Loading...
HomeMy WebLinkAboutINSP FIRE PROTECTION SYSTEM 3/29/2012n 25 -78 INSIIEC'1'ION,'I'CSTING, AND MAINTGNANCB.OP :VA'1'ER -BASED FIRE• PROTECTION SYSTEMS 1 Inspection, Testing, and Maintenance Cover Sheet NFPA 25 as amended by CCR, Title 19 Property Information: / QN( %%1, Name: r'V2V" lV cfZ4 Occupancy /Use: Address: k e, %QjConstruction Type: City: No. Stories: 1j ZIP: - Year Constructed: Contact: iC A _ Telephone: S 7 Contractor Information: Number of System Risers Name:. Copy sent to: Address: U">1 / n Yj e Owner Date 3-23;V-_2 City: IL +` I: LD r* Fire AHJ Date --ZCI' State: C6 (Contractor Date 3 -2-C (&, Telephone: (i /4 NOTES: C 2-11 1) For specific inspection, testing, and CA License# O Q maintenance requirements and Information, see NFPA 25, 2002 Edition as amended by Job // California Code of Regulations, Title 19, §901 y A'/ ` to §906. Performed b : C/ J e Print) 2) Inspection Items may be performed by the Owner in accordance with California Code of Note: Contractor information may be pre - printed Regulations Title 19 904.1 a Forms Included with this report FP.At25 Number of Forms N/A FAIL* PASS Automatic Sprinkler System 5 Standpipe and Hose Systems 6 Private Water Supply System 7 Fire Pump 8 Water Storage Tank 9 Water Spray System 10 Foam Water Sprinkler System 11 See "Deficiencies and Comments" section at end of each respective form. State Fire Marshal AES 1 March 21, 2006 Inspection, Testing, and Maintenance Fire Sprinkler System Page 1 of 4NFPA25Chapter5asamendedbyCCRTitle19 Date of Inspection, Testing, Maintenance: System Riser ID: Property Information: vv II Type of stem: ofc.4 Name: K l L V-Y- Ct <r,otT{ et Pipe ll ( Dry Pipe\ Address: Preaction Deluge /P City: ct f ey_ —1_,.e 0A G Main Drain Test Results: Initial Static Pressure: (psi) Residual Pressure: e (psi) Restored Static Pressure: (psi) Abbreviation Key: I = Inspection T = Test M = Maintenance A -O = After Operation MI = Per Manufacturer's Instructions Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.1 1 Daily Weekly Preaction /Deluge Valves — Enclosure temperature 12.4.3.1 1.2 1 Daily Weekly Dry Pipe Valves'— Enclosure temperature 12.4.4.1.1 1.3 1 Quarterly Gauges (Dry, Preaction, Deluge Systems) 5.2.4.2 5.2.4.3 1.4 1 Quarterly Control Valves 12.3.2.1 1.5 1 Quarterly Alarm Devices 5.2.6 1.6 1 Quarterly Gauges (Wet Pipe Systems) 5.2.4.1 1.7 1 Quarterly Hydraulic nameplate 5.2.7 1.8 1 Quarterly Sprinklers 5.2.1 r 1.9 1 Quarterly Spare Sprinklers 5.2.1.3 1.10 1 Quarterly Fire Department Connections 12.7.1 1.11 1 Quarterly Alarm Valves — Exterior Inspection 12.4.1.1 1.12 1 Quarterly Preaction /Deluge Valves — Exterior Inspection 12.4.3.1.6 1.13 1 Quarterly Pressure Reducing Valves 12.5.1.1 1.14 1 Quarterly Dry Pipe Valves _ Exterior Inspection 12.4.4.1.4 1.15 1 Quarterly Backflow Preventers 12.6.1 1.16 1 Annually Pipe and Fittings 5.2.2 1.17 1 Annually Buildings 5.2.5 State Fire Marshal AES 2 June 17, 2008 Inspection, Testing, and Maintenance Fire Sprinkler System Page 2 of 4 NFPA 25 Chapter 5 as amended by CCR Title 19 Date of Inspection, Testing, Maintenance: — Z System Riser ID: Property Information: 4it NFPA 25 Reference Name: Type o ystem: of Wet PiperVZe jAddress: c 1 -dG 9fP Dry PreactionPreaction 1. 1 Deluge Hangers E MPS City: Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.18 1 Annually Hangers 5.2.3 1.19 1 Annually Seismic Braces 5.2.3 1.20 1 5 Years Hangers (Accessible concealed spaces) 5.2.3.3 1.21 1 5 Years Seismic Braces (Accessible concealed spaces) 5.2.3.3 1.22 1 5 Years Pipe and Fittings (Accessible concealed spaces) 5.2.2.3 1.23 1 5 Years Sprinklers (Accessible concealed spaces) 5.2.1.1.4 1.24 1 5 Years Alarm Valves – Interior Inspection 12.4.1.2 1.25 1 5 Years Alarm Valves - Strainers, filters, orifices 12.4.1.2 1.26 1 5 Years Check Valves – Interior Inspection 12.4.2.1 1.27 1 5 Years Preaction /Deluge Valves – Interior Inspection 12.4.3.1.7 1.28 1 5 Years Preaction /Deluge Valves - Strainers, filters, orifices 12.4.3.1.8 1.29 1 5 Years Dry Pipe Valves – Interior Inspection 12,4.4.1.5 1.30 1 5 Years Dry Pipe Valves - Strainers, filters, orifices 12.4.4.1.6 2.1 T Annually Alarm Devices (90 Sec) 5.3.3 12.2.7 f 2.2 T Annually Main Drain Test (Enter data on Page 1) 12.2.6 12.2.6.1 12.3.3.4 2.3 T Annually Antifreeze Test 5.3.4 2.4 T Annually Control Valve - Position 12.3.3.1 2.5 T Annually Control Valve – Operation 12.3.3.1 2.6 T Annually Supervisory 12.3.3.5 2.7 T Annually Preaction Valve - Priming Water 12.4.3.2.1 2.8 T Annually Preaction Valve – Low Air Pressure Alarm 12.4.3.2.10 State Fire Marshal AES 2 June 17, 2008 Inspection, Testing, and Maintenance Fire Sprinkler System Page 3 of 4 NFPA 25, Chapter 5 as amended by CCR. Title 19 Date of Inspection, Testing, Maintenance: System Riser ID: Property Information: Name: i (.()et Type o ystem: o c !A C!'/o Wet Pipe 1A Address: F I1 !e ( Dry Pipe - Preaction d Deluge City: cq Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 2.9 T Annually Preaction Valve — Full Flow Trip Test 12.4.3.2.2 2.10 T Annually Dry Pipe Valve — Priming Water 12.4.4.2.1 2.11 T Annually Dry Pipe Valve _ Low Air Pressure Alarm 12.4.4.2.6 2.12 T Annually Dry Pipe Valve — Quick- Opening Device 12.4.4.2.4 2.13 T Annually Dry Pipe Valve — Trip Test 12.4.4.2.2 2.14 T Annually Backflow Preventer Assemblies 12.6.2 2.15 T 3 Years Dry Pipe Valve — Full Flow Trip Test 12.4.4.2.2.2 2.16 T 5 Years Gauges 5.3.2 i 2.17 T 5 Years Pressure Reducing Valve 12.5.1.2 2.18 T 5 Years Fire Department Connection Backflush 12.7.4 i 2.19 T 5 Years Sprinklers — Extra Nigh Temperature 5.3.1.1.1.3 I 2.20 T 5 Years Sprinklers — Corrosive environment or corrosive water 5.3.1.1.2 2.21 T 10 Years Sprinklers - Dry 5.3.1.1.1.5 2.22 T 20 Years Sprinklers - Fast Response 5.3.1.1.1.2 2.23 T 50 Years Sprinklers 5.3.1.1.1 I 2.24 T 75 Years Sprinklers 75 years in service 5.3.1.1.1.4 2.25 T Sprinklers manufactured prior to 1920 — Re lace 5.3.1.1.1.1 3.1 M Annually Control Valves 12.3.4 3.2 M Annually Preaction /Deluge Valves 12.4.3.12 3.3 M Annually Dry Pipe Valves /Quick- Opening Devices 12.4.4.3.2 3.4 M Annually Dry Pipe Valve — Low Point Drains 12.4.4.3.3 3,5 M 5 Years Obstruction Investigation Chapter 13 State Fire Marshal AES 2 ,tune 17, 2008 Deficiencies and Comments: Item Deficiencies and Comments Item number must correspond to the Item number of the Activitv listed above: Vee Continuation Page(s) _ (Indicate the number of continuation pages) V PASS FAIL Signature Date State Fire Marshal AES 2 June 17, 2008 Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25 Chapter 5 as amended by CCR Title 19 Page 4 of 4 Date of Inspection, Testing, Maintenance: System Riser ID: Property Information: YC Address: 92 -4Y l""" Type of System: et Pipe Dry Pipe Preaction Deluge 9 t ipI . 1ZIName: u U City Deficiencies and Comments: Item Deficiencies and Comments Item number must correspond to the Item number of the Activitv listed above: Vee Continuation Page(s) _ (Indicate the number of continuation pages) V PASS FAIL Signature Date State Fire Marshal AES 2 June 17, 2008