1. FACILITY INFORMATION
Facility Name: SAYEGH GROUP INC. Date of Testing: 06/03/2011
Facility Address: 2800 PANAMA LANE , BAKERSFIELD, CA, 93313
Facility Contact: MARK SATER Phone: (6 61) 835-0643
Date Local Agency Was Notified of Testing: 05/16/2011
Name of Local Agency Inspector (if present during testing): ERNIE
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY , INC.
Pass
Technician Conducting Test: DANIEL VISSER
Repairs
Made
Credentials:
Pass
CSLB Licensed Contractor
Not
Tested
SWRCB Licensed Tank Tester
Piping Sump 1 UNL
License Type: A License Number: 743160
0
Manufacturer
Manufacturer Training
Component(s) Date Training Expires
INCON TS -STS 06/01/2012
0
Piping Sump 1 UNL x
3. SUMMARY OF TEST RESULTS
Component Pass Fail
Not
Tested
Repairs
Made Component Pass Fail
Not
Tested
Repair
MadL
Piping Sump 1 UNL E 0 0 0 0 0 0
Piping Sump 1 UNL x
Piping Sump 2 UNL E] El
Piping Sump 2 UNL x
Piping Sump 3 UNL 1:1 El
Piping Sump 3 UNL El
Piping Sump 4 PRE El
Piping Sump 4 PRE 1:1
0 0 I 0 0 0 0 0
0 E-110 0
0 0 0 0 0 0
0 0 0 0 0 0 0
If hydrostatic testing was performed, describe what was done with the water after completion of tests:
WATER WAS REUSED.
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best ofmy knowledge, thefacts state //d in this document are accurate and infull compliance with legal requirements
Technician's Signature: CDC4 u-1 Lu '` Date: 06/03/2011
SWRCB, January 2002
6. PIPING SUMP TESTING
Page 2.
Test Method Developed By: F-1
El
Sump Manufacturer X Industry Standard F-1 Professional Engineer
Other (Specify)
Test Method Used:
0
Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: INCON Equipment Resolution: +- . 0020
Sump # 1 UNL Sump # 1 UNL Sump # 2 UNL Sump # 2 UNL
Sump Diameter: 4811 4811 4811 4811
Sump Depth: 55" 55" 56" 56"
Sump Material: FIBERG FIBERG FIBERG FIBERG
Height from Tank Top to Top of
Highest Piping Pentration:
24" 24" 24" 24"
Height from Tank Top to Lowest
Electrical Pentration:
24 If 2411 2 4 " 24 "
Condition of sump prior to testing: CLEAN CLEAN CLEAN CLEAN
Portion of Sump Tested: 2 "ABOVE 2 "ABOVE 2 "ABOVE 2 "ABOVE
Does turbine shut down when
sump sensor detects liquid (both
product and water) ?*
E]Yes E]No[EN F]Yes NoaN F]Yes Noah Yes No
Turbine shutdown response time: 0 0 0 0
Is system programmed for fail -safe
shutdown ?* Yes N X N Y r--1
es N N Yes N Na Yes
r--N
No
Was fail -safe verified to be
operational ?*
r___1YesNN N X NYes N X NYes No XYes
Wait time between applying
pressure /vacuum/water and starting
test:
15MIN 15MIN 15MIN 15MIN
Test Start Time: 850 907 832 850
Initial Reading (RI ): 5.9147 5.9147 S.5693 5.5196
Test End Time: 905 922 847 905
Final Reading (RF ): 5.9146 5.9144 5.5682 5.5194
Test Duration: 15MIN 15MIN 15MIN 15MIN
Change in Reading (R F - RI ): 0001 0003 0 011 0002
Pass/Fail Threshold or Criteria: 0020 0020 0020 0020
Test Result: a Pass El Fail a Pass Fail a Pass Fail a Pass El Fail
Was sensor removed for testing? X Yes N N ayes N N X Yes N N E Yes No
Was sensor properly replaced and
verifed functional after testing? X Ye N NA X e NA Ye N NA yes N `1__N
Comments - (include information on repairs madeprior to testing, and recommendedfollow -upforfailed tests)
1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)
SWRCB, January 2002
6. PIPING SUMP TESTING
Page 3 .
Test Method Developed By: F-1
0
Sump Manufacturer X Industry Standard F-1 Professional Engineer
Other (Spec)
Test Method Used:
0
Pressure Vacuum Hydrostatic
Other (Specify)
Test Equipment Used: INCON Equipment Resolution: +- . 0 02 0
Sump # 3 UNL Sump # 3 UNL Sump # 4 PRE Sump # 4 PRE
Sump Diameter: 4811 4811 4811 4811
Sump Depth: 58" 58" 60" 60"
Sump Material: FIBERG FIBERG FIBERG FIBERG
Height from Tank Top to Top of
Highest Piping Pentration:
2411 2 4 " 24 If 24
Height from Tank Top to Lowest
Electrical Pentration:
2411 2411 2411 2411
Condition of sump prior to testing: CLEAN CLEAN CLEAN CLEAN
Portion of Sump Tested: 1 2 "ABOVE 2 "ABOVE 2 "ABOVE 211ABVE
Does turbine shut down when
sump sensor detects liquid (both
product and water) ?*
yes No N Yes No N Yes ENo N Yes No XNT
Turbine shutdown response time: 0 0 0 0
Is system programmed for fail -safe
shutdown ?* Yes N X N Yes N X N Yes N X N Yes No X
Was fail -safe verified to be
operational ?*
Yes N X N Yes N X N Yes N X N No XYes
Wait time between applying
pressure /vacuum/water and starting
test:
15MIN 15MIN 15MIN 15MIN
Test Start Time: 1019 1034 1019 1034
Initial Reading (RI ): 4.5447 4 . 5458 4.9893 4 .49893
Test End Time: 1034 1049 1034 1049
Final Reading (RF ): 4.54S5 4 . 5462 4.9890 4 . 9894
Test Duration: 15MIN 15MIN 15MIN 15MIN
Change in Reading (RF- RI ): 0008 0004 0003 0001
Pass/Fail Threshold or Criteria: 0020 0 0 2 0 0020 0 0 2 0
Test Result: J Pass - Fail 1 Pass Fail, 0 PasS Fal Pass D Fail
Was sensor removed for testing? X Yes N N X Yes N N X Yes N N X Yes No
Was sensor properly replaced and
verified functional after testing? YeC] Nc[:] NA X Ye N NA YesDN NA Yes N
Comments - (include information on repairs made prior to testing, and recommendedfollow -upforfailed tests)
Ifthe entire depth of the sump is not tested, specify how much was tested. If the answer to any-of the questions indicated with an
asterisk ( *) is "NO" or "NA ", the entire sump must be tested. (See SWRCB LG -160)
41-0 Tbn
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE:06 /03/11 WORK ORDER NUMBER3183963.
CLIENT: SAYEGH GROUP INC. SITE: SAYEGH GROUP INC.
COMMENTS
Finish SB -989 Testing - All STP Sumps. Replaced (5) 3 inch caps.
PARTS REPLACED
QUANTITY DESCRIPTION
5 13 inch caps
HELIUM PINPOINT TEST RESULTS (IF APPLICABLE)
ITEMS TESTED
HELIUM PINPOINT LEAK TEST RESULTS
Printed 06/17/2011 07:28 MTUTTLE
SITE DIAGRAM
Tanknobgy
8501 N MOPAC EXPRESSWAY, SUITE 400
AUSTIN, TEXAS 78759
512) 451 -6334
FAX (512) 459 -1459
TEST DATE: 06/03/11 WORK ORDER NUMBER3183961
CLIENT: SAYEGH GROUP INC. SITE: SAYEGH GROUP INC.
AIR/ VR/ INCON
H2O
C- STORE
z
w
7 #3
o_
8 #4 > STP REG F V
STP REG j
5 #1
6 #2 *-REG
STP PREM I
Printed 06/17/2011 07:28 MTUTTLE
Work Order: 3183961
87SYSTP
TEST STARTED 0.32 AM
TEST STARTED
TEST STARTED 06/03•12011
5.9147 IN
BEGIN LEVEL 5.5693 IN r,YEGH ARCO
END TIME 8:47 AM 313961
END MATE
END LEVEL
06/03/2011
5.5682 IN 201). 10."74 AiM
LEAK THRESHOLD 0.002 IN SUMP LEAK TES? REPORTTESTRESULTPASSED
7SSTP
TEST STARTED 10:19 AMTESTSTARTED06/03/2011BEGINLEVEL4.5447 INENDTIME10:34 HNENDDATE06/03/2011END ;_FUEL 4.:.7455 i;`
LEAK THRESHOLD 0.002 IN
SAY;GH ARCO TEST RESULT PASSED
3133961
06/03/2011 9:05 AM
SUMP LEAK TEST REPORT
a71^.STP
TEST STARTED 8:50 AM
TEST STARTED 06/03/2011BEGINLEVEL5.9147 IN
END TIME 9 :05 AM
END DATE 06/03/2011
END ;LEVEL 5.9146 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT ASSED
87SYSTP
TEST STARTED 8:50 AM
TEST STARTED 06/03 /2011
BEGIN LEVEL 5.5196 IN
END TIME 9:05 AM
END DATE 06/033/2011
END LEVEL 5.5194 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
91STP
I t_.7 STARTED i 0: i 9 ArMTESTSTARTED06103/201! EGIN LEVEL 4.9893 INENDTIME10:34 AMENDDATE06103/2011ENDLEVEL4,9890 Ir4LEAKTHRESHOLD19.002 INTESTRESULTPASSED
X16 'F 3/201' 1=1:50 AM
SUMP LEAK TEST REPORT
TEST STARTED 10:34 AM
TEST STARTED 06/03/2011
BEGIN LEVEL 4.545' IN
END TTM.E 10:49 AM
END DATE 06/03!2011
END `_EUEL 4.5462 Ii
LEAK THRESHOLD 0.002 I.v
SAYE;H ARCO TEST RESULT PASSED
31c3961
07/03/2011 9:22 Ail
SUMP LEAK TEST REPORT
7P1STP
TEST STARTED 9 :07 AM
TEST STARTED 06/03/2011
BEGIN LEVE: 5.9147 IN
END TIME 9 :22 API
END DATE 06/03/2011
END :.EVEI_ 9144 IN
LEAK THRESHOLD 0.002 IN
TEST RESUL7 AS'3ED
91STP
TEST STARTED 10:34 AM
TEST STARTED 06/03/2011
SEG1N EUEL 4.9893 IN
END TIME 10:49 AM
END DATE 06/03/2011
END LEVEL 4.9894 IN
LEAK THRESHOLD 0.902 IN
TEST RESULT PASSED
Tanknology Inc. 11000 N. MoPac Expressway, Suite 500, Austin, Texas 78759
1PP Tanknology
11000 N. MoPac Expressway, Suite 500
Austin, Texas 78759
Phone: (512) 451 -6334
Fax: (512) 459 -1459
BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR CRAIG PERKINS
1501 TRUXTUN AVE.
BAKERSFIELD, CA. 93301
Test Date: 06/03/2011
Order Number: 3183961
Dear Regulator,
Date Printed and Mailed: 06/17/2011
Enclosed are the results of recent testing performed at the following facility:
SAYEGH GROUP INC.
2800 PANAMA LANE
BAKERSFIELD, CA. 93313
Testing performed:
Secondary Containment Turbine Sump
Sincerely,
Dawn Kohlmeyer