HomeMy WebLinkAboutSB989 2011SWRCB, January 2002 Page-A, of
Secondary Containment Testing Report Form
This form is intendedfor use by contractors performingperiodic testing ofUST secondary containment systems. Use the
appropriate pages ofthisform to report resultsfor all components tested The completedform, written testprocedures, and
printouts from tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: GOSFORD SHELL Date ofTesting: 6/2/11
Facility Address: 4050 GOSFORD ROAD, BAKERSFIELD
Facility Contact: j Phone:
Date Local Agency Was Notified of Testing: 4/28/11
Name of Local Agency Inspector (fpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Rich Environmental
Pass
Technician Conducting Test: RICH PHiLLMS
Not
Tested
Credentials: X CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: C61/D40 A HAZ
Manufacturer
License Number. 809850
Manufacturer Training
Component(s) Date Training Expires
INCON TS -STS 6/11/2012
UNL87 #1 ANNULAR C X UNL87 #1 STP
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not
Tested
Repairs
Made Component pass Fail Not
Tested
Repairs
Made
UNL87 #1 ANNULAR C X UNL87 #1 STP X
UNL87 #2 ANNULAR X UNL87 #2 STP X
PREM91 ANNULAR 1 X PREM91 STP X
DIESEL ANNULAR X DIESEL STP X 10 G
UNL87 #1 SEC. PIPE X UDC #1/2 X
UNL87 #2 SEC. PIPE X UDC. #3 /4 X
PREM91 SEC. PIPE X UDC #5/6 X1
1
1
DIESEL SEC. PIPE X UDC #7/8 X
VR SEC. PIPE X UNL87 #1 FILL SUMP X
87 #l, 87 42, 91 VENT SEC X UNL87 42 FILL SUMP X
DIESEL VENT SEC PIPE X PREM91 FILL SUMP X
1 DIESEL FILL SUMP X I 1 1
if hydrostatic testing was performed, describe what was done with the water after completion oftests:
CERTIFICATION OF TECHN161AN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, thefacts scat n this document are accurate and infull compliance with legal requirements
Technician's Signature: Date: 6/2/11
Rich Environmental Service Station Services
5643 Brooks Ct.
Bakersfield, CA 93308
661326-8402 Fax 661.588 -7808
Ca. Lic4 C61 /D40 809850
Bill To
GOSFORD SHELL (HENG)
4050 GOSFORD RD,
BAKERSFIELD, CA. 93309
AM: FIENG K. & SING CHAO
Location
Invoice
Date Invoice #
6!212011 42917
GOSFORD SHELL
4050 GOSFORD RD.
BAKERSFIELD, CA. 93309
ATTN: HENG K. & SING CHAO
1, (print)
to pay in full upon completion of this job.
agree
Signature Date
PAST DUE ACCOUTS ARE SUBJECT TO A FINANCE CHARGE OF 1.5% PER MONTH OR A
5.00 CHARGE WHICH EVER IS MORE. BOUNCED CHECK FEE $25 & YOU CAN BE,
LIABLE FOR UP TO 3 TIMES THE AMOUNT OF THIS INVOICE.
Subtotal 1,79200
Sales Tax (7.25°/x) $0.00
Tots 1 1 $ 1,792.00
r,
P.O. No.. Terms Tech.
Due on receipt RLP
Quantity Description Inspected Month Price Rate Amount
3 -YEAR S8989 SECONDARY 0.00
CONTAINMENT TESTING
0 TANK ANNULAR SPACE TESTING ONLY 100.00 0.00
7 SECONDARY PIPING TESTING ONLY 100.00 700.00
4 PIPING SUMP CONTAINMENT TESTING 100.00 400.00
ONLY
4 SECONDARY PIPING TESTING ONLY 100.00 400.00
3 DISPENSER SECONDARY CONTAINMENT 100.00 300.00
TESTING ONLY
3 SPILL/OVERFILL CONTAINMENT BOXES 50.00 150.00
SUBTOTAL 1,950.00
DISCOUNT APPLIED ( PER CUSTOMER) 350.00 350.00
SUBTOTAL 1,600.00
BAKERSFIELD CITY FIRE DEPARTMENT 192.00 192.00
PERMIT FEE
1, (print)
to pay in full upon completion of this job.
agree
Signature Date
PAST DUE ACCOUTS ARE SUBJECT TO A FINANCE CHARGE OF 1.5% PER MONTH OR A
5.00 CHARGE WHICH EVER IS MORE. BOUNCED CHECK FEE $25 & YOU CAN BE,
LIABLE FOR UP TO 3 TIMES THE AMOUNT OF THIS INVOICE.
Subtotal 1,79200
Sales Tax (7.25°/x) $0.00
Tots 1 1 $ 1,792.00
r,
Rich Environmental Service Station Services
5643 Brooks Ct.
Bakersfield, CA 93308
661 326 -8402 Fax 661588-7808
Ca. Lie# C61/D40 809850
Bill To
GOSFORD SHELL (HENG)
4050 GOSFORD RD.
BAKERSFIELD, CA. 93309
ATTN: HENG K. & SING CHAO
Location
Invoice
Date Invoice #
612/2011 42917
GOSFORD SHELL
4050 GOSFORD RD.
BAKERSFIELD, CA. 93309
ATTN: HENG K: & SING CHAO
P.O. No.. Terms Tech
Due on receipt RLP
Quantity Description Inspected Month Price Rate Amount
3 -YEAR SB989 SECONDARY 0.00
CONTAINMENT TESTING
0 TANK ANNULAR SPACE TESTING ONLY 100.00 0.00
7 SECONDARY PIPING TESTING ONLY 100.00 700.00
4 PIPING SUMP CONTAINMENT TESTING 100.00 400.00
ONLY
4 SECONDARY PIPING TESTING ONLY 100.00 400.00
3 DISPENSER SECONDARY CONTAINMENT 100.00 300.00
TESTING ONLY
3 SPILL /OVERFILL CONTAINMENT BOXES 50.00 150.00
SUBTOTAL 1,950.00
DISCOUNT APPLIED ( PER CUSTOMER) 350.00 350.00
SUBTOTAL 1,600.00
BAKERSFIELD CITY FIRE DEPARTMENT 192.00 192.00
PERMIT FEE
1, (print) agree
to pay in full upon completion of this job.
Signature Date
Subtotal 1,792.00
PAST DUE ACCOUTS ARE SUBJECT TO A FINANCE CHARGE OF 1.5% PER MONTH OR A
5.00 CHARGE WHICH EVER IS MORE. BOUNCED CHECK FEE $25 & YOU CAN BE
Sales Tax (7.25 %) 0.00LIABLEFORUPTO3TIMESTHEAMOUNTOFTHISINVOICE.
Total 1,792.00
LWIV ,I
SWRCB, January 2002 Page Z of
Secondary Containment Testing Report Form
Thisform is intendedfor use by contractors performingperiodic testing ofUSTsecondary containment systems. Use the
appropriate pages ofthisform to report resultsfor all components tested The completedform, written test procedures, and
printoutsfrom tests (ifapplicable), should be provided to thefacility owner /operatorfor submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Date ofTesting:
Facilit}. Address: i ..
Facility Contact: Phone:
Date Local Agency Was Notified of Testing:
Name of Local Agency Inspector (fpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Name: Rich EnvironmentalCompany
Technician Conducting Test: RICH PHILLIPS
Credentials: X CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester
License Type: C61 /D40 A HAZ
Manufacturer
License Number: 809850
Manufacturer Training
Component(s) Date Training Expires
INCON TS-STS. 6/11/2012
3. SUMMARY OF TEST RESULTS
Component
2 VPR
PREM91 VPR BOX
a oo oo
otaoo oo r:.
o000 n
If hydrostatic testing was performed, describe what was done with the water after completion oftests:
CERTIFICATION OF TECHNI AN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, the facts state this document are accurate andinfull compliance with legal requirements
Technician's Signature: Date: 6/2/11
SWRCB, January 2002
4. TANK ANNULAR TESTING
LAIAM
Page, of
Test Method Developed By: Tank Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure X Vacuum Hydrostatic
C Other (Spec)
Used: 4" DIAL GAUGE Equipment Resolution: Equipment
0 Tank #87 #1 Tank #87 #2 Tank #91 Tank #DSL
From X Yes No X Yes No X Yes No X Yes No
o apacity: 12K 12K 12K 12K
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure /vacuum /water and
starting test:
30MIN 30MIN 30MIN 30MIN
Test Start Time:
Initial Reading (Rj):
Test End Time:
Final Reading (Rr):
Test Duration: 60 MIN 60 MIN 60 MIN 60MIN
Change in Reading (RF -R,):
Pass /Fail Threshold or Criteria:
ai I i t Rif
Yes No NA Yes No NA
t
Yes No 0N
i 1
Yes No NAWassensorremovedfor
T or properly replaced
and verified functional after Yes 11 No 0N Yes ONO DNA Yes No 0N 0Yes 0N 0N
testing?
Comments - (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests)
WET ANNULARS
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic
containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6))
SWRCB, January 2002
5. SECONDARY PIPE TESTING
Li
Page A- of
Test Method Developed By: Piping Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: X Pressure Vacuum 0 Hydrostatic
Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Material:
Piping Run #87 #1 Piping Run #87 #2 Piping Run #91 Piping Run #DSL
FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer: SMITH SMITH SMITH SMITH
Piping Diameter: 3" 3" 3" 3"
Length of Piping Run: 200' 200' 200' 180'
Product Stored: UNL87 UNL87 PREM91 DIESEL
Method and location of
piping-run isolation: BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP
Wait time between
applying
pressure/vacuum/water and
30 MIN 30 MIN 30 MIN 30 MIN
31time#@stime: 10:45 10:45 10:45 12:00
Initial Reading (Rj): 6.0 6.0 6.0 5.5
Test End Time: 11:45 11:45 11:45 1:00
Final Reading (RF): 6.0 6.0 6.0 5.5
Test Duration: 60 MIN 60 MIN 60 MIN 60 MIN
Change in Reading (RF -Rj): 0 0 0 0
Pass /Fail Threshold or
Criteria: 0 PSI 0 PSI 0 PSI 0 PSI
i.. ..vlkiSr;: 'Ir:i 'tis 7::;::: „i';,; .., 1• ^ :+ ': r i' i .r u M dj G:•• a' t t q! • t . i' j , 1r -. -ui, , i;ci u•: t i #. `5`E r.' cr:•
Comments — (include information on repairs made prior to testing, andrecommendedfollow -upforfailed tests)
Lk c"'
SWRCB, January 2002 Page <, of q
5. SECONDARY PIPE TESTING
Test Method Developed By: 0 Piping Manufacturer X Industry Standard Professional Engineer
0 Other (Spec)
Test Method Used: X Pressure Vacuum Hydrostatic
0 Other (Spec)
Test Equipment Used: 4" DIAL GAUGE Equipment Resolution: .5%
Piping Run #VR Piping Run #87 #1,
87#2191 VENT
Piping Run #DSL
VENT Piping Run #
Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer: SMITH SMITH SMITH
Piping Diameter 41' 4" 3"
Length of Piping Run: 400' 75' 50'
Product Stored: GASOLINE GASOLINE DIESEL
Method and location of
piping-run isolation: BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP
Wait time between applying
pressure /vacuum /water and
starting test:
30 MIN 30 MIN 30 MIN
Test Start Time: 1: l5 1:15 1:15
Initial Reading (RO: 5.5 6.0 5.5
Test End Time: 2:15 2:15 2:15
Final Reading (RF): 5.5 6.0 5.5
Test Duration: 60 MIN 60 MIN 60 MIN
Change in Reading (RF -Rj: 0 0 0
Pass/Fail Threshold or
Criteria: 0 PSI 0 PSI 0 PSI
ss:.ry ;
Qt:: -
sr: ii;, "•:: I r a:
t . L. r >.! Nt;kHt1 ,11
x
i 4
r
1 .
1. n
I i ! I ,rIr,^•s z({ srepjn °•a; e
i •1 yf
Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests)
87 #1- 87 #2 -91 VENT LINE MANIFOLDED 3" VENT PIPE
LAIAki
SWRCB, January 2002 Page (10 of Q
6. PIPING SUMP TESTING /
Test Method Developed By: Sump Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: D Pressure Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: iNCON TS -STS Equipment Resolution:
Sump Diameter:
Sump #87 #1 87M Sump #87 #2 87S Sump #91 Sump #DSL
42" 42" 42" 42"
Sump Depth: 74" 74" 74" 74"
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
Height from Tank Top to Top of
Highest Piping Penetration: 22" 22" 22" 22"
Height from Tank Top to Lowest
Electrical Penetration: 26" 26" 26" 26"
Condition ofsump prior to CLEAN CLEAN CLEAN CLEAN
iii of Sump Tested` 24" 24" 24" 24"
Does turbine shut down when
sump sensor detects liquid (both
product and water)?*
Yes No X NA DYes No X NA Yes No XNA Yes DNo XNA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown ?` Yes 0N X NA Yes 11No XNA Yes 0N XNA Yes No XNA
Was fail-'safe verified to be
operational?*
11 Yes No X NA Yes 0N XNA Yes 0N XNA Yes No XNA
Wait time between applying
pressure /vacuum /water and
starting test:
30 MIN 30 MIN 30 MIN 30 MIN
Test Start Time: 1:42 1:59 2:44 3:02 1:42 1:59 2:44 3:02
Initial Reading (Ri): 3.091 3.089 2.892 2.892 3.760 3.761 4.412 4.411
Test End Time: 1:58 2:15 2:59 3:12 1:58 2 :15 2:59 3:17
Final Reading (Rr): 3.090 3.087 2.892 2.892 3.761 3.761 4.412 4.411
Test Duration: 15MIN 15MIN 155M 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -Ri): 001 002 000 000 001 000 000 -.000
Pass/FaifThreshold or Criteria: 002 002 002 002 002 002 002 -.002
c- , ,i {?: , t i rl1 , ;1
i ..
n 1 , S • ; , i. ' f y • t p r^ ry . E
Was sensor removed for testing? X Yes No NA X Yes D No NA X Yes No NA X Yes No NA
Was sensor properly replaced
and verified functional after X Yes No NA X Yes No NA X Yes No NA X Yes No D NA
testing'?
Comments - (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
If the entire depth of the sump is not tested, specify how much was tested. If the answer to an of the questions indicated
with an asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)
livAt t
SWRCB, January 2002 Page T__ of
7. UNDER- DISPENSER CONTAINMENT DC TESTING
Test Method Developed By: UDC Manufacturer X Industry Standard Professional Engineer
0 Other (Spec)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Sped)
Test Equipment Used: INCON TS -STS Equipment Resolution:
UDC #1/2
UDC Manufacturer: UNKNOWN
UDC #3/4 UDC #5/6 UDC #7/8
UNKNOWN UNKNOWN UNKNOWN
UDC Material. FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
UDC Depth: 30" 30" 30" 30"
Height from UDC Bottom to
Top of Highest Piping
16" 1" 16" 16"
Pk igbt*om UDC Bottom to
Lowest Electrical Penetration:
12" 12" 12" 12"
Condition of UDC prior to
testing:
CLEAN CLEAN. CLEAN CLEAN
Portion ofUDC Tested 18" 18" 1 8" 18"
Does turbine shut down when
UDC sensor detects liquid (both
product and water)?*
Yes No X NA Yes No XNA Yes No XNA Yes No X NA
Turbine shutdown response time
Is system programmed for fail-
safe shutdown ?`
Oyes 0 No XNA Yes No XNA Yes No X NA 0 Yes No X NA
Was fail -safe verified to be
operational?* 0 Yes No X NA Yes 0 N XNA Yes El No XNA Yes 0 N XNA
Wait time between applying
pressure /vacuum /water and
starting test
30MIN 30MIN 30MIN 30MIN
Test Start Time: 4:24 4:40 4:24 4:40 5:30 5:46 5:30 5:46
Initial -Reading Rf): 3.422 3.422 2.322 2.323 4.894 4.894 5.239 5.239
Test End Time: 4 :39 4:55 4:39 4:55 5:45 6:02 5:45 6:02
Final Reading (RF): 3.422 3.422 2.323 2.323 4.894 4.894 5.239 5.239
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF -R, ): 000 -.000 001 000 000 000 000 -.000
Pass /Fail Threshold or Criteria: 002 -.002 002 000 002 002 002 -.002tINNINNI, si ixjbLa
Was sensor removed for
uis i ..
i. x
XYes 0 N NA
I: il!'.
XYes ONo NA
I..c _
XYes
t'
0N NA
t3
XYes 0N 0 N
R%kVlsor properly replaced
and verified functional after X Yes O No NA X Yes No DNA X Yes O No NA X Yes No DNA
testing?
Comments - (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
If the entire depth ofthe UDC is not tested, specify how much was tested. If the answer to a y ofthe questions indicated
with an asterisk ( *) is "NO" or "NA ", the entire UDC must be tested. (See SWRCB LG -160)
SWRCB, January 2002
8. FILL RISER CONTAINMENT SUMP TESTING
41AQ
Page (& ofg
Facility is Not Equipped With Fill Riser Containment
OHMer Containment Sumps are Present, but were Not Tested
Test Method Developed By: Sump Manufacturer X Industry Standard 0 Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Specify)
Test Equipment Used: INCON TS -STS
MEEMM11M=Fil1=S=um=
pp487ffi#
T Fill SumE 487 #2
Sump Diameter: 42" 42"
Equipment Resolution:
Fill Sump #91 Fill Sum #DSL .
42" 42"
Depth: 74" 74" 74" 74" Sump
Height from Tank Top to Top
of Highest Piping Penetration:
16" 32". 32" 16"
Height from Tank Top to
Lowest; Electrical Penetration:
30" 30" 30" 30"
Condition of sump prior to
testing:
CLEAN CLEAN CLEAN CLEAN
Portion of Sump Tested 18" 34" 34" 18"
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
Wait time between applying
pressure /vacuum /water and
starting test:
30MIN 30MIN 30MIN 30MIN
Test'Start Time: 12:00 12:21 12:21 12 :40 12 :21 12:40 2:44 3:27
Initial Reading (Ri): 3.906 3.906 4.976 4.976 5.097 5.098 3.495 4:515
Test End Time: 12:15 12:36 12:36 12:55 12:36 12:55 2:59 3:42
Final Reading (RF): 3.906 3.906 4.976 4.976 5.098 5.098 3.497 4.515
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading RF -R,): 000 -.000 000 000 001 000 002 -,000
Pass /Fail Threshold or Criteria: 002 .002 002 002 002 002 002 -.002
Is there a sensor in the sump? X Yes No X Yes 0 No X Yes No X Yes No
Does the sensor alarm when
either product or water is
detected?
Yes No X NA Yes No X NA Yes No XNA Yes No X NA
Was sensor removed for X Yes No NA X Yes []No NA XYes No NA X Yes No. NA
Wiwi sor properly replaced
and verified functional after X Yes 0N NA X Yes No NA XYes No NA X Yes No NA
testing?
Comments — (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests)
SWRCB, January 2002 Page a of
9. SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes
Spill /Overfill Containment Boxes are Present, but were Not Tested C
Test Method Developed By: 0 Spill Bucket Manufacturer X Industry Standard Professional Engineer
Other (Specify)
Test Method Used: Pressure Vacuum X Hydrostatic
Other (Spec)
Test Equipment Used: INCON TS -STS Equipment Resolution:
Bucket Diameter:
Spill Box 487 #1 VPR Spill Box #87 #2 VPR Spill Box #91 VPR Spill Box #
12" 12" 12"
Bucket Depth; 16" 16" 16"
Wait time between
applying
pressure/vacuum/water
30MIN 30MIN 30MrN 30MIN
444twAngiffto: 11:24 11:41 11:44 12:06 11:41 12:00 1:42 1 :59
Initial Reading (R,): 4.100 4.100 5.106 5.160 5.290 5.290 5.163 5.163
Test Eif& Time: 11:39 11:57 11:57 12:15 11:57 12:15 1:58 2:15
Final Reading (RF): 4.100 4.100 5.106 5.106 1 5.290 5.290 5.163, 5.163
Test Duration: 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF- 000 000 000 000 000 000 000 000
Fail Threshold or
Criteria: 002 002 002 002 002 002 002 002
l{ 8$tlilti 'l::, dl « fit' c;u• (;, : [• • !. ... , 1Fly, ;
1. { !jti i a
i S i iai
r
Comments -- (include information on repairs made prior to.testing, and recommendedfollow -upforfailed tests)
arURD gHELLI4SAKGOSFORDAUFRSFIELDCA
OEi r2 /i911 i'
11:30 AMSLrM+' LEAK TEST REPOR7'
8 ? -1VPR
rEST STARTEDEST ' 11:24BEGIN `LEVEED 06ig2 11
END TIME L
1.INATE
06_,@2i2@139AMENDLEVEL1TEST. THRESHOLD 41094 INRESULT
A0"
2
ED
41 OOSFORU .SHELL`: j50Gr7SFORD- A
RKERSFIELD CfAk 1
06/02 /2011„ 11:5
SUMP LEAK-.TEST RB4'OPIT
E7 —IUPR
TEST STARTED 11:'4Y
TEST STARTED 06102/2011
BEGIN LEVEL 411 06
END TIME
END DATE 06/02/2011
END LEVEL 4.1086 IN..
LEAK THRESH
TEST RESULT
OLD 0.002
PRSSED
87-261.4 8 ` •
TEST STARTED 11°
TEST STARTED 06/02`W1 "1
BEGIN LEVEL` 5.1064 14s1.
END TIME
END DATE. 06/021,20fiI
END LEVEL. 5.1061., TN
LEAK THRESHOLD 0.002:11
TEST RESULT PASSED
91VPR
TEST STARTED
TEST STARTED
BEGIN LEVEL
END TIME
END DATE
END LEVEL
LEAK THRESHG
TEST RESULT
11: 41 !AM
06/02/2011
5.2902 IN
11:57 AM
06/02/2011
5.2905 IN
LD 0.002 IN
PASSED
GOSFORD SHELL
4050 GOSFORD AVE
BAKERSFIELD CA
06/02/2011 12:16 PM'
SUMP LEAK TEST REPORT
871FILS
TEST STARTED 12:00 PM
TEST STARTED .06/02/2011
BEGIN LEVEL 3.9066 IN
END TIME 12:15 PM
END DATE 06/02/2011 ..
END..LEVEL. 3 9065 IN
LEAK THRESHOLD 0N.
TEST .RESULT
87 -2VPR At
TEST .STARTED 12:'00
TEST STARTED 06/11., .,
BEGIN LEVEL 5.16b2'IN
END TIME 12 15 PM
END DATE 06/022011
END LEVEL 5.1065 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91VPR
TEST STARTED
TEST STARTED 12:00 PM j
TEST STARTED 06/02/2011
BEGIN LEVEL .. 5.2907 IN
END TIME 12:15 PM:
END DATE 06/02/201.1
END .LEVEL 5.2905 IN
LEAK THRESN_P 0. ,.IN PASSED
GOSFORD SHELL
4050 GGSFORD AVE
BAKERSFIELD CA
06/02/20.11 12:36 PM
SUMP LEAK TEST REPORT
871FILS ...
TEST STARTED 12:21 PM
TEST STARTED 06/02/2011
BEGIN t FUEL 3.903. PM
IN
TIME 1
END DATE /201,1
END. LEVEL.. ' IN
L : THRESHOI p 8 `I1+1:.
RESU 1 h
TEST'' ' b r17 21 PMiTESTSTARTED06i02i2011
BEGIN LEVEL 4.9765
36 PMEND, TIME,
END DATE 06/02/2011
END LEVEL 4.768 IN
LEAK THRESHOLD 0. 002 IN
TEST RESULT PASSED
91FILS
TEST STARTED 12:21 PM
TEST STARTED 06/02/2011
BEGIN LEVEL. 5.0978 IN
END TIME PM.
END GATE 06/02/2011
END LEVEL 5.0984 IN
LEAK THRESHOLD . 0.002 IN
TEST RESULT PASSED
GOSFORD SHELL .
4050 GOSFORD AUE.
BAKERSFIELD CA
06/02!2011 12:55 PM
SUMP LEAK TEST REPORT
871FILS
TEST STARTED 12:40 PM
TEST STARTED 06/02/2011
BEGIN LEVEL 3.9064 IN
END TIME 12:55 PM
END DATE 06/02/2011
END '., LE14EL 3.91360 IN
LEA'iC"FF tSHOLD :0;802 °IN:
TEST RESULT PASSED
872FILS
TEST STARTED r2--40 PM
TEST STARTED 06/02./201.1
BEGIN LEVEL 4.9765 IN
END-TIME 1255 PM
END DATE 06/02/2011
END LEVEL 4.9765 IN
LEAK THRESHOLD 0.0162 IN
TEST RESULT . PASSED
GOSFORD SHEL)..
4050 GOSFORD AUE
BAKERSFIELD CA.
06/02/2011 1:58 PM
SUMP LEAK TEST REPORT
871STP
TEST STARTED 1:42 PM
TEST STARTED 06/02/2011
BEGIN LEVEL 3.0910 IN
END TIME 1:58 PM
END DATE @6/ok2011 i
END LEVEL I 3; "IN,j
LEAK T.HRESHt'lL0 8 $ 2: IN
TEST RESULT P tSSED
91.STP
TEST STARTED Z 1:42 PM 1
TEST STARTED 06/02/2011,,
BEGIN LEVEL 3.7600.IN
END TIME 1:58 PM
END DATE 06/02/2011
END LEVEL 3.7610 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91FILS
TEST STARTED 12:40 PM
TEST STARTED 06/02/2011
BEGIN LEVEL 5.0985 IN
END TIME 12:55 PM
END DATE 06/02/2011,,
END LEVEL 5x0986 IN '.
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED.
TEST ST` ; D'
h
DSLFILS- 7-
TEST. STARTED 3 P. ,ITESTSTARTED06/02/11
BEGIN LEVEL 4.5151 :1H
END TIME 314$ PP1
END DATE 06102/2011
END LEVEL. 4.5153 IN
LEAK THRESHOLD 0.002 IN ."
TEST RESULT PASSED
GOSFORD SHELL !
4050 GOSFORD AUE
BAKERSFIELD CA
06/02/21 2:59 PM
SUMP LEAK TEST REPORT
872STP
TEST STARTED 2:44 PM
TEST STARTED 06/02/2011
BEGIN LEVEL 2.8921 IN
END TIME 2:59 PM
END DATE 06/02/2011
END LEVEL 2.5927 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
DSLUPR
TEST STARTED 1 :42 PM
TEST STARTED 06/02/2011
BEGIN LEVEL 5.1635 IN
END TIME 1:58 PM
END DATE 06/02/201.1
END LEVEL 5..1638 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED.. }
i
GOSFORD;.SHELL f4050G15F010AVE
BAKERSFIELD qA
06/02/2011 3:17 PM
SUMP LEAK TEST REPORT
872STP
TEST -STARTED
TEST STARTED
BEGIN LEVEL
END TIME
END DATE
END LEVEL
LEAK THRESHOI
TEST RESULT
3:02 PM
06/02/2011
2.8922 IN
3:'17 PM
06/02/2011
2.3917 IN
D 0,002 IN
PASSED
DSLSTP
j TEST STARTED 3:02 PM
TEST. STARTED 06/02x2 !
BEGIN LEVEL. 4.4119 1
END TIME 3'.i7'PM
ENb DATE 0922011
END.aEVEL:
3.0873. IN
1 LEAK. THRESHOLD 0.062 ,IN'
TEST RESULTi PASSED
GOSFORD SHELL
4050 GOSFORD AVE
BAKERSFIELD CA
06/02/2011 2:15 PM
SUMP LEAK.TEST REPORT
S71'STP
TEST STARTED 1?59.PM
TEST STARTED 0642011
BEGIN.LEVEL 3.0893 IN
END TIME 2:15 PM
END DATE 06!02/2011
END LEVEL 3.0873. IN
LEAK H.K -SHOLQ 0..Q02 IN
TEST R SULT PASSED
TEST ST` ; D' 1:59. PM
TEST s ED 06/022011
BEGIN LEVEL 3.7612 IN
MD'TIME 2:15 PM
END;.,$0TE 06/92/201.1
END` LEVEL 3.7611 IN
LEAK THRESHOLD 0.0 &2 IN
TEST. RESULT PASSED
DSLUPR
TEST STARTED 1:59 PM
TEST STARTED 06/82/2011
LEVEL 5.1639 ININ
TIME 2:15 PM
DATE 06/02/2811
END.LEVEL 5.1634 IN
LEAK THRESHOLD .0.$02 IN
TEST R SULT PASSED
t ' TEST .. T 2 44 PM
N 11EVEL ¢ X2,3117E2i fitDATE66i82BILE -L 4.4TES40LD0.002TRESULTPASSED
DSLPILS
TEST.STARTED °2 :44 PMTEST'STARTED 0 1BEGINLEVEL3.4952 INENDTIME2:59 PMENDDATE06/02x2011ENDLEVEL3.4971 INLEAKTHRESHOLD0,002 INTESTRESULTIts
tti l 1
1
oO.SFORD SHELL
4350 GOSFORD AUE
BAKERSFIELD CA, .
Pr
46/92/2011 4:39
SUMP !EAK TEST REPORT
DIS ?1 -2 j
TEST STARTED 4 .2, PM.
TEST 5TRRTE6.- 06/011 i
BEGIN .:
LEVEL .422-4
END TIME
D-4D DATE b6!C' X11
END. LEUEL 2.4226
IIIwwH .
AK THRESHOLD 0.002
TEST RESULT
t
DISPT -4
TEST STARTED 4:24 NM
TEST STARTED 02.32229 /
2 11 .
BEGIN LEVEL 4:39 PMENDTIME06/02/201" END DATE I
END LEVEL 2.32g
LEAK THRESHOLD 0.t 0 IN
TEST RESULT PASSED
4RAKERRFIER6 ACVAE .
s.
06/02/2011 4:55 PM
BEAK. TES' REPORT
DISP1-2
TEST STARTED 4:40 PM
TEST •;TARTED 06/02/2011
T IrUEL 3.4223 IN.
E!A. TIME 4:55 PM
EN''! r?ATE 06/02/2011
END LEVEL 3.4223 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
DISP3 -4
TEST STARTED
TEST STARTED
BEGIN LEVEL
END TIME
END DATE
END LEVEL .:
LEAK THRE843L
TEST RESEILT
4.40 PM
06/02/2011
2.3233 IN
4:55 PM
06/02/2011
2.3231 -IN ;
A , 0 90; <IN
PASSED...
GOSFORD SHELL
4050 GOS.ORD AVE !
BAKERSFIELD CA
06/02/2011 5:45 PM
SUMP LEAK TEST REPORT
DISP5 -6
TEST STARTED 5:30 PM
TEST STARTED 06/02/2011
BEGIN LEVEL 4.8949 IN
END TIME 5:45 PM
END DATE 06/02/2011
END LEVEL 4.8944 IN.
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
DISP7 -2
TEST STARTED 5:30 PM
TESTTRTED 06/02/2011j: Sol 1''ECi ..: 5 2:97 IN
ENQM':$ PM
END 9 7 06/A2 7_ j :
5:239.4 .I.N '. END TIME
LEAK THRESiOI
END DATE
TEST RESULT PASSED
COSFORD SHELL
4050 GOSFORD AVE
BAKERSFIELD CA
06/02/2011 6:02 PM
SUMP LEAK TEST REPORT
DISP5 -6
D 5:46 AM
7` 06/02/2011
f ZM7t'y°4 .kJi°
i D '
TEST STfil 46 ': PMTESTSTAR]' . ,..; 6/@2/201.1:: BEGIN LEVEL: :, 5:239.4 .I.N '. END TIME 6 :02 PfdENDDATE06i02011ENDLEVEL5.239 INLEAKTHRESHOLD0.062 INTESTRESULTPASSED
SB989 TESTING FAILURE REPORT
SITE NAME: GOSFORD SHELL DATE: 6/2/11
THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE
TESTING.
REPAIRS: /t/a/ -r
LABOR:
PARTS INSTALLED:
NAME: TITLE:
SIGNATURE:
THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING
THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR
THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMENTAL FOR
ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF
ANY FINES OR PENALTIES OCCURiNG FROM NON - COMPLIANCE.
A COPY OF THIS DOCUMENT HAS BEEN LEFT ON -SITE FOR YOUR
CONVIENENCE.