Loading...
HomeMy WebLinkAboutFMC 2011w- i1PPTanlmology 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451 -6334 Fax: (512) 459 -1459 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR CRAIG PERKINS 1501 TRUXTUN AVE. BAKERSFIELD, CA. 93301 Test Date: 05/17/2011 Order Number: 3183613 Dear Regulator, 415-5 Date Printed and Mailed: 05/24/2011 Enclosed are the results of recent testing performed at the following facility: 7- ELEVEN #32376, MKT 2368 9600 BRIMHALL RD. BAKERSFIELD, CA. 93312 Testing performed: Impact Valve Leak detector tests Monitor Certification Secondary Containment -Spill Container Sincerely, Dawn Kohlmeyer Manager, Field Reporting r tpp I7 0*Oi TANKNOLOGY CERTIFICATE OF TESTING 8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759 TELEPHONE (512) 451 -6334 FAX (512) 459 -1459 PURPOSE: COMPLIANCE TEST RESULT SUMMARY REPORT TEST DATE: 05/17/11 WORK ORDER NUMBER: 3183613 CUSTOMER PO: CLIENT: 7- ELEVEN, INC. SITE: 7- ELEVEN #32376, MKT 2368 P.O. BOX 711 9600 BRIMHALL RD. DALLAS, TX 75221 BAKERSFIELD, CA 93312 MANAGER 972)828 -7908 (661)5884059 TEST TYPE: TLD -1 Prnrluct Pina Tinhtnacc Tact Rociil4c LINE ID LINE PRODUCT LINE MATERIAL DELIVERY TYPE TEST RESULT A B C D FINAL LEAK RATE (gph) A B C D IMPACT VALVE FUNCTION 2 RUL 2 REGULAR ENVIROFLEX PRESSURE RESULT 2 RUL 2 Y 3 PUL 3 PREMIUM ENVIROFLEX PRESSURE Y FYictinn I ino I aalr notar -Mr Tact LINE ID EXISTING LEAK DETECTOR #1 EXISTING LEAK DETECTOR #2 MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT 2 RUL 2 VAPORLESS LD2000 02164 P 3 PUL 3 VAPORLESS LD2000 08041486 P Now Ranlacamont I ina I aak notat -Mr Tact LINE ID REP ACED LEAK DE ECTOR #11 RE ED LEAK DET ECTOR #2 MANUFACTURER MODEL # SERIAL # RESULT MANUFACTURER MODEL # SERIAL # RESULT tor owner aetauea report mrormation, visa www.tanKnology.com ana select un -Line Keports -w KAt-, or contact your iocai t anxnoiogy ontce. Tester Name: AXEL MEDINA Technician Certification Number: Printed 05/24/2011 07:24 MTUTTLE INDIVIDUAL TANK INFORMATION AND TEST RESULTS PP Tanknabgy TEST DATE:05 /17/11 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBERS 183613 CLIENT: 7 -ELEVEN, INC. AUSTIN, TEXAS 78759 (512) 451 -6334 SITE:7- ELEVEN #32376, MKT 2368 Printed 05/24/2011 07:24 TANK INFORMATION Tank ID: 2 RUL 2 Tank manifolded: NO Bottom to top fill in inches: 144.0 Product: REGULAR Vent manifolded: YES Bottom to grade in inches: 147.0 Capacity in gallons: 10,028 Vapor recovery manifolded: YES Fill pipe length in inches: 48.0 Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 Length in inches: 324 Overspill protection: YES Stage I vapor recovery: DUAL Material: Dw JCTD ST Installed: ATG Stage II vapor recovery: ASSIST CP installed on: COMMENTS TANK TEST RESULTS Test Method:vacuTect LEAK DETECTOR TEST RESULTS Test method: LDT -5000 Start (in) End (in) Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced Dipped Product Level: L.D. #1 L.D. #1 L.D. #2 L.D. #2 Probe Water Level: Make: VAPORLESS Ingress Detected: Water Bubble Ullage Model: LD2000 Test time: S /N: 02164 Open time in sec: 8.28 Inclinometer reading: Holding psi: 29 VacuTect Test Type: NOT Resiliency cc: 325 NOT ry TESTEDVacuTectProbeEntPoint: Test leak rate ml /m: 189.0 TESTED Pressure Set Point: Metering psi: 22 Tank water level in inches: Calib. leak in gph: 3.00 Water table depth in inches: Results: PASS Determined by (method): Result: COMMENTS COMMENTS LINE TEST RESULTS Test type: TLD -i LINE A B C D Material: ENVIROFLEX Diameter (in): 1.5 Length (ft): 260.0 Test psi: Bleedback cc: Test time (min): NOT NOT NOT NOT Start time: TESTED TESTED TESTED TESTED End time: Final gph: Result: Pump type: PRESSURE Pump make: FE PETRO COMMENTS Impact Valves Operational: YES Printed 05/24/2011 07:24 INDIVIDUAL TEST DATE: 05/17/11 CLIENT: 7 -ELEVEN, INC. TANK INFORMATION AND i Tanknobgy 8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759 (512) 451 -6334 TEST RESULTS WORK ORDER NUMBER3183613 SITE:7- ELEVEN #32376, MKT 2368 Printed 05/24/2011 07:24 TANK INFORMATION Tank ID: 3 PUL 3 Tank manifolded: NO Bottom to top fill in inches: 146.0 Product: PREMIUM Vent manifolded: YES Bottom to grade in inches: 150.0 Capacity in gallons: 10,028 Vapor recovery manifolded: YES Fill pipe length in inches: 50.0 Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 Length in inches: 324 Overspill protection: YES Stage I vapor recovery: DUAL Material: Dw JCTD ST Installed: ATC Stage II vapor recovery: ASSIST CP installed on: COMMENTS TANK TEST RESULTS Test Method:vacuTect LEAK DETECTOR TEST RESULTS Test method: LDT-5000 Start (in) End (in) Dipped Water Level: New /passed Failed /replaced New /passed Failed /replaced L.D. #1 L.D. #1 L.D. #2 L.D. #2 Dipped Product Level: Probe Water Level: Make: VAPORLESS Ingress Detected: Water Bubble Ullage Model: LD2000 Test time: S /N: 080+1486 Open time in sec: 9.99 Inclinometer reading: Holding psi: 20 VacuTect Test Type: NOT Resiliency cc: 180 NOT VacuTect Probe Entry Point: TESTED Test leak rate ml /m: 189.0 TESTED Pressure Set Point: Metering psi: 22 Tank water level in inches: Calib. leak in gph: 3.00 Water table depth in inches: Results: PASS Determined by (method): Result: COMMENTS COMMENTS LINE TEST RESULTS Test type: TLD -1 LINE A B C D Material: ENVIROBLEx Diameter (in): 1.5 Length (ft): 280.0 Test psi: Bleedback cc: Test time (min): NOT NOT NOT NOT Start time: TESTED TESTED TESTED TESTED End time: Final gph: Result: Pump type: PRESSURE Pump make: FE PETRO COMMENTS Impact Valves Operational: YES Printed 05/24/2011 07:24 MONITORING SYSTEM CERTIFICATION For Use By All Jurisdictions Within the State of California Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3 Title 23, California Code of Regulations This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is installed at the facility, a separate certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system owner /operator. The owner /operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. A. General Information Facility Name: 7- ELEVEN #32376, MKT 2368 Site Address: 9600 BRIMHALL RD. Facility Contact Person: MANAGER City: BAKERSFIELD Contact Phone No: 588 -4059 Date of Testing/Service: 05/17/2011 Make /Model of Monitoring System:TLS -350 Work Order Number: B. Inventory of Equipment Tested /Certified Check the appropriate boxes to indicate specific equipment inspected /serviced 3183613 CA Zip: 93312 Tank ID: 2 -RUL Tank ID: 3 -PUL X In -Tank Gauging Probe. Model: MAG X In -Tank Gauging Probe. Model: MAG X Annular Space or Vault Sensor. Model: VR-420 Annular Space or Vault Sensor. Model: VR-420 X Piping Sump/Trench Sensogs). Model: VR -352 Piping Sump/Trench Sensogs). Model: VR -352 Fill Sump Sensogs). Model: Fill Sump Sensogs). Model: Mechanical Line Leak Detector. Model: LD -2000 X Mechanical Line Leak Detector. Model: LD -2000 Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: X Tank Overfill /High -Level Sensor. Model: FLAPPER Tank Overfill /High -Level Sensor. Model: FLAPPER Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model in Section E on page 2). Tank ID: Tank ID: In -Tank Gauging Probe. Model: In -Tank Gauging Probe. Model: Annular Space or Vault Sensor. Model: Annular Space or Vault Sensor. Model: Piping Sump/Trench Sensogs). Model: Piping Sump/Trench Sensogs). Model: Fill Sump Sensogs). Model: Fill Sump Sensogs). Model: Mechanical Line Leak Detector. Model: 7 Mechanical Line Leak Detector. Model: Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: Tank Overfill /High -Level Sensor. Model: Tank Overfill /High -Level Sensor. Model: Other (specify equipment type and model in Section E on page 2). Other (specify equipment type and model In Section E on page 2). ispenser : 1 -2 Dispenser ID: 3-4 Dispenser Containment Sensors) Model: VR -352 X Dispenser Containment Sensors) Model: VR -352 X Shear Valve(s). X Shear Valve(s) 11 Dispenser Containment Floats) and Chain(s). 7 Dispenser Containment Float(s) and Chain(s). Dispenser ID: 5 -6 Dispenser ID: 7 -8 0 Dispenser Containment Sensors) Model: VR -352 X Dispenser Containment Sensors). Model: VR -352 RI Shear Valve(s). Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser Containment Floats) and Chain(s). Dispenser ID: 9-10 Dispenser ID: 11 -12 0 Dispenser Containment Sensors) Model: VR -352 X Dispenser Containment Sensors). Model: VR -352 X Shear Valve(s). 11-71 Shear Valve(s). Dispenser Containment Float(s) and Chain(s). Dispenser Containment Float(s) and Chain(s). If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. C. Certification I certify that the equipment identified in this document was inspected /serviced in accordance with the manufacturers' guidelines. Attached to this certification is information (e.g manufacturers' checklists) necessary to verify that this information is correct. and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also attached a copy of the (Check all that apply): System set -up XO Alarm history report Technician Name (print): AXEL MEDINA Signature: a Certification No.: B -36644 License. No.: 743160 (Class 'A' General Enginering Contractor License) Testing Company Name: Tanknology Phone No.: (800) 800 -4633 Site Address: 11000 N. MoPac Expressway, suite 500, Austin, TX 78759 Date of Testing /Servicing: 05/17/2011 Monitoring System Certification Page 1 of 3 Based on CA form dated 03/08 Site Address 9600 BRIMHALL RD. D. Results of Testing /Servicing Software Version Installed: 329.02 Complete the following checklist: Monitoring System Certification Date of Testing /Service: 05/17/2011 FRI Yes No • Is the audible alarm operational? 0 Yes No • Is the visual alarm operational? 0 Yes No • Were all sensors visually inspected, functionally tested, and confirmed operational? Q Yes No. Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper operation? Yes D No • X N/A If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? 0 Yes No • N/A For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (check all that apply) x Sump/Trench Sensors; X Dispenser Containment Sensors. Did you confirm positive shut -down due to leaks and sensor failure /disconnection? X Yes No Yes No' x0 N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.: no mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill points(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? so FYes' No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name and model for all replacement parts in Section E, below. Yes* XD No Was liquid found inside any secondary containment systems designed as dry systems? (check all that apply) Product; Water. If yes, describe causes in Section E, below. OX Yes No • Was monitoring system set -up reviewed to ensure proper settings? Attach set -up reports, if applicable. Qx Yes No Is all monitoring equipment operational per manufacturers' specifications? In Section E below, describe how and when these deficiences were or will be corrected. E. Comments: DAMAGEDVR-352 SENSOR IN DISP.#5/6 WAS . Page 2 of 3 Based on CA form dated 03/08 Monitoring System Certification Site Address: 9600 BRIMHALL RD. F. In -Tank Gauging / SIR Equipment Check this box if no tank gauging or SIR equipment is installed. Date of Testing /Service: 05/17/2011 Check this box if tank gauging is used only for inventory control. Check this box if no tank gauging or SIR equipment is installed. This section must be completed If in -tank gauging equipment is used to perform leak detection monitoring. Complete the following checklist: EYes No Has all input wiring been inspected for proper entry and termination, including testing for ground faults? X Yes No • Were all tank gauging probes visually inspected for damage and residue buildup? 0 Yes No' Was accuracy of system product level readings tested? El Yes No Was accuracy of system water level readings tested? FRI Yes No' Were all probes reinstalled properly? 0 Yes No • Were all items on the equipment manufacturers' maintenance checklist completed? In the Section H, below, describe how and when these deficiencies were or will be corrected. G. Line Leak Detectors (LLD) : Complete the following checklist: Check this box if LLDs are not installed. X Yes No' N/A For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? Check all that apply) Simulated leak rate: X 3 g.p.h 0.1 g.p.h 0.2 g.p.h X Yes No' Were all LLDs confirmed operational and accurate within regulatory requirements? EYes No' Was the testing apparatus properly calibrated? Yes No' N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? Yes No' X N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? Yes No • 0 N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? Yes No ` X N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? Yes No' Q N/A For electronic LLDs, have all accessible wiring connections been visually inspected? 0 Yes No' Were all items on the equipment manufacturers' maintenance checklist completed? In the Section H, below, describe how and when these deficiencies were or will be corrected. H. Comments: Page 3 of 3 Based on CA form dated 03/08 SWRCB, January 2002 Page 1. Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performingperiodic testing of UST secondary containment systems. Use the appropriatepages ofthisform to report resultsfor all components tested. The completedform, written testprocedures, and printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: 7- ELEVEN #32376, MKT 2368 Date ofTesting: 05/17/2011 Facility Address: 9600 BRIMHALL RD. BAKERSFIELD, CA, 93312 Facility Contact: MANAGER Phone: (6 61) 588-4059 Date Local Agency Was Notified of Testing: Name ofLocal Agency Inspector (if present during testing): ERNIE MEDINA 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY , INC. Pass Technician Conducting Test: AXEL MEDINA Repairs Made Credentials: Pass CSLB Licensed Contractor a SWRCB Licensed Tank Tester Spill Box 2 REG FILL License Type: A- UT I License Number: 743160-- 8 014 68 2 Manufacturer Manufacturer Training Component(s) Date Training Expires OPW 5507 SPILLBUCKETS 01/28/2012 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repair Made Spill Box 2 REG FILL El Fx Spill Box 3 PRE FILL x Spill Box 2 PEG FILL El El El El El El El El El El El El El 7 0 El El El El El Ell El E El El El F-1 E El El El El El El E El I El I El El El F El El- El El 0 E El El El Ell Ell El I El I I Ell Ell El I El I If hydrostatic testing was performed, describe what was done with the water after completion of tests: WATER WAS REMOVED FROM SITE. CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: Date: OS/17/2011 o SWRCB, January 2006 9. Spill Bucket Testing Report Form Thisform is intendedfor use by contractors performing annual testing of USTspill containment structures. The completedform and printouts from tests (ifapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: 7- ELEVEN #32376, MKT 2368 DateofTesting: 05/17/2011 Facility Address: 9600 BRIMHALL RD. BAKERSFIELD, CA, 93312 Facility Contact: MANAGER Phone: (661) 5 8 8 - 4 0 5 9 Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (if present during testing): ERNIE MEDINA 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY, INC. Technician Conducting Test: AXEL MEDINA Credentials : CSLB Contractor E ICC Service Tech. E SWRCB Tank Tester Other (Specify) A- UT License Number: 743160-- 8 014 6 82 3. SPILL BUCKET TESTING INFORMATION Test Method Used: [K] Hydrostatic Vacuum Other Test Equipment Used: MEASURING TAPE Equipment Resolution: VISUAL Identify Spill Bucket(By Tank Number, Stored Product, etc.) I 2 REG FILL 2 3 PRE FILL 3 2 REG FILL 4 Bucket Installation Type: 0 Direct Bury Contained in Sump X Direct Bury Contained in Sump Direct Bury Contained in Sump Direct Bury Contained in Sump Bucket Diameter: 12" 12" 12" Bucket Depth: 1211 1411 1211 Wait time between applying vacuum/water and starting test: 0 0 0 Test Start Time (TI ): 0 915 0 915 0935 Initial Reading (RI ): 9.511 11.5 " 7 . 5 " Test End Time (TF ): 0920 1015 1035 Final Reading (RF ): 9.011 11.5 7.5 Test Duration: 5 MIN 1 HOUR 1 HOUR Change in Reading (R F - RI ): 0.5 " 0.011 0.0" Pass/Fail Threshold or Criteria: 0 0 0 Test Result: 0 Pass [K] Fail fl Pass Fail E Pass Fail Pass 0 Fail Comments - (include information on repairs madeprior to testing, and recommendedfollow -up forfailed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, accurate, and infull compliance with legal requirements. Technician's Signature: 05/17/2011 I State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements Work Order: ' 3181613 I FSO) & (6SV) Tcstin Form - Version !- 6012007 Emergency Shut Off (ESO) & Dispenser Emergency Shutoff Valve (ESV) ANNUAL TEST RECORD LOCATIONS AND TEST DATA Emergency Shut Off (ESO) Testing Results Ong 17• // in accordande with "ESO Vendor Letter (3- 21- 05).doc ", from Valero's Retail Compliance Department, as a part of annual compliance testing, this representative bested the Emergency Shut Off ESO switches indicated on this sketch. Finding, listed below; . Dispenser Emergency Shutoff Valve ESV Testing Results On 5 -r7 -1 in accordance with NFPA 30A this representative tested the automatic- closing feature of the Dispenser Emergency Shutoff VALVE(S) (ESV) located in the supply lines at the base ofeach individual island type dispenser indicated on the diagram below. Each device ( #) rf in all, would automatically close. Findings listed below: Disp. Emergency Shut Off If No, Provide Valve (ESV) Operational? / Maintenance Log # Date Called: Site M DI Location and Plomm—rD ie Tested. AIR/ VENTS 00 CAS 12 H24 #10 — F( ,l o Ca a 11 #99 OF ICE 3vdsklpr : sps REG PREM 10K 10K OA U CTPi (ST I a, J Li L W 3 1g1 Si nature Of Representative: t Testing Company-, Date• Location Name: - 1 Store #: St ! t:: ID !i: Address: Q City Emergency Shut Off (ESO) If No, Provide Operational? Maintenance Log # Date Called StBte: Emergency Shut Off (ESO) If No, Provide Operational? Maintenance Log # Date Called Tanknology Inc. 11000 N. MoPac Expressway, Suite 500, Austin, Texas 78759 Emergency Stop Switch Test WO# / Date 3183613 05/17/2011 Site ID 32376 Street address 9600 BRIMHALL RD. City, ST BAKERSFIELD, CA Total Time Testing E -Stop 10 MIN Location of E -Stop Shut Down Turbine (Y /N) Dispenser (Y /N) Comments /Repairs Outside Wall Yes Yes PASS Inside Wall Other Did ESO function correctly (remove 220 from both sides of the relay)? YES NO Test Result (PASS / FAIL) PASS If the test FAILS call the Elite Customer Solutions Center Immediately. Date / Time / Name at Help Desk notified If the test FAILS teach the site personnel alternative emergency shut down procedure e.g. Circuit breakers, pump controller) Date / Time / Name at employee trained If system does not turn back on when the E -Stop is reactivated, the site personell are to contact the BP Help Desk. The Help desk will talk them through resetting the E -Stop and I or Issue a 4 hour contractor response. Technician Signature / Date Rev: March 2007 j A-- 05/17/2011 SITE DIAGRAM Tanknofogy 8501 N MOPAC EXPRESSWAY, SUITE 400 AUSTIN, TEXAS 78759 512) 451 -6334 FAX (512) 459 -1459 TEST DATE: 05 /17/11 CLIENT: 7 -ELEVEN, INC. AIR/ 12 H2O 1 #10 e 11 #9 8 #6 E) 7 #5 4 #2 LT8 =4Tn 3 #1 VENTS O Ono I; 10K O WORK ORDER NUMBER3183613 SITE:7- ELEVEN #32376, MKT 2368 CAS L4 O O PREM 10K O e 10, I mm C Printed 05/24/2011 07:24 MTUTTLE ATG Information Work Order# 3183613 110100 MAY 17, 2011 11:35AM 235431 7 -11 32376 9600 BRIMHALL BAKERSFIELD,CA 93312 B0687875505001 SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL 120100 MAY 17, 2011 11:35 AM 235431 7 -11 32376 9600 BRIMHALL BAKERSFIELD,CA 93312 80687875505001 IN -TANK INVENTORY TANK PRODUCT VOLUME TC VOLUME ULLAGE HEIGHT WATER TEMP 2 RUL 8250 8230 1778 73.60 0.00 63.43 3 PUL 7804 7722 2224 69.75 0.00 74.88 150301 MAY 17, 2011 11:35 AM 1:235431 7 -11 32376 150302 MAY 17, 2011 11:35 AM 2:9600 BRIMHALL cl 150303 MAY 17, 2011 11:35AM 3:BAKERSFIELD,CA93312 150304 MAY 17, 2011 11:35AM 4:60687875505001 151700 MAY 17, 2011 11:35AM SYSTEM TYPE AND LANGUAGE FLAG SYSTEM UNITS U.S. SYSTEM LANGUAGE ENGLISH SYSTEM DATE/TIME FORMAT MON DO YYYY HH:MM:SS xM I50F00 MAY 17, 2011 11:35AM MON DDYYYY HH:MM:SS xM 160100 MAY 17, 2011 11:35 AM TANK CONFIGURATION DEVICE LABEL CONFIGURED 1 OFF 2 RUL ON 3 PUL ON 4 OFF 160200 MAY 17, 2011 11:35 AM TANK PRODUCT LABEL TANK PRODUCT LABEL 1 2 RUL 3 PUL 3183613 ATG Information Work Order# 3183613 160300 MAY 17, 2011 11:35 AM TANK PRODUCT CODE TANK PRODUCT LABEL 1 1 2 RUL 2 3 PUL 3 4 4 160400 MAY 17, 2011 11:35 AM TANK FULL VOLUME TANK PRODUCT LABEL GALLONS 1 0 2 RUL 10028 3 PUL 10028 4 0 160700 MAY 17, 2011 11:35 AM TANK DIAMETER TANK PRODUCT LABEL INCHES 1 0.00 2 RUL 96.00 3 PUL 96.00 4 0.00 160900 MAY 17, 2011 11:35 AM TANK THERMAL COEFFICIENT TANK PRODUCT LABEL 1 0.000000 2 RUL 0.000700 3 PUL 0.000700 4 0.000000 D 162200 MAY 17, 2011 11:35 AM TANK HIGH PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 RUL 9526 3 PUL 9526 4 0 162300 MAY 17, 2011 11:35 AM TANK OVERFILL LEVEL LIMIT 3183613 161200 MAY 17, 2011 11:35AM TANK MANIFOLDED PARTNERS TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS 1 NONE NONE 2 RUL NONE NONE 3 PUL NONE NONE 4 NONE NONE 162100 MAY 17, 2011 11:35AM TANK LOW PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 RUL 900 3 PUL 769 4 0 D 162200 MAY 17, 2011 11:35 AM TANK HIGH PRODUCT LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 RUL 9526 3 PUL 9526 4 0 162300 MAY 17, 2011 11:35 AM TANK OVERFILL LEVEL LIMIT 3183613 ATG Information Work Order# 3183613 TANK PRODUCT LABEL GALLONS 1 0 2 RUL 9025 3 PUL 9025 4 0 162400 MAY 17, 2011 11:35 AM 2 RUL 1.5 3 PUL 1.5 162800 MAY 17, 2011 11:35 AM TANK MAXIMUM VOLUME LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 RUL 10028 3 PUL 10028 4 0 162900 MAY 17, 2011 11:35 AM TANK DELIVERY REQUIRED LIMIT TANK PRODUCT LABEL GALLONS 1 0 2 RUL 1504 3 PUL 1504 4 0 170300 MAY 17, 2011 11:35 AM LIQUID TYPE SENSOR LOCATION TYPE 1 RUL STP SUMP DUAL FLT. HIGH VAPOR 2 RUL ANNULAR TRI -STATE (SINGLE FLOAT) 3 PUL STP SUMP DUAL FLT. HIGH VAPOR 4 PUL ANNULAR TRI -STATE (SINGLE FLOAT) 5 DISP. 1 -2 DUAL FLT. HIGH VAPOR 6 DISP. 3-4 DUAL FLT. DISCRIMINATING 7 DISP. 1 -2 DUAL FLT. HIGH VAPOR 8 DISP. 3-4 DUAL FLT. DISCRIMINATING 9 DISP. 5-6 DUAL FLT. DISCRIMINATING 10 DISP. 7-8 DUAL FLT. DISCRIMINATING 11 DISP. 9 -10 DUAL FLT. DISCRIMINATING 12 DISP. 11 -12 DUAL FLT. DISCRIMINATING 13 TRI -STATE (SINGLE FLOAT) 14 TRI -STATE (SINGLE FLOAT) 15 TRI -STATE (SINGLE FLOAT) 16 TRI -STATE (SINGLE FLOAT) 190200 MAY 17, 2011 11:35 AM SOFTWARE REVISION LEVEL VERSION 329.02 SOFTWARE# 346329 -100 -C CREATED - 09.07.01.16.29 S- MODULE# 330160106 -a SYSTEM FEATURES: PERIODIC IN -TANK TESTS ANNUAL IN -TANK TESTS CSLD BIR ISD 120600 MAY 17, 2011 11:36 AM 235431 7 -11 32376 9600 BRIMHALL BAKERSFIELD,CA 93312 B0687875505001 3183613 ATG Information Work Order# 3183613 TANK ALARM HISTORY TANK 2 RUL HIGH WATER ALARM MAY 17, 2011 11:01 AM OVERFILL ALARM MAY 17, 2011 10:49 AM MAY 9, 2011 5:45 AM APR 21, 2011 5:56AM LOW PRODUCT ALARM MAY 17, 2011 10:47 AM APR 29, 2011 6:31 PM MAR 14, 2011 12:16 PM HIGH PRODUCT ALARM MAY 17, 2011 10:51 AM FEB 19, 2011 9:00 PM INVALID FUEL LEVEL MAY 17, 2011 10:48 AM PROBE OUT MAY 17, 2011 11:10 AM MAY 17, 2011 10:47 AM HIGH WATER WARNING MAY 17, 2011 11:01 AM DELIVERY NEEDED MAY 17, 2011 10:47 AM MAY 7, 2011 10:18 AM APR 29, 2011 5:00 PM MAX PRODUCT ALARM MAY 17, 2011 10:54 AM LOW TEMP WARNING MAY 17, 2011 11:11 AM MAY 17, 2011 10:48 AM TANK 3 PUL HIGH WATER ALARM MAY 17, 2011 11:01 AM OVERFILL ALARM MAY 17, 2011 10:49 AM LOW PRODUCT ALARM MAY 17, 2011 10:48 AM HIGH PRODUCT ALARM MAY 17, 2011 10:51 AM INVALID FUEL LEVEL MAY 17, 2011 10:48 AM PROBE OUT MAY 17, 2011 11:23 AM MAY 17, 2011 11:01 AM MAY 17, 2011 10:47 AM HIGH WATER WARNING MAY 17, 2011 11:01 AM DELIVERY NEEDED MAY 17, 2011 10:48 AM MAX PRODUCT ALARM MAY 17, 2011 10:54 AM LOW TEMP WARNING MAY 17, 2011 11:24 AM 0 130200 MAY 17, 2011 11:36 AM 235431 7 -11 32376 9600 BRIMHALL BAKERSFIELD,CA 93312 B0687875505001 LIQUID ALARM HISTORY REPORT SENSOR LOCATION 1 RUL STP SUMP MAY 17, 2011 9:34 AM SENSOR OUT ALARM MAY 17, 2011 9:15 AM FUEL ALARM MAY 17, 2011 9:14 AM FUEL ALARM 2 RUL ANNULAR MAY 17, 2011 9:34AM SENSOR OUT ALARM MAY 17, 2011 9:16AM FUEL ALARM 3 PUL STP SUMP MAY 17, 2011 9:34 AM SENSOR OUTALARM MAY 17, 2011 9:17 AM LIQUID WARNING MAY 17, 2011 9:17 AM LIQUID WARNING 4 PUL ANNULAR MAY 17, 2011 9:34 AM SENSOR OUTALARM MAY 17, 2011 9:18 AM FUELALARM 7 DISP. 1-2 MAY 17, 2011 9:34 AM SENSOR OUTALARM MAY 17, 2011 9:23 AM LIQUID WARNING MAY 17, 2011 9:23 AM LIQUID WARNING 8 DISP. 3.4 MAY 17, 2011 9:34 AM SENSOR OUTALARM MAY 17, 2011 9:24 AM LIQUID WARNING MAY 17, 2011 9:24 AM LIQUID WARNING 9 DISP. 5.6 MAY 17, 2011 9:34 AM SENSOR OUT ALARM MAY 17, 2011 9:27 AM LIQUID WARNING MAY 17, 2011 9:27 AM LIQUID WARNING 10 DISP. 7-8 MAY 17, 2011 9:34 AM SENSOR OUT ALARM MAY 17, 2011 9:21 AM LIQUID WARNING MAY 17, 2011 9:21 AM LIQUID WARNING 11 DISP.9 -10 MAY 17, 2011 9:34 AM SENSOR OUT ALARM 3183613 ATG Information Work Order# 3183613 MAY 17, 2011 9:19 AM MAY 17, 2011 9:19 AM 12 DISP.11 -12 MAY 17, 2011 9:34 AM MAY 17, 2011 9:20 AM MAY 17, 2011 9:20 AM 110100 MAY 17, 2011 11:36 AM 235431 7.11 32376 9600 BRIMHALL BAKERSFIELD,CA 93312 80687875505001 SYSTEM STATUS REPORT ALL FUNCTIONS NORMAL 3183613 LIQUID WARNING LIQUID WARNING SENSOR OUT ALARM LIQUID WARNING LIQUID WARNING