Loading...
HomeMy WebLinkAbout6001 SCHIRRA COURT25 -78 INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION SYSTEMS Inspection, Testing, and, Maintenance Cover Sheet NFPA 25 as amended by CCR, Title 19 Property Information: F A`,A,0Name: S Occupancy /Use: Address: %'aol S:-"141 ee Construction Type: rD City: j Fj f.4i No. Stories: ZIP: Year Constructed: E MPQ Contact: Telephone: Contractor Information: Number of System Risers Jorgensen Company Copy sent to: 2345 S. Fruitvale Ave., #1 x Owner Date Bakersfield ra:Fire AHJ Date CA 93306 Contractor Date 661- 327 -4352 NOTES: 262995. 1) For specific inspection, testing, and maintenance requirements and information, see NFPA 25, 2002 Edition as amended by Job # h' California Code of Regulations, Title 19, §901 to §906. 2) Inspection Items may be performed by the Performed by: Print) Owner in accordance with California Code of Regulations Title 19 §904.1(a) Forms included with this report NFPA 25 Chapter Number of Forms NIA FAIL* PASS Automatic Sprinkler System 5 7 Standpipe and Hose Systems 6 Private Water Supply System 7 Fire Pump g Water Storage Tank 9 Water Spray System 10 Foam Water Sprinkler System 11 See "Deficiencies and Comments" section at end of each respective form. State Fire Marshal AES 1 March 21, 2006 ANNEX B 25 -79 Main Drain Test Results: Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25, Chapter 5*as amended b CCR, Titie 19 Page 1 of 4 Date of Inspection, Testing, Maintenance: System Riser ID: ls j Property Information: E M = Maintenance Residual Pressure: (psi) Name: i DS Type of System: LB Wet Pipe Dry PipeDPie o -[i, . 0/ Address: 0 S/-/ Y C/` l 11 Preaction N Description NFPA 25 Reverence Deluge ARE MP City: 226 1.1 1 Daily Preaction /Deluge Valves - Enclosure Main Drain Test Results: Abbreviation Key: I = Inspection Initial Static Pressure: (psi) T = Test E M = Maintenance Residual Pressure: (psi) A -O = After Operation MI =Per Manufacturer's Instructions Restored Static Pressure: (psi) Item Activity Frequency Description NFPA 25 Reverence Fail N/A Pass 1.1 1 Daily Preaction /Deluge Valves - Enclosure 12.4.3.1Weeklytemperature 1.2 1 Daily Dry Pipe Valves - Enclosure 12.4.4.1.1 NC` Weekly temperature 1.3 1 Quarterly Gauges (Dry, Preaction, Deluge 5.2.4.2 Systems) 5.2.4.3 1.4 1 Quarterly Control Valves 12.3.2:1 1.5 1 Quarterly Alarm Devices 5.2.6 1.6 1 Quarterly Gauges (Wet Pipe Systems) 5.2.4.1 1.7 1 Quarterly Hydraulic nameplate 5.2.7 1.8 1 Quarterly Pipe and Fittings 5.2.2 1.9 1 Quarterly Sprinklers 5.2.1 1.10 1 Quarterly Spare Sprinklers 5.2.1.3 1.11 1 Quarterly Fire Department Connections 12.7.1 1.12 1 Quarterly Alarm Valves - Exterior Inspection 12.4.1.1 y 1.13 1 Quarterly Preaction /Deluge Valves - Exterior 12.4.3.1.6Inspection 1.14 1 Quarterly Pressure Reducing Valves 12.5.1.1 X 1.15 1 Quarterly Dry Pipe Valves- Exterior Inspection 12.4.4.1.4 1.16 1 Quarterly Backflow Preventers 12.6.1 Y 1.17 1 Annually Buildings 5.2.5 State Fire Marshal AES 2 March 21, 2006 25 -80 INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION SYSTEMS Inspection, 'testing, and Maintenance Fire Sprinkler System Page 2 of 4 NFPA 25, Chapter 5 as amended b CCR, TItie '19 Date of Inspection, Testing, Maintenance: -- _ System Riser ID: L j Property Information: Name: / Type of System: o Wet Pipe ,.Q Address: yf _S , f / /'0 Dry Pipe iPreaction Deluge City: Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.18 1 Annually Hangers 5.2.3 X 1.19 1 Annually Seismic Braces 5.2.3 1.20 1 5 Years Hangers (Accessible concealed spaces) 5.2.3.3 1.21 1 5 Years Seismic Braces (Accessible concealed 5.2.3.3spaces) 1.22 1 5 Years Pipe and Fittings (Accessible concealed 5.2.2.3spaces) 1.23 1 5 Years Sprinklers (Accessible concealed spaces) 5.2.1.1.4 1.24 1 5 Years Alarm Valves — Interior Inspection 12.4.1.2 1.25 1 5 Years Alarm Valves - Strainers, filters, orifices 12.4.1.2 1.26 1 5 Years Check Valves — Interior Inspection 12.4.2.1 1.27 1 5 Years Preaction /Deluge Valves — Interior 12.4.3.1.7Inspection 1.28 1 5 Years Preaction/Deluge Valves - Strainers, 12.4.3.1.8filters, orifices 1.29 1 5 Years Dry Pipe Valves — Interior Inspection 12.4.4.1.5 1.30 1 5 Years Dry Pipe Valves - Strainers, filters, orifices 12.4.4.1.6 x 2.1 T Annually Alarm Devices (90 Sec) 5.3.3 12.2.7 12.2.6 2.2 T Annually Main Drain Test (Enterdata on Page 1) 12.2.6.1 12.3.3.4 2.3 T Annually Antifreeze Test 5.3.4 2.4 T Annually Control Valve - Position 12.3.3.1 2.5 T Annually Control Valve— Operation 12.3.3.1 2.6 T Annually Supervisory 12.3.3.5 2.7 T Annually Preaction Valve — Priming Water 12.4.3.2.1 2.8 T Annually Preaction Valve — Low Air Pressure Alarm 12.4.3.2.10 2.9 T Annually Preaction Valve — Full Flow Trip Test 12.4.3.2.2 7C State Fire Marshal AES 2 March 21, 2006 ANNEX .B 25 -81 Inspection, Testing, and Maintenance Fire Sprinkler System Page 3 of 4 NFPA 25, Chapter 6 as amended h CCR, Title 19 Date of Inspection, Testing, Maintenance: — y—r/ System Riser ID: Property Information: Name: Type of System: oV: C c oarWetPipe r (j' Ij, \ op Dry PipeAddress: e;cx / J f j'G'y Preaction Deluge 4F`, i5Xq City:IGESh Item Activity Frequency Description NFPA 25 Reference Fail NIA Pass 2.10 T Annually Dry Pipe Valve — Priming Water 12.4.4.2.1 2.11 T Annually Valve — Low Air Pressure 12.4.4.2.6Aarm' pe C 2.12 T Annual) y Dry Pipe Valve — Quick - Opening 12.4.4.2.4Device 2.13 T Annually Dry Pipe Valve — Trip Test 12.4.4.2.2 2.14 T Annually Back-flow Preventer Assemblies 12.6.2 2.15 T 3 Years Dry Pipe Valve — Full Flow Trip Test 12.4.4.2.2.2 2.16 T 5 Years Gauges 5.3.2' 2.17 T 5 Years Pressure Reducing Valve 12.5.1.2 js 2.18 T 5 Years Fire Department Connection Backflush 12.7.4 2.19 T 5 Years Sprinklers — Extra High Temperature 5.3.1.1.1.3 2.20 T 5 Years Sprinklers — Corrosive environment or 5.3.1.1.2corrosivewater 2.21 T 10 Years Sprinklers - Dry 5.3.1.1.1.5 2.22 T 20 Years Sprinklers - Fast Response 5.3.1.1.1.2- 2.23 T 50 Years Sprinklers 5.3.1.1.1 2.24 T 75 Years Sprinklers 75 years in service 5.3.1.1.1.4 2.25 T Sprinklers manufactured prior to 1920 5.3.1.1.1.1Replace 3.1 M Annually Control Valves 12.3.4 3.2 M Annually Preaction /Deluge Valves 12.4.3.3.2 3.3 M Annually Valves/Quick-Opening 12.4.4.3.2Devices 3.4 M Annually Dry Pipe Valve — Low Point Drains 12.4.4.3.3 3.5 M 5 Years Obstruction Investigation Chapter 13 State Fire Marshal AES 2 March 21, 2006 25 -82 INSPECTION, TESTING, AND MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS Item inspection, Testing, and Maintenance Fire Sprinkler System Page 4 of 4 NFPA 25, Chapter 5 as amended b CCR, Title 19 Date of Inspection, Testing, Maintenance: System Riser ID: 1X.17. Property information: Name: Type of System: lglwet Pipe 0F < <, Address: fC C' Dry Pipe co `p Deluge City: ins Item Deficiencies and Comments: Deficiencies and Comments Item number must correspond to the Item number of the Activity listed above: i See Continuation Page(s) (Indicate the number of continuation pages) p, -PASS Cl FAIL Signature Date J State Fire Marshal AES 2 March 21, 2006 ANNEX B 25 -79 Inspection, Testing, and Maintenance Fire Sprinkler System Page 1 of 4 NFPA 25, Chapter 5 as amended b CCR, Title '19 Date of Inspection, Testing, Maintenance: System Riser ID:. °r/ -3 Property Information: Initial Static Pressure: (psi) Name: -- Address: / G j -rr C Type of System: .01 N-Wet Dry PPfipe y P Preaction •,. M = Maintenance Deluge F /RE MPS'' A -O = After Operation Restored Static Pressure:i Main Drain Test Results: Abbreviation Key: I = Inspection Initial Static Pressure: (psi) T = Test M = Maintenance Residual Pressure: -S (psi) A -O = After Operation Restored Static Pressure:i MI = Per Manufacturer's Instructions psi) Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.1 1 Daily Preaction /Deluge. Valves - Enclosure 12.4.3.1Weeklytemperature 1.2 1 Daily Dry Pipe Valves - Enclosure 12.4.4.1.1Weeklytemperature 1.3 1 Quarterly Gauges (Dry, Preaction, Deluge 5.2.4.2 Systems) 5.2.4.3- 1.4 1 Quarterly Control Valves 12.3.2.1 1.5 1 Quarterly Alarm Devices 5.2.6 jr 1.6 1 Quarterly Gauges (Wet Pipe Systems) 5.2.4.1 1.7 1 Quarterly Hydraulic nameplate 5.2.7 1.8 1 Quarterly Pipe and Fittings 5.2.2 1.9 1 Quarterly Sprinklers 5.2.1 1.10 1 Quarterly Spare Sprinklers 5.2.1.3 1.11 1 Quarterly Fire Department Connections 12.7.1 1.12 1 Quarterly Alarm Valves - Exterior Inspection 12.4.1.1 Y 1.13 1 Quarterly Preaction /Deluge Valves - Exterior 12.4.3.1.6Inspection 1.14 1 Quarterly Pressure Reducing Valves 12.5.1.1 1.15 1 Quarterly Dry Pipe Valves - Exterior Inspection 12.4.4.1.4 1.16 1 Quarterly Backflow Preventers 12.6.1 1.17 1 Annually Buildings 5.2.5 State Fire Marshal AES 2 March 21, 2006 25 -80 INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION SYSTEMS Inspection, Testing, and Maintenance Fire Sprinkler System Page 2 of 4 NFPA 25, Chapter 5 as amended by CCR, Title 19 Date of Inspection, Testing, Maintenance: System Riser ID:G' -3 Property Information: Type of System: Name: , et Pipe rAF'i °92 Address: 46a 1' SGf rJ G Dry P co;' D Pie 1PreactionN„\., 13 Deluge 9TF'._' Fil?E MP4' City: lrrry c Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.18 1 Annually Hangers 5.2.3 1.19 1 Annually Seismic Braces 5.2.3 1.20 1 5 Years Hangers (Accessible concealed spaces) 5.2.3.3 1.21 1 5 Years Seismic Braces (Accessible concealed 5.2.3.3 spaces) 1.22 1 5 Years Pipe and Fittings (Accessible concealed 5.2.2.3spaces) 1.23 1 5 Years Sprinklers (Accessible concealed spaces) 5.2.1.1.4- 1.24 1 5 Years Alarm Valves - Interior Inspection 12.4.1.2 1.25 1 5 Years Alarm Valves - Strainers, filters, orifices 12.4.1.2 1.26 I 5 Years Check Valves - Interior Inspection 12.4.2.1 Nc- 1.27 1 5 Years Preaction/Deluge Valves - Interior 12.4.3.1.7Insection Y" 1.28 1 5 Years Preaction/Deluge Valves - Strainers, 12.4.3.1.8filters, orifices 1.29 1 5 Years Dry Pipe Valves - Interior Inspection 12.4.4.1.5 c, 1.30 1 5 Years Dry Pipe Valves - Strainers, filters, orifices 12.4.4.1.6 2.1 T Annually Alarm Devices (90 Sec) 5.3.3 12.2.7 12.2.6 2.2 T Annually Main Drain Test (Enterdata on Page 1) 12.2.6.1 12.3.3.4 2.3 T Annually Antifreeze Test 5.3.4 2.4 T Annually Control Valve - Position 12.3.3.1 2.5 T Annually Control Valve - Operation 12.3.3.1- 2.6 T Annually Supervisory 12.3.3.5 j- 2.7 T Annually Preaction Valve - Priming Water 12.4.3.2.1 2.8 T Annually Preaction Valve - Low Air Pressure Alarm 12.4.3.2.10 2.9 T Annually Preaction Valve - Full Flow Trip Test 12.4.3.2.2 State Fire Marshal AES 2 March 21, 2006 113r 1217.`f 25 -81 Inspection, Testing, and Maintenance Fire Sprinkler System Page 3 of 4 NFPA 25, Chapter 5 as amended by CCR, Title 19 Date of Inspection, Testing, Maintenance: 02 _5_11 System Riser ID: "0 -3 Property Information: Name: Type of System: o V-Wet Pipe Q/ °9 jtej' Dry Pipe ' InAddress: Preaction Deluge ARE MPQ City: Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 2.10 T Annually Dry Pipe Valve — Priming Water 12.4.4.2.1 2.11 T Annually Dry Pipe Valve — Low Air Pressure 12.4.4.2.6Alarm 2.12 T Annuallyy ry Pipe Valve — Quick - Opening 12.4.4.2.4Device 2.13 T Annually Dry Pipe Valve — Trip Test 12.4.4.2.2 2.14 T Annually Backflow Preventer Assemblies 12.6.2 2.15 T 3 Years Dry Pipe Valve — Full Flow Trip Test 12.4.4.2.2.2 2.16 T 5 Years Gauges 5.3.2 2.17 T 5 Years Pressure Reducing Valve 12.5.1.2 2.18 T 5 Years Fire Department Connection Backflush 12.7.4 2.19 T 5 Years Sprinklers — Extra High Temperature 5.3.1.1.1.3 2.20 T 5 Years Sprinklers — Corrosive environment or 5.3.1.1.2corrosivewater 2.21 T 10 Years Sprinklers - Dry 5.3.1.1.1.5 2.22 T 20 Years Sprinklers - Fast Response 5.3.1.1.1.2 2.23 T 50 Years Sprinklers 5.3.1.1.1 2.24 T 75 Years Sprinklers 75 years in service 5.3.1.1.1.4 2.25 _ T Sri manufactured prior to 1920 5.3.1.1.1.1lace 3.1 M Annually Control Valves 12.3.4 3.2 M Annually Preaction /Deluge Valves 12.4.3.3.2 3.3 M Annually Dry Pipe Valves /Quick- Opening 12.4.4.3.2Devices 3.4 M Annually Dry Pipe Valve — Low Point Drains 12.4.4.3.3 3.5 M 5 Years Obstruction Investigation Chapter 13' State Fire Marshal AES 2 March 21, 2006 25 -82 INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION SYSTEMS Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 26, Chapter 5 as amended b CCR, Title 19 Page 4 of 4 Date of Inspection, Testing, Maintenance: System Riser ID: Property Information: Name:' Type of System: Wet Pipe c F- 'Q 09 Address: r/ J ' /v'N a Cj Dry Pipe Preaction Deluge City: Item Deficiencies and Comments: Deficiencies and Comments Item number must correspond to the Item number of the Activity listed above: i LF1 See Continuation Page(s) c.) (indicate the number of continuation pages) ePASS FAIL Si nature Date State Fire Marshal AES 2 March 21, 2006 ANNEX B 25 -79 Inspection, Testing, and Maintenance Fire Sprinkler System Page I of 4 NFPA 25, Chapter 5' as amended b CCR, Title 19 Abbreviation Key: System Riser ID: I = Inspection Date of Inspection, Testing, Maintenance: T = Test Property Information: Name: , S- Type of System: o9 ?J Address: 1Net Pipe Dry Pipe QCQ, Preaction Frequency Deluge ARE MPF' City: N/A Pass 1.1 1 Daily Main Drain Test Results: Abbreviation Key: I = Inspection Initial Static Pressure: (psi) T = Test M = Maintenance Residual Pressure: .z (psi) A -0 = After Operation MI =Per Manufacturer's Instructions Restored Static Pressure: (psi) Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.1 1 Daily Preaction /Deluge Valves — Enclosure 12.4.3.1Weeklytemperature 1.2 1 Daily Dry Pipe Valves — Enclosure 12.4.4.1.1Weeklytemperature 1.3 I Quarterly Gauges (Dry, Preaction, Deluge 5.2.4.2 Systems) 5.2.4.3 1.4 1 Quarterly Control Valves 12.3.2.1 1.5 1 Quarterly Alarm Devices 5.2.6 1.6 1 Quarterly Gauges (Wet Pipe Systems) 5.2.4.1 1.7 1 Quarterly Hydraulic nameplate 5.2.7 X 1.8 1 Quarterly Pipe and Fittings 5.2.2 1.9 1 Quarterly Sprinklers 5.2.1 1.10 1 Quarterly Spare Sprinklers 5.2.1.3 1.11 1 Quarterly Fire Department Connections 12.7.1 1.12 1 Quarterly Alarm Valves — Exterior Inspection 12.4.1.1 1.13 1 Quarter) Quarterly Preaction /Deluge Valves — Exterior 12.4.3.1.6Inspection 1.14 1 Quarterly Pressure Reducing Valves 12.5.1.1 1.15 1 Quarterly Dry Pipe Valves — Exterior Inspection 12.4.4.1.4 1.16 1 Quarterly Backflow Preventers 12.6.1 1.17 1 Annually Buildings 5.2.5 State Fire Marshal AES 2 March 21, 2006 25 -80 INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION SYSTEMS Inspection, Vesting, and Maintenance Fire Sprinkler System Page 2 of 4 NFPA 25, Chapter 5 as amended b CCR, Title 19 Date of Inspection, Testing, Maintenance:1 System Riser ID: Property Information: F-- Type of System: Name: Wet Pipe CO!, Address: 66 11 Dry Pipe Preaction NT \9JAte•, IV Deluge p City: X1 J Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.18 1 Annually Hangers 5.2.3 1.19 1 Annually Seismic Braces 5.2.3 1.20 1 5 Years Hangers (Accessible concealed spaces) 5.2.3.3 1.21 1 5 Years Seismic Braces (Accessible concealed 5.2.3.3spaces) 1.22 1 5 Years Pipe and Fittings (Accessible concealed 5.2.2.3spaces) 1.23 1 5 Years Sprinklers (Accessible concealed spaces) 5.2.1.1.4 1.24 1 5 Years Alarm Valves — Interior Inspection 12.4.1.2 1.25 1 5 Years Alarm Valves - Strainers, filters, orifices 12.4.1.2 1.26 1 5 Years Check Valves— Interior Inspection 12.4.2.1 1.27 1 5 Years Preaction/Deluge Valves — Interior 12.4.3.1.7Inspection 1.28 1 5 Years Preaction/Deluge Valves - Strainers, 12.4.3.1.8filters, orifices 1.29 1 5 Years Dry Pipe Valves — Interior Inspection 12.4.4.1.5 A 1.30 1 5 Years Dry Pipe Valves - Strainers, filters, orifices 12.4.4.1.6 2.1 T Annually Alarm Devices (90 Sec) 5.3.3 12.2.7 12.2.6 2.2 T Annually Main Drain Test (Enter data on Page 1) 12.2.6.1 12.3.3.4 2.3 T Annually Antifreeze Test 5.3.4 2.4 T Annually Control Valve - Position 12.3.3.1 2.5 T Annually Control Valve — Operation 12.3.3.1 j( 2.6 T Annually Supervisory 12.3.3.5 2.7 T Annually Preaction Valve — Priming Water 12.4.3.2.1 2.8 T Annually Preaction Valve — Low Air Pressure Alarrn 12.4.3.2.10 2.9 T Annually Preaction Valve — Full Flow Trip Test . 12.4.3.2.2 State Fire Marshal AES 2 March 21, 2006 ANNEX B 25 -81 Inspection, Testing, and Maintenance Fire Sprinkler System Page 3 of 4 NFPA 25, Chapter 5 as amended by CCR, Title 19 Date of Inspection, Testing, Maintenance: — Property Information: f Name: Address: 116 S C — City:s = =-, System Riser ID: Type of System: 1 Wet Pipe h Dry Pipe , i '` . Preaction Deluge RE MP Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 2.10 T Annually Dry Pipe Valve — Priming Water 12.4.4.2.1 2.11 T Annuallyy ry Pipe Valve — Low Air Pressure Alarm 12.4.4.2.6 2.12 T Annuallyy ry Pipe Valve — Quick - Opening Device 12.4.4.2.4 2.13 T Annually Dry Pipe Valve — Trip Test 12.4.4.2.2 2.14 T Annually Backflow Preventer Assemblies 12.6.2 2.15 T 3 Years Dry Pipe Valve — Full Flow Trip Test 12.4.4.2.2.2 2.16 T 5 Years Gauges 5.3.2 2.17 T 5 Years Pressure Reducing Valve 12.5.1.2 2.18 T 5 Years Fire Department Connection Backflush 12.7.4 2.19 T 5 Years Sprinklers — Extra High Temperature 5.3.1.1.1.3 2.20 T 5 Years Sprinklers — Corrosive environment or corrosive water 5.3.1.1.2 2.21 T 10 Years Sprinklers - Dry 53.1.1.1.5 2.22 T 20 Years Sprinklers - Fast Response 5.3.1.1.1.2 x 2.23 T 5b Years Sprinklers 5.3.1.1.1 2.24 T 75 Years Sprinklers 75 years in service 5.3.1.1.1.4 2.25 T Sprinklers manufactured prior to 1920 Replace 5.3.1.1.1.1 3.1 M Annually Control Valves 12.3.4 3.2 M Annually Preaction /Deluge Valves 12.4.3.3.2 3.3 M Annually Dry Pipe Valves /Quick- Opening Devices 12.4.4.3.2 3.4 M Annually Dry Pipe Valve — Low Point Drains 12.4.4.3.3 3.5 M 5 Years Obstruction Investigation Chapter 13 State Fire Marshal AES 2 March 21, 2006 25 -32 INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION SYSTEMS Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25, Chap-ter 5 as by CCR, Title 19 Page 4 of 4 amended Date of Inspection, Testing, Maintenance: < ol System Riser ID: Property Information: Type of System: Name: Wet Pipe oF Address: OCR( f}- Dry Pipe is j1: Preaction N,. , ') Deluge city: Item Deficiencies and Comments: Deficiencies and Comments Item number must correspond to the Item number of the Activity listed above: See Continuation Page(s) ndicate the number of continuation pages) ASS FAIL .._. Si nature Date State Fire Marshal AES 2 March 21, 2006 ANNEX B 25 -79 Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25, Chapter 5-as b CCR, 'title 19 Page 1 of 4 amended Date of Inspection, Testing, Maintenance: l `l System Riser ID: Initial Static Pressure: lJ (psi) Property Information: Type of System: M = Maintenance Name: /-57(4 Wet Pipe Dry Pipe aAddress: tom! SV 12, 2 1 Restored Static Pressure: (psi) Preaction pc Activity Deluge RE M City: Fail N/A Main Drain Test Results: Abbreviation Key: nn I = Inspection Initial Static Pressure: lJ (psi) T = Test M = Maintenance Residual Pressure: (psi) A -O = After Operation 77 MI =Per Manufacturer's Instructions Restored Static Pressure: (psi) Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.1 I Daily Preaction /Deluge Valves – Enclosure 12.4.3.1Weeklytemperature 1.2 1 Daily Dry Pipe Valves – Enclosure 12.4.4.1.1Weeklytemperature 1.3 1 Quarterly Gauges (Dry, Preaction, Deluge 5.2.4.2 Systems) 5.2.4.3 J 1.4 1 Quarterly Control Valves 12.3.2.1 1.5 1 Quarterly Alarm Devices 5.2.6 1.6 1 Quarterly Gauges (Wet Pipe Systems) 5.2.4.1 1.7 1 Quarterly Hydraulic nameplate 5.2.7 1.8 1 Quarterly Pipe and Fittings 5.2.2 1.9 1 Quarterly Sprinklers 5.2.1 1.10 1 Quarterly Spare Sprinklers 5.2.1.3 1.11 1 Quarterly Fire Department Connections 12.7.1 1.12 1 Quarterly Alarm Valves – Exterior Inspection 12.4.1.1 1.13 1 Quarterly Preaction /Deluge Valves – Exterior 12.4.3.1.6Inspection 1.14 1 Quarterly Pressure Reducing Valves 12.5.1.1 1.15 1 Quarterly Dry Pipe Valves – Exterior Inspection 12.4.4.1.4 1.16 1 Quarterly Backflow Preventers 12.6.1 1.17 1 Annually Buildings 5.2.5 State Fire Marshal AES 2 March 21, 2006 25 -80 INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION SYSTEMS Inspection, Testing, and Maintenance Fire Sprinkler System page 2 of4 NFPA 25, Chapter 5 as amended by CCR, Title 19 Date of Inspection, Testing, Maintenance: System Riser ID: Property Information: hh Name: J. Type System: °— c— A, co 1, Wet Pipe Address: Dry Pipe rr #n. Preaction .,,T``aDeluge n City: 6K F IE(J) Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.18 1 Annually Hangers 5.2.3 1.19 1 Annually Seismic Braces 5.2.3 1.20 1 5 Years Hangers (Accessible concealed spaces) 5.2.3.3 1.21 1 5 Years Seismic Braces (Accessible concealed 5.2.3.3spaces) 1.22 1 5 Years Pipe and Fittings (Accessible concealed 5.2.2.3spaces) 1.23 1 5 Years Sprinklers (Accessible concealed spaces) 5.2.1.1.4 1.24 1 5 Years Alarm Valves — Interior Inspection 12.4.1.2 1.25 1 5 Years Alarm Valves - Strainers, filters, orifices 12.4.1.2 1.26 1 5 Years Check Valves — Interior Inspection 12.4.2.1 1.27 1 5 Years Preaction/Deluge Valves — Interior 12.4.3.1.7Inspection 1.28 1 5 Years Preaction/Deluge Valves - Strainers, 12.4.3.1.8filters, orifices 1.29 1 5 Years Dry Pipe Valves — Interior Inspection 12.4.4.1.5 1.30 1 5 Years Dry Pipe Valves - Strainers, filters, orifices 12.4.4.1.6 x 2.1 T Annually Alarm Devices (90 Sec) 5.3.3 12.2.7 2.2 T Annually Main Drain Test (Enterdata on Page 7) 12.2.6 12.2.6.1 12.3.3.4 2.3 T Annually Antifreeze Test 5.3.4 2.4 T Annually Control Valve - Position 12.3.3.1 2.5 T Annually Control Valve— Operation 12.3.3.1 2.6 T Annually Supervisory 12.3.3.5 2.7 T Annually Preaction Valve — Priming Water 12.4.3.2.1 2.8 T Annually Preaction Valve — Low Air Pressure Alarm 12.4.3.2.10 2.9 T Annually Preaction Valve — Full Flow Trip Test . 12.4.3.2.2 State Fire Marshal AES 2 March 21, 2006 ANNEX B 25 -81 Inspection, Testing, and Maintenance Fire Sprinkler System Page 3 of 4 NFPA 25, Chapter 5 as amended b CCR, 'Tit9e 19 Date of Inspection, Testing, Maintenance: 6 — System Riser ID: C7 -l Property Information: Type f System:? Name: 0 • 7 Wet Pipe Address: y i l . / Dry Pipe Preaction V,. k1 f J 9Deluge MPpS City: A E Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 2.10 T Annually Dry Pipe Valve — Priming Water 12.4.4.2.1 2.11 T Annuallyy ry Pipe Valve — Low Air Pressure 12.4.4.2.6Alarm 2.12 T Annually Dry Pipe Valve — Quick- Opening 12,4.4.2.4Device 2.13 T Annually Dry Pipe Valve — Trip Test 12.4.4.2.2 2.14 T Annually Backflow Preventer Assemblies 12.6.2 2.15 T 3 Years Dry Pipe Valve — Full Flow Trip Test 12 4.4.2.2.2 2.16 T 5 Years Gauges 5.3.2 2.17 T 5 Years Pressure Reducing Valve 12.5.1.2 2.18 T 5 Years Fire Department Connection Backflush 12.7.4 2.19 T 5 Years Sprinklers — Extra High Temperature 5.3.1.1.1.3 2.20 T 5 Years Sprinklers — Corrosive environment or 5.3.1.1.2corrosivewater 2.21 T 10 Years Sprinklers - Dry 5.3.1.1.1.5 2.22 T 20 Years Sprinklers - Fast Response 5.3.1.1.1.2 2.23 T 50 Years Sprinklers 5.3.1.1.1 2.24 T 75 Years Sprinklers 75 years in service 5.3.1.1.1.4 2.25 T Sprinklers manufactured prior to 1920 5.3.1.1.1.1Replace 3.1 M Annually Control Valves 12.3.4 3.2 M Annually Preaction /Deluge Valves 12.4.3.3.2 3.3 M Annually Dry Pipe Valves /Quick- Opening 12.4.4.3.2Devices 3.4 M Annually Dry Pipe Valve — Low Point Drains 12.4.4.3.3 3.5 M 5 Years Obstruction Investigation Chapter 13 State Fire Marshal AES 2 March 21, 2006 25 -82 INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION SYSTEMS Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25, Chapter 5 as amended by CCR, Title 19 Gage 4 of 4 Date of Inspection, Testing, Maintenance: r 0 System Riser ID: Property Information: x1 61 Type of System: Name: 7""D' ,/J ' Wet Pipe gr Azl' j ° ? Address: SI" Dry Pipe Preaction iaj, Deluge TFFIPE V!P T City: & z F_ y A Item Deficiencies and Comments: Deficiencies and Comments Item number must correspond to the Item number of the Activit sted above: 0 U See Continuation Page(s) (indicate th number of continuation pages) PASS Q FAIL R— / ! < _ Si nature Date State Fire Marshal AES 2 March 21, 2006