HomeMy WebLinkAbout2900 BERKSHIRE ROAD (3)Pre - Engineered Restaurant Fire Suppression Systems Report
SERVICE COMPANY
AM QUALM SERVICES, INC.
5800 SO. UNION
BAKERSFIELD, CA 03307 -5426
669) 833 -5510 FAX 833 -5512
GUSTOMI=R
Name
Address 29/7
City Z ::54 Staten ZIPQ-7?
Telephone 4/9 Store No.
Owner or Manager c/D.E
COOKING APPLIANCE LOCATIONS: LEFT TO RIGHT
DATE OF SE VICE TIME A.M. P.M.
3. Check positioning of all nozzles. 22. Piping & conduit securely bracketed
4. System installed in accordance w /MFG UL listing
I
ANNUAL SEMI-ANNUAL RECHARGE INSTALLATION RENOVATION
LOCATION OF SYSTEM CYLINDERS UL 300
mI0 O/e ( -loO 6 ES E] NO
MANUFACTURER MODEL NUMBER WET DRY CHEMICAL
1ivs-v4 I P 102. 1
13. Operate system from terminal link
CYLINDER SIZE MASTER CYLINDER SIZE SLAVE CYLINDER SIZE SLAVE
15. Check operation of micro switch 34. Personnel instructed in manual operation of system
16. Check operation of gas valve
FUSE LINKS 350° F. FUSE LINKS 450° F. FUSE LINKS 500° F. OTHER
37. Service & Certification tag on system
19. Check fuse links and clean NOTE DISCREPANICES OR DEFICIENCIES BELOW
FUEL SHUT -OFF ELECTRIC GAS SIZE
SERIAL NUMBER( LAST H DROTEST DATE
tic
L.T
ly
RECH11ARGE DA E
w O FYI
MANUFACTURER'S MANUAL REFERENCE
PAGE NUMBER: DRAWING NUMBER: DATE
1. All appliances properly covered w /correct nozzles _L_ 20. Replaced fuse links
2. Duct and plenum covered w /correct nozzles 7 21. Check travel of cable nuts /S -hooks
3. Check positioning of all nozzles. 22. Piping & conduit securely bracketed
4. System installed in accordance w /MFG UL listing 23. Proper separation between fryers & flame
5. Hood /duct penetrations sealed w /weld or UL device 24. Proper clearance -flame to filters
6. Check if seals intact, evidence of tampering 25. Exhaust fan in operating order
7. If system has been discharged, report same 26. All filters in place
8. Pressure gauge in proper range (If gauged) 27. Fuel shut -off in on position
9. Check cartridge weight (If applicable) 28. Manual & remote set/seals in place
10. Hydrostatic test date 29. Replace systems covers
11. 6 year maintenance date 30: System operational & seals in place
12. Inspect cylinder and mount 31. Slave system operational
13. Operate system from terminal link 32. Clean cylinder & mount
14. Test for proper operation from remote 33. Fan warning sign on hood
15. Check operation of micro switch 34. Personnel instructed in manual operation of system
16. Check operation of gas valve 35. Proper hand portable extinguishers
17. Clean nozzles 36. Portable extinguishers properly serviced
18. Proper nozzle covers in place 37. Service & Certification tag on system
19. Check fuse links and clean NOTE DISCREPANICES OR DEFICIENCIES BELOW
COMMENTS: ze-L
On this date, this pre- engineered fire suppression system was inspected and operationally tested in accordance with the fire
suppression system requirements of NFPA17 or 17A, 96 and the manufacturer's manual with the results indicated above.
2.3
SERVICE TECHNICIAN ' PERMIT NO. DATE: TIME: AM PM CUSTOM ER'S -'AUTHORIZED AGENT
The above service. technician certifies that the system was personally inspected and found conditions to be as indicated on this report.
AUTHORITY HAVING JURISDICTION