Loading...
HomeMy WebLinkAbout2012 RESULTSPiss 4G y, SWRCB, January 2002 Page ( of 4 Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performing periodic testing of USTsecondary containment systems. Use the appropriate pages ofthis form to report resultsfor all components tested. The completedform, written test procedures, and printouts from tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: FASTBREAK MOBIL Date of Testing: 5 -15 -12 Facility Address: 4800 WHITE LN BAKERSFIELD CA Facility Contact: Phone: Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (ifpresent during testing): ERNIE MEDINA 2. TESTING CONTRACTOR INFORMATION Company Name: Rich Environmental Pass Technician Conducting Test: RICH PHILLIPS Not Tested Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: C61/1)40 A HAZ Fail License Number: 809850 Manufacturer EMMMUMMSEEM Manufacturer Training Component(s) Date Training Expires INCON TS -STS 6/11/2012 X UDC 1 -2 X 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made UNL87 ANNULAR X UDC 1 -2 X PLUS89 ANNULAR X UDC 3 X PREM91 ANNULAR X UDC 4 -5 X DIESEL ANNULAR X UDC 6 -7 X UNL87 SEC. PIPE X UDC 8 X PLUS89 SEC. PIPE X UDC 9 -10 X PREM91 SEC. PIPE X UNL87 FILL SUMP X DIESEL SEC. PIPE X PLUS89 FILL SUMP X UNL87 STP X PREM91 FILL SUMP X PLUS89 STP X DSL FILL SUMP X PREM91 STP X UNL87 VPR BUCKET X DIESEL STP X PLUS89 VPR BUCKET IX i 01 1 If hydrostatic testing was performed, describe what was done with the water after completion of tests: RECYCLE AND REUSED CERTIFICATION OF TECHNI WAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts state this document are accurate and in full compliance with legal requirements Technician's Signature: Date: ' -% 7— YG ql(t-( L / SWRCB, January 2002 Page of Secondary Containment Testing Report Form Thisform is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages ofthisform to report resultsfor all components tested. The completedform, written test procedures, and printoutsfrom tests (ifapplicable), should beprovided to thefacility owner /operatorfor submittal to the local regulatory agency. I. FACILITY INFORMATION Facility Name: FASTBREAK MOBIL I Date of Testing: 5 -15 -12 Facility Address: 4800 WHITE LN BAKERSFIELD CA Facility Contact: Phone: Date Local Agency Was Notified ofTesting: Name of Local Agency Inspector (ifpresent during testing): ERNIE MENINA 2. TESTING CONTRACTOR INFORMATION Company Name: Rich Environmental Technician Conducting Test: RICH PHILLIPS Credentials,, X CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester License Type: C61 /D40 A HAZ License Number: 809850 Manufacturer Manufacturer Trainine Component(s) Date Training Expires INCON TS -STS 6/11/2012 aa000 3. SUMMARY OF TEST RESULTS If hydrostatic testing was performed, describe what was done with the water after completion of tests: RECYCLE AND USED CERTIFICATION OF TECHNIC RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated ' is document are accurate and in full compliance with legal requirements Technician's Signature: Date: Component 000 aa000 nn o noon' 0000 0000! n000i anooi n000 oo o omoo noo 0000. 0000 n000 oo o rao a o mono n000i r.oo omo 0000 mom If hydrostatic testing was performed, describe what was done with the water after completion of tests: RECYCLE AND USED CERTIFICATION OF TECHNIC RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated ' is document are accurate and in full compliance with legal requirements Technician's Signature: Date: SWRCB, January 2002 4. TANK ANNULAR TESTING tit Page -L of ¢ Test Method Developed By: Tank Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: 0 Pressure X Vacuum Hydrostatic Other (Spec) Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: Is Tank Exempt From Testing ?' Tank # Rom Tank # lmiligiiiiiiummiiilm, Tank # 11111 Tank # 0 Yes 0 No Yes No 0 Yes No Yes No Tank Capacity: Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressure/vacuum/water and starting test NOT TESTED Test Start Time: Initial Reading (Rj): Test End Time: Final Reading (RF): Test Duration: 60 MIN 60 MM 60 MIN 60MIN Change in Reading (RF -R): Pass/Fail Threshold or Criteria: Test Result: 0 Pass 0 Fail Pass Fail 0 Pass 0 Fail Pass 0 Fail Was sensor removed for testing? Yes No NA 0 Yes 0 No NA Yes 0 No DNA 0 Yes 0No NA Was sensor properly replaced and verified functional after testing? Yes No 0 NA Yes No NA Yes No 0 NA Yes No 0 NA COMMentS — (include information on repairs made prior to testing, and recommendedfollow -upfor, failed tests) SINGLE WALL TANKS Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) SWRCB, January 2002 5_ SF,CC)NnARV PIPE TESTING Page of a Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer Other (Spec) Test Method Used: X Pressure 0 Vacuum Hydrostatic Other (Spec) Test Equipment Used 4" DIAL GAUGE Equipment Resolution: .5% Piping Run # Piping Material: Piping Run # Piping Run # Piping Run # Piping Manufacturer. Piping Diameter: Length of Piping Run: Product Stored: Method and location of piping-run isolation: Wait time between applying pressure/vacuum /water and starting test: NOT TESTED Test Start Time: Initial Reading (R4): Test End Time: Final Reading (RF): Test Duration: 60 MIN 60 MIN 60 MIN 60 MIN Change in Reading (R4-R,): Pass/fail Threshold or Criteria: 0 PSI 0 PSI 0 PSI 0 PSI Test Result: Pass Fail Pass 0 Fail 0 Pass Fail Pass 0 Fail COmmaits — rinclude information on repairs made prior to testing, and recommendedfollow -upforfailed tests) SINGLE WALL LINES SWRCB, January 2002 6_ PIPING SUMP TESTING Page of Q Test Method Developed By: 0 Sump Manufacturer X Industry Standard 0 Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum X Hydrostatic Other (Specify) Test Equipment Used: INCON TS -STS Equipment Resolution: Sump # Sump Diameter. Sump # Sump # Sump # Sump Depth: Sump Material: Height from Tank Top to Top of Piping Penetration: Highest Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested' Does turbine shut down when sump sensor detects liquid (both product and water) ?* 0 Yes 0 No NA Yes No NA Yes 0 No 0NA 0 Yes 0 No NA Turbine shutdown response time Is system programmed for fail -safe shutdown ?' yes No NA Yes No DNA 0 Yes ONO NA 0 Yes No 0 NA Was fail -safe verified to be o rational ?* 0 Yes No NA Yes No NA Yes 0 No 0 NA Yes No 0 NA Wait time between applying pressure /vacuum /water and starting test: NOT TESTED Test Start Time: Initial Reading (R,): Test End Time: Final Reading (RF): Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN Change in Reading (RF -R,): Pass/Fail Threshold or Criteria: Test Result: Pass Fail 0 Pass 0 Fail 0 Pass 0 Fail Pass Fail Was sensor removed for testing? Yes No 0 NA Yes C No DNA 0 Yes No NA 0 Yes D No NA Was sensor properly replaced and verified functional after testin . Yes No NA D Dyes D No NA Yes D No NA Yes No NA Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests) VO SIT SUMPS Ifthe entire depth ofthe sump is not tested, specify how much was tested. If the answer to any ofthe questions indicated with an asterisk (") is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160) SWRCB, January 2002 7. UNDER- DISPENSER CONTAINMENT (UDC) TESTING 416Wq Page of i. Test Method Developed By: UDC Manufacturer X Industry Standard 0 Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum X Hydrostatic Other (Spec) Test Equipment Used: INCON TS -STS I Equipment Resolution: UDC # 1 -2rUDCrManufa:cturer: UNKNOWN UDC # 3 UDC # 4-S UDC # 6 -7 UNKNOWN UNKNOWN UNKNOWN FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS 31" 31" 31" 31" Height from UDC Bottom to Top of Highest Piping Penetration: 9" 10" 9" 9" Height from UDC Bottom to Lowest Electrical Penetration: 3" 3" 3" 3" Condition of UDC prior to testing: GOOD GOOD GOOD GOOD Portion ofUDC Tested 11" 12" l 1" 11" Does turbine shut down when UDC sensor detects liquid (both product and water),) Yes No X NA Yes No X NA Yes No X NA 0 Yes No X NA Turbine shutdown re22nse time Is system programmed for fail- safe shutdown? Yes No X NA Yes 0 No XNA 0 Yes 0 No X NA 0 Yes 0 No XNA Was fail -safe verified to be operational?* Yes No X NA Yes No XNA Yes No XNA Yes No XNA Wait time between applying pressure/vacuum/water and starting test 30MIN 30MIN 30MIN 30MIN Test Start Time: 11:19 11:36 10:17 10:56 10:17 10:56 10:17 10:56 Initial Reading (Ri ): 3.355 3.355 5.290 5.283 2.554 2.500 2.585 2.593 Test End Time: 11:34 11:51 10:33 11:11 10:33 11:11 10:33 11:11 Final Reading (RF): 3.355 3.355 5.288 5.212 2.555 2.581 2.587 2.595 Test Duration: 15MIN 15MIN 15MIN I 15MIN 15MIN 15MIN 15MtN I 15MIN Chan a in Readin (RF-R{ ): 000 000 002 1 -.001 001 001 002 +.002 Pass/Fail Threshold or Criteria: 002 002 002 002 002 002 002 -.002 Test Result: X Pass Fail X Pass Fail X Pass Fail X Pass Fail Was sensor removed for testing? X Yes 0 No NA X Yes 0 No DNA X Yes No NA X Yes No NA Was sensor properly replaced and verified functional after testing? X Yes 0 No NA X Yes No 0 NA X Yes No NA X Yes No NA C0MMeUtS - (include information on repairs madeprior to testing, andrecommendedfollow -upforfailed tests) 1 Ifthe entire depth ofthe UDC is not tested, specify how much was tested. If the answer to any ofthe questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) SWRCB, January 2002 7_ i1NDF.R- DiCPF.NSFR CONTAINMENT (UDCI TESTING LIZ eIPageof1 Test Method Developed By: UDC Manufacturer X Industry Standard 0 Professional Engineer 0 Other (Specify) Test Method Used: 0 Pressure Vacuum X Hydrostatic 0 Other (Spec) Test Equipment Used: INCON TS -STS Equipment Resolution: UDC # 8 UDC # 9-10 UDC # UDC # UDC Manufacturer. UNKNOWN UNKNOWN UDC Material: FIBERGLASS FIBERGLASS UDC Depth: 31" 31" Height from UDC Bottom to Top ofHighest Piping Penetration: 10" 9" Height from UDC Bottom to Lowest Electrical Penetration: 2" 3" Condition ofUDC prior to testing; GOOD GOOD Portion of UDC Tested 12" 12" Does turbine shut down when UDC sensor detects liquid (both product and water)?* 0 Yes No X NA 0 Yes No XNA Yes No NA 0 Yes 0 No 0 NA Turbine shutdown response time Is system programmed for fail- safe shutdown ?' 0 Yes 0 No X NA Yes 0 No X NA 0 Yes 0 No 0 NA 0Yes 0 No NA Was fail -safe verified to be operational?* yes 0 No X NA Yes No X NA 0 Yes 0 No NA 0 Yes 0 No 0 NA Wait time between applying pressure/vacuum/water and starting test 30MIN 30MIN 30MIN 30MIN Test Start Time: 11:38 11:52 11:38 11:52 Initial Reading 3.906 3.907 3.906 3.907 Test End Time: 11:51 12:07 11:51 12:07 Final Reading (RF): 3.906 3.906 3.906 3.906 Test Duration: 15MIN 15MIN 15MIN 15MIN 15MiN 15M1N 15MIN 15MIN Change in Reading (RF-R,): 000 001 000 001 Pass/Fail Threshold or Criteria: 002 002 002 002 Test Result: X Pass 0 Fail X Pass Fail 0 Pass 0 Fail 0 Pass Fail Was sensor removed for testing? X Yes 0 No NA X Yes 0 No DNA 0 Yes 0 No 0 NA C Yes 0No 0 NA Was sensor properly replaced and verified functional after testing? X Yes 0 No NA X Yes No NA Yes 0 No 0NA 0 Yes No 0NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) Ifthe entire depth of the UDC is not tested, specify how much was tested. Ifthe answer to gnny of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) S WRCB, January 2002 8. FILL RISER CONTAINMENT SUMP TESTING 1 Page - of Facility is Not Equipped With Fill Riser Containment Sums Fill Riser Containment Sumps are Present, but were Not Tested Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum X Hydrostatic Other (Spec) Test Equipment Used: INCON TS -STS Fill Sump # Fill Sump # Sum Diameter: Equipment Resolution: Fill Sump Fill Sump# Sum De the Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested Sump Material: Wait time between applying pressure /vacuum/water and starting test: NOT TESTED Test Start Time: Initial Reading (R,): Test End Time: Final Reading (RF ): Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN Change in Reading (RF -R,): Pass /Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Is there a sensor in the sump? Yes No Yes No Yes No Yes No Does the sensor alarm when either product or water is detected? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testin ? Yes No NA Yes No NA Yes No NA Yes No NA Comments — (include information on repairs made prior to testing, and recommendedfollow -upfor failed tests) NO FILL SUMPS SWRCB, January 2002 9. SPILL/OVERFILL CONTAINMENT BOXES lb1_l1cf Page T of Q f Facility is NoiEquipped With Spill/Overfill Containment Boxes Spill/Overfill Containment Boxes are Present, but were Not Tested Test Method Developed By: 0 Spill Bucket Manufacturer Other (Spec) X Industry Standard Professional Engineer Test Method Used: Pressure Other (Specify) Vacuum X Hydrostatic Test Equipment Used: INCON TS-STS Equipment Resolution: Bucket Diameter: mom 1111INNINIUM Spill Box # 87VPR 12" N me Spill Box # 89VPR Spill Box # 91 VPR Spill Box # 12" 12" Bucket Depth: 16" 16" 16" Wait time between applying pressure/vacuum/water and starting test: 30MIN 30MIN 30MIN 30MIN Test Start Time: 9:11 9:31 9:11 9:31 9:11 9:31 Initial Reading N): 4.469 4.489 1.894 1.892 2.754 2.752 Test End Time: 9:27 9:46 927 9:46 9:27 9:46 Final Reading (RF): 4.469 4.469 1.892 1.892 2.753 2.752 Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN Change in Reading (RF -R,): 000 -.000 002 000 001 000 Pass/Fail Threshold or Criteria: 002 -.002 002 002 002 002 Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail 0 Pass 0 Fail Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests) PHILE -TITE BUCKETS rASTBREAK MOBIL 4806 WHITE LN BAKERSFIELD CA 05/15012 9:27 AM SUMP LEAK TEST REPORT 87UPR TEST STARTED 9:11 AM TEST STARTED 05/15/2012 BEGIN LEVEL 4.4694 IN END TIME 9:27 AM END DATE 05/15/2012 END LEVEL 4.4692 IN LEAK THRES)iOLD 0.002 IN TEST RESULT PASSED 89VPR TEST STARTED 9:11 AM TEST STARTED 05 /15/2012 BEGIN LEVEL 1.6944 IN END TIME 9:27 AM END DATE 05/15/2012 EHD LEVEL 1.8929 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 91VPR TEST STARTED 9:11 AM TEST STARTED 05/15/2012 BEGIN LEVEL 2.7543 IN END TIME 9:27 AM END DATE 05/15/2012 END LEVEL 2.7530 IN LEW THRESHOLD 0.002 IN TEST RESULT PASSED ASTBREAK MOBIL 4800 WHITE LN BAKERSFIELD CA 05/15/2012 9:46 AM SUMP LEAK TEST REPORT 87UPR TEST STARTED 9:31 AM TEST STARTED K/15/2012INBEGINLEVEL9:46 AMENDTIME END DATE 05/15/2012 END LEVEL 4.4690 IN LEAK THRESHOLD 0.062 IN TEST RESULT PASSED 89VPR TEST STARTED 9:31 AM TEST STARTED 05/15/2012 BEGIN LEVEL 1.89ENDTIME END DATE 01/>2501 END LEVEL IN LEAK THRESHOLD O.e82 IDTESTRESULT 91VPR TEST STARTED 9:31 AM TEST STARTED 05 /15/2012 BEGIN LEVEL 2.7528 IN END TIME 9:46 AM END DATE 05./15/2012 523 NENDLEVELccaKTHRESHOLD0.002 _IN UDC3 TEST STARTED 10:17 AP1 TEST STARTED 05/15/2012 BEGIN LEVEL 5.2905 IN END TIME 10:33 AM END DATE 05/15/2012 END LEUEL 5.2887 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC4 -5 TEST STARTED 10:17 AM TEST STARTED 05/15/2012 BEGIN LEVEL 2.5534 IN END TIME 10.33 AM END DATE 05/15/2012 END LEVEL 2.5550 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED JDC6 -7 TEST STARTED- 10:17 AM TEST STARTED 05 /15/2012 BEGIN LEVEL 2.5&.51 IN END TIME 10:33 AM END DATE 05/15/2012 END LEVEL 2.5870 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC3 TEST STARTED 10 :56 AM TEST STARTED 05/15/2012 BEGIN LEVEL 5.2339 IN END TIME 11:11 AM END DATE 05/15/2012 END LEVEL 5.2825 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC4 -5 TEST STARTED 10:56 All TEST STARTED 05//5/2012 BEGIN LEVEL 2.5608 IN END TIME 11:11 AM END DATE 05/15/2012 END LEVEL 2.5618 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC6 -7 TEST STARTED 10:56 Atli TEST STARTED 05/15/2012 BEGIN LEVEL 2.5931 IN END TIME 11:11 AM END DATE . 05/15/2012 END LEVEL 2.5958 IN LEAK THRESHOLD 0.002 IN TEST RESULT C-ASTBREAK MOBIL 7 I'7• 4500 WHITE LN BAKERSFIELD CA 05/15/2012 11:24 AM SUMP LEAK TEST REPORT UDC1 -2 TEST STARTED 11:19 AM TEST STARTED 05 /15/2012 BEGIN LEVEL 3. 554 AMENDTIME END DATE 05 /15/2012 END LEVEL 3.3556 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED rASTBREAK MOBIL 480x_+ WHITE. LN BWE SFIEL4 CA 05/15/2012 11:51 AM SUMP LEAK TEST REPORT UDC, 1-2 MST STARTED 11:36 AM TEST STARTED 05/15/2012 BEGIN LEVEL 3.3556 IN END TIME 11:51 AM END DATE 05/15/2012 END LEVEL 3.3556 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC8 TEST STARTED TEST STARTED BEGIN LEVEL END TIME END DATE END LEUEL LEAK THRESH01 TEST RESULT 11:36 AM 05/15/2012 1.7676 IN 11:51 AM 05/15/2012 1.7678 IN D 0.002 IN PASSED UDC9 -10 TEST STARTED 11:36 AM TEST STARTED 05/15/2012 BEGIN LEVEL 3.9066 INENDTIME11:51 AM END DATE 05/15/2012 END LEVEL 3.9067 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC8 TEST STARTED 11:52 AN TEST STARTED 05/15/2012 BEGIN LEVEL 1.7677 IN END TIME 12:07 PM END DATE 05/15/2012 END LEVEL 1.7679 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC9 -10 TEST STARTED 11:52 AM TEST STARTED 05/15/2012 BEGIN LEVEL 3.5079 IN END TIME 12:07 Pt1 END DATE 65/15/2012 END LEVEL 3.9067 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 7v .. V ,