Loading...
HomeMy WebLinkAboutINSP COVERLETTER 7/21/201125-78 INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION SYSTEMS Inspection, Testing,,an& aintenance Cover Sheet NFPA 25 as: amend' d?by,_; CR, Title 19 Property Information: Name: .. %/`` %/tGt' Occupancy /Use: of CA op Address: L // .. ;CE L, D Construction. Type: v City: No. Stories: ZIP: 73, v Year Constructed: Contact: F Telephone: ontractor Information: Number of System Risers Jorgensen Company Copy sent to: 2345 S. Fruitvale Ave., #1 Owner Date Bakersfield gfire AHJ Date CA 93308 Contractor Date 661 - 327 -4352 NOTES: 262995 1) For.specific Inspection, -testing, and maintenance requirements and information, see NFPA-25,2002 Edition as amended:by Job # S California Code of Regulations, Title.191,, §001 to §906. 2) Inspection Items may be performed by. the Performed by: Print) Owner in accordance with California Code of Regulations Title 19 §904.1(a) Forms included with this report NFPA 25 Chapter Number of Forms N/A FAIL' PASS rAutomatic Sprinkler System 5 Standpipe and Hose Systems g Private Water Supply System 7 Fire Pump g Water Storage Tank g Water Spray System 10 Foam Water Sprinkler System 11 See "Deficiencies and Comments ", section at end of each respective form. State Fire Marshal AES 1 March 21, 2006 wil1fc1 25 -79 Inspection, Testing, and Maintenance Fire Sprinkler System NFPA 25, Chapter Sas amended by CCR, Title 19 Page 1 of 4 Date of Inspection, Testing, Maintenance: System Riser ID: Initial Static Pressure: 60 (psi) Property Information: M = Maintenance Name: /% G —' %s Type of System: Wet Pipe of CA4./. 0 MI = Per Manufacturer's Instructions Address: 32% /V . gC?Z- ,2 0 Dry Pipe a Description 0 Preaction Fail N/A O Deluge r, ARE MP+ City: /eG /;:7 Daily Preaction /Deluge Valves — Enclosure Main Drain Test Results: Abbreviation Key: I =Inspection Initial Static Pressure: 60 (psi) T = Test M = Maintenance Residual Pressure: SS (psi) A -O = After Operation MI = Per Manufacturer's Instructions Restored Static Pressure: S` (psi) Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.1 1 Daily Preaction /Deluge Valves — Enclosure 12.4.3.1Weeklytemrature X 1.2 1 Daily Dry Pipe Valves — Enclosure 12,4.4.1.1Weeklytemperature k- 1.3 1 Quarterly Gauges (Dry, Preaction, Deluge 5.2.4.2 Systems) 5.2.4.3 1.4 I Quarterly Control Valves 12.3.2.1 1.5 1 Quarterly Alarm Devices 5.2.6 1.6 1 Quarterly Gauges (Wet Pipe Systems) 5.2.4.1 X 1.7 1 Quarterly Hydraulic nameplate 5.2.7 1.8 1 Quarterly Pipe and Fittings 5.2.2 1.9 1 Quarterly Sprinklers 5.2.1 k 1.10 1 Quarterly Spare Sprinklers 5.2.1.3 Nc 1.11 1 Quarterly Fire Department Connections 12.7.1 1.12 1 Quarterly Alarm Valves — Exterior Inspection 12.4.1.1 1.13 1 Quarter) Quarterly Preaction /Deluge Valves — Exterior 12.4.3.1.6 Inspection 1.14 1 Quarterly Pressure Reducing Valves 12.5.1.1 1.15 1 Quarterly Dry Pipe Valves — Exterior Inspection 12.4.4.1.4 1.16 1 Quarterly Backflow Preventers 12.6.1 X 1.17 1 Annually Buildings 5.2.5 k State Fire Marshal AES 2 March.21, 2006 25 -80 INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FIRE PROTECTION SYSTEMS Inspection, Testing, and Maintenance Fire Sprinkler System Page 2 of 4 NFPA 25, Chapter 5 as amended by CCR Title 19 Date of Inspection, Testing, Maintenance: —Z/ "/l System Riser ID: Property Information: Name: G / /—G dE Type of System: OF CAI. Wet Pipe Z Address: 13 Dry Pipe " a Preaction Deluged ARE MP City: tG. /i Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 1.18 1 Annually Hangers 5.2.3 1.19 1 Annually Seismic Braces 5.2.3 1.20 1 5 Years Hangers (Accessible concealed spaces) 5.2.3.3 1.21 1 5 Years Seismic Braces (Accessible concealed 5.2.3.3 1.22 1 5 Years Pipe a Fittings (Accessible concealed 5.2.2.3spaces) 1.23 1 5 Years Sprinklers (Accessible concealed spaces) 5.2.1.1.4 1.24 1 5 Years Alarm Valves — Interior Inspection 12.4.1.2 1.25 1 5 Years Alarm Valves - Strainers, filters, orifices 12.4.1.2 1.26 1 5 Years Check Valves — Interior Inspection 12.4.2.1 1.27 1 5 Years PreaclorvDeluge Valves — ,Interior 12.4.3.1.7Inspection 1.28 1 5 Years PreactioNDeluge Valves - Strainers, 12,4.3.1.8filtersorifices 1.29 1 5 Years Dry Pipe Valves — Interior Inspection 12.4.4.1.5 1.30 1 5 Years Dry Pipe Valves - Strain* filters, orifices 12.4.4.1.6 2.1 T Annually Alarm Devices (90 Sec) 5.3.3 12.2.7 12.2.6 2.2 T Annually Main Drain Test'(Enterdatp on Page 1) 12.2.6.1 12.3.3.4 2.3 T Annually Antifreeze Test 5.3.4 X 2.4 T Annually Control Valve - Position 12.3.3.1 2.5 T Annually Control Valve — Operation 12.3.3.1 2.6 T Annually Supervisory 12.3.3.5 2.7 T Annually Preaction Valve— Priming Water 12.4.3.2.1 2.8 T Annually Preaction Valve — Low Air Pressure Alarm 12.4.3.2.10 k 2.9 T Annually Preaction Valve — Full Flow Trip Test 12.4.3.2.2 State Fire Marshal AES 2 March 21, 2006 25 -81 Inspection, Testing, and Maintenance Fire Sprinkler System Page 3 of 4 NFPA 25 Chapter 5 as.amended by CCR Title 19 Date of Inspection, Testing, Maintenance: System Riser ID: Property Information: Name: 1—/-,L76-7 //U1't e of of c,aL, o9TypesW tstem Pipe Address: .72 -7 /t/ % i 1 D Pipe ` 2DryPiPipa n Deluges P SAE Mp City: Item Activity Frequency Description NFPA 25 Reference Fail N/A Pass 2.10 T Annually Dry Pipe Valve — Priming Water 12.4.4.2.1 2.11 T Annuallyy ry Pipe Valve — Low Air Pressure 12.4.4.2.6Alarm k 2.12 T Annually DD Valve — Quick - Opening 12.4.4.2.4 2.13 T Annually Dry Pipe Valve — Trip Test 12.4.4.2.2 2.14 T Annually Backflow Preventer Assemblies 12.6.2 x 2.15 T 3 Years Dry Pipe Valve — Full Flow Trip Test 12.4.4.2.2.2 2.16 T 5 Years Gauges 5.3.2 2.17 T 5 Years Pressure Reducing Valve 12.5.1.2 2.18 T 5 Years Fire Department Connection Backflush 12.7.4 2.19 T 5 Years Sprinklers — Extra High Temperature 5.3.1.1.1.3 k 2.20 T 5 Years Sprinklers — Corrosive environment or 5.3.1.1.2 corrosive water 2.21 T 10 Years Sprinklers - Dry 5.3.1.1.1.5 2.22 T 20 Years Sprinklers - Fast Response 5.3.1.1.1.2 2.23 T 50 Years Sprinklers 5.3.1.1.1 2.24 T 75 Years Sprinklers 75 years in service 5.3.1.1.1.4 2.25 T Sprinklers manufactured prior to 1920 5.3.1.1.1.1Replace 3.1 M Annually Control Valves 12.3.4 3.2 M Annually Preaction/Deluge Valves 12.4.3.3.2 3.3 M Annually Dry Pipe Valves/Quick- Opening 12.4.4.3.2 kDevices 3.4 M Annually Dry Pipe Valve — Low Point Drains 12.4.4.3.3 3.5 M 5 Years Obstruction Investigation Chapter 13 State Fire Marshal AES 2 March 21, 2006