Loading...
HomeMy WebLinkAbout2900 BERKSHIRE ROAD (3)Pre - Engineered Restaurant Fire Suppression Systems Report SERVICE COMPANY AM QUALM SERVICES, INC. 5800 SO. UNION BAKERSFIELD, CA 03307 -5426 669) 833 -5510 FAX 833 -5512 GUSTOMI=R Name Address 29/7 City Z ::54 Staten ZIPQ-7? Telephone 4/9 Store No. Owner or Manager c/D.E COOKING APPLIANCE LOCATIONS: LEFT TO RIGHT DATE OF SE VICE TIME A.M. P.M. 3. Check positioning of all nozzles. 22. Piping & conduit securely bracketed 4. System installed in accordance w /MFG UL listing I ANNUAL SEMI-ANNUAL RECHARGE INSTALLATION RENOVATION LOCATION OF SYSTEM CYLINDERS UL 300 mI0 O/e ( -loO 6 ES E] NO MANUFACTURER MODEL NUMBER WET DRY CHEMICAL 1ivs-v4 I P 102. 1 13. Operate system from terminal link CYLINDER SIZE MASTER CYLINDER SIZE SLAVE CYLINDER SIZE SLAVE 15. Check operation of micro switch 34. Personnel instructed in manual operation of system 16. Check operation of gas valve FUSE LINKS 350° F. FUSE LINKS 450° F. FUSE LINKS 500° F. OTHER 37. Service & Certification tag on system 19. Check fuse links and clean NOTE DISCREPANICES OR DEFICIENCIES BELOW FUEL SHUT -OFF ELECTRIC GAS SIZE SERIAL NUMBER( LAST H DROTEST DATE tic L.T ly RECH11ARGE DA E w O FYI MANUFACTURER'S MANUAL REFERENCE PAGE NUMBER: DRAWING NUMBER: DATE 1. All appliances properly covered w /correct nozzles _L_ 20. Replaced fuse links 2. Duct and plenum covered w /correct nozzles 7 21. Check travel of cable nuts /S -hooks 3. Check positioning of all nozzles. 22. Piping & conduit securely bracketed 4. System installed in accordance w /MFG UL listing 23. Proper separation between fryers & flame 5. Hood /duct penetrations sealed w /weld or UL device 24. Proper clearance -flame to filters 6. Check if seals intact, evidence of tampering 25. Exhaust fan in operating order 7. If system has been discharged, report same 26. All filters in place 8. Pressure gauge in proper range (If gauged) 27. Fuel shut -off in on position 9. Check cartridge weight (If applicable) 28. Manual & remote set/seals in place 10. Hydrostatic test date 29. Replace systems covers 11. 6 year maintenance date 30: System operational & seals in place 12. Inspect cylinder and mount 31. Slave system operational 13. Operate system from terminal link 32. Clean cylinder & mount 14. Test for proper operation from remote 33. Fan warning sign on hood 15. Check operation of micro switch 34. Personnel instructed in manual operation of system 16. Check operation of gas valve 35. Proper hand portable extinguishers 17. Clean nozzles 36. Portable extinguishers properly serviced 18. Proper nozzle covers in place 37. Service & Certification tag on system 19. Check fuse links and clean NOTE DISCREPANICES OR DEFICIENCIES BELOW COMMENTS: ze-L On this date, this pre- engineered fire suppression system was inspected and operationally tested in accordance with the fire suppression system requirements of NFPA17 or 17A, 96 and the manufacturer's manual with the results indicated above. 2.3 SERVICE TECHNICIAN ' PERMIT NO. DATE: TIME: AM PM CUSTOM ER'S -'AUTHORIZED AGENT The above service. technician certifies that the system was personally inspected and found conditions to be as indicated on this report. AUTHORITY HAVING JURISDICTION