HomeMy WebLinkAboutHOOD REP. 3/3/2011PHOENIX FIRE
PROTECTION C_ vb1
r o Ct, A(i
1, U,,
West Goshen Ave.
Visalia CA 93291
559) 622 -8969
FAX (559) 622 -0167
LIC# C16- 779030
Name rry
6.
Date of Service Time
v
TankHydro ............................ ...............................
Address,.
An nu al Semi- Annual
City //
1 iGd,t''' r. f1
State..
J ,•,
Zip
Cash
Check #' "
Terms Net 10 Days
Authorized By:
Phone, Serviced By:
lvw, ,!
Description • .
System Description
Date of Service Time
Carbon
TankHydro ............................ ...............................
Tank........................................ ...............................
An nu al Semi- Annual Recharge Install Renovation
Fuse Links pla or Cleaned .........................
Wet Chemical
Location of System
d-O
Cylinder Size
Z . 5— i%a/
Cylinder Size Slave
Fuse Links 6Q F Fuse Links 450 F Fuse Links 500 F Other
Other................ ......... . .............................. PAI
1
Dry Chemical
Fuel Shut -Off Electric Gas Size
Hydrostatic Testing
Model Number Wet Dry
ProductionD`ate Hydro Date Last Serviced
Go
Description of Automatic Sytern
Rang Guard
Hydrostatic Testi
Failures & Recommendations
The signature below assures that the above stated services have been rendered accordingly. I have
been given authority to allow and approve payment for such required services by the establishment
which has received this service and hereby authorized payment for all services rendered.
Services performed prior to 30 days of expiration
Hood System Report
System Description
Date of Service Time A.M. P.M.
TankHydro ............................ ...............................
Tank........................................ ...............................
Annual Semi- Annual Recharge Install Renovation
Fuse Links pla or Cleaned .........................
Systems Installed to Mfctr's Recommendations ..........
Location of System
d-O
Cylinder Size
Z . 5— i%a/
Cylinder Size Slave
Fuse Links 6Q F Fuse Links 450 F Fuse Links 500 F Other
Other................ ......... . .............................. PAI
Fuel Shut -Off Electric Gas Size
Manufacturer Model Number Wet Dry
ProductionD`ate Hydro Date Last Serviced
Go
Signature ` Date
r '
Payment due upon completion.
Item Inspected Pass Fail
PullStation .............................. ..............................]
GasVavle ............................... ...............................
Nozzle Location/Appliance Coverage .................
TankHydro ............................ ...............................
Tank........................................ ...............................
ControlHead ......................... ............................... m
Braketing................................ ...............................
UL300 ......... ..... ..................... ...............................
Fuse Links pla or Cleaned .........................
Systems Installed to Mfctr's Recommendations ..........
Filter.......................................... :............................
ExhaustFan ............................ ............................... a
Makeup Air ........................... ............................... 0' Gti 1Other..................................... ...............................
Other................ ......... . .............................. PAI
Appliance Arrangement