Loading...
HomeMy WebLinkAboutHAZ-BUSINESS PLAN 12/31/2012UPS Ground Freight, Bakersfield, 12/20/2011 11:16:07 AM HAZARDOUS MATERIALS BUSINESS PLAN CERTIFICATION FORM For Use by Unidocs MemberAgencies or where approved byyour LocalJurisdiction Authority Cited; Hulth and SajetylCode §I5503.3(c); 19 CCR §2719. S(c) To: Agency Name: Bakersfield Fire Department Prevention Services Agency Mailing Address: 1600 Truxtun Ave. Suite 401 Bakersfield, CA 53301 Pursuant to Section 25503.3(c) of California Health and Safety Code (HSC), the Hazardous Materials Business Plan (HMBP) certification described below is hereby submitted for the following facility: Facility Name: UPS Ground Freight, Inc., DBA UPS Freight Facility Street Address: 600 Williams Street city: Bakersfield Date of Current HMBP:2012/12/31 I certify that: (Check the appropriate box.) I have personally reviewed the Hazardous Materials Business Plan currently on file with your agency and certify that the HMBP is complete and accurate, (See bottom ofpagefor details.) If this facility is subject to Federal Emergency Planning and Community Right to Know Act (EPCRA) reporting requirements, I have submitted the following documents with this Certification Form: Unified Program Consolidated Form UPCF) Business Activities page; UPCF Business Owner /Operator Identification page with current signature and date; Hazardous Materials Inventory Statement page(s) with an original signature, photocopy of an original signature, or signature stamp on each page for all Extremely Hazardous Substances (EHS) handled at or above their Federal Threshold Planning Quantity (TPQ) or 500 pounds, whichever is less. or Q Revisions to the Hazardous Materials Business Plan are necessary. The HMBP as revised is complete and accurate and is being implemcnted. A copy of the revisions has been electronically submitted or is enclosed with this Certification along with a signed UPCF Business Owner /Operator Identification page and UPCF Business Activities page if the HMBP revision include changes to the Hazardous Materials Inventory Statement, OWNER/OPERATOR CERTIFICATION: I hereby certify under penalty of law that, based upon my inquiry of those Individuals responsible for obtaining the information reported above, I believe that the submitted information is true, accurate, aad complete, I understand that a revised RMBP must be submitted within 30 days of any change in this facility's storage or handling of hazardous materials that would require updating of the HMBP. Name of Owner /Operator (Print): Joe Phone.213- 215 -7938 Signal UPS Freight Region Vice President Date: 12/20/2011 By checking the upper box on this form, you are ciitttfying V I The information contained in the HMBP most recently su mitred is complete, accurate, and up -to -date; and There has been no change in the quantity of any hazardous material as.reported in the most recently submitted Hazardous Materials Inventory forms; and The facility has not begun handling any hazardous material in a 11MBP reportable quantity that is not currently listed in the Hazardous Materials Inventory; and The most recently submitted RMBP cogtains the information required by Section 11022 of Title 42 of the United States Code; and There have been no substantial chances in the facility's operations that would require revision of the current_fINME UN -039 -Ill www.untd0cs.0rg Rev. 10109/07 f