Loading...
HomeMy WebLinkAboutFlow Monitoring Report PAGE 1 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 2 Flow Report City of Bakersfield 2 Meter sites McCutchen Buena Vista PAGE 2 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 3 Contents  US3 Information and Services  Project Approach  Sensor Used and Specifications  Summary of sites / Estimated Capacities  Map Location  Confined Space  Meter Site McCutchen o Site Documentation o Site Statistics o Site Data and Graphs  Meter Site Buena Vista o Site Documentation o Site Statistics o Site Data and Graphs PAGE 3 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 4 Who we are: Utility Systems, Science and Software, Inc. (US3), was founded in 2002 as a specialty technical engineering service company with its headquarters located in Santa Ana, California and Service and Engineering Facilities in San Diego, Sacramento. The owners and management team are all professional and degreed engineers and have extensive experience in the application and implementation of Water/Waste Water and associated Process Control Projects. We are currently working in many facilities throughout the USA and are selectively guiding the growth of our business into markets and areas where we can provide the highest quality value of service to our clients. US3 supports Municipalities, Consulting Engineering firms and other water/waste water systems integrators by providing technical services for engineering, software programming, technical site maintenance and calibration site support work primarily in the Water and Waste Water industries. Services Include:  Sewer Monitoring o US3 installs and maintains Marsh-McBirney Meters for Sewer Monitoring. US3 will then interface the standard MM Meter for Real-time Web-Based Wireless Flow Monitoring using CDMA, GPRS/GSM, VHF/UHF/Trunk radio networks (including Motorola Networks). US3 provides the following: o Detailed Preliminary Investigation. o Validate Hydraulic Suitability, o Provide Detailed Site Data, o Install Meter to Exact Specifications,  Interface Rain Gauge Instrumentation,  Provide Communications to all instruments,  Train Utility Engineers and Technicians how to access Web-Based Data,  Provide complete Calibration and Maintenance Services.  SSO Monitoring & Event Notification  US3 provides simple, cost effective, wireless SSO/CSO Monitoring & Event Notification. This information will be sent to your cell phone, pager, work/home phone and/or email. PAGE 4 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 5  Flow Meter Maintenance o US3 provides supplemental or dedicated maintenance Marsh-McBirney service for short-term or long-term requirements. Our highly trained and skilled technicians are experts in all phases of waste monitoring system maintenance  Sanitary System Evaluation Services  US3 has experienced licensed civil engineers who can work with City or County personnel to develop a comprehensive SSES program.  US3 provides the procedures, equipment, and results of each activity performed during the investigation. US3 will develop a report to discuss the existing sanitary sewer collection system, identifies the system defects and problem areas, prioritizes and ranks the inflow/infiltration sewer segments, and details the recommended improvements. The report also includes a preliminary cost estimate associated with the selected rehabilitation methods to effectively reduce inflow/infiltration volumes and extend the useful life of the existing piping. Project Management Approach: Our Structure for Project Management puts “Checks and Balances” in to ensure the Customer is satisfied with the solutions and product provided. PAGE 5 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 6 Flow Meter Used in your Flow Study Flo-Dar incorporates a Doppler Radar Velocity Sensor and Ultrasonic Depth Transducer for use in Open Channel Applications. It is available with a Permanent Flo-Station. The Flo-Station is available with or without a display and is powered with 120/240 VAC, or 12 VDC. The Flo-Station requires Flo-Ware software, which is included on some models, and a customer supplied PC. Flo-Station with display shows flow rate, total flow, velocity and level. Both Flo-Station's have four outputs one each for level, velocity, flow rate, surcharge level, and a contact closure. PAGE 6 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 7 Enclosure Material: Polystyrene Dimensions: 6.9" W x 16.65" L x 11.7" D (17.5 cm x 42.3 cm x 29.7 cm) Weight: 10.5 lbs. (4.8 kg) Temperature Operating Range: 14° F to 122°F (-10° C to 50° C) Storage Range: -40° F to 140° F (-40° C to 60° C) Velocity Measurement Method: Radar Range: 0.75 to 20 ft/s (0.23 m/s to 6.10 m/s) Accuracy: ±0.5%; ±0.1 ft/s (±0.03 m/s) Level Measurement Method: Ultrasonic Standard Operating Range: 0.25 to 60 in. (0.634 to 152.4 cm) Optional Operating Range: 0 (0 cm) to 240" (6.1 m) (with 18" dead band) Temperature Compensated Accuracy: ±0.1 in. (±0.25 cm) 1% Accuracy Surcharge Conditions Level/Velocity Level Method: Piezo-resistive pressure transducer Maximum Range: 138 inches (3.5 meters) Velocity Method: Electromagnetic Range: -5 to +20 ft/s (-1.5 to +6.1 m/s) Specifications Flo-Dar Sensor Information: Flow Station information: Data Storage 64K (16K cycles of velocity/level data) Local Terminal RS232C at 19.2K baud Timebase Accuracy: 1 second per day Outputs: Four 4-20 mA outputs; system-isolated, up to 600Ω load. Each output is selectable between FLOW, LEVEL, VELOCITY OR SURCHARGE LEVEL. Power Requirements AC: 85-264 VAC, 47-63 Hz. 32 watts DC: 12 VDC for Flo-Station without Display or Flo-Station with Display (Backlight Off) 180 mA (2.1 watts) with (1) 4-20 mA utilized. Housing Material: ABS Plastic, NEMA 4 Dimensions: 10.2" W x 9.3" H x 4" D (25.9 cm W x 23.6 cm H x 10.2 cm D) Weight: 5 lbs. Temperature Operating Range: 14° F to 122° F (-10° C to 50° C) Temperature Storage Range: (without display) -40°F to 140°F (-40°C to 60°C) (with display) 4°F to 140°F (-20°C to 60°C) w/Display PAGE 7 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 8 Map PAGE 8 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 9 Site Information and location information Summary Comments: McCutchen has a Combination of Residential and some commercial flows. Estimated Capacity is near 17%. Flow Stats Velocity Stats Level Stats PAGE 9 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 10 Summary Comments: Buena Vista has very predictable Residential flow. Estimated at or near 22% of Capacity. Flow Stats Velocity Stats Level Stats 27.9 6.8 3.66 . .MGD 4. .MGD 8. .MGD 12. .MGD 16. .MGD 20. .MGD 24. .MGD 28. .MGD 1 EST. Cap Max Flow Average Flow 5 2.2 . .FPS .5 .FPS 1. .FPS 1.5 .FPS 2. .FPS 2.5 .FPS 3. .FPS 3.5 .FPS 4. .FPS 4.5 .FPS 5. .FPS 5.5 .FPS 6. .FPS 1 Max Velocity Averge Velocity 18.2 13.1 .IN 5.IN 10.IN 15.IN 20.IN 25.IN 30.IN 35.IN 40.IN 45.IN 1 Max Level Average Level PAGE 10 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 11 Confined Space Installation US3 Installation Practices does not require Full Confined space entry into the Manhole. We do cross the plane with our hands and arms but never actually enter the Manhole. We do take Gas readings and Fill out the confined space permitting. All of our Technicians have been fully trained in Confined Space and CPR. Technicians: Greg Serres Gus Williams PAGE 11 Friday, March 28, 2014 Sales Office: 601 N. Parkcenter Drive, Suite 209 Santa Ana, Ca 92705 Phone: 714-542-1004 Engineering Office: 6190 Fairmont Ave Suite E San Diego, Ca 92120 Phone: 619-546-4281 Report Summary 12 Report Data PAGE 12 McCutchen fieldBakersfield manhole X Install Date: 3/8/2014 Access:System Type: StormSanitary Map Technology Traffic Plan Flow Meter Meter Depth ":16.5' Meter SN ": N/A Avg Velocity Avg Measured Level Multiplier o 26"1 Gas O2 H2S CO LEL 19.4 4 5 9.4 Notes only saw mud / dirt Traffic Safety on side of road Land Use Residential Commercial Industrial Trunk X X East Manhole Depth " 42" 20.5' Round 42"/ poor concrete 26 N/A 35.8" Upstream Flow Heading Flow Direction Sensor Dist. to Crown Sensor Offset Velocity Profile Data Velocity Profile Taken Silt (inches) Manhole Material Pipe Condition Pipe Shape Inner Pipe Size " (In/Out) Pipe Size " Manhole No. Site Report Confidential Proprietary Information 03-21-2014 PAGE 13 Bakersfield McCutchen field Meter Site Document Manhole Before Install Installed Downstream Site Installation Process Upstream PAGE 14 Temporary Flow Study Bakersfield McCutchen Utility Systems, Science and Software Santa Ana, CA 92705 601 N. Parkcenter Drive Suite 209 Meter Start Date From 3/8/2014 12:00:00 AM Meter Stop Date To 3/18/2014 12:00:00 AM Velocity (fps)Level (in)Flow (mgd) Average 0.812 6.137 0.879 Maximum 3.150 30.730 6.193 Minimum 0.000 0.000 0.000 Pipe Size 48.000 Estimated Capacity (mgd)36.497 Capacity Used 16.97 % Sensor Type Hach - Flodar San Diego, CA 92021 6190 Fairmount Ave. Suite E PAGE 15 Flow (GPM)Flow (MGD)Velocity (FPS)Level (inches) Date Avg Max Min Avg Max Min Avg Max Min Avg Max Min Total Gal Rain 3/8/2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.31 12.98 2.73 0 3/9/2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.13 14.36 0.00 0 Week:0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.72 14.36 0.00 0 3/10/2014 226.84 2436.69 0.00 0.33 3.51 0.00 0.32 3.00 0.00 5.79 14.68 0.00 326,651 3/11/2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.68 15.44 1.32 0 3/12/2014 380.73 4300.89 0.00 0.55 6.19 0.00 0.12 1.13 0.00 7.84 30.73 0.00 548,254 3/13/2014 485.59 1658.85 0.00 0.70 2.39 0.00 1.13 2.69 0.00 2.96 8.00 0.00 699,256 3/14/2014 402.43 1878.18 0.00 0.58 2.70 0.00 0.83 2.79 0.00 2.45 8.83 0.00 579,506 3/15/2014 1233.28 3568.73 0.00 1.78 5.14 0.00 1.44 3.15 0.00 5.26 12.73 0.00 1,775,9 17 3/16/2014 1706.90 3838.14 0.00 2.46 5.53 0.00 1.83 3.15 0.00 6.83 13.11 0.00 2,457,9 42 Week:633.68 4300.89 0.00 0.91 6.19 0.00 0.81 3.15 0.00 5.69 30.73 0.00 6,387,5 25 3/17/2014 1314.98 3854.54 0.00 1.89 5.55 0.00 2.00 3.15 0.00 6.34 13.15 0.00 1,893,5 65 3/18/2014 1244.01 2601.05 0.00 1.79 3.75 0.00 1.97 2.88 0.00 6.19 10.62 0.00 1,791,3 73 Page 1 of 2 Utility Systems Science and Software History for McCutchen: 03/08/2014 thru 03/18/2014 Report Date: 03/21/2014 Customer: Bakersfield Group: Plant 032014 SiteID: 339 PAGE 16 Flow (GPM)Flow (MGD)Velocity (FPS)Level (inches) Date Avg Max Min Avg Max Min Avg Max Min Avg Max Min Total Gal Rain 3/19/2014 2545.03 2545.03 2545.03 3.66 3.66 3.66 2.86 2.86 2.86 10.33 10.33 10.33 3,664,8 45 Week:1701.34 3854.54 0.00 2.45 5.55 0.00 2.28 3.15 0.00 7.62 13.15 0.00 7,349,7 83 Page 2 of 2 Utility Systems Science and Software History for McCutchen: 03/08/2014 thru 03/18/2014 Report Date: 03/21/2014 Customer: Bakersfield Group: Plant 032014 SiteID: 339 PAGE 17 Velocity (fps)Level (in)Flow (mgd) Average 0.000 8.379 0.000 RainFall Inches Maximum 0.000 12.310 0.000 Minimum 0.000 2.730 0.000 3/21/2014 1:36:55 PM PAGE 18 Velocity (fps)Level (in)Flow (mgd) Average 0.429 5.745 0.393 RainFall Inches Maximum 3.150 30.730 6.193 Minimum 0.000 0.000 0.000 3/21/2014 1:36:55 PM PAGE 19 Velocity (fps)Level (in)Flow (mgd) Average 2.015 6.870 2.228 RainFall Inches Maximum 3.150 13.150 5.550 Minimum 0.000 0.000 0.000 3/21/2014 1:36:55 PM PAGE 20 3/21/2014 1:36:55 PM 3/8/2014 thru 3/18/2014 PAGE 21 buenavista In MedianBakersfield manhole X Install Date: 3/8/2014 Access:System Type: StormSanitary Map Technology Traffic Plan Flow Meter Meter Depth ":16'5" Meter SN ": good flow Avg Velocity Avg Measured Level Multiplier 2.35 14.20"1 Gas O2 H2S CO LEL 20.9 13 0 0 Notes in center medium Traffic Safety cones, work sign Land Use Residential Commercial Industrial Trunk X X South Manhole Depth " 42 17' Round 42/ good concrete 0 2-4-8 55.77 12" Downstream Flow Heading Flow Direction Sensor Dist. to Crown Sensor Offset Velocity Profile Data Velocity Profile Taken Silt (inches) Manhole Material Pipe Condition Pipe Shape Inner Pipe Size " (In/Out) Pipe Size " Manhole No. Site Report Confidential Proprietary Information 03-28-2014 PAGE 22 Bakersfield buenavista In Median Meter Site Document Manhole Before Install Installed Downstream Site Installation Process Upstream PAGE 23 Temporary Flow Study Bakersfield buenavista Utility Systems, Science and Software Santa Ana, CA 92705 601 N. Parkcenter Drive Suite 209 Meter Start Date From 3/8/2014 12:00:00 AM Meter Stop Date To 3/19/2014 12:00:00 AM Velocity (fps)Level (in)Flow (mgd) Average 2.231 13.109 3.658 Maximum 5.029 18.250 6.830 Minimum 1.580 1.248 0.108 Pipe Size 42.000 Estimated Capacity (mgd)27.944 Capacity Used 24.44 % Sensor Type Hach - Flodar San Diego, CA 92021 6190 Fairmount Ave. Suite E PAGE 24 Flow (GPM)Flow (MGD)Velocity (FPS)Level (inches) Date Avg Max Min Avg Max Min Avg Max Min Avg Max Min Total Gal Rain 3/8/2014 1706.30 4702.79 74.86 2.46 6.77 0.11 3.27 5.03 1.72 9.00 16.72 1.25 2,457,0 65 3/9/2014 2636.04 4466.88 1277.66 3.80 6.43 1.84 2.17 2.64 1.91 13.42 17.91 8.58 3,795,8 94 Week:2171.17 4702.79 74.86 3.13 6.77 0.11 2.72 5.03 1.72 11.21 17.91 1.25 6,252,9 60 3/10/2014 2499.77 3657.49 1259.78 3.60 5.27 1.81 2.12 2.44 1.78 13.25 15.93 8.96 3,599,6 71 3/11/2014 2571.15 4313.78 1259.81 3.70 6.21 1.81 2.15 2.50 1.82 13.34 17.70 8.90 3,702,4 53 3/12/2014 2678.23 4313.78 1311.09 3.86 6.21 1.89 2.20 2.72 1.90 13.51 17.70 9.12 3,856,6 57 3/13/2014 2640.03 4451.67 1250.01 3.80 6.41 1.80 2.15 2.75 1.77 13.57 16.87 8.94 3,801,6 42 3/14/2014 2599.66 4075.90 1275.76 3.74 5.87 1.84 2.13 2.60 1.84 13.61 16.47 8.98 3,743,5 17 3/15/2014 2632.70 4487.21 1207.77 3.79 6.46 1.74 2.14 2.66 1.58 13.59 17.45 8.61 3,791,0 90 3/16/2014 2848.79 4743.08 1242.01 4.10 6.83 1.79 2.24 2.66 1.80 13.76 18.25 8.65 4,102,2 57 Week:2638.62 4743.08 1207.77 3.80 6.83 1.74 2.16 2.75 1.58 13.52 18.25 8.61 26,597, 285 Page 1 of 2 Utility Systems Science and Software History for buenavista: 03/08/2014 thru 03/19/2014 Report Date: 03/28/2014 Customer: Bakersfield Group: Plant 032014 SiteID: 341 PAGE 25 Flow (GPM)Flow (MGD)Velocity (FPS)Level (inches) Date Avg Max Min Avg Max Min Avg Max Min Avg Max Min Total Gal Rain 3/17/2014 2501.14 4261.72 1412.09 3.60 6.14 2.03 2.17 2.54 1.93 13.06 17.33 9.14 3,601,6 40 3/18/2014 2374.94 3505.81 1421.97 3.42 5.05 2.05 2.12 2.41 1.77 12.82 15.58 9.03 3,419,9 16 3/19/2014 2230.53 2941.28 1392.82 3.21 4.24 2.01 2.14 2.40 1.80 12.23 15.51 8.55 3,211,9 60 Week:2368.87 4261.72 1392.82 3.41 6.14 2.01 2.14 2.54 1.77 12.70 17.33 8.55 10,233, 516 Page 2 of 2 Utility Systems Science and Software History for buenavista: 03/08/2014 thru 03/19/2014 Report Date: 03/28/2014 Customer: Bakersfield Group: Plant 032014 SiteID: 341 PAGE 26 Velocity (fps)Level (in)Flow (mgd) Average 4.124 5.283 1.472 RainFall Inches Maximum 5.029 16.720 6.772 Minimum 2.160 1.248 0.108 3/28/2014 1:10:30 PM PAGE 27 Velocity (fps)Level (in)Flow (mgd) Average 2.139 13.409 3.708 RainFall Inches Maximum 2.750 17.910 6.461 Minimum 1.580 8.580 1.739 3/28/2014 1:10:30 PM PAGE 28 Velocity (fps)Level (in)Flow (mgd) Average 2.185 13.247 3.727 RainFall Inches Maximum 2.660 18.250 6.830 Minimum 1.770 8.550 1.788 3/28/2014 1:10:30 PM PAGE 29 3/28/2014 1:10:30 PM 3/8/2014 thru 3/19/2014 PAGE 30