':
OrT 2.1. 2011 10:02 AM
FUEL HLHRM
Cx:T 24. 2011 9:53 AM
SETUP DmTH WAPN I N-
140V I . 2010 10:10 01.1
ALAF41 HISTORY REPORT
SENSOR ALAFM --
L 4:SUPREhIE STP
5TP SUMP
FUEL ALARM
r•1hR 17. 2011 3:05 W1
SEN:;OR OUT ALARM
OCT 5. 2010 9:21 Ali
SENSOR OUT ALARM
OCT 5. 201 CI 9:211 13M
x H x x 'r. END .i . A r t
HLHRM HISTORY REPORT
SENSOR ALARM - - - --
L 5:REk3ULAR ANN
ANNULAR SPACE
FUEL HLARM
OC'T 5, 20111 9:21 AM
FUEL ALARM
OCT 5. 2010 9 :20 NM
FUEL HLHRh1
OCT 5. 2010 9:15 AM
A ErID . .t ". 'i . . . r . END 's . k .• i
ALHklhl H I STORY REPCIFT
SENSOR 04LARM - - - --
L 6 : REGULAR STP
OTHER. SEIVSOkS
FUEL MLAR11
APP 13, 2131 1 1 1
FUEL HLARM
APR 9, 2011 9:24 Ahi
SENSOR, OUT HLARIh
OCT 5. 201 u 9: i FrM
ri x k i END r. s ii k ..
TRE,'!_w"URE LINE 1-CM), 1.DARH SENSOR HLARM 1,N.iHITE LANE CHEVRONLI :Lj I ESEL it-11,111 2525 WHITE LANE
I-HUTDOWH HLI;Rll HNNI-11-e-iR BHKERSFIELD 0A 93304
C-(;T 24. I I 10:19 1-91 rijEl- "ADAR11 6J-832-9701ClOCT24. 2011 10:221 AM
OCT 24, 2011 10:24 HM
SYSTEM STATUS REPORT
ALL FUm,,rioi%iLi i,toF.liAi,
r'ENSOk 'Loflll
L *:PE,','LlL.t4P 'F, FIRES-.AAE LIPIL LEmK ALAPll
C:THER 0 2:aIPPEME
FUEL ADIRN H-LD tiHUTDOWN HLHPI-I
I'*T 24. 201 1 10:19 HM OCT ':4, 2011 10:22 i-vrl
ARCHIVE UTILITY
WAVE ciETW DATA:
START TIME:
OCT 24, 2011 10:26:09 #'V-1
FIRFS;IIPE LINE LEHK I-EPISOR Hb-iRH
L 3:SUPREME (-410
tq,L[o
U (-:,r 24. I ILI: l': pri FUEL HLHRMOCT01GPI- 2 Cj I I I ID : 22 W,
SIT, PRESSURE LINE LEAK 01-HRM
0 ll:REGULAR
T'll-D ALt-oRll
r'T 24 - 20 1 1 10 : 19 i4l'l OC:T 24. 201 1 10: 22 AM
APCHIVE UTILITY
SfA\IE 7.;E'I'UP D,A,ri^k:
END TIME:
0"1 24. 2101 1 10:21w I",; mN
B"I"Mc), : 15872
LINE L17-Ai•: i ENWR fit,i4pll F'PESSURL LINE LEAF: Ab-%RmS-';U]-AR ANN1:j i :to I E2EL L :KE,
ANNULAP SF'Al-E PLLD llr'HUTDOWN til_HRNFUELALARP,l
oci 24 - 201 1 10: 22 HM OCT 24. T-101 i:Am
sEn,,Op Al-hyll SENSOR ALARM
J,lE":;EL SM, L 3:2UPREVIE olliq
ll, ss UNP APINULFiR SPm(_'E
FUEL AJ_ Pfi FUEL ALARM
ol,:,r 7,4. 7,cil 1 113:2.10 14-1 M' 24. 2011 10: 28 mil
PPE,S,-;URE 1-111IF LE;,I'. iiLi.iRll PRBSSURE L[PIE LEAK ADiRM
i,j I: El J ESEL (,) I :DI ESEL
F,LL[, ',-.:oHUTf,(_AJN rL.f:%RH N.11, SHUTDOWN AL-iRM
OCT 2,1 • 2101 1 10 : 21 AH 0f::T 24. 2'01 1 10:'29 AM
L I :D I ESEL ANN
FI-IEJ- Al.oRII
Of:'T '24. 20 1 1 10:'28 All
SENSOR ALmPll
L. STP
sp sumP
SEMOR wr musm
ot,,*r 2.1. 2011 mil
S'EITS0,R OUT ALPRl'l
OCT 24. -,!) I I 1 11 : 2'8 All
LIP ,E 1.1111E LE*,.' N.f-)P.111
6l 1 1 u: 2'G Hm
FUEL tAl-HR.1-1
T 2 LI - I I I 11-1 : 28 All
L
OTHEP SEPISOK',
SENSOR OUT HU-iPll
WHITE LANE C'HEVPOI'4
2525 WHITE Li-ANE
f-A 9:1304
6M - 0309781
OCT' 211. 2011 113:30 All
SYSTEN STATUS REF,owr
ALL FUNC*T I ONS NORNmL
WHITE LANE -,HEVR0N
21525 WHITE LANE
INKERSFIELD 0i 93304
1561-832-9781
OCT 24, 2011 10:73C1 N1
S'I'm'FUS REPORT
iLL FIL11,10TIONS NOPMAL
LA-11 TE LANE C'FIEVRON
2525, '.-,IHITE LANE
BiAKER';'NELF) ('A 92:30.1
661 - 832 -97191
OCT 24 • 201 1 10 :4 1 Hl"I
T I :DIESEL
VOU-1111" .
LILLA(;E = 9976 13AL2
90% Ml-kGE= 8773 GALS
TC VOLT 31E - 2212.1
IIE I C.HT - 25. 10 1 N•HES
WATER VOL = 0 ALS
WATER . 0.00 1 N1,11ES
I-Er-lP . 8J. I DEG F
T PSUPREME
VOLUME . 2694 GALS
lJLLmGE = 9J28 GN-S'
90: !kLmGE= 8125 CALS
TO VOLUME - 2650 GALS
HE I GHT - 30.52 1 HCHES
WiATER VOL - 12 GALS
WATER . 0.81 1 IIICHES
TEMP = 82.6 DEG F
T 3 AEG MAR
VOLUME . 5857 GALS)
ULLpi','E = E.165 GoUni
90% 496' GALS
TC; VOLUME - 5769 GALS
HE I - 54.313 I W.1I ES
WATER VOL - 0 .(-iLS
WATER . 0.00 1 PICHES
TErlF' . al.2 DEC, F
PRESSURE LINE LEr4!. Hb,R-I'l
0 3: FE(;'JLAR
GROL'DIS L I 14E FA I L
OCT , 2,1, 2i-1I I ICI : 5U All
F,PEI-:',SUPE L I NE I-EtAK. AbliPtl
Q 3AE6ULiiR
PLLD RHlrh,,,66mq
Oi'.,T 24, 2011 10:51) f-Ml
WHITE Lt-AIIIE GHEVP(.)N
2525 WHITE LANE
BmKEPSFIELD CA 93q04
661-832-9781
oc*r 24 - 2o i I I 1): 51) Am
Sl;'S,TEI,l 1MATI-12 REPORT
3: C;JdC)SS L I NE' Fm I L
G 3:rLLri SHUTIJOWN
PPE'SSLIPE LINE I..E(--,I:
D ':SUPREME
RC,SS L I 14F FFi I L
Ot','T 24. 2011 10:56 All
PRESSURE LINE ml-mlill
C.) 2:SUPREME
PLLP SHUTDOWN ml-tARI"
OCT 24, 201 1 10: S6 P11
wo I rL LWIF CHEVRON
Z525 66rri:-: LANE WHITE LmPIE "HFVR0Iq
DAKFIRSFIELD r, KiJU-1 95:5 WHITE Lo4NF
fIt"I -8 2-9781 i1H)-Ek:;FIELD 0A 92304
661-832-9781
0T 2 10:56 A1•
OCT 24. 21311 11 :05 AM
SYSTEH STi-fl*lj:i P.,EK,ORT
c",'S TW,I SToTUS REI:,OP'I*
LINE FmIL
1 L I PIE VIA I I.,
HL•Vf,l
0 •:13ROSS LINE FoM.
0 2'(;ROSS LINE FmIL
i:PLLD SHUTDOWN ALARM
Q 2:PLLr) SHUTDOWN HLARM
4o 3:13RUSS LINE FHIL
4 3:PLLIP SHUTrKupi HI-iiRli
L1141: I-DAK "I-441H,11
0,1 1 :(,1 ESEL
s:.),0SS LINE F,01-
OCT 24. YOH ll*,I).l 011
WHITE LMNE C'HaIRON
2525 WHITE LmPIE
W-WERSFIE'Ll)
661-832-9781
01—f 24. 21011 11:05 H-1
14F.IFSI. UPE LINE LEAP:
E --'EL VSTEII STmTLIS REPORTb
PLIJ) SHUTDWN ml-mPI-1 - - - - - - - - - - - -
G!: T 2a. 2611 11:1-14 HM 1 I :GROSS L I 14E FA 11_
G I :T,I-Ll) SHUTDOWN HLARH
G 2: *;R0SS, LINE FA I L
0 2:PLLD SHUTDOWN mLHRI,l
3::ROSS L I HE FA I L
1HITE LAIIF Clif ' VR0Iq 3:PLL[o SHUTDOWN i-if-HP.1-1
2525 WHITE LAWE
BHK ERSF I ELD
661 -032 9781
01**T 24, 2'011 11 : IDS All
S',
A1:
3TEf1 :—;Ti-;T1jS RE1,0K1'
G I LINE FAIL
I :F,LI-D 'SHUTDOWN W-API'l
CU 2:GPOS2 I- INL FAIL
Gj '?:PLLI) SHUTDOWN kLHRI,l
1:1 Vo-01-
C-i SHITHiO14PI r0.,ARM
WHITI: LANE "107VP01-1
661 -832-9701
OC*r 24. 2ol I I I : I? mm
SY!t',TIYI REPUPT
6 1: RQSS L 11-1 E Fi; I L
I : PLU SHLl•rrjowjj ;ALtARM
LINL PHIL
2:PLI-D SIIUTEJOVIN 61-HRI-I
121 3: GROSS LINE FAIL
i D;PILLI.*, SHUTDOWN i-iLHPM
PPL-3SUPE LINE LEAK i4i-iiPll
C4 '':SUPREME
PLLI., 4ifff.Xmi,i ALARI-i
01--r 24. 2011 1):43 Fill
i•iIlJr4lJI-mR SPmcE
FUEL i-)UAM
Cll`T 24. 201 1 It :4'j I-q.1
WHITE LANE 1"l-ID)RON
2525 WHITE LHhIE
DfAKM*nFIELD CH 9330.1
661-832-9781
0",'T 24 • 201 1 1 1 : -1i i4ll
2Y;TEM STATUS REPORT
L 3:FUEL ml-AR11
0 2.PLI..D SHUTrOWN HLPARM
WHITE LANE CHLMN
2,5215 WHITE I-mHE
Si-WERSFIELI, --'- 93304
661-832-9781
CCT 24. 2011 1 :43 0411
SYSTEM STATUS
L 3:FUEL mLARI-I
Q 2:PLL1, 31-1UT[JOWN
SWRCB, January 2006
Spill Bucket Testing Report Form
This form is intendedfor use by contractors performing annual testing ofUST spill containment structures. The completedform and
printoutsfrom tests (fapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Chevron I Date of Testing: 10/24/2011
Facility Address: 2525 White Lane, Bakersfield, CA 93304
Facility Contact: Gaby Jabbour I Phone: 805- 444 -4229
Date Local Agency Was Notified of Testing: 10/18/2011
Name of Local Agency Inspector (tfpresent during testing): Ester Duran
2 Super
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services, Inc.
Technician Conducting Test: Bryan A Self
Credentials: I] CSLB Contractor OO ICC Service Tech. El SWRCB Tank Tester Other (Spec)
License Number(s): CSLB# 804904 ICC# 8022804 -UT SWRCB# 11 -1756
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: OO Hydrostatic Vacuum Other
Test Equipment Used: Lake Test Equipment Resolution: 0.0625"
Identify Spill Bucket (By Tank
Number, Stored Product, etc.
1 Regular 2 Super 3 Diesel 4
Bucket Installation Type: XDirect Bury
Contained in Sump
x Direct Bury
Contained in Sump
x Direct Bury
Contained in Sump
Direct Bury
Contained in Sum
Bucket Diameter: 12.00" 12.00" 12.00"
Bucket Depth: 13.50" 13.50" 14.00"
Wait time between applying
vacuum/water and start oftest: 5 min. 5 min. 5 min.
Test Start Time (T,): 10:00 am 10:00 am 10:00 am
Initial Reading (RI): 10.00" 10.25" 9.75"
Test End Time (TF): 11:00 am 11:00 am 11:00 am
Final Reading (RF): 10.00" 10.25" 9.75"
Test Duration (TF — Tj): 1 hour 1 hour 1 hour
Change in Reading (RF - RI): 0.00" 0.00" 0.00"
Pass/Fail Threshold or
Criteria: 0.0625" 0.0625" 0.0625"
Test Result: X Pass Fail X Pass Fail X Pass Fail Pass Fail
Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
Ihereby certify that all the Information contained in this report is true, accurate, and Infull compliance with legal requirements.
Technician's Signature: ` Date: 10/24/2011
State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements
may be more stringent.