Loading...
HomeMy WebLinkAboutINSP FIRE PROTECTION SYSTEM 3/29/2012 (COPY)C OPI 25 -78 INSPECTION, TESTING, AND MAIN` ENANCIr.OF WA'T'ER -BASED FIRE PROTECTION SYSTEMS Inspection, Testing, and Maintenance Cover Sheet NFPA 25 as amended by CCR, Title 19 Property Information: Name: aJA'r,,ccupancy /Use: Address: 9 ' / ! Costruction Type: City; '( Y-QC s ' No. Stories: ZIP;2oZJ Year Constructed: Contact: ,,59 Telephone:Z2 1 b5 CJ -2_ FS'O Contractor Information: L Number of System Risers Number of Forms A FAIL* Name: 1 Copy sent to: Address: jiff Z d s, i< _ d- 05- wrier Date 2 City: bgAucsc; •Q Id t Fire AHJ Date State: CA VContractor Date Private Water Supply System 7 NOTES: Telephone: '/11 1) For specific inspection, testing, and CA License #5 I maintenance requirements and information, see NFPA 25, 2002 Edition as amended by Job # California Code of Regulations, Title 19, §901 to gsos. Performed by; Print) 2) Inspection Items may be performed by the 11 Owner In accordance with California Code of Note: Contractor information may be pre - printed Reaulations-Tltle 19 6904.1(a) Forms included with this report NFPA 25 Chapter Number of Forms N/A FAIL* PASS Automatic Sprinkler System 5 Standpipe and Hose Systems 6 Private Water Supply System 7 Fire Pump 8 Water Storage Tank 9 Water Spray System 10 Foam Water Sprinkler System 11 See "Deficiencies and Comments" section at end of each respective fo State Fire Marshal AES 1 March 21, 2006 Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25 Chapter 5 as amended by CCR Title 19 Date of Inspection, Testing, Maintenance: + -w C System Riser ID: Property Information: Name: y U( L,.S ( rn . Type Wetst Pipe Address: D ry Pipe Preaction Deluge City: 66 Ke rSC e ld C 6, C Page 1 wicn, urain i est rcesuits: Initial Static Pressure: (psi) Residual Pressure: '7` (psi) Restored Static Pressure: (o ( (psi) Abbreviation Key: 1 = Inspection T = Test M = Maintenance A -O = After Operation MI = Per Manufacturer's Instructions Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.1 1 Daily Weekly Preaction /Deluge Valves - Enclosure temperature 12.4.3.1 1.2 1 Daily Weekly Dry Pipe Valves - Enclosure temperature 12.4.4.1.1 1.3 1 Quarterly Gauges (Dry, Preaction, Deluge Systems) 5.2.4.2 5..2.4.3 .3 1.4 1 Quarterly Control Valves 12.3.2.1 1.5 1 Quarterly Alarm Devices 5.2.6 1.6 1 Quarterly Gauges (Wet Pipe Systems) 1.7 1 Quarterly Hydraulic nameplate 5.2.7 1,8 1 Quarterly Sprinklers 5.2.1 1.9 1 Quarterly Spare Sprinklers 5.2.1.3 1.10 1 Quarterly Fire Department Connections 12.7.1 1.11 1 Quarterly Alarm Valves - Exterior Inspection 12.4.1.1 1.12 1 Quarterly Preaction /Deluge Valves - Exterior Inspection 12.4.3.1.6 1.13 1 Quarterly Pressure Reducing Valves 12.5.1.1 1.14 1 Quarterly Dry Pipe Valves - Exterior Inspection 12.4.4.1.4 1.15 1 Quarterly Backflow Preventers 12.6.1 1.16 1 Annually Pipe and Fittings 5.2.2 1.17 r-171 Annually Buildings 5.2.5 State Fire Marshal AES 2 June 17, 2008 Inspection, Testing, and Maintenance Fire Sprinkler System Page 2 of NFPA 25 Chapter 5 as amended by CCR, Title 19 Date of Inspection, Testing, Maintenance: 3 --/ System Riser ID: Property Information: Name: t Type of ystem: ,o A4,1tVP.E n 1 k °p C 7/^ Wet Pipe Q,` 0 urn Dry PipeAddress: d Preaction Deluge M City: I d Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.18 1 Annually Hangers 5.2.3 1.19 1 Annually Seismic Braces 5.2.3 1.20 1 5 Years Hangers (Accessible concealed spaces) 5.2.3.3 1.21 1 5 Years Seismic Braces (Accessible concealed s aces 5.2.3.3 1.22 1 5 Years Pipe and Fittings (Accessible concealed spaces) 5.2.2.3 1.23 1 5 Years Sprinklers (Accessible concealed spaces) 5.2.1.1.4 1.24 1 5 Years Alarm Valves — Interior Inspection 12.4.1.2 1.25 1 5 Years Alarm Valves - Strainers, filters, orifices 12.4.1.2 1.26 1 5 Years Check Valves — Interior Inspection 12.4.2.1 1.27 1 5 Years Preaction /Deluge Valves — Interior Inspection 12.4.3.1.7 1.28 1 5 Years Preaction /Deluge Valves - Strainers, filters, orifices 12.4.3.1.8 1.29 1 5 Years Dry Pipe Valves — Interior Inspection 12.4.4.1.5 1.30 1 5 Years Dry Pipe Valves - Strainers, filters, orifices 12.4.4.1.6 2.1 T Annually Alarm Devices (90 Sec) 5.3.3 12.2.7 2.2 2.3 T T Annually Annually Main Drain Test (Enter data on Page 1) Antifreeze Test 12.2.6 12.2.6.1 12.3.3.4 5.3.4 2.4 T Annually Control Valve - Position 12.3.3.1 2.5 T Annually Control Valve — Operation 12.3.3.1 16 T Annually Supervisory 12.3.3.5 2.7 T Annually Preaction Valve - Priming Water 12.4.3.2.1 2.8 T Annually Preaction Valve — Low Air Pressure Alarm 12.4.3.2.10 State Fire Marshal AES 2 June 17, 2008 Inspection, Testing,'and Maintenance Fire Sprinkler System Page 3 of 4 / NFPA 25, Chapter 5 as amended by CCR. Title 19 Date of Inspection, Testing, Maintenance: — System Riser ID: Property Information: Name; , ( Type of ystem: dr cq; et Pipe Q 4x Dry Pipe` Address: - Preaction u, y Deluge b f. IRE N City: Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 2.9 T Annually Preaction Valve — Full Flow Trip Test 12.4.3.2.2 2.10 T Annually Dry Pipe Valve — Priming Water 12.4.4.2.1 2.11 T Annually Dry Pipe Valve — Low Air Pressure Alarm 12.4.4.2.6 2.12 T Annually Dry Pipe Valve — Quick- Opening Device 12.4.4.2.4 2.13 T Annually Dry Pipe Valve — Trip Test 12.4.4.2.2 2.14 T Annually Backflow Preventer Assemblies 12.6.2 2.15 T 3 Years Dry Pipe Valve — Full Flow Trip Test 12.4.4.222 2.16 T 5 Years Gauges 5.3.2 2.17 T 5 Years Pressure Reducing Valve 12.5.1.2 2.18 T 5 Years Fire Department Connection Backflush 12.7.4 2.19 T 5 Years Sprinklers — Extra High Temperature 5.3.1.1.1.3 2.20 T 5 Years Sprinklers — Corrosive environment or corrosive water 5.3.1.1.2 2.21 T 10 Years Sprinklers - Dry 5.3.1.1.1.5 2.22 T 20 Years Sprinklers - Fast Response 5.3.1.1.1.2 2.23 T 50 Years Sprinklers 5.3.1.1.1 2.24 T 75 Years Sprinklers 75 years in service 5.3.1.1.1.4 2.25 T Sprinklers manufactured prior to 1920 — Replace 5.3.1.1.1.1 3.1 M Annually Control Valves 12.3.4 3.2 M Annually Preaction /Deluge Valves 12,4.3.3.2 3.3 M Annually Dry Pipe Valves /Quick - Opening Devices 12.4.4.3.2 3.4 M Annually Dry Pipe Valve — Low Point Drains 12.4.4.3.3 3.5 M 5 Years Obstruction Investigation Chapter 13 State Fire Marshal AES 2 June 17, 2008 Inspection, Testing, and Maintenance Fire Sprinkler System Page 4 of d NFPA 25, Chapter 5 as amended by CCR Title 19 Date of Inspection, Testing, Maintenance: ? System Riser 1D: Property Information: 9 Type ofs cA 4) d1ttName: IHWtPipe Address: Dry Pipe 4 Preaction Deluge v City: CwKr YS Deficiencies and Comments: Item Deficiencies and Comments Item number must correspond to the Item number of the Activity listed above: SS e Continuation Page(s) _ (Indicate t umber of continuation pages) f ASS FAIL. /a Signature Date State Fire Marshal AES 2 June 17, 2008