Loading...
HomeMy WebLinkAbout2011 SB989 RESULTSSWRCB, January 2002 Page _ of Secondary Containment Testing Report Form Thisform is intendedjor use by contractors performing periodic testing ofUST secondary containment systems. Use the appropriate pages of this form to report resultsfor all components tested The completedform, written test procedures, and printoutsfrom lests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulaion, agency. 1. FACILITY INFORMATION Facility Name: CHEVRON Date ofTestima: 9/12/11 Facility Address: 5609 STING ROAD, BAKERSFIELD Facility Contact: Phone: Date Local Agency Was Notified of Testing: 8/18/1 t Name of Local Agency Inspector (fpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Rich Environmental Pass Technician Conducting Test: RICH PHILLIPS Not Tested Credentials: X CSLB Licensed Contractor i] SWRC13 Licensed Tank Tester License Type: C61/1340 A HAL License Number: 809850 t Manufacturer INCON Manufacturer Training Component(s) Date Training Expires TS -STS 6/11 /2012 UNL87 ANNULAR X UDC 95/6 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made UNL87 ANNULAR X UDC 95/6 17 X PREM91 /DSL ANNULAR X LI Ci UDC #7/8 1] X UNL87 SEC PIPE 1 -6 X UDC #9/10 X f_i LINL87 SEC PIPE 7 -10 X L] L-" i UNL87 FILI, SUMP I o f. i PREM91 SEC PIPE 1 -6 X PREM91 FILL SUMP 71 PRE-M91 SEC PIPE 7 -10 X 0 DIESEL FILL SUMP C DIESEL SEC PIPE X p UNL87 VAPOR BUCKET X I1 h STP 0 PREM91 VAPOR BKT XUNL87 STP X L li i i C'; PREM91 DIESEL STP X I C UDC 91/2 X U 01 1 r-1 F1 UDC #3/4 X L1 LI i:; Ifhydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OFTECHVeTAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best ofmy knowledge, thefacts stat this document are accurate and infull compliance with legal requirements Technician's Signature:_ — 4__ _. W_. Date: 9/12/11 S WRC B, January 2002 4. TANK ANNULAR TESTING t7 to Page ' Z' of Q\ . I Test Method Developed By: 0 Tank Manufacturer X Industry Standard 0 Professional Engineer n Other (Spec) Test Method Used: 0 Pressure X Vacuum Cl Hydrostatic 0 Other (Sped) Test Equipment Used: 4" DIAL. GAUGE Equipment Resolution: Tank # 87 Tani: # 91 /DSL Tank # Tank # Is Tank Exempt From Testing?' 11 Yes X No FJ Yes X No 0 Yes n No C Yes D No Tank Capacity: Tank Material: STEEL STEEL Tank Manufacturer: UNKNOWN UNKNOWN Product Stored: UNL87 PREM91 /DSL Wait time between applying pressure /vacuum /water and startin test: 30MIN 30MIN Test Start Time: 9:00 9:00 Initial Reading (R,): IOHG l0HG Test End Time: 10:00 10:00 Final Reading (RF): I OHG IOHG Test Duration: 60 MIN 60 MIN Change in Reading (R, -R,): 0 0 Pass/Fail Threshold or Criteria: O 0 Test ResWt X Pass::_, G £aih X Pass ' O,Eail f] (Pass` Q: Fail 0 Pass. C1.1Eaii Was sensor removed for testing? X Yes L1 No DNA X Yes ONO U NA 0 Yes n No DNA O Yes FI No FI NA Was sensor properly replaced and verified functional after testin ? X Yes No Cl NA X Yes No t. NA Cl Yes U No NA f_l Yes U No DNA I Comments — (include information on repairs made prior to testing, and recommended.Jollow -upforfailed tests) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) SWRCB, January 2002 5. SECONDARY PLPE TESTING Page 3 of 1 Test Method Developed By: Piping Manufacturer X Industry Standard U Professional Engineer U Other (Spec) Test Method Used: X Pressure U Vacuum Hydrostatic Other (,Specify) Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: _5% Piping Run #87 1-6 Piping Run 487 7 -10 Piping Run #91 1 -6 Piping Run #91 7 -10 Piping Material: FIBERGLASS PLASTIC FIBERGLASS PLASTIC Piping Manufacturer: SMITH TCI SMITH TCl Piping Diameter: 3" 2" 3" 2" Length of Piping Run: 150' 1.00' 150' 100' Product Stored: UNL87 IJNL87 PREM91 PREM91 Method and location of piping-run isolation: BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP Wait time between applying pressure /vacuum/water and starting test: 30 MIN 30 MIN 30 MIN 30 MIN Test Start Time: VISUAL FAIL 10:00 10:00 VISUAL FAIL Initial Reading (Rj): 5.5 5.0 rest End Time: 11:00 11:00 Final Reading (RF): 5.5 5.0 Test Duration: 60 MIN 60 MIN 60 MIN 60 MIN Change in Reading (RF -R {): 0 0 Pass /Fail Threshold or Criteria: 0 PSI 0 PSI 0 PSI 0 PSI Test Result::" D Pass . Xat! X':Pass ::[1 Fatl -_ X'Pass . :O Fail. n Pass:;_:: X 1Fa(t Comments — (include in/ormalion on repairs made prior to testing, and recommendedfollow -up for, failed tests) TEST BOOTS BAD SWRCB, January 2002 5. SECONDARY PIPE TESTING C) lD" // Page 4 -of _ Q r l Test Method Developed By: 1-1 Piping Manufacturer X Industry Standard 0 Professional Engineer U Other (Spec) Test Method Used: X Pressure 0 Vacuum Hydrostatic n Other (Sped) Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5% Piping Run #DSL Piping Material: FIBERGLASS Piping Run # Piping Run # Piping Run # Piping Manufacturer: SMITH Piping Diameter: 3" Length of Piping Run: 75' Product Stored: DIESEL Method and location of piping-run isolation: BOOT IN SUMP Wait time between applying pressure/vacuum /water and startin test: 30 MIN Test Start Time: 10:00 Initial Reading (R,): 5PS1 1'est End Time: 11:00 Final Reading (RF): 5PSl Test Duration: 60 MIN Change in Reading (RrR,): 0 Pass /Fail Threshold or Criteria: 0 PSI Test Result X Pass O;;Fail O; .Pass 0 Fail " _ Q .= P ss ; b* : fl Pass'..: 0 Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) SWRCB, January 2002 6_ PIrPiNG Si1MP TESTING I'D o Page of Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer 0 Other (Specify) Test Method Used: 0 Pressure Vacuum X Hydrostatic 0 Other (Specify) Test Equipment Used: INCON TS -STS Equipment Resolution: Sump #87 Sump Diameter: 37" Sump #91 Sump #DSL Sump # 37" 37" Sump Depth: 52" 52" 52" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS Height from Tank Top to Top of Piping Penetration: 32" 32" 18" Highest Height from Tank Top to Lowest Electrical Penetration: 21" 21" 21" Condition of sump prior to testing: CLEAN CLEAN CLEAN Portion of Sump Tested' 34" 34" 20" Does turbine shut down when sump sensor detects liquid (both product and water)?* 0 Yes No DNA 0 Yes 0 No DNA 0 Yes No NA 0 Yes 0 No 0 NA Turbine shutdown response time is system programmed for fail -safe shutdown ?* 0 Yes 0 No NA 0 Yes 0 No DNA Yes No DNA Yes No DNA Was fail -safe verified to be operational?* Yes No NA Yes No NA Yes No 0 NA Yes 0 No 0 NA Wait time between applying pressure/vacuum /water and starting test: 30 MIN 30 MIN 30 MIN 30 MIN Test Start Time: 12:00 12:17 12:00 12:15 10:27 10:49 Initial Reading (Rj): 2.494 2.495 2.540 2.544 2.201 2.218 Test End Time: 12:15 12:32 12:15 12:32 10:42 11:04 Final Reading (RF): 2.495 2.496 2.541 2.541 2.201 2.217 Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN Change in Reading (RF -Ri): 001 001 001 001 001 001 Pass/Fail Threshold or Criteria: 002 002 002 002 002 002 Test Result:..; X Pass. Fell X. Pass , Fail X! 'Pass:.. 0 Fail .:. Pass- .. :Fail Was sensor removed for testing? X Yes 0 No NA X Yes 0No NA X Yes 0 No NA Yes No DNA Was sensor properly replaced and verified functional after testing? X Yes 0 No NA X Yes No 0NA X Yes 0 No DNA Yes No 0 NA Comments — (include information on repairs madeprior to testing, andrecommendedfollow -upforfailed tests) Ifthe entire depth of the sump is not tested, specify how much was tested. Ifthe answer to any ofthe questions indicated with an asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160) SWRCB, January 2002 7. UNDER - DISPENSER CONTAINMENT (UDC) TESTING R 'D LbV Page (10 ofI_ Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer 11 Other (Spec) Test Method Used: L1 Pressure 0 Vacuum X Hydrostatic J Other (Specify) Test Equipment Used: INCON TS -STS Equipment Resolution: UDC #1/2 UDC #3/4 UDC 45 /6 UDC #7/8 UDC Manufacturer: UNKNOWN UNKNOWN UNKNOWN TC1 UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS PLASTIC UDC Depth: 30" 30" 30" 30" Height. from UDC Bottom to Top of Ni hest Piping Penetration: 14" 14" 14" 10" Height from UDC Bottom to Lowest I ?.lectrical Penetration: 2" 2" 2" 2" Condition ofUDC prior to tcstin;: CLEAN CLEAN CLEAN CLEAN Portion of UDC Tested 16" 16" 16" 16" Does turbine shut down when UDC sensor detects liquid (both product and water)?* 17 Yes []No XNA LI Yes No XNA Yes 0 N X NA CJ Yes 0 No X NA Turbine shutdown response time Is system programmed for fail- safe shutdown? Yes No X NA Cl Yes U No XNA U Yes nNo XNA li Yes n No X NA Was fail -safe verified to be operational?* Yes 1:7 No XNA 17 Yes LI No XNA 17 Yes F1 No X NA C; Yes +i No XNA Wait time between applying pressure /vacuum/water and starting test 30MIN 30MIN 30MIN 30MIN Test Start Time: 12:00 12:17 1 1:27 1:46 VISUAL FAIL VISUAL. FAIL Initial Reading (R1): 4.1.08 4.110 3.398 3.400 Test End Time: 12:15 12:32 1:42 2:01 Final Kcading (RF): 4.110 4.111 3.400 3.400 Test Duration: 15MIN 15MIN 15MIN 15MIN Chan a in Reading RF -R,): 002 001 002 0007 Pass/Fail Threshold or Criteria: 002 1 .002 002 002 TesrResult .: ,: X bass`'. C]:)Fauf X Pass::: [7 Faii1= Pass Pass::' X Fail:.:,;. Was sensor removed for testing? X Yes U No CJ NA X Yes No DNA Yes No 1 NA Yes 17 No Cl NA Was sensor properly replaced and verified functional after testin ? X Yes No NA X Yes F3 No DNA Yes No NA Yes CJ No DNA Comments — (include information on repairs made prior to testing, and recommended follow -ripforfailed tests) DISP #5/6,x# 7/8 VISUAL FAILURE ON TEST BOOT ON LISP #718 AND CRACKS IN FIBERGLASS SECONDARY DISP #516 Ifthe entire depth ofthe UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) SWRCB, January 2002 7. UNDER- DISPENSER CONTAINMENT (UDC) TESTING t wt.., Page i of I rest Method Developed By: n UDC Manufacturer X Industry Standard Cl Professional Engineer D Other (Spec) Test Method Used: C Pressure Vacuum X Hydrostatic Q Other (Spec) Test Equipment Used: 1NCON TS -STS Equipment Resolution: UDC #9/10 UDC # UDC # UDC # UDC Manufacturer: TCI UDC Material: PLASTIC UDC Depth: 24" Height from UDC Bottom to Top of Highest Piping Penetration: 10" Height from UDC Bottom to Lowest Electrical Penetration: 2" Condition of UDC prior to testing: CLEAN Portion of UDC Tested 12" Does turbine shut down when UDC sensor detects liquid (both product and water)?* U Yes IJ No I7 NA U Yes l7 No 13NA Tn Yes Ll No DNANA f7Yes DNo fl NA Turbine shutdown response time Is system programmed for fail- safe shutdown ?' L-] Yes 11JNo DNA D Yes DNo LI NA J Yes D No L NA U Yes D No ,j NA Was fail -safe verified to be operational?* D Yes D No [.I NA f ]Yes DNo DNA D Yes O No fINA D Yes DNo DNA Wait time between applying pressure /vacuum /water and starting test 30MIN rest Start Time: 1:27 1:46 Initial Reading (RI): 2.656 2.658 Test End Time: 1:42 2:01 Final Readin (Ri:): 2.658 2.658 Test Duration: 15MIN I 15MIN Change in Reading (RF -R,): 002 -.000 Pass/Fail Threshold or Criteria: 002 -.002 Test Result:.. X Pass: a Fail Pass -.. C1 Rail.:. 7: Pass :: C- Fsii: 8 Pass O Fail . Was sensor removed for testing? X Yes DNo ON U Yes C No DNA 11 Yes D No C NA C1 Yes C No O NA Was sensor properly replaced and verified functional after testing? X Yes DNo DNA D Yes No DNA o Yes D No C NA 11 Yes [I No Ll NA Comments — (include information on repairs made prior to testing, and recommendedfollow -up for. failed tests) 1 f the entire depth ofthe UDC is not tested, specify how much was tested. If the answer to any ofthe questions indicated with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160) SWRCB, January 2002 R_ FftJ,RISER ('ONTAINMENT SUMP TESTING f:) l -bb Page of Facili is Not Equipped With Pill Riser Containment Sums Fill Riser Containment Sumps are Present, but were Not Tested Test Method Developed By: CI Sump Manufacturer X Industry Standard 11 Professional Engineer G Other (Specify) Test Method Used: Pressure D Vacuum X Hydrostatic C1 Other (Sped) Test Equipment Used: INCON TS -STS Equipment Resolution: Sump Diameter: Fill Sump # Rem Fill Sump # Fill Sump um Fill SUM2 # Sump Depth: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing; Portion ofSump Tested Sump Material: Wait time between applying pressure /vacuum/water and starting test: 30MIN Pest Start Time: Initial Reading (Rj): Test End Time: Final Reading RF): Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN Change in Reading-(RF -Rj : Pass/FaiI Threshold or Criteria: Test'Resialt:`; d Pass: O Fail D Pass. B$il D Pas§ Fail D Pass =' a. Fail . ' Is there a sensor in the sump? 11 Yes D No 13 Yes No Yes 13 No LI Yes 0 No Does the sensor alarm when either product or water is detected? Yes No NA Yes No NA Yes No Cl NA r Yes D No 17 NA Was sensor removed for testing? Yes Ll No 11 NA C3 Yes No NA 1 Yes 13-No t7 NA I_Yes Li No _^ NA Was sensor properly replaced and verified functional after testin ? Q Yes No 11 NA 7 Yes No L1 NA Yes L No tl NA ID Yes IJ No Fl NA CoMmentS — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) _ NO FILL SUMPS SWRCB, January 2002 9. SPILL/OVERFILL CONTA1NNMNT BOXES 1l J t u n v Page —1 of `\ Facility is Not Equipped With Spill/Overfill Containment Boxes DSpill /Overfill Containment Boxes are Present, but were Not Tested Ci Test Method Developed By: U Spill Bucket Manufacturer X Industry Standard U Professional Engineer 0 Other (Specify) rest Method Used: U Pressure U Vacuum X Hydrostatic U Other (Specify) Test Equipment Used: INCON TS -STS Equipment Resolution: Spill Box #87 VPR Spill Box #91 VPR Spill Box # Spill Box # Bucket Diameter: 12" 12" Bucket Depth: 16" 16" Wait time between applying pressure /vacuum/water and starting test: 30MIN 30MIN rest Start Time: 10:27 10:49 10:27 10:49 Initial Reading (Ri): 2.524 2.524 2.482 2.481 test End Time: 10:42 11:04 10:42 11:04 Final Reading (Rr): 2.525 2.525 2.482 2.481 Test Duration: 15MIN 15MIN 15MIN 15MIN Change in Reading (R,: Rl): 001 +.001 000 000 Pass /Fail Threshold or Criteria: 002 -.002 002 002 A: Pass:: 0..2 l X; Bass - :D Fail D :)Pass ;.: D fail; D Pass. Fail: Comments — (include inLrmation on repairs made prior to resting and recommendedfollow -upfor.failed tests) CHEORON 560? S71mE RD SAKERSPIELD CA 09/12/201 i 11:04 Are 6UMP wEHK TEST REPORT 041, ST MW ED 10;49 Am TEST STARTEM09/iWOn WEGIN LWEL 2.5246 IN END TIME 11:04 AM iND GATE 09/12/2e11 END LEVEL 2.5254 IN WK THRESHOLD 0.002 1H TEST RESULT PASSED 91FILB TEST STARTED 10:49 AM TEST STARTED 09/12/201.1 BEGIN LEVEL 2.4817 IN END TIME 11104 AM END DATE 09/12/2011 END LEVEL 2.4818 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED DSLSTP TEST STARTED 10:49 AM TEST STARTED 09/12/201 "A BEGIN LEVEL 2.2180 1 END TIME 11:04 A END DATE 89112.2810 END LEVEL 2.2173, tT-AK THRESHOLD 0.002 IN-: TEST RESULT PA;Pgb A , AQ 5609 STINE RD SAKERSFIELD CA 09/12/20!1 10%42 AN SUMP LEAK TEST REPORT 801W TEST STAR"ilD 1012? AM TEST STARTED 09112/2011 BEGIN LEVEL 2.5248 IN END TIME 10:42 AM END DATE 09/12/2011 -1 END,LEVEL 2.5252 IN .4 LA THREWOLD 0.002 IN QA TEST RESULT PASSED Z 91FILS Z_10 OwTESTSTARTED10:27 AN TEST STARTED 09/1'2/261,1 14, BEGIN LEVEL 2.4928 JA END TIME 19:42 A jt-" END DRTE. 0 1 END. 2.022 MIT111 L Fig D 6.002 I Tf& THRESHOLD RESULT-,-, PASSED DSLSTP TEST STARTED 10270m TEST STARTED K/1?/2011 BEGIN LEVEL 2.2011 IN END TIME 10-42 AMENDDATE' 09/W20li END LEVEL 2.2017 IN LEAK THRESHOLD 0.002 IN 1 TEST RESULT PASSED I.... I - --. - -- -1 . ---L-t 116b 5609 SINE Q WKERSPE0 CA 04/12/20o A42 pp* SW wEAK TEST REPORT DISQ-4 T87 WARTED W? Pm TEST STARTED 09/12/201: BEGIN QUEL 3,3980 IN E&D 71ME. !:42 Pri imo 06TE 09/12/2011 END LEQEu 1.4000 ir,; LEAK THRESHOLD 0.002 IN TEST RESULT PASSED WSP910 TEST STARTED W? A TEST STARTED 09/12/2011 BEGIN LEVEL 2.6562 IN END TIME 1:42 Am END DATE 09/12/200. END LEVEL 2.6584 a LEAK THRESHOLD 0.002 Its TEST RESULT INCREASED YAK THRESHOLD 6.002 IN 7EST .RESULT Gf-;EijRON 5609 STINE P0 WERSFIELO CA 09/12/ 2011 am SUMP LEW TEST REPORT 0103-a TEST STARTED ', 1:46 09 TEST STARTED 09/12/2@1! WIN 0VEL 3.4002 lN END QmE 2:0 Pm END OATE 09/12/2011 END LEVEL 3.4004 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED DISR910 TEST STARTED 1:46 W; TEST STARTED 09/12/2011 BEGIN LEVEL 2.6586 hv. AD TIME 2:01 PM END DATE 09/i2/201! END LEVEL 2.6589 W YAK THRESHOLD 6.002 IN 7EST .RESULT PASSED f 4EVRON 56E STINE RD8AKER' FIELD ch 5609 ST(NE RD 9 2. 6AKEi6PIELL) C;A SUMP TEST REPORT 09/12/20)l 2 :32 PP*, LEAK 'TtST REPORT W'E -0 12:00 PMTEST 67STP EGI r-VEL 2.4941 YEST. STARTED 12'17 Pil END . f ImE IN N") ..22:.,5 Pp.f TEST STARTED 09/12/20!i H7E 09,,'12120ilEND BEGIN LEVEL 2.4956 IN LEVE, - AK ,R z 2.495.5 1r4kSHOLD0-002 END TIME END :,'PHTE 12:32 Pm 09/12/2011 EF: RESULT IN PASSED ENE) LEVEL HRr--6HOLO 2.4961 IN LcAK 0.002 lN TEST RE,,UL-l' PASSED 41 S E .5ii R7EO !2:00 ppCl - :Z, f NRTEo iSTP R4iN LEVEL. 2.540 1 TEST STARTED 12:17 PM ME END I)A'IE 12, 15 pf, TEST STARTED 09/12/2011 ND 09/12/2011 BEGIN LEVEL 2.5414 IN LEVELLEAKTHRESHOLD Z.5415 IN END TIME END DATE 12:32 PM' 09/12/2011 tRESLLr 0.402 It, PASSED END LEVEL 2.5413 IN', LEAK THRESHOLD 0.002 IN TEST RESULT PASSED OISPI-2 137f)R- 1" pED klo pmTES. T ' DISPI-2 S I TED 09 /12,'2011GINLEQEL4.laDq TEST STARTED 12,17 Pm AND IME IN 12: i5 pp-, TEST STARTED 09/12/201'. ND DATE 9/12/2011N0 BEGIN LEVEL 4.1109 IN LEVEL 4.1107 IN1HRESHOLD0.002 END TIME ENDND DATE 12:32 PM 2t:AK 09lZe-011INRESULTPASSEDENDLEVEL4.1112 IN LEAK THREa4OLD 0.002 IN TEST RESULT PASSED 43r4`6 SB989 TESTING FAILURE REPORT SITE NAME: CHEVRON DATE: 9/12/11 THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE TESTING. REPAIRS: ioJ T fl tD 0-61 i i CL"Lb1- ra /Z ( /-.,k J G LABOR: PARTS INSTALLED: NAME: TITLE: SIGNATURE: THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMENTAL FOR ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE. A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR CONVIENENCE. SWRCB, January 2002 Page t of Secondary Containment Testing Report Form This form is intendedfor use by contractors performingperiodic testing of UST secondary containment systems. Use the appropriate pages ofthisform to report resultsfor all components tested The completedform, written testprocedures, and printoutsfrom tests (rfapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: CHEVRON I Date of Testing: 9/12/11 Facility Address: 5609 STWE ROAD, BAKERSFIELD Facility Contact: Phone: Date Local Agency Was Notified ofTesting: Name of Local Agency inspector (ifpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: RICH ENVIRONMENTAL Technician Conducting Test: JAMES RICH Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type: C61 / D40 License Number: 809850 Manufacturer Training Manufacturer Component(s) Date Training Expires 3. SUMMARY OF TEST RESULTS If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: Date: 9/12/11 Component UNL87 SEC PIPE 1-6 PREM91 SEC PIPE 7-10 oo m o oo. a000; or oo niao ono: 0000 ono omoo aano s o00o anoo ain o; oaoo onoo noon If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: Date: 9/12/11 SWRCB, January 2002 5. SECONDARY PIPE TESTING aac,FJv Page z of Z Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer Other (Spec) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Piping Run #87 1 -6 Piping Material: FIBERGLASS Piping Run #917-10 Piping Run # Piping Run # PLASTIC Piping Manufacturer. SMITH TCI Piping Diameter 3" 2" Length of Piping Run: 150' 100' Product Stored: UNL87 PREM91 Method and location of piping-run isolation: BOOT IN SUMP BOOT IN SUMP Wait time between applying pressure/vacuum/water and test: 30 MIN 30 MIN starting Test Start Time: 6:00PM 5:30PM Initial Reading (R): 5.0 PSI 5.1 PSI Test End Time: 7:OOPM 6:30PM Final Reading (RF): 5.0 PSI 5.1 PSI Test Duration: I -HOUR 1 -HOUR Change in Reading (RF -R): 0 0 Pass/Fail Threshold or Criteria: 0.00 0.00 Test Result: X Pass Fail X Pass Fail Pass Fail Pass Fail Comments — (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests) REPLACED TEST BOOTS ON 87 AND 91 NAbS -4,- SB989 TESTING FAILURE REPORT SITE NAME: CM12caN DATE: THE FOLLOWING COMPONENTS WERE REPLACENREPAIRED TO COMPLETE TESTING. LABOR: / &2 5'tl4fc FSl 4& i2y CARTS INSTALLED: I.,&) 5--,17wc, NAME: TITLE: SIGNATURE: THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF ANY FINES OR PENALTIES OCCURING FROM NON - COMPLIANCE. A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR CONVIENENCE.