Loading...
HomeMy WebLinkAbout4201 ARROW (2)i 25 -7S INSPECTION, TESTING, AND MAINTENANCE OF WATER - BASED FIRE PROTECTION SYSTEMS Inspection, Testing, and Maintenance Cover Sheet I NFPA 25 as amended by CCR, Title 19 Property Information: Name: Y" Occupancy /Use: CAC,o 01 Address: Construction Type: 13P City: — No. Stories: ARE ZIP: Year Constructed: pQ, Contact: Telephone: Contractor Information: Number of System Risers Jorgensen Company Copy sent to: 2345 S. I ruftvale have., #1 Owner date BakersfMd -- ire ANJ Date / — CA 93303 Contractor Date 661 - 327 -4352 NOTES: 262995 1) For specific inspection, testing, and maintenance requirements and, information, see NFPA 25, 2002 Edition as amended by Job # California Code of Regulations, Title 19, §901 to §906. A / Performed bv: 2) Inspection Items may be performed by thePrint) Owner in accordance with California Code of Regulations Title 19 §904.1(a) Forms included with this report NFPA 25 Chapter Number of Forms NIA FAIL* PASS Automatic Sprinkler System 5 Standpipe and Hose Systems g Private Water Supply System 7 Fire Pump g Water Storage Tank g Water Spray System 10 0 Foam Water Sprinkler System 11 See "Deficiencies and Comments" section at end of each respective form. State Fire Marshal AES 1 March 21, 2006