Loading...
HomeMy WebLinkAboutUST-TESTING REPORT 5/17/2011us6 S WRCB, January 2002 Page of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performingperiodic testing ofUSTsecondary containment systems. Use the appropriate pages ofthisform to report results for all components tested. The completedform, written test procedures, and printouts from tests (ifapplicable),. should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: BASHAARS CHEVRON Date ofTesting: 5/17111 Facility Address: 2301 PANAMA LANE, BAKERSFIELD Facility Contact: Phone: Date Local Agency Was Notified ofTesting: 3/25/11 Name of Local Agency Inspector (rfpresent.during testing): TESTING CONTRACTOR INFORMATION Company Name: Rich Environmental Technician Conducting Test: RICH PHIILLLIPS Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: C61/D40 A HAZ License. Number: 809850 Manufacturer Training Manufacturer Component(s) Date Training Expires INCON TS -STS 6/11/2012 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made 91 SEC (TURBINE - TRANS) X DISP #7/8 X 87 SEC (TURBINE - TRANS) X 11 p 91 VPR BUCKET X 89 SEC (TURBINE - TRANS) X 87 VPR BUCKET X 91 SEC (TRANS -UDC) X 89 VPR BUCKET X 87 SEC (TRANS -UDC) X TRANSITION SUMP X 89 SEC (TRANS -UDC) X 91STP X 87 STP X 89 ST? X DISP #1/2 X DISP #3/4 X DISP #5/6 X If hydrostatic testing was performed, describe what was done with the .water after completion oftests: CERTIFICATION OF TE AN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts slat in this document are accurate and infull compliance with legal requirements Technician's Signature: Date: 5 /17 /11 SWRCB, January 2002 4. TANK ANNULAR TESTING LE?.c10 Page `7i of Test Method Developed By: Tank Manufacturer X Industry Standard Professional Engineer Other (Sped) Test Method Used: Pressure X Vacuum Hydrostatic Other (Specify) Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: Is Tank Exempt From Testing ?l Tank # Tank # Tank # Tank # Yes No Yes No Yes No Yes No Tank Capacity: Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressure /vacuum/water and starting test: 30MIN 30MIN 30MIN 30MIN Test Start Time: Initial Reading (Rj): Test End Time: Final Reading (RF): Test Duration: 60 MIN 60 MIN 60 MIN 60MIN Change in Reading (RF -Rj): Pass/Fail Threshold or Criteria: 011 Was sensor removed for testing? Yes No NA Yes No NA Q Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? lees D No DNA Yes No DNA Yes No D NA Yes No NA Comments — (include information on repairs made prior to testing, andrecommendedfollow -up forfailed tests) SINGLE WALL TANKS Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) SWRCB, January 2002 5. SECONDARY PIPE TESTING LiUSL Page -3 of ) Test Method Developed By: 0 Piping Manufacturer X Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic 0 Other (Spec) Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5% Piping Material: Piping Run ##1 Piping Run 42 Piping Run #3 Piping Run #4 PLASTIC PLASTIC PLASTIC FIBERGLASS Piping Manufacturer. TCI TCI TCI SMITH Piping Diameter: 2" 2" 2" 2" Length of Piping Run: 15' 15' 15' 75' Product Stored: UNL91 UNL87 UNL89 UNL91 Method and location of piping-run isolation: TEST BOOT TEST BOOT TEST BOOT TEST BOOT Wait time between applying pressure /vacuum/water and starting test: 30 MIN 30 MIN 30 MIN 30 MIN Test Start Time: 9:30 11:30 930 2:00 Initial Reading 5.5 6.0 5.5 6.0 Test.End Time: 10:30 2:30 10:30 3:00 Final Reading (RF): 5.5 6.0 5.5 6.0 Test Duration: 60 MIN 60 MIN 60 MIN 60 MIN Change in Reading (RF -R4): 0 0 0 0 Pass/Fail Threshold or Criteria: 0 PSI 0 PSI 0 PSI 0 PSI i , ., i... Comments — (include information on repairs made prior to testing; and recommendedfollow -upforfailed tests) INSTALLED TEST PORT ON DISP ##4 IN TRANSITION SUMP SWRCB, January 2002 5. SECONDARY PIPE TESTING L47AS( yPageof Q8 Test Method Developed By: 0 Piping Manufacturer X Industry Standard 0 Professional Engineer 0 Other (Spec) Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic 0 Other (Spec) Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: Piping °Material: Piping Run #5 Piping Run #6 Piping Run # Piping Run # FIBERGLASS FIBERGLASS Piping Manufacturer: SMITH SMITH Piping Diameter. 3" 3" Length ofPiping Run: 75' 75' Product Stored: UNL87 UNL89 Method and location of piping-run isolation: TEST BOOT TEST BOOT Wait time between applying pressure/vacuum/water and startle test: 30 MIN 30 MIN Test Start Time: 2:00 2.00 Initial Reading (111): 5.0 6.0 Test End Time: 3:00 3:00 Final Reading (RF): 5.0 6.0 Test Duration: 60 MIN 60 MIN Change in Reading (RF-R,): 0 0 Pass/Fail Threshold or Criteria: OPSI OPSI COMMents — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) INSTALLED TEST PORT ON DISP #5 & #6 IN TRANSITION SUMP SWRCB, January 2002 6. PIPING SUMP TESTING 41A% Page -5 of Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum X Hydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: Sump Diameter. Sump #iINL91 Sump #UNL87 Sump #UNL89 Sump #TRANS SUMP 36" 36" 36" 36" Sump Depth: 27" 27" 27" 36" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Height from Tank Top to Top of Highest Piping Penetration: 13" 13" 20" Height from Tank Top to Lowest Electrical Penetration: 17" 17" 22" Condition of sump prior to testing: 15" 15" 22" Portion of Sump Tested' Does turbine shut down when sump sensor detects liquid (both product and water) ?. Yes No X NA Yes No NA Yes No X NA Yes No X NA Turbine shutdown response time Is system programmed for fail -safe shutdown ?* Yes No X NA Yes No NA Yes No X NA Yes No X NA Was fail -safe verified to be o rational ?* Yes No X NA Yes No NA Yes No X NA Yes No X NA Wait time between applying pressure /vacuum/water and starting test: 30 MIN 30 MIN 30 MIN 30 MIN Test Start Time: 10:36 10:58 1:33 2:01 10:36 10:58 12:07 12:22 Initial Reading (RO: 3.538 3.538 2.322 2.321 2.946 2.946 2.049 2.049 Test End Time: 10:51 11:13 1:48 2:16 10:51 11:13 12:22 12:37 Final Reading (RF): 3.538 3.537 2.3211 2.321 2.946 2946 2.049 2.050 Test Duration: 15MIN 15MIN I5MM 15MIN 15MIN 15MIN 15MIN 15MIN Change in Reading (RF-R,): 001 -.001 001 000 000 000 000 +.001 Pass/Fail Threshold or Criteria: 002 .002 002 002 002 002 002 +.002 On X Yes No NAWassensorremovedfortesting? X Yes No NA. X Yes No NA X Yes No NA Was sensor properly replaced and verified functional after testing? X Yes No NA X Yes No NA X Yes No NA X Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upfor failed tests) Ifthe entire depth ofthe sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk(*) is "NO" or "NA ", the entire sump mustbe tested. (See SWRCB LG -160)' SWRCB, January 2002 7. UNDERDISPENSER CONTAINMENT fUDC1 TESTING Page 6 of Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer 0 Other (Spec) Test Method Used: Pressure Vacuum X Hydrostatic 0 Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: UDC Manufacturer: UDC #1/2 UDC #3/4 UDC #5/6 UDC #7 /8 UNKNOWN UNKNOWN UNKNOWN UNKNOWN UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS UDC Depth: 27' 27" 27" 27" Height from UDC Bottom to Top ofHighest Piping Penetration: 11" 11" 11" 11" Height from UDC Bottom to Lowest Electrical Penetration: 4" 4" 4" 4" Condition of UDC prior to testing: GOOD GOOD GOOD GOOD Portion ofUDC Tested 13" 13" 13" 13" Does turbine shut down when UDC sensor detects liquid (both product and water)?* 0 Yes 0 No X NA Yes No X NA 0 Yes 0 No XNA Yes No XNA Turbine shutdown response time Is system programmed for fail- safe shutdown ?* safe 11 No X NA 0 Yes []No X NA Yes No X NA Yes No X NA Was fail -safe verified to be operational?* Yas 0 No X NA Yes 0No XNA 0 Yes 0 No XNA 0 Yes 0 No X NA Wait time between applying pressure/vacuum/water and starting test 30MIN 30MIN 30MIN 30MIN Test Start Time: 3:53 4:14 5:29 5:46 4:51 5:11 5:29 5:46 Initial Reading (Rj): 5.350 5.351 2.719 2.719 3.151 3.152 2.497 2.497 Test End Time: 4:09 4:29 5:45 6:02 5:07 5:26 5:45 6 :02 Final Reading (RF): 5.350. 5.3511 2.719 2.719 3.I51 3.152 2.497 2.497 Test Duration: 15MIN 15MIN 15M1N 15MIN 15MIN 15MIN 15MIN 15MIN Chan e.in Reading RF-&): 000 000 000 000 000 1 000 000 -.000 Pass/Fail Threshold or Criteria: 002 002 002 002 002 002 002 -.002 i i i3 Was sensor removed for testing? X Yes 0 No NA XYes 0No 0 NA X Yes 0No NA XYes No NA Was sensor properly replaced and verifed,functional after tes6n ? X Yes No DNA X Yes No NA X Yes 0 No NA X Yes No NA Comments - (include information on repairs made prior to testing, andrecommendedfollow -up forfailed tests Ifthe entire depth ofthe UDC is not tested, specify how much was tested. Ifthe answer to My of the questions indicated with an asterisk (*) is "NO" or `NA ", the entire UDC must.be tested. (See SWRCB LG -160) SWRCB, January 2002 Page I of 8. FILL. RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sums Fill Riser Containment Sumps are Present, but were Not Tested 0 Test Method Developed By: 0 Sump Manufacturer X Industry Standard 0 Professional Engineer Other (Spec) Test Method Used: 0 Pressure Vacuum X Hydrostatic 0 Other (Specify) Test Equipment Used: INCON TS -STS Fill Sump # Fill Sump # Equipment Resolution: Fill Sump # Fill Sump# Sump Diameter. Sum De the Height from Tank Top to Top of lfighest Piping ' Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested Sump Material: Wait time between applying pressure /vacuum/water and starting test: 30MIN 30MIN 30MIN 30MIN Test Start Time: Initial Reading (Rj): Test End Time: Final Reading (RO: Test Duration: 15MIN 15MIN' 15MM 15MIN 15MIN 15MIN 15MIN 15MIN Change in Reading 1; : Pass/Fail Threshold or Criteria: E.* 8,: Is there a sensor in the sump? 0 Yes No 0 Yes No Yes a No0Yes No Does the sensor alarm when either, product or water is detected? Yes No DNA Yes 0 No 0NA Yes Q No DNA 0Yes a No NA Was sensor removed for testing? Yes 0 No 0 NA Yes 0No 0NA D Yes No NA Yes No NA Was sensor properly replaced and verified functional after testin . Yes 0 No 0 NA 0 Yes 0No 0NA 0 Yes 0 No 0 NA Yes No NA Comments —_(include information on repairs made prior to testing•, and recommendedfollow -upforfailed tests) NO FILL SUMPS SWRCB, January 2002 Page b of 9. SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: Spill Bucket Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum X Hydrostatic 0 Other (Specify) Pest Equipment. Used: INCON TS -STS Equipment Resolution: 9:28 9:47 NNINNEWN 5.575 9 ;43 Spill Bog #91 VPR I Spill Box #87 VPR I Spill Box #89 VTR Spill Box # Bucket Diameter: Bucket Depth: Wait time between applying pressure /vacuum/water and starting test: Test StartTime: Initial Reading (111): Test End Time: Final Reading (RF): Test Duration: Change in Reading (Rr-R,): Pass/Fail Threshold or Criteria: 12" 14" 30MIN 9:28 4.451 9:43 4.451 I MN 000 002 9:47 4.451 10:02 4.45 . 15MIN 000 1'1 12" 14" 30MIN 9:28 9:47 5.514 5.575 9 ;43 10:02 5.514 5.515 15MIN 15MIN 000 000 002" 002 12" 14" 30MIN 9:28 9:47 2.469 2.470 9:43 10:02 2.469 2.470 15MIN 15MM 000 000 002 002 Comments — (include information on repairs made prior to testing, andrecommendedfollow -up forfailed tests) FASHAARS CHEVRON 2301 PANAMA LN BAKERSFIELD CA 05/17/2011 9:43'AM SUMP LEAK TEST REPORT 91UPR TEST STARTED 9:28 AM TEST STARTED 05/17/2011 BEGIN LEVEL •4.4511 IN END TIME 9:43 AM END DATE 05/17/2011 END LEVEL 4,4514 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED LASHAAW CHEVRON 2301 PANAMA LN BAKERSFIELD CA 05/17/2011 10:02 AM SUMP LEAK TEST REPORT 91UPR TEST STARTED 9:47 AM TEST STARTED 05/17/2011 BEGIN LEVEL 4.4513,IN END TIME END DATE G5/17/201A1 END LEVEL 4.45.15 IN LEAK THRESHOLD 01.007 IN TEST RESULT . PASSED 87VPR 10:58 AM 87UPR 05/17/2011 TEST STARTED 9:28 AM TESS STARTED 95/17/2011TESTSTARTED BEGIN LEVEL 05 /17/201.1 5.5143 I END LEVEL 5,5153 END TIME 43 SNDJ. TIMEVEL END DATE 10102 AM 05/17 /2011ENDDATE END LEVEL 05/17/2011 5.5148 IN '. ELENDLEVEL 5.5157 IN LEAK THRESHOLD 0.002 IN Oe2 IN TEST THRESTOLD 0• PRSSED TEST RESULT PASSED 89UPR TEST STARTED 9:28 AM T.EST STARTED 05/17/2011 BEGIN LEVEL 2,4694 IN END TIME 9:43 AM END DATE 05/17/2011 END LEVEL 2.4699 PH LEAK THRESHOLD 0.002 IN TEST RESULT I PASSED M 89STP TEST STARTED 10:58 AM TEST STARTED 05/17/2011 BEGIN LEVEL 2.9465 IN END TIME 11:13 AM END DATE 05/17x2011 END LEVEL 2.9466 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 89STP TEST STARTED 10:36 AM TEST STARTED 05/17 /2011 IN BEGIN LEVEL 2.9465 1 AMENDTIME /17/2011ENDDATE2.9466 INENDLEVELLEAKTHRESHOLD0-002 IN PASSEDTESTRESULT 89UPR TEST STARTED TEST STARTED BEGIN LEVEL END TIME END DATE END LEVEL LEAK THRESHOI TES's RESULT 9=.47 AM 05/17;1011 2.4702 IN 10:02 AM 05/17/2011 2:4704 IN D 0.002 IN PASSED t B . SHAARSu..:. BAKERSFIELD UA 05/1711 10:51 AM SUMP LEAK TEST REPORT 91STP TEST STARTED 10'36 AM; TEST STARTED t!5/17/2911 530IN BEGIN LEVE).: 1051 AM END 'TIME 05/17x2011ENDDATE3.5397 INENDLEVEL .0.002 114 TEST THRESHOLD T PASSED SHAARS CHEVRON N1 PANAMA LN iA. RSFIELD CA 05/17/201 12:22 PM SIJMF LEAK EST REPORT TEST STARTED \ 12:07 PM TEST STARTED /17/2011 BEGIN, LEVEL 0498 IN END '"IME 2:22 PM END C;ATE 05/ 7/2011 END (,EVEL 2. 97 IN LEAK THRESHOLD 0. 2 IN TEST RESULT P SSED ASHAARS CHEVRON 2501 PANAMA LN 9AKERSFIELD CA 17/2011 12:37 PM SUMP LEAK TEST REPORT TRANSMP TEST STARTED 12:22 PM TEST STARTED 05/17/2011 BEGIN; LEUEL 2.0497 IN END TIME 12:37 PM END DATE 05/1712011 END LEVEL 2,0500 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED gASHAARa CHEVRON 2301 PANAVIA 04BAKERSFIELDCA 05/17/2011 11:13 AM SUMP LEAK TEST REPORT 91STP TEST STARTED 10:.58 AM TEST STARTED 05/17/2011 BEGIN LEVEL 3113813 AM END TIME 95/17/2011ENDDATE -3.5376 INENDLEVEL8.002 INLEAKTHRESHOLDPASSED TEST RESULT DISP5 -6 ASHAARS CHEVRON 9ASHAARS CHEVRON 4:51 PM2301PANAMALN2381PANAMALNTESTSTARTED05/17/2011BAYERSFIELDCABAKERSFIELDCATESTSTARTED3.1519 IN 05/1 ?/2011 :1.1 48 PM 05/17/2011 4:09 PM BEGIN LEVEL END TIME 5:07 Poi 05/17/2011 SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT END [SATE END LEVEL 0.002 IN 0• LEAK THRESHOLD PASSED87STPDISPI -2 TEST RESULT TEST STARTED 1 :33 PM TEST STARTED 3:53 PM TEST STARTED 05/17/201.1 TEST STARTED 05/17/2011 BEGIN LEVEL 2.3224 IN BEGIN LEVEL 5.3503 ININ- END TIME 1:48 PM END TIME 4 :09 PM DISP5 -6 fEND gTE 0S/17/2011 END C-gTE 05/17./ 2011. END !-FUEL 2,3219 IN END i_EVEL 5.3508 IN TEST STARTED 5 :11 PM LEAK THRESHOLD 0.002 IN LEAK. THRESHOLD 0.002 IN TEST STARTED 05/17/2011TESTTHREATPASSEDTESTRESULTPASSEDBEGIN! LEVEL 3.1520 IN END TIME 5 :26 PM END DATE 05/17/2011 END !_EVEL 3.1520 IN LEAK THRESHOLD 0.002 IN A9 HF1AR8 CHEt1RpW TEST RESULT PASSED LN2'v1 KERP7NELDA CA 95/ 1 ?/2011 NCHEVRON ! 4 :36 PM vUMF• LEAK DISP7 -8 JSH ARS LN TEST REPORT TEST STARTED 5:29 PMRAKERSFIELDCAr DISp1_2 TEST STARTED 05/17/2011 05/1 ?/2011 2: 16 .PM TEST S,TART BEGIN LEVEL END TIME 2.4974 IN 5:45 PM SUMP LEAK TEST REPORT TEST STARTED 0 X714 PmBEGINLEVEL END DATE END LEVEL 05/17/2011 2.4975 IN5.351@Ijy29 LEAK THRESHOLD 0.002 IN 37STP pmEND (4)TE 05i TEST RESULT PASSED TEST STARTED 2 :01 PM. LEAj< TH GHO 5.35 80INLDTESTSTARTED05/17/2011 TEST RESULT 0.002 IN BEGIN LEVEL 2.3218 IN PASSED END TIME 2 :16 PM END DATE 05/17/2011 DISP7-8ENDLEVEL2.3219 IN LEAK THRESHOLD 0.002 IN DISP3= 8:46 PM TEST RESULT PASSED TEST STARTED 05/17 /2011 TEST STARTED 5:29 PM TEST H T. EV BE01 2.4976 IN6:02 PMTESTSTARTED /17./2011 BEGIN EL • 5•• 719-4 IN T''Rm END 45 PM END,DATE 05 17/2011 2.49770INEND1-EVEl- 8.002 INTHRESHOLD END LEVEL 2. 192 IN LEAK TEST RESULT PASSED . LEAK THRES LD 002 IN TEST RESULT ASSED DISP3 =4 TEST STARTED 5:46 PM TEST STARTED 05/17/2011 BEGIN LEVEL 2.7193 IN END TIM£ 6'02 PM END DATE 05/17/2011 END LE'VEL 2.7193 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 4za56 SB989 TESTING FAILURE REPORT SITE NAME: BASHAAR'S CHEVRON DATE: 4/21/11 THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE TESTING. LABOR: PARTS INSTALLED: .14-0 NAME: . TITLE: SIGNATURE: THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR ANY NEEDED RETESTING. THIS ALSO RELEASES RICH. ENVIRONMENTAL OF ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE. A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR CONVIENENCE.