Loading...
HomeMy WebLinkAboutSB989 2011SWRCB, January 2002 Page of Secondary Containment Testing Deport Form Thisform is intendedfor use by contractors performingperiodic testing of USTsecondary containment systems. Use the appropriate pages ofthisform to report resultsfor all components tested. The completedform, written testprocedures, and printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Shell Date ofTesting: 9/8/2011 Facility Address: 4700 Coffee Road, Bakersfield, CA 93308 Facility Contact: Matt Jeffries I Phone: 661 - 496 -7006 Date Local Agency Was Notified of Testing: 7/26/2011 Name ofLocal Agency Inspector (ifpresent during testing): Ester Duran 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Pass Fail Technician Conducting Test: Bryan A Self Repairs Made Component Credentials: x CSLB Licensed Contractor x SWRCB Licensed Tank Tester Not Tested License Type: CSLB DSL Fill License Number: 804904 Manufacturer Manufacturer Training Component(s) Date Training Expires Franklin Fueling TS -STS 1 -06 -2013 UST Service technician ICC 7 -5 -2013 Star. Smith. Fibercast Fiber Glass Systems N.A. Reg. #1 PL X 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made DSL Fill X DSL PL X Reg. #1 Fill X Reg. #1 PL X Reg. #2 Fill X Reg. #2 PL X Super Fill X Super PL X DSL STP X Disp. 1 -2 X Reg. #1 STP X Disp. 3 -4 X Reg. #2 STP X Disp. 5 -6 X Super STP X Disp. 7 -8 X DSL Annular X Reg. #1 Annular X Reg. #2 Annular X Super Annular X If hydrostatic testing was performed, describe what was done with the water after completion oftests: Water was put back into test trailer and waste drum CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, the facts stated in this document qre accurate and infull compliance with legal requirements Technician's Signature: ,. "j >Avi SWRCB, January 2002 Page of 4. TANK ANNULAR TESTING Test Method Developed By: Tank Manufacturer x Industry Standard Professional Engineer Other (Specie) Test Method Used: Pressure x Vacuum Hydrostatic Other (Specify) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Tank #DSL Tank # Reg. #1 Tank # Reg. #2 Tank # Super Is Tank Exempt From Testing ?' Yes x No Yes x No Yes x No Yes x No Tank Capacity: 10,000 10,000 10,000 10,000 Tank Material: Steel Steel Steel Steel Tank Manufacturer: Unknown Unknown Unknown Unknown Product Stored: DSL Reg. Reg. Super Wait time between applying pressure /vacuum /water and starting test: 5 min. 5 min. 5 min. 5 min. Test Start Time: 9:15am 9:15am 9:15am 9:15am Initial Reading (R,): 10 Hg 10 Hg 10 Hg 10 Hg Test End Time: 10:15am 10:15am 10:15am 10:15a n Final Reading (RF): 10 Hg 10 Hg 10 Hg 10 Hg Test Duration: 1 hour 1 hour I hour 1 hour Change in Reading (RF -R,): 0.00" 0.00" 0.00" 0.00" Pass /Fail Threshold or Criteria: 0.00" 0.00" 0.00" 0.00" Test Result: X Pass Fail X Pass Fail X Pass Fail X Pass Fail Was sensor removed for testing? X Yes No NA X Yes No NA X Yes []No NA X Yes No NA Was sensor properly replaced and verified functional after testin ? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) SWRCB, January 2002 5. SECONDARY PIPE TESTING Page of Test Method Developed By: Piping Manufacturer x Industry Standard Professional Engineer Other (Specify) Test Method Used: x Pressure Vacuum Hydrostatic Other (Specie) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Piping Run # DSL Piping Run # Reg. #1 Piping Run# Reg. #2 Piping Run # Super Piping Material: FRP FRP FRP FRP Piping Manufacturer: Total Containment Total Containment Total Containment Total Containment Piping Diameter: 2.00" 2.00" 2.00" 2.00" Length of Piping Run: 150' 155' 150' 155' Product Stored: Diesel Secondary 87 Secondary 87 Secondary 91 Secondary Method and location of piping -run isolation: Test Boot Test Boot Test Boot Test Boot Wait time between applying pressure /vacuum /water and starting test: 5 min. N.A. N.A. N.A. Test Start Time: 1 1:30am Initial Reading (Ri): 5" psi Test End Time: 12:30pm Final Reading (RF): 5" psi Test Duration: I hour Change in Reading (RF -111): 0.00" Pass /Fail Threshold or Criteria: 0.00" Test Result: X Pass Fail Pass X Fail Pass X Fail Pass X Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) There are three boots with hole's in them, Both regulars Lines are leakiny- in Disp. #5 -6. The Super Line is leaking in Disp. #3 -4. The secondary's are leaking Just as fast as I was flowing in so there was no test ran. SWRCB, January 2002 6. PIPING SUMP TESTING Page of Test Method Developed By: Sump Manufacturer x Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum x Hydrostatic Other (Specify) Test Equipment Used: Ts -sts Equipment Resolution: Sump # DSL Sump # Reg. #1 Sump # Reg. #2 Sump # Super Sump Diameter: 40.00" 40.00" 40.00" 40.00" Sump Depth: 44.00" 46.00" 44.00" 44.00" Sump Material: FRP FRP FRP FRP Height from Tank Top to Top of Highest Piping Penetration: 4.50" 9.50" 5.00" 8.00" Height from Tank Top to Lowest Electrical Penetration: 2.00" 3.00" 5.00" 2.00" Condition of sump prior to testing: Dry Dry Dry Dry Portion of Sump Tested' Not Tested Not Tested Not Tested Not Tested Does turbine shut down when sump sensor detects liquid (both product and water) ?* Yes No X NA Yes No X NA Yes No X NA Yes No X NA Turbine shutdown response time NA NA NA NA Is system programmed for fail -safe shutdown ?` X Yes No X NA X Yes No X NA X Yes No X NA X Yes No X NA Was fail -safe verified to be operational ?* X Yes No X NA X Yes No X NA X Yes No X NA X Yes No X NA Wait time between applying pressure /vacuum /water and starting test: NA NA NA NA Test Start Time: Initial Reading (Rj): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF -Ri): Pass /Fail Threshold or Criteria: Test Result: Pass X Fail Pass X Fail Pass X Fail Pass X Fail Was sensor removed for testing? Yes No X NA Yes No X NA Yes No X NA Yes No X NA Was sensor properly replaced and verified functional after testing? Yes No X NA Yes No X NA Yes No X NA Yes No X NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) If the entire depth of the sump is not tested, specify how much was tested. If the answer to as of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160) SWRCB, January 2002 7. UNDER - DISPENSER CONTAINMENT (UDC) TESTING Page of Test Method Developed By: UDC Manufacturer x Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum x Hydrostatic Other (Specify) Test Equipment Used: Ts -sts Equipment Resolution: UDC # 1 -2 UDC # 3 -4 UDC # 5 -6 UDC # 7 -8 UDC Manufacturer: GBCO GBCO GBCO GBCO UDC Material: FRP FRP FRP FRP UDC Depth: 27.00" 27.00" 27.00" 27.00" Height from UDC Bottom to Top of Highest Piping Penetration: 12.00" 12.00" 12.00" 12.00" Height from UDC Bottom to Lowest Electrical Penetration: 0.00" 0.00" 0.00" 0.00" Condition of UDC prior to testing: Clean & Dry Clean & Dry Clean & Dry Clean & Dry Portion of UDC Tested Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration Does turbine shut down when UDC sensor detects liquid (both product and water) ?* Yes No X NA Yes No X NA Yes No X NA Yes No X NA Turbine shutdown response time NA NA NA NA Is system programmed for fail- safe shutdown?* Yes No X NA Yes No X NA Yes No X NA Yes No X NA Was fail -safe verified to be operational?* Yes No X NA Yes No X NA Yes No X NA Yes No X NA Wait time between applying pressure /vacuum /water and starting test 5 Minuets 5 Minuets 5 Minuets 5 Minuets Test Start Time: Initial Reading (R,): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF -R,): Pass /Fail Threshold or Criteria: Test Result: X Pass Fail Pass X Fail Pass X Fail X Pass Fail Was sensor removed for testing? X Yes No NA Yes X No NA Yes X No NA X Yes No NA Was sensor properly replaced and verified functional after testing? X Yes No NA Yes No X NA Yes No X NA X Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) Both UDC #34 and #5 -6 were visual fails. If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) SWRCB, January 2002 8. FILL RISER CONTAINMENT SUMP TESTING Page of Facility is Not Equipped With Fill Riser Containment Sumps Fill Riser Containment Sumps are Present, but were Not Tested r Developed By: Sump Manufacturer El Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specie) Test Equipment Used: I Equipment Resolution: Fill Sump # DSL Fill Sump # Reg. #1 Fill Sump # Reg. #2 Fill Sump # Super Sump Diameter: 37.00" 37.00" 37.00" 37.00" Sump Depth: 44.00" 43.00" 44.00" 43.00" Height from Tank Top to Top of Highest Piping Penetration: FRP FRP FRP FRP Height from Tank Top to Lowest Electrical Penetration: 6.50" 8.00" 7.00" 8.00" Condition of sump prior to testing: 0.50" 0.50" 0.50" 0.50" Portion of Surnp Tested Pipe Penetration Pipe Penetration Pipe Penetration Pipe Penetration Sump Material: FRP FRP FRP FRP Wait time between applying pressure /vacuum /water and starting test: 5 Minuets 5 Minuets 5 Minuets 5 Minuets Test Start Time: Initial Reading (R,): See 1NG01PTestEndTime: Final Reading (RF): Kesults Test Duration: Change in Reading (R,: -Ri): Pass /Fail Threshold or Criteria: Test Result: X Pass Fail X Pass Fail X Pass Fail X Pass Fail Is there a sensor in the sump? X Yes No X Yes No X Yes No X Yes No Does the sensor alarm when either product or water is detected? X Yes []No NA X Yes No NA X Yes No NA X Yes No NA Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Was sensor properly replaced and verified functional after testing? X Yes No NA X Yes No NA X Yes []No NA X Yes No NA Comments — (include informalion on repairs made prior to testing, and recommendedfollow -up forfailed tests) i y.,, {. N,aC U T.:.o,.n SWRCB, January 2002 Page of 9. SPILL /OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill /Overfill Containment Boxes Spill /Overfill Containment Boxes are Present, but were Not Tested X Test Method Developed By: Spill Bucket Manufacturer x Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum x Hydrostatic Other (Spec) Test Equipment Used: Ts -sts Equipment Resolution: Spill Box # Spill Box # Spill Box # Spill Box # Bucket Diameter: Bucket Depth: Wait time between applying pressure /vacuum /water and starting test: Test Start Time: Initial Reading (R,): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF -R,): Pass /Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -up for failed tests) SHELL 4700 COFFIE RD BACKERSFIELD CA 93308 661 -06 -7006 27331 09/08/2011 10:24 AM SUMP LEAK TEST REPORT OS FILL TEST STARTED 10:08 AM TEST STARTED 09/08/2011 BEGIN LEVEL 4.9901 IN END TIME 10:23 AM END DATE 09 /08/2011 END LEVEL 4.9900 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 87 1F IL TEST STARTED 10:08 AM TEST STARTED 09/08/2011 BEGIN LEVEL 6.1584 IN END TIME 10:23 AM END DATE 09/08/2011 END LEVEL 6,1586 1N LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 87 2FIL TEST STARTED 10:08 AM TEST STARTED 09 /08/2011 BEGIN LEVEL 5.0355 IN EN) TIME 10:23 AM END DATE 09/08/2011 END LEVEL 5.0350 1N LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 91 FILL TEST STARTED 10:08 AM TEST STARTED 09 /08/2011 BEGIN LEVEL 5.7557 IN 940 TIME 10:23 AM END DATE 09 /08/2011 END LEVEL 5.7556 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED SHELL 4700 COFFIE RD BAKERSFIELD CA 93303 661 - 495-7006 27331 09/08/2011 12:38 PM SUMP LEAK TEST REPORT DIS 7 -8 TEST STARTED 12:23 PM TEST STARTED 09/08/2011 BEGIN LEVEL 1,0283 IN END TIME 12:38 PM END DATE 09/08/.2011 END LEVEL 1,0283 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED s SHELL 4700 COFFIE RD BAKERSFIELD CA 93308 661- 495 -7006 27331 09/08/2011 1.04 PM SUMP LEAK TEST REPORT DIS 7 -8 TEST STARTED 12:49 PM TEST STARTED 09/08/2011 BEGIN LEVEL 5.4585 IN END TIME 1:04 PM END DATE 09 /08/2011 END LEVEL 5,4584 IN LEAK THRESHOLD 0.002 114 TEST RESULT PASSED SWRCB, January 2002 Page of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of thisform to report results for all components tested. The completedform, written test procedures, and printoutsfrom tests (if applicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Shell Date of Testing: 9/28/11 Facility Address: 4700 Coffee Rd Facility Contact: Matt Jeffries Phone: 661496 -7006 Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (ifpresent during testing): Ester(BFD) 2. TESTING CONTRACTOR INFORMATION Company Name: Confidence UST Services Pass Fail Technician Conducting Test: Frank Landa Repairs Made Component Credentials: x CSLB Licensed Contractor x SWRCB Licensed Tank Tester Not Tested License Type: CSLB 87 #1 SEC License Number:804904 Manufacturer Manufacturer Training Component(s) Date Training Expires Franklin Fueling TS -STS 9 -20 -2012 UST Service technician ICC 2 -2 -2013 Star. Smith. Fibercast Fiber Glass Systems N.A. 91 SEC 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made 87 #1 SEC X 87 #2 SEC X 91 SEC X 8791 STP X 87 #2 STP X 91 STP X DSL STP X I 1 UDC #3 -4 X UDC #5 -6 X 1 I 1 If hydrostatic testing was performed, describe what was done with the water after completion of tests: Water was out back into test trailer and waste drum CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To lite best ofmy knowledge, thefacts stated i s document are accurate and in full compliance with legal requirements Technician's Signature: Date: 9/28/11 SWRCB, January 2002 5. SECONDARY PIPE TESTING Page of Test Method Developed By: Piping Manufacturer x Industry Standard Professional Engineer Other (Specify) Test Method Used: x Pressure Vacuum Hydrostatic Other (Spec) Test Equipment Used: Calibrated Gages Equipment Resolution:0.0625" Piping Run 87 #1 Piping Run #87 #2 Piping Run #91 Piping Run # Piping Material: PLASTIC PLASTIC PLASTIC Piping Manufacturer: TOTAL CONTAINMENT TOTAL CONTAINMENT TOTAL CONTAINMENT Piping Diameter: 2" 2" 2" Length of Piping Run: 100, 100' 100, Product Stored: REGULAR REGULAR REGULAR Method and location of piping-run isolation: BOOT IN STP BOOT IN STP BOOT IN STP Wait time between applying pressure /vacuum /water and starting test: 5MIN 5MIN 5MIN Test Start Time: I O:00AM I O:OOAM 10:00 Initial Reading (Ri): 5PSI 5PSI 5PSI Test End Time: 11:OOAM 1 1:OOAM 1 1:OOAM Final Reading (RF): 5PSI 5PSI 5PSI Test Duration: 1 HR I HR 1 HR Change in Reading (RF -R,): 0 0 0 Pass /Fail Threshold or Criteria: 0 0 0 Test Result: X Pass Fail X Pass Fail X Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -up forfailed tests) Replaced test boots in 603 -4 (2) Replaced test boots in dsp #5 -6 (2) Replaced ilamaers in both dSD's SWRCB, January 2002 6. PIPING SUMP TESTING Page of Test Method Developed By: Sump Manufacturer x Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum x Hydrostatic Other (Specify) Test Equipment Used: Ts -sts Equipment Resolution: Sump #87 #1 Sump #87 #2 Sump #91 Sump #DSL Sump Diameter: 40" 40" 40" 40" Sump Depth: 44" 44" 44" 44" Sump Material: PLASTIC PLASTIC PLASTIC PLASTIC Height from Tank Top to Top of Highest Piping Penetration: 9.5" 5" 8" 4.5" Height from Tank Top to Lowest Electrical Penetration: 3" 5" 2" 2" Condition of sump prior to testing: CLEAN /DRY CLEAN /DRY CLEAN /DRY CLEAN /DRY Portion of Sump Tested' 13" 8" 10" 7" Does turbine shut down when sump sensor detects liquid (both product and water) ?* Yes No X NA Yes No X NA Yes No NA Yes No NA Turbine shutdown response time 8 Seconds 8 Seconds 8 SECONDS 8 SECONDS Is system programmed for fail -safe shutdown ?* X Yes []No NA X Yes No NA Yes No NA Yes No NA Was fail -safe verified to be operational?* X Yes No NA X Yes No NA Yes No NA Yes No NA Wait time between applying pressure /vacuum /water and starting test: 15 Minutes 15 Minutes 15 Minutes 15 Minutes Test Start Time: Initial Reading (R,): Test End Time: Sea Final Reading (RF): Test Duration: Change in Reading (RF -R,): Pass /Fail Threshold or Criteria: Test Result: X Pass Fail X Pass Fail X Pass Fail. X Pass Fail Was sensor removed for testing? X Yes No NA X Yes No NA X Yes No NA X Yes No NA FW-as sensor properly replaced and rified functional after testing? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) Replaced pipiny_ penetrations in all stp's Replaced with 3950DW Diversivied product, If the entire depth of the sump is not tested, specify how much was tested. Ifthe answer to a of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160) SWRCB, January 2002 Page of 7. UNDER - DISPENSER CONTAINMENT (UDC) TESTING Test Method Developed By: UDC Manufacturer x Industry Standard Professional Engineer Other (Specie) Test Method Used: Pressure Vacuum x Hydrostatic Other (Spec) Test Equipment Used: Ts -sts Equipment Resolution: UDC # 3 -4 UDC # 5 -6 UDC # UDC # 7 -8 UDC Manufacturer: Unknown Unknown UDC Material: Plastic Plastic UDC Depth: 27" 27" Height from UDC Bottom to Top of Highest Piping Penetration: 12" 12" Height from UDC Bottom to Lowest Electrical Penetration: 0" 10" Condition of UDC prior to testing: Clean Clean Portion of UDC Tested 14" 14" Does turbine shut down when UDC sensor detects liquid (both product and water) ?" X Yes No NA X Yes No NA Yes No NA Yes No NA Turbine shutdown response time 8 Seconds 8 Seconds Is system programmed for fail- safe shutdown ?" X Yes No NA X Yes No NA Yes No NA Yes No NA Was fail -safe verified to be o erational ?" X Yes No NA X Yes No NA Yes No NA Yes No NA Wait time between applying pressure /vacuum /water and starting test Test Start Time: Initial Reading (Rj): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF -Rj): Pass /Fail Threshold or Criteria: Test Result: X Pass Fail X Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) Replaced test boots in dsv #34, and 5 -6 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) VA 0 3 0 X92 4700'COFFEE BAKERSFIELD CA 93308 27895 09/19/2011 11:08 AM SUMP LEAK TEST REPORT DSP3 -4 TEST STARTED 10:52 AM TEST STARTED 09/19/2011 BEGIN LEVEL 4,8010 IN END TIME 11:08 AM END DATE 09/19/2011 END LEVEL 4,8011 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED DSP5 -6 TEST STARTED 10:52 AM TEST STARTED 09/19/2011 BEGIN LEVEL 2,6539 IN END TIME 11:08 AM END DATE 09/19/2011 END LEVEL 2,6537 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 4700 COFFEE BAKERSFIELD CA 93308 27895 09/19/2011 11 :24 AM SUMP LEAK TEST REPORT DSP3 -4 TEST STARTED 11 :09 AM TEST STARTED 09/19/2011 BEGIN LEVEL 4,8011 IN END TIME 11:24 AM END DATE 09/19/2011 END LEVEL 4,8009 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED DSP5 -6 TEST STARTED 11 :09 AM TEST STARTED 09/19/2011 BEGIN LEVEL 2,6537 IN END TIME 11:24 AM END DATE 09/19/2011 END LEVEL 2,6536 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED BROOKSIDE BACKERSFIELD 09/28/2011 10:34 AM SUMP LEAK TEST REPORT 872STP TEST STARTED 10:19 AM TEST STARTED 09/28/2011 BEGIN LEVEL 3,3418 IN END TIME 10:34 AM END DATE 09/28/2011 END LEVEL 3, 3415 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 871STP TEST STARTED 10:19 AM TEST STARTED 09/28/2011 BEGIN LEVEL 4,8083 IN END TIME 10:34 AM END DATE 09/28/2011 END LEVEL 4,8081 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED DSLSTP TEST STARTED . 10:53 AM TEST STARTED 09/28/2011 BEGIN LEVEL 5,6021 IN END TIME 11:08 AM END DATE 09/28/2011 END LEVEL 5,6021 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 91STP IEST STARTE4 9:29. AM TEST STARTED 092/28/2011 7 IN BEGIN LEVEL 9:44 AMENDTIME END DATE 09/28/2011 END LEVEL 2,7216 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED BROOKSIDE BACKERSFIELD 09/28/2011 10:51 AM SUMP LEAK TEST REPORT 872STP TEST STARTED 10:36 AM TEST STARTED 09/28/2011 BEGIN LEVEL 3,3415 IN END TIME 10:51 AM END DATE 09/28/2011 END LEVEL 3,3414 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 871STP TEST STARTED 10:36 AM TEST STARTED 09/28/2011 BEGIN LEVEL 4,8081 IN END TIME 10:51 AM END DATE 09/28/2011 END LEVEL 4.8080 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED DSLSTP TEST STARTED 10:36 AM TEST STARTED 09/28/2011 BEGIN LEVEL 5,6018 IN END TIME 10:51 AM END DATE 09/28/2011 END LEVEL 5.6022 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 91STP TEST STARTED TEST STARTED BEGIN LEVEL END TIME END DATE END LEVEL LEAK THRESH( TEST RESULT 8:59-. AM 09/28/2011 2, 7261 IN 9 :14 AM 09/28/2011 2 7242 IN ILD 0, 002 IN PASSED