HomeMy WebLinkAboutFMC 2011w-
i1PPTanlmology
11000 N. MoPac Expressway, Suite 500
Austin, Texas 78759
Phone: (512) 451 -6334
Fax: (512) 459 -1459
BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR CRAIG PERKINS
1501 TRUXTUN AVE.
BAKERSFIELD, CA. 93301
Test Date: 05/17/2011
Order Number: 3183613
Dear Regulator,
415-5
Date Printed and Mailed: 05/24/2011
Enclosed are the results of recent testing performed at the following facility:
7- ELEVEN #32376, MKT 2368
9600 BRIMHALL RD.
BAKERSFIELD, CA. 93312
Testing performed:
Impact Valve
Leak detector tests
Monitor Certification
Secondary Containment -Spill Container
Sincerely,
Dawn Kohlmeyer
Manager, Field Reporting
r
tpp I7 0*Oi TANKNOLOGY CERTIFICATE OF TESTING
8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759
TELEPHONE (512) 451 -6334 FAX (512) 459 -1459
PURPOSE: COMPLIANCE TEST RESULT SUMMARY REPORT
TEST DATE: 05/17/11 WORK ORDER NUMBER: 3183613
CUSTOMER PO:
CLIENT: 7- ELEVEN, INC. SITE: 7- ELEVEN #32376, MKT 2368
P.O. BOX 711 9600 BRIMHALL RD.
DALLAS, TX 75221 BAKERSFIELD, CA 93312
MANAGER
972)828 -7908 (661)5884059
TEST TYPE: TLD -1
Prnrluct Pina Tinhtnacc Tact Rociil4c
LINE
ID
LINE
PRODUCT
LINE
MATERIAL
DELIVERY
TYPE
TEST RESULT
A B C D
FINAL LEAK RATE (gph)
A B C D
IMPACT
VALVE
FUNCTION
2 RUL 2 REGULAR ENVIROFLEX PRESSURE
RESULT
2 RUL 2
Y
3 PUL 3 PREMIUM ENVIROFLEX PRESSURE Y
FYictinn I ino I aalr notar -Mr Tact
LINE
ID
EXISTING LEAK DETECTOR #1 EXISTING LEAK DETECTOR #2
MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT
2 RUL 2 VAPORLESS LD2000 02164 P
3 PUL 3 VAPORLESS LD2000 08041486 P
Now Ranlacamont I ina I aak notat -Mr Tact
LINE
ID
REP ACED LEAK DE ECTOR #11 RE ED LEAK DET ECTOR #2
MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT
tor owner aetauea report mrormation, visa www.tanKnology.com ana select un -Line Keports -w KAt-, or contact your iocai t anxnoiogy ontce.
Tester Name: AXEL MEDINA Technician Certification Number:
Printed 05/24/2011 07:24 MTUTTLE
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
PP Tanknabgy
TEST DATE:05 /17/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBERS 183613
CLIENT: 7 -ELEVEN, INC. AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:7- ELEVEN #32376, MKT 2368
Printed 05/24/2011 07:24
TANK INFORMATION
Tank ID: 2 RUL 2 Tank manifolded: NO Bottom to top fill in inches: 144.0
Product: REGULAR Vent manifolded: YES Bottom to grade in inches: 147.0
Capacity in gallons: 10,028 Vapor recovery manifolded: YES Fill pipe length in inches: 48.0
Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 324 Overspill protection: YES Stage I vapor recovery: DUAL
Material: Dw JCTD ST Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TEST RESULTS Test Method:vacuTect LEAK DETECTOR TEST RESULTS Test method: LDT -5000
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
Dipped Product Level: L.D. #1 L.D. #1 L.D. #2 L.D. #2
Probe Water Level: Make: VAPORLESS
Ingress Detected: Water Bubble Ullage Model: LD2000
Test time: S /N: 02164
Open time in sec: 8.28
Inclinometer reading: Holding psi: 29
VacuTect Test Type: NOT
Resiliency cc: 325 NOT
ry TESTEDVacuTectProbeEntPoint: Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi: 22
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINE TEST RESULTS Test type: TLD -i
LINE A B C D
Material: ENVIROFLEX
Diameter (in): 1.5
Length (ft): 260.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 05/24/2011 07:24
INDIVIDUAL
TEST DATE: 05/17/11
CLIENT: 7 -ELEVEN, INC.
TANK INFORMATION AND
i Tanknobgy
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759 (512) 451 -6334
TEST RESULTS
WORK ORDER NUMBER3183613
SITE:7- ELEVEN #32376, MKT 2368
Printed 05/24/2011 07:24
TANK INFORMATION
Tank ID: 3 PUL 3 Tank manifolded: NO Bottom to top fill in inches: 146.0
Product: PREMIUM Vent manifolded: YES Bottom to grade in inches: 150.0
Capacity in gallons: 10,028 Vapor recovery manifolded: YES Fill pipe length in inches: 50.0
Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 324 Overspill protection: YES Stage I vapor recovery: DUAL
Material: Dw JCTD ST Installed: ATC Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TANK TEST RESULTS Test Method:vacuTect LEAK DETECTOR TEST RESULTS Test method: LDT-5000
Start (in) End (in)
Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced
L.D. #1 L.D. #1 L.D. #2 L.D. #2
Dipped Product Level:
Probe Water Level: Make: VAPORLESS
Ingress Detected: Water Bubble Ullage Model: LD2000
Test time: S /N: 080+1486
Open time in sec: 9.99
Inclinometer reading: Holding psi: 20
VacuTect Test Type: NOT
Resiliency cc: 180 NOT
VacuTect Probe Entry Point: TESTED
Test leak rate ml /m: 189.0 TESTED
Pressure Set Point: Metering psi: 22
Tank water level in inches: Calib. leak in gph: 3.00
Water table depth in inches: Results: PASS
Determined by (method):
Result:
COMMENTS
COMMENTS
LINE TEST RESULTS Test type: TLD -1
LINE A B C D
Material: ENVIROBLEx
Diameter (in): 1.5
Length (ft): 280.0
Test psi:
Bleedback cc:
Test time (min): NOT NOT NOT NOT
Start time: TESTED TESTED TESTED TESTED
End time:
Final gph:
Result:
Pump type: PRESSURE
Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 05/24/2011 07:24
MONITORING SYSTEM CERTIFICATION
For Use By All Jurisdictions Within the State of California
Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3 Title 23, California Code of Regulations
This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is installed at the facility, a separate
certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank
system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date.
A. General Information
Facility Name: 7- ELEVEN #32376, MKT 2368
Site Address: 9600 BRIMHALL RD.
Facility Contact Person: MANAGER
City: BAKERSFIELD
Contact Phone No: 588 -4059
Date of Testing/Service: 05/17/2011
Make /Model of Monitoring System:TLS -350 Work Order Number:
B. Inventory of Equipment Tested /Certified
Check the appropriate boxes to indicate specific equipment inspected /serviced
3183613
CA Zip: 93312
Tank ID: 2 -RUL Tank ID: 3 -PUL
X In -Tank Gauging Probe. Model: MAG X In -Tank Gauging Probe. Model: MAG
X Annular Space or Vault Sensor. Model: VR-420 Annular Space or Vault Sensor. Model: VR-420
X Piping Sump/Trench Sensogs). Model: VR -352 Piping Sump/Trench Sensogs). Model: VR -352
Fill Sump Sensogs). Model: Fill Sump Sensogs). Model:
Mechanical Line Leak Detector. Model: LD -2000 X Mechanical Line Leak Detector. Model: LD -2000
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
X Tank Overfill /High -Level Sensor. Model: FLAPPER Tank Overfill /High -Level Sensor. Model: FLAPPER
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2).
Tank ID: Tank ID:
In -Tank Gauging Probe. Model: In -Tank Gauging Probe. Model:
Annular Space or Vault Sensor. Model: Annular Space or Vault Sensor. Model:
Piping Sump/Trench Sensogs). Model: Piping Sump/Trench Sensogs). Model:
Fill Sump Sensogs). Model: Fill Sump Sensogs). Model:
Mechanical Line Leak Detector. Model: 7 Mechanical Line Leak Detector. Model:
Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model:
Tank Overfill /High -Level Sensor. Model: Tank Overfill /High -Level Sensor. Model:
Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model In Section E on page 2).
ispenser : 1 -2 Dispenser ID: 3-4
Dispenser Containment Sensors) Model: VR -352 X Dispenser Containment Sensors) Model: VR -352
X Shear Valve(s). X Shear Valve(s)
11 Dispenser Containment Floats) and Chain(s). 7 Dispenser Containment Float(s) and Chain(s).
Dispenser ID: 5 -6 Dispenser ID: 7 -8
0 Dispenser Containment Sensors) Model: VR -352 X Dispenser Containment Sensors). Model: VR -352
RI Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Floats) and Chain(s).
Dispenser ID: 9-10 Dispenser ID: 11 -12
0 Dispenser Containment Sensors) Model: VR -352 X Dispenser Containment Sensors). Model: VR -352
X Shear Valve(s). 11-71 Shear Valve(s).
Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s).
If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility.
C. Certification
I certify that the equipment identified in this document was inspected /serviced in accordance with the manufacturers' guidelines.
Attached to this certification is information (e.g manufacturers' checklists) necessary to verify that this information is correct.
and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached
a copy of the (Check all that apply): System set -up XO Alarm history report
Technician Name (print): AXEL MEDINA Signature: a
Certification No.: B -36644 License. No.: 743160 (Class 'A' General Enginering Contractor License)
Testing Company Name: Tanknology Phone No.: (800) 800 -4633
Site Address: 11000 N. MoPac Expressway, suite 500, Austin, TX 78759 Date of Testing /Servicing: 05/17/2011
Monitoring System Certification Page 1 of 3 Based on CA form dated 03/08
Site Address 9600 BRIMHALL RD.
D. Results of Testing /Servicing
Software Version Installed: 329.02
Complete the following checklist:
Monitoring System Certification
Date of Testing /Service: 05/17/2011
FRI Yes No • Is the audible alarm operational?
0 Yes No • Is the visual alarm operational?
0 Yes No • Were all sensors visually inspected, functionally tested, and confirmed operational?
Q Yes No. Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not
interfere with their proper operation?
Yes D No • X N/A If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational?
0 Yes No • N/A
For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment
monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive
shut -down? (check all that apply) x Sump/Trench Sensors; X Dispenser Containment Sensors.
Did you confirm positive shut -down due to leaks and sensor failure /disconnection? X Yes No
Yes No' x0 N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanical
overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill points(s) and operating
properly? If so, at what percent of tank capacity does the alarm trigger? so
FYes' No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the
manufacturer name and model for all replacement parts in Section E, below.
Yes* XD No Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) Product;
Water. If yes, describe causes in Section E, below.
OX Yes No • Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable.
Qx Yes No Is all monitoring equipment operational per manufacturers' specifications?
In Section E below, describe how and when these deficiences were or will be corrected.
E. Comments:
DAMAGEDVR-352 SENSOR IN DISP.#5/6 WAS .
Page 2 of 3 Based on CA form dated 03/08
Monitoring System Certification
Site Address: 9600 BRIMHALL RD.
F. In -Tank Gauging / SIR Equipment
Check this box if no tank gauging or SIR equipment is installed.
Date of Testing /Service: 05/17/2011
Check this box if tank gauging is used only for inventory control.
Check this box if no tank gauging or SIR equipment is installed.
This section must be completed If in -tank gauging equipment is used to perform leak detection monitoring.
Complete the following checklist:
EYes No Has all input wiring been inspected for proper entry and termination, including testing for ground faults?
X Yes No • Were all tank gauging probes visually inspected for damage and residue buildup?
0 Yes No' Was accuracy of system product level readings tested?
El Yes No Was accuracy of system water level readings tested?
FRI Yes No' Were all probes reinstalled properly?
0 Yes No • Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
G. Line Leak Detectors (LLD) :
Complete the following checklist:
Check this box if LLDs are not installed.
X Yes No' N/A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance?
Check all that apply) Simulated leak rate: X 3 g.p.h 0.1 g.p.h 0.2 g.p.h
X Yes No' Were all LLDs confirmed operational and accurate within regulatory requirements?
EYes No' Was the testing apparatus properly calibrated?
Yes No' N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak?
Yes No' X N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak?
Yes No • 0 N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
Yes No ` X N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test?
Yes No' Q N/A For electronic LLDs, have all accessible wiring connections been visually inspected?
0 Yes No' Were all items on the equipment manufacturers' maintenance checklist completed?
In the Section H, below, describe how and when these deficiencies were or will be corrected.
H. Comments:
Page 3 of 3 Based on CA form dated 03/08
SWRCB, January 2002 Page 1.
Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performingperiodic testing of UST secondary containment systems. Use the
appropriatepages ofthisform to report resultsfor all components tested. The completedform, written testprocedures, and
printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: 7- ELEVEN #32376, MKT 2368 Date ofTesting: 05/17/2011
Facility Address: 9600 BRIMHALL RD. BAKERSFIELD, CA, 93312
Facility Contact: MANAGER Phone: (6 61) 588-4059
Date Local Agency Was Notified of Testing:
Name ofLocal Agency Inspector (if present during testing): ERNIE MEDINA
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY , INC.
Pass
Technician Conducting Test: AXEL MEDINA
Repairs
Made
Credentials:
Pass
CSLB Licensed Contractor a SWRCB Licensed Tank Tester
Spill Box 2 REG FILL
License Type: A- UT I License Number: 743160-- 8 014 68 2
Manufacturer
Manufacturer Training
Component(s) Date Training Expires
OPW 5507 SPILLBUCKETS 01/28/2012
3. SUMMARY OF TEST RESULTS
Component Pass Fail
Not
Tested
Repairs
Made Component Pass Fail
Not
Tested
Repair
Made
Spill Box 2 REG FILL El Fx
Spill Box 3 PRE FILL x
Spill Box 2 PEG FILL El
El El El El El
El El El El El El El
7 0 El El El
El El Ell El E
El El El F-1 E El
El El El El El E
El I El I El El El F El El-
El El 0 E El El El
Ell Ell El I El I I Ell Ell El I El I
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
WATER WAS REMOVED FROM SITE.
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, thefacts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: Date: OS/17/2011
o
SWRCB, January 2006
9. Spill Bucket Testing Report Form
Thisform is intendedfor use by contractors performing annual testing of USTspill containment structures. The completedform and
printouts from tests (ifapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: 7- ELEVEN #32376, MKT 2368 DateofTesting: 05/17/2011
Facility Address: 9600 BRIMHALL RD. BAKERSFIELD, CA, 93312
Facility Contact: MANAGER Phone: (661) 5 8 8 - 4 0 5 9
Date Local Agency Was Notified of Testing:
Name of Local Agency Inspector (if present during testing): ERNIE MEDINA
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY, INC.
Technician Conducting Test: AXEL MEDINA
Credentials : CSLB Contractor E ICC Service Tech. E SWRCB Tank Tester Other (Specify) A- UT
License Number: 743160-- 8 014 6 82
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: [K] Hydrostatic Vacuum Other
Test Equipment Used: MEASURING TAPE Equipment Resolution: VISUAL
Identify Spill Bucket(By Tank
Number, Stored Product, etc.)
I 2 REG FILL 2 3 PRE FILL 3 2 REG FILL 4
Bucket Installation Type:
0 Direct Bury
Contained in Sump
X Direct Bury
Contained in Sump
Direct Bury
Contained in Sump
Direct Bury
Contained in Sump
Bucket Diameter: 12" 12" 12"
Bucket Depth: 1211 1411 1211
Wait time between applying
vacuum/water and starting test:
0 0 0
Test Start Time (TI ): 0 915 0 915 0935
Initial Reading (RI ): 9.511 11.5 " 7 . 5 "
Test End Time (TF ): 0920 1015 1035
Final Reading (RF ): 9.011 11.5 7.5
Test Duration: 5 MIN 1 HOUR 1 HOUR
Change in Reading (R F - RI ): 0.5 " 0.011 0.0"
Pass/Fail Threshold or
Criteria:
0 0 0
Test Result: 0 Pass [K] Fail fl Pass Fail E Pass Fail Pass 0 Fail
Comments - (include information on repairs madeprior to testing, and recommendedfollow -up forfailed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is true, accurate, and infull compliance with legal requirements.
Technician's Signature: 05/17/2011
I
State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements
Work Order: ' 3181613
I
FSO) & (6SV) Tcstin Form - Version !- 6012007
Emergency Shut Off (ESO) &
Dispenser Emergency Shutoff Valve (ESV)
ANNUAL TEST RECORD LOCATIONS AND TEST DATA
Emergency Shut Off (ESO) Testing Results
Ong 17• // in accordande with "ESO Vendor Letter (3- 21- 05).doc ", from Valero's Retail
Compliance Department, as a part of annual compliance testing, this representative bested the
Emergency Shut Off ESO switches indicated on this sketch. Finding, listed below; .
Dispenser Emergency Shutoff Valve ESV Testing Results
On 5 -r7 -1 in accordance with NFPA 30A this representative tested the automatic- closing feature
of the Dispenser Emergency Shutoff VALVE(S) (ESV) located in the supply lines at the base ofeach
individual island type dispenser indicated on the diagram below. Each device ( #) rf in all,
would automatically close. Findings listed below:
Disp. Emergency Shut Off If No, Provide
Valve (ESV) Operational? / Maintenance Log # Date Called:
Site M DI Location and Plomm—rD ie Tested.
AIR/ VENTS 00
CAS
12
H24 #10 —
F( ,l o
Ca a
11 #99 OF ICE
3vdsklpr :
sps
REG PREM
10K 10K
OA U
CTPi (ST
I a, J
Li L
W
3 1g1
Si nature Of Representative:
t
Testing
Company-, Date•
Location Name: - 1 Store #: St ! t:: ID !i:
Address: Q City
Emergency Shut Off (ESO) If No, Provide
Operational? Maintenance Log # Date Called
StBte:
Emergency Shut Off (ESO) If No, Provide
Operational? Maintenance Log # Date Called
Tanknology Inc. 11000 N. MoPac Expressway, Suite 500, Austin, Texas 78759
Emergency Stop Switch Test
WO# / Date 3183613 05/17/2011
Site ID 32376
Street address 9600 BRIMHALL RD.
City, ST BAKERSFIELD, CA
Total Time Testing E -Stop 10 MIN
Location of E -Stop
Shut Down
Turbine (Y /N) Dispenser (Y /N) Comments /Repairs
Outside Wall Yes Yes PASS
Inside Wall
Other
Did ESO function correctly (remove 220 from both sides of the relay)? YES NO
Test Result (PASS / FAIL) PASS
If the test FAILS call the Elite Customer Solutions Center Immediately.
Date / Time / Name at Help Desk notified
If the test FAILS teach the site personnel alternative emergency shut down procedure
e.g. Circuit breakers, pump controller)
Date / Time / Name at employee trained
If system does not turn back on when the E -Stop is reactivated, the site personell are to contact the BP Help Desk. The
Help desk will talk them through resetting the E -Stop and I or Issue a 4 hour contractor response.
Technician Signature / Date
Rev: March 2007
j A-- 05/17/2011
SITE DIAGRAM
Tanknofogy
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE: 05 /17/11
CLIENT: 7 -ELEVEN, INC.
AIR/
12
H2O 1 #10
e
11 #9
8 #6
E)
7 #5
4 #2
LT8 =4Tn
3 #1
VENTS
O
Ono
I;
10K
O
WORK ORDER NUMBER3183613
SITE:7- ELEVEN #32376, MKT 2368
CAS
L4
O
O
PREM
10K
O
e
10,
I
mm
C
Printed 05/24/2011 07:24 MTUTTLE
ATG Information Work Order# 3183613
110100
MAY 17, 2011 11:35AM
235431 7 -11 32376
9600 BRIMHALL
BAKERSFIELD,CA 93312
B0687875505001
SYSTEM STATUS REPORT
ALL FUNCTIONS NORMAL
120100
MAY 17, 2011 11:35 AM
235431 7 -11 32376
9600 BRIMHALL
BAKERSFIELD,CA 93312
80687875505001
IN -TANK INVENTORY
TANK PRODUCT VOLUME TC VOLUME ULLAGE HEIGHT WATER TEMP
2 RUL 8250 8230 1778 73.60 0.00 63.43
3 PUL 7804 7722 2224 69.75 0.00 74.88
150301
MAY 17, 2011 11:35 AM
1:235431 7 -11 32376
150302
MAY 17, 2011 11:35 AM
2:9600 BRIMHALL
cl
150303
MAY 17, 2011 11:35AM
3:BAKERSFIELD,CA93312
150304
MAY 17, 2011 11:35AM
4:60687875505001
151700
MAY 17, 2011 11:35AM
SYSTEM TYPE AND LANGUAGE FLAG
SYSTEM UNITS
U.S.
SYSTEM LANGUAGE
ENGLISH
SYSTEM DATE/TIME FORMAT
MON DO YYYY HH:MM:SS xM
I50F00
MAY 17, 2011 11:35AM
MON DDYYYY HH:MM:SS xM
160100
MAY 17, 2011 11:35 AM
TANK CONFIGURATION
DEVICE LABEL CONFIGURED
1 OFF
2 RUL ON
3 PUL ON
4 OFF
160200
MAY 17, 2011 11:35 AM
TANK PRODUCT LABEL
TANK PRODUCT LABEL
1
2 RUL
3 PUL
3183613
ATG Information Work Order# 3183613
160300
MAY 17, 2011 11:35 AM
TANK PRODUCT CODE
TANK PRODUCT LABEL
1 1
2 RUL 2
3 PUL 3
4 4
160400
MAY 17, 2011 11:35 AM
TANK FULL VOLUME
TANK PRODUCT LABEL GALLONS
1 0
2 RUL 10028
3 PUL 10028
4 0
160700
MAY 17, 2011 11:35 AM
TANK DIAMETER
TANK PRODUCT LABEL INCHES
1 0.00
2 RUL 96.00
3 PUL 96.00
4 0.00
160900
MAY 17, 2011 11:35 AM
TANK THERMAL COEFFICIENT
TANK PRODUCT LABEL
1 0.000000
2 RUL 0.000700
3 PUL 0.000700
4 0.000000
D
162200
MAY 17, 2011 11:35 AM
TANK HIGH PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 RUL 9526
3 PUL 9526
4 0
162300
MAY 17, 2011 11:35 AM
TANK OVERFILL LEVEL LIMIT
3183613
161200
MAY 17, 2011 11:35AM
TANK MANIFOLDED PARTNERS
TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS
1 NONE NONE
2 RUL NONE NONE
3 PUL NONE NONE
4 NONE NONE
162100
MAY 17, 2011 11:35AM
TANK LOW PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 RUL 900
3 PUL 769
4 0
D
162200
MAY 17, 2011 11:35 AM
TANK HIGH PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 RUL 9526
3 PUL 9526
4 0
162300
MAY 17, 2011 11:35 AM
TANK OVERFILL LEVEL LIMIT
3183613
ATG Information Work Order# 3183613
TANK PRODUCT LABEL GALLONS
1 0
2 RUL 9025
3 PUL 9025
4 0
162400
MAY 17, 2011 11:35 AM
2 RUL 1.5
3 PUL 1.5
162800
MAY 17, 2011 11:35 AM
TANK MAXIMUM VOLUME LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 RUL 10028
3 PUL 10028
4 0
162900
MAY 17, 2011 11:35 AM
TANK DELIVERY REQUIRED LIMIT
TANK PRODUCT LABEL GALLONS
1 0
2 RUL 1504
3 PUL 1504
4 0
170300
MAY 17, 2011 11:35 AM
LIQUID TYPE
SENSOR LOCATION TYPE
1 RUL STP SUMP DUAL FLT. HIGH VAPOR
2 RUL ANNULAR TRI -STATE (SINGLE FLOAT)
3 PUL STP SUMP DUAL FLT. HIGH VAPOR
4 PUL ANNULAR TRI -STATE (SINGLE FLOAT)
5 DISP. 1 -2 DUAL FLT. HIGH VAPOR
6 DISP. 3-4 DUAL FLT. DISCRIMINATING
7 DISP. 1 -2 DUAL FLT. HIGH VAPOR
8 DISP. 3-4 DUAL FLT. DISCRIMINATING
9 DISP. 5-6 DUAL FLT. DISCRIMINATING
10 DISP. 7-8 DUAL FLT. DISCRIMINATING
11 DISP. 9 -10 DUAL FLT. DISCRIMINATING
12 DISP. 11 -12 DUAL FLT. DISCRIMINATING
13 TRI -STATE (SINGLE FLOAT)
14 TRI -STATE (SINGLE FLOAT)
15 TRI -STATE (SINGLE FLOAT)
16 TRI -STATE (SINGLE FLOAT)
190200
MAY 17, 2011 11:35 AM
SOFTWARE REVISION LEVEL
VERSION 329.02
SOFTWARE# 346329 -100 -C
CREATED - 09.07.01.16.29
S- MODULE# 330160106 -a
SYSTEM FEATURES:
PERIODIC IN -TANK TESTS
ANNUAL IN -TANK TESTS
CSLD
BIR
ISD
120600
MAY 17, 2011 11:36 AM
235431 7 -11 32376
9600 BRIMHALL
BAKERSFIELD,CA 93312
B0687875505001
3183613
ATG Information Work Order# 3183613
TANK ALARM HISTORY
TANK 2 RUL
HIGH WATER ALARM MAY 17, 2011 11:01 AM
OVERFILL ALARM MAY 17, 2011 10:49 AM
MAY 9, 2011 5:45 AM
APR 21, 2011 5:56AM
LOW PRODUCT ALARM MAY 17, 2011 10:47 AM
APR 29, 2011 6:31 PM
MAR 14, 2011 12:16 PM
HIGH PRODUCT ALARM MAY 17, 2011 10:51 AM
FEB 19, 2011 9:00 PM
INVALID FUEL LEVEL MAY 17, 2011 10:48 AM
PROBE OUT MAY 17, 2011 11:10 AM
MAY 17, 2011 10:47 AM
HIGH WATER WARNING MAY 17, 2011 11:01 AM
DELIVERY NEEDED MAY 17, 2011 10:47 AM
MAY 7, 2011 10:18 AM
APR 29, 2011 5:00 PM
MAX PRODUCT ALARM MAY 17, 2011 10:54 AM
LOW TEMP WARNING MAY 17, 2011 11:11 AM
MAY 17, 2011 10:48 AM
TANK 3 PUL
HIGH WATER ALARM MAY 17, 2011 11:01 AM
OVERFILL ALARM MAY 17, 2011 10:49 AM
LOW PRODUCT ALARM MAY 17, 2011 10:48 AM
HIGH PRODUCT ALARM MAY 17, 2011 10:51 AM
INVALID FUEL LEVEL MAY 17, 2011 10:48 AM
PROBE OUT MAY 17, 2011 11:23 AM
MAY 17, 2011 11:01 AM
MAY 17, 2011 10:47 AM
HIGH WATER WARNING MAY 17, 2011 11:01 AM
DELIVERY NEEDED MAY 17, 2011 10:48 AM
MAX PRODUCT ALARM MAY 17, 2011 10:54 AM
LOW TEMP WARNING MAY 17, 2011 11:24 AM
0
130200
MAY 17, 2011 11:36 AM
235431 7 -11 32376
9600 BRIMHALL
BAKERSFIELD,CA 93312
B0687875505001
LIQUID ALARM HISTORY REPORT
SENSOR LOCATION
1 RUL STP SUMP
MAY 17, 2011 9:34 AM SENSOR OUT ALARM
MAY 17, 2011 9:15 AM FUEL ALARM
MAY 17, 2011 9:14 AM FUEL ALARM
2 RUL ANNULAR
MAY 17, 2011 9:34AM SENSOR OUT ALARM
MAY 17, 2011 9:16AM FUEL ALARM
3 PUL STP SUMP
MAY 17, 2011 9:34 AM SENSOR OUTALARM
MAY 17, 2011 9:17 AM LIQUID WARNING
MAY 17, 2011 9:17 AM LIQUID WARNING
4 PUL ANNULAR
MAY 17, 2011 9:34 AM SENSOR OUTALARM
MAY 17, 2011 9:18 AM FUELALARM
7 DISP. 1-2
MAY 17, 2011 9:34 AM SENSOR OUTALARM
MAY 17, 2011 9:23 AM LIQUID WARNING
MAY 17, 2011 9:23 AM LIQUID WARNING
8 DISP. 3.4
MAY 17, 2011 9:34 AM SENSOR OUTALARM
MAY 17, 2011 9:24 AM LIQUID WARNING
MAY 17, 2011 9:24 AM LIQUID WARNING
9 DISP. 5.6
MAY 17, 2011 9:34 AM SENSOR OUT ALARM
MAY 17, 2011 9:27 AM LIQUID WARNING
MAY 17, 2011 9:27 AM LIQUID WARNING
10 DISP. 7-8
MAY 17, 2011 9:34 AM SENSOR OUT ALARM
MAY 17, 2011 9:21 AM LIQUID WARNING
MAY 17, 2011 9:21 AM LIQUID WARNING
11 DISP.9 -10
MAY 17, 2011 9:34 AM SENSOR OUT ALARM
3183613
ATG Information Work Order# 3183613
MAY 17, 2011 9:19 AM
MAY 17, 2011 9:19 AM
12 DISP.11 -12
MAY 17, 2011 9:34 AM
MAY 17, 2011 9:20 AM
MAY 17, 2011 9:20 AM
110100
MAY 17, 2011 11:36 AM
235431 7.11 32376
9600 BRIMHALL
BAKERSFIELD,CA 93312
80687875505001
SYSTEM STATUS REPORT
ALL FUNCTIONS NORMAL
3183613
LIQUID WARNING
LIQUID WARNING
SENSOR OUT ALARM
LIQUID WARNING
LIQUID WARNING