HomeMy WebLinkAbout04/17/2015AT
OFFICE OF THE CITY MANAGER
April 17, 2015 TO: Honorable Mayor and City Council
FROM: Alan Tandy, City Manager
Subject: General Information
Notable Items
We are pleased to acknowledge that the ribbon cutting for the final phase of the
Westside Parkway occurred earlier this week. The project extends the Westside
Parkway from Allen Road to the Stockdale Highway/Heath Road intersection,
and includes two miles of freeway and a bridge at Renfro Road. Please see
attached photos.
Attached is an updated schedule for TRIP project target dates. Completed
projects have been removed from the list and existing and future projects have
been updated.
The Water Department stopped water flow from Truxtun Lake east to Truxtun Lake
west this week. The purpose is to preserve water during the drought and maintain
water in Truxtun Lake east which is the larger lake. Truxtun Lake west will dry out,
however, it has been over 10 years since Truxtun Lakes has been cleaned and this
will provide the opportunity to perform much needed maintenance. This activity
can be considered part of the drought emergency regulations.
This will be another busy weekend for local hotels and restaurants as Cali Finale
returns to Rabobank Theatre for its third year in a row. This event brings
cheerleaders from throughout the state to Bakersfield for two days of
competition. As its name implies, this is the final event of the season. According to the Convention and Visitors Bureau, Cali Finale is larger for some local hotels
than the CIF Boys Wrestling Championships.
A proposal for transportation funding was announced this week by Sen. Jim Beall
to create a five-year temporary funding source for California’s transportation
system. Sen. Jim Beall’s plan, SB 16, would expressly address the backlog of
maintenance needs, and is estimated to generate between $2.8 and $3.6 billion
annually. The funds would be directed to maintain and preserve local streets and
roads and the state highway system. In addition, five percent of the revenues
General Information
April 17, 2015 Page 2
would be set aside to incentivize counties currently without a local transportation
funding measure to approve such a measure.
The League has developed preliminary estimates of the revenues that cities could
receive under the proposal. These numbers should be approached with caution
as there are likely to be adjustments to the proposal as it moves through the
legislative process.
The Senate plan proposes to raise revenues through:
• A 10 cent increase in the excise tax on gasoline and diesel;
• $35 Vehicle Registration Fee (VRF) increase for all vehicles;
• A $100 VRF increase for zero-emission vehicles;
• Payback of outstanding transportation loans over a three-year period;
and
• Truck Weight Fees would be returned to the transportation fund over a
five-year period (20 percent annually). The general fund would be
backfilled by a 0.35 percent increase in the VLF over the five-year
period (raised in 0.07 percent increments over the five-year period).
If the State is to allocate $1.33 billion, Bakersfield’s share would be $7.5 million. If
the State allocates $1.71 billion, Bakersfield’s share would be $9.58 million. This
could be a big positive for the City of Bakersfield.
The Recreation and Parks Summer Brochure is now available online and contains
all the activities and services that will be provided this summer by City staff. Some
of the more popular items include swim lessons, summer day camps, concerts
and movies in the parks!
Local students from the Si Se Puede Learning Center recently sold cupcakes and
lemonade to raise money to purchase toys and food for the animals at our
shelter. Staff also went to the school and provided education on animal health
and safety to the children. We appreciate their efforts!
TRIP
Striping Activities Scheduled for State Route 58
Motorists are advised to anticipate nighttime lane closures, ramp closures and
detours on State Route 58, between State Route 99 and Cottonwood Road, from
April 19th through April 23rd. The closures and detours are needed for road striping
activities required for construction of the Beltway Operational Improvements
Project. This work will be performed Sunday through Thursday nights, between the
hours of 9 p.m. and 5 a.m.
General Information
April 17, 2015 Page 3
Striping activities will affect both directions of travel and will include closures of
freeway lanes and on- and off-ramps along the route. Closures will be in effect in
localized areas where work is being performed so closures will change from night
to night. At least one freeway lane will remain open to traffic, in each direction,
while work is underway.
The westbound State Route 58 to northbound State Route 99 connector ramp will
require a short, but full closure while this segment is re-striped. Traffic will be
detoured to Real Road then to the northbound State Route 99 on-ramp from Wible Road while work is completed on the connector ramp.
Northbound Chester Avenue, between Loustalot Lane and Brink Drive will also be
re-striped and will require alternating lane closures while work is underway.
Nighttime Construction Work on Rosedale Highway
Construction on the Rosedale Highway Widening Project is scheduled to begin
next week, Sunday, April 19th through Thursday, April 23rd. The contractor plans to
begin removing the median and installing temporary paving, which will allow two
lanes to remain open to daytime traffic during construction.
Work is scheduled to begin at Gibson Street and continue westward to Patton
Way, and will require nighttime closures of the inside lanes, in both directions,
while work is underway. These closures are expected to be in effect Sunday
through Thursday night between the hours of 8 p.m. and 6 a.m. the following
morning for the next two months.
Reports
For your reference, the following reports are attached:
Streets Division work schedule for the week of April 20th; and
Recreation and Parks Monthly Report
Event Notifications
Event Calendar for Rabobank Arena Theater and Convention Center
AT:CH:cb:al
cc: Department Heads
Roberta Gafford, City Clerk
Westside Parkway
TRIP Project Target Dates
Project Projected Opening
Morning Drive Interchange July, 2015
Hosking Road Interchange January, 2016
Rosedale Highway Widening October, 2016
SR-178 Widening, Canteria – Miramonte April, 2017
Beltway Operational Improvements July, 2017
24th Street Improvements
Final Design – October 2015 ROW Cert – May, 2016
Duration 24-month
Projected bid award –
August, 2016 August, 2018
Centennial Corridor
Final Environmental
Document expected to be
approved by CalTrans –
FED - July, 2015 ROD – October 2015
November, 2019
Phase 1, Kern River Bridge
Package:
• Projected bid award – April, 2016
• Projected completion –
November, 2017
Duration 14-month
Phase 2, SR-58 Connector to
WSP:
• Projected bid award – September, 2017
ROW – July 2017 Duration 30-month
Hageman Flyover
Design completion
expected – May, 2016 Note: The Hageman Flyover is not currently
funded for construction. Property Acquisition
projected completion –
October, 2017
Week of April 20_2015_Work Schedule.doc
Page 1 of 2 STREETS DIVISION – WORK SCHEDULE
Week of April 20, 2015 – April 24, 2015
Resurfacing/Reconstructing streets in the following areas:
Sealing streets in the area south of Ming Ave and east of Gosford Rd
Reconstructing streets in the area south of Wilson Rd and west of New Stine
Paving & grinding streets in Beale HUD area in preparation for street reconstruction/resurfacing
Paving streets in the area of Oleander to “H” St from Palm to Cherry St (HUD)
Paving streets in the area of Wilson to Planz west of So. Chester (HUD)
Miscellaneous Streets Division projects:
Video inspection of City owned Sewer & Storm lines to evaluate condition of pipes
Repairing damaged sewer line found during video inspection
Miscellaneous concrete repairs throughout the city
Dirt work and sewer line installation at Sports Village
Miscellaneous work at PD property room
Working on Brick repairs at Centennial Plaza
Grading for new parking lot at Mesa Marin Sports Complex and storm line installation NOTE: If raining, there will be no street sweeping service and all street cleaning personnel will
be assigned to cleaning plugged drains and part circle culverts. This also applies when a large
number of street sweeper are in Fleet for repairs. Areas that have been missed during this time
will be swept at the end of the month only when possible.
THIS SPACE INTENTIONALLY LEFT BLANK
Week of April 20_2015_Work Schedule.doc
Page 2 of 2 STREETS SWEEPING SCHEDULE Monday, April 20, 2015 City areas between 99 Hwy. & Stine Rd. – Panama Ln. & Taft Hwy.
Tuesday, April 21, 2015
Between Panama Lane & Woodmere Dr. – Ashe Rd. & Stine Rd.
Between District Blvd. & Panama Ln. -- Gosford Rd. & Ashe Rd.
Between Akers Rd. & Phyllis St. – Harris Rd. & Panama Ln.
City areas between Akers Rd. & Stine Rd. – Harris Rd. & Panama Ln.
Cul-De-Sacs on the north side of Angela Wy., between Manely Ct. & Cris Ct.
Between Oswell Park Dr. & Brundage Ln. – Oswell St. & Leeta St.
Wednesday, April 22, 2015
City areas between Snow Rd. & Rosedale Hwy. – Jewetta Ave., west to the City limit.
Between Ming Ave. & So. Laurelglen Blvd. – Coffee Rd. & El Portal / Laurelglen Blvd.
Thursday, April 23, 2015
Between Snow Rd. & Olive Dr. – Jewetta Ave., east to the canal boundary.
Between Olive Dr. & Hageman Rd. – Jewetta Ave. & Calloway Dr.
Between Niles St. & Sumner St. – Union Avenue & Beale Ave.
Between Sumner St. & E. Truxtun Ave. – Beale Ave. & Brown St.
Between Brundage Ln. & E. Belle Terrace St. – Union Ave. & Kincaid St.
Between Camino Media & Kroll Wy. – Coffee Rd., west to the PG&E easement.
Friday, April 24, 2015
Between Etchart Rd. & Pavilion Dr. -- Calloway Dr., west to the canal boundary.
Between Norris Rd. & Olive Dr. – Calloway Dr. & Coffee Rd.
Between Olive Dr. & Noriega Rd. – Calloway Dr. & Verdugo Ln.
City areas between Coffee Rd./Riverlakes ext. & Allen Rd. – Hageman Rd. & Rosedale Hwy.
City areas between Pacheco Rd. & Harris Rd. – Stine Rd. & Wible Rd.
We enhance the quality of life through a variety of programs, parks, and partnerships.
Department of Recreation and Parks
Date: April 16, 2015
To: Alan Tandy, City Manager
From: Dianne Hoover, Director of Recreation & Parks
Subject: March 2015 Monthly Report
Total monthly attendance for all programs, reservations and volunteers combined for
the month of March totaled 68,224 as compared to last year’s total of 56,946.
ADMINISTRATION
o Silver Creek & Yokuts Park Playground Rehabilitation Project – The
playground audit by Playsafe is scheduled for April 16th with a tentative
opening date of April 18th.
o WSP Weed Abatement – Tour with TRIP staff to clearly identify area for
spraying.
o Multiple meetings have been held with R&P Staff to discuss:
a. budget items b. water saving measures
c. design of Sports Village Phase III
o Worked with General Services to coordinate MLK gym floor and ceiling
project bids.
o Represented CPRS at event in Santa Barbara on 3/25/15 and Ventura on
3/24/15.
o Coordinated and met with Protection Force Security Force to discuss
ongoing contract needs and extension on 3/27/15.
o Agreements:
a. Parks Security –Staff met with Protection Force Private Security, Inc.
and has come to a mutual agreement on terms of the extended
agreement, which includes extending through December 31, 2015
and will add $50,000.
Department of Recreation and Parks March 2015 Monthly Report Page 2
We enhance the quality of life through a variety of programs, parks, and partnerships.
o Budget: a. 75% of Fiscal Year 2014-15 has passed. The Department has
expended 66.96% of the Operating Budget, which is 4.27% lower when compared to the same point in time in last year’s budget.
Most of this savings is attributed by the Department’s reduction in water use.
Wall Repairs:
Current Wall Repair List Summary:
*A notice to proceed with the repair work was given on 12/3/14
The City’s annual concrete contractor Cen-Cal Construction will be performing repairs
on the following walls locations:
o Wible Rd. south of Harris (west wall planters)-Completed
o Wible Rd. north of Harris (west wall planters)-Completed
o Milo Ave. & Marina Dr. (sump wall)
o Gosford @ Kroll & Reina (wall planters)
o Deer Peak Park (various locations)
o Greystone Park (shade structure pilaster)
o 5200 block of Gosford Rd. (canal wall)
o Olive Dr. & Alderbrook (S/E corner)
o Berkshire & Old River Road (S/E Corner)
o Calloway & Manhattan (molding on monument corner)
o Old Farm Rd & Rendley St. (Letter “I” Brimhall Estates Monument Sign)
o 11700 Block of River Run Blvd. & Mountain Park Dr. (N/E Planter)
o Harris Rd. & Silvergate St.
Aquatic Maintenance:
Aquatics Staff completed maintenance repair work on the men & women’s poll restrooms.
McMurtrey’s acid chemical room was painted by Elite Painting contractors. Further maintenance work pending.
New Pool chemical contract was awarded to Brenntag Chemicals
Aquatics staff met with Howard Wines (City Fire Dept.) to assist in hazard
assessment of pool equipment/ chemical room.
Staff is fencing a section of the Sumner warehouse to store materials specific to
aquatics maintenance.
Department of Recreation and Parks March 2015 Monthly Report Page 3
We enhance the quality of life through a variety of programs, parks, and partnerships.
RECREATION Total Attendance: 68,224 Special Event Reservations:
March 1st – Sister City Gardens South, Friendship Force World Friendship Day –
100 guests
March 7th –
Central Park, Empty Space Productions V-Day Festival – 150 guests
TPRW, Second Star to the Right Walk/Run – 500 Guests
Uplands of the Kern, Brain Injury Association Walk/Run – 100 Guests
Wayside Park, Color Me Rad Walk/Run – 500 Guests
March 21st –
TPRW, Cystic Fibrosis Foundation Walk/Run – 400 Guests
Yokuts Park, Love Water Inc., Walk/Run – 250 Guests
Total Attendance: 17,418 Reservations/Special Events
Silver Creek Community Center
Total Attendance:
o Overall attendance was 647 as compared to last year of 690.
o There were no rentals for the month of March.
After School Fun – Attendance:
Weekly Average: 59 Monthly: 295
Total Revenue: $2,829.00 Saunders Recreational Facility
Total Attendance:
o Overall attendance was 1,532 as compared to last year of 1,810.
o There were six (6) rentals for the month of March.
Hockey Program: 67 Registered Participants / Total Revenue: $335.00
Soccer Program: 10 Registered Teams / Total Attendance: 120 Aquatics
Overall Aquatic Attendance:
o Total attendance for Aquatics was 14,566 compared to March 2014 of 15,257.
o Total attendance for City aquatic programming had a slight decrease of 4.5% compared to the same time last year. This was due to the decrease
in number of preschool children participating in the Water Safety Presentations this month and the number of participants in the high
schools swimming and swim meets at Jefferson Pool.
McMurtrey Aquatic Center:
o Monthly attendance at the McMurtrey Aquatic Center was 8,982 compared to last year’s 8,796. This 2.1% growth was due to the
increase in lap swimming and other aquatic programs.
Department of Recreation and Parks March 2015 Monthly Report Page 4
We enhance the quality of life through a variety of programs, parks, and partnerships.
100 Mile Lap Swim Club
o The 100 Mile Lap Swim Club is currently made up of 416 active
members that swam 14,742.91 miles this month. The club has
swum a combined total of 145,092 miles.
Jefferson Pool:
o Foothill and Mira Monte High School’s Swim Teams attendance at
Jefferson Pool for the month of March was 1,661compared to last year’s
2,388. This decrease in attendance is due to holding 2 smaller swim meets
instead of 4 swim meets last year.
Silver Creek Pool:
o Stockdale and Ridgeview High School’s Swim Teams attendance at Silver Creek Pool for March was 2,846 compared to last year’s 2,641 total. This
increase is due to having more swimmers on their teams as there were only 2 swim meets held this month compared to 4 last year.
First 5 Kern Make A Splash Program:
o Staff presented 40 Water Safety Presentations to 977 children at 21
different schools. The evaluations from these Water Safety Presentations have been very positive and reflect the impact “Stewie the Duck Learns
to Swim” has on the children. Staff also had a booth at the Kern Medical Center’s Kid’s Health and Wellness Fair on March 13th from 11:30 am to
1:30 pm. Water Safety, Rethink Your Drink, and CPR class information was
shared to approximately 100 employees and visitors. Additionally, the
Department was awarded $175,000 for another 5 year term 2015-2020 First
5 Kern Make A Splash Grant. This grant cycle begins on July 1, 2015.
Kaiser Permanente Operation Splash Grant:
o The Department received a 2015 Operation Splash Grant for $31,500 from
Kaiser Permanent. This grant will serve hundreds of low-income children
and adults throughout Bakersfield. They will have the opportunity to learn
to swim, practice their swimming skills during open swim or join the
Jefferson’s or Dr. Martin Luther King’s Recreational Swim Teams. This grant
will also educate families on the health benefits gained by reducing their
intake of sugar-sweetened beverages and encourage them to “Rethink
their Drink” by drinking more water.
USA Swimming Foundation Make A Splash Grant:
o The Department received the USA Swimming Foundation Make A Splash
Grant again this year for $4,500. This grant provides 100 $5.00 swim lessons
for income eligible children 3 to 17 years of age.
Waterpark Lifeguard & Water Safety Instructor Courses:
o Two classes were conducted this month by our Aquatic Trainers. On
March 7th, 8th, and 14th a Blended Waterpark Lifeguard class with 7
participants was held and on March 30th through April 3rd a Waterpark
Lifeguard class with 32 participants. Staff has been busy interviewing and
hiring new staff for the summer. Also, on March 1st a recertification class
was held with 24 Lifeguards renewing various certifications that were set
to expire.
Department of Recreation and Parks March 2015 Monthly Report Page 5
We enhance the quality of life through a variety of programs, parks, and partnerships.
Underwater Eggstravaganza:
o The Ninth Annual Underwater EGGStravaganza was held at McMurtrey on Saturday, March 28th. Total attendance for the event was 487, with 257
children participating in the underwater egg hunt. Families enjoyed the opportunity to swim, play games, visit the Water Safety Booth, and slide
down the waterslides following the egg hunt which included approximately 4,000 eggs.
CPRS District 15:
o The California Parks & Recreation Society (CPRS) District 15 held its Annual
Awards and Installation Luncheon and Ja’Nette Beck received the 2015
President Award for her outstanding service as President of District 15 for
2014. Mac Robertson was also presented with an Outstanding
Community Service Award for his dedication and commitment to
Aquatics. Mac Robertson leadership and accomplishments have made a
significant difference in Aquatics as he has taught hundreds of children
how to swim as well as trained hundreds of Lifeguards and Water Safety
Instructors.
Donation Total: $1,902.38 Athletics
Total Attendance:
o Adult, Youth, Fitness and Adaptive Programs total attendance for the
month of March was 30,766 as compared to last year’s total of 25,724.
Monthly attendance increased by 5,042 or 19.6% as compared to the
same time last year. The increase in attendance is attributed to:
o Increased participation in: League of Dreams Baseball, Little T-Ball Stars,
Adaptive Softball, St Patrick’s Day Run and the Quality of Life Lecture
Series.
o Increased participation in softball tournaments held at the Mesa Marin
Sports Complex with the addition of the BHS High School Girls Fast Pitch
Softball Tournament.
Athletic Programming:
o Adult Softball:
o The Spring Adult Softball League is made up of 166 teams – 96
Men’s, 66 Coed and 4 Women’s.
o The Spring League began their ten weeks of regular league play on
March 3rd.
o To accommodate the 83 softball games a week, Mesa Marin’s 4
fields are used 5 nights per week, Beach five nights per week, and Wayside is used three nights a week.
Softball Tournaments:
o Mesa Marin hosted the Bakersfield high School Girls Fast Pitch
Softball Tournament on March 5th, 6th & 7th. Twenty teams participated in the tournament.
o Mesa Marin also hosted the Mira Monte High School Girls Fast Pitch
Softball Tournament on March 13th & 14th. Eighteen teams
participated in the tournament.
Department of Recreation and Parks March 2015 Monthly Report Page 6
We enhance the quality of life through a variety of programs, parks, and partnerships.
Adaptive Programming:
o Adaptive Softball:
o Adaptive Softball games started on Thursday, March 19th at Beach
Park for this seven week spring league.
o Seven teams from local adult day programs play each week in this
modified softball league.
o League of Dreams – Adaptive T-Ball:
o League of Dreams Baseball did not have to charge anyone to
participate in t-ball for a third year in a row due to their fund raising
efforts. The participation level increased again this year growing
from 242 participants last year to 271 this year.
o 345 “Angel” Volunteers donated 1,035 hours this month for a total value of
$9,187.
Fourth Annual “Quality of Life” Presentation & St. Patrick’s Day 5K Run/Walk
The City and CSUB joined forces again this year to improve the quality of
life in Bakersfield by partnering to present a lecture on “Stress Success!
Perspectives and Strategies”. The lecture was given by Dr. Steven Bacon,
Janet Millar, LMFT, Amberly Neese, and David Atkins, LMFT on Tuesday,
March 10th.
In conjunction with this presentation, a St. Patrick’s Day 5K Run/Walk was
held on Saturday, March 14th at The Park at River Walk. There were 242
people that participated in the run.
25 CSUB P.E.A.K. students donated 112.5 hours working at the St. Patrick’s
Day Run for a total value of $1,080.
Donation Total: $10,267.20 Dr. Martin Luther King, Jr. Community Center
Total Attendance:
o Overall attendance for the month was 3,295 as opposed to last year’s
total of 2,029. Attendance at the center was up 42% from last March due to new exercise class through Kaiser Permanente, the after-school snack
program and additional rentals.
o Grants – The center received a grant from the Arts Council of kern for
$1,000. The grant will be used for a variety of artists to come work with the center participants during the summer Camp King Program.
Donation Total: $ 21,516.00
Department of Recreation and Parks March 2015 Monthly Report Page 7
We enhance the quality of life through a variety of programs, parks, and partnerships.
PARKS
California Avenue
New synthetic turf in medians east and west of “H” Street on California
Avenue were installed this month. City in the Hills
Tumbleweeds were removed in undeveloped areas (Paladino Dr.
&Panorama Dr.)
Jefferson Park
Fidel Gonzalez, Frank Hinojosa and Mike Reynoso attended a pre-
construction meeting on 3/19/15 with contractor that will be installing new
shade structure at reservation area.
Mill Creek
Members of Leadership Bakersfield conducted a walking tour along Mill
Creek from the Mill House to the Museum of Arts on 3/20/15. Staff cleaned
and trimmed areas for event. Mt. Vernon
Renovation/re-construction of medians between Columbus St. and
University Ave were completed this month. Fidel Gonzalez, Frank Hinojosa,
Dan Cestone and Jesse Arruejo attended a final inspection with contractor
on 3/13/15. This area will go into a one year maintenance period in which
the contractor will be responsible for maintaining and thereafter the City will
take over. Truxtun Avenue
New mow ramps (6 total) were installed in medians between “T” Street and
“L” Street by cement contractor on 3/12/15 and 3/13/15. Westside Parkway
Area 2 staff assisted with cleanup at Allen Road bridge on 3/24/15. SRO
assisted with spraying new addition to Westside Parkway. Craftworker Division Mesa Marin
On 3/4/15 Special Projects Craftworkers assisted Electricians in locating and
exposing conduit of irrigation controller electrical feed in preparation of grading for Phase 2 parking lot.
On 3/19/15 Special Projects staff started irrigation main line, irrigation wire reroute project. Project completed on 3/31/15. Wilderness Park
On 3/6/15 Supervisor 1 and Craftworker completed a facility safety
inspection of the playground at Wilderness Park.
Department of Recreation and Parks March 2015 Monthly Report Page 8
We enhance the quality of life through a variety of programs, parks, and partnerships.
8 Tree Division
The annual Tree Contractor, General Tree has completed trimming at the
following locations:
Stine Center divider from Planz Rd to Stockdale Hwy
California Center divider from Stockdale Hwy to Hwy 99
Removal of three (3) trees, two (2) on Texas Street and one
(1) on Augusta. This was requested by the Streets
Department for sidewalk replacement.
Beale Park
Tree staff trimmed all trees at Fire Station 5
Tree staff removed trash from over 30 homeless encampments in the Kern
River.
City Tree Staff removed several trees on “H” Street & Bradley requested by
Code Enforcement.
Tree Staff removed five (5) trees at City Hall North. This was requested by
the Streets Department for sidewalk replacement. The trees will be
replanted with 24” box trees by annual contractor.
Trimming:
Trees Trimmed: 58 Clearance: 227 Removals: 7
Service Tickets:
Received: 38 Completed: 36 UPCOMING/ONGOING EVENTS:
Lifeguard Academy – Interested in becoming a Lifeguard? Inquire at
www.bakersfieldparks.us for details.
Adult Softball Signups – Registration from April 6th – May 8th $475 per team.
For additional activities and events offered through the Recreation and Parks
Department, Please visit our website at www.bakersfieldparks.us.
BOX OFFICE HOURS
Mon-Fri 10 AM - 5 PM
Closed Saturday & Sunday
(Excluding Event Days)
TICKETMASTER LOCATIONS
Walmart - 2601 Fashion Place
Walmart - 6225 Colony Street
Walmart - 8400 Rosedale Hwy
CHARGE-BY-PHONE
1-800-745-3000
GROUP SALES INFORMATION
661-852-7309
SEASON TICKET INFORMATION
Bakersfield Condors
661-324-PUCK (7825)
www.bakersfieldcondors.com
Bakersfield Symphony
661-323-7928
www.BSOnow.org
Bakersfield Community
Concert Association
661-589-2478
661-663-9006
www.bakersfieldcca.org
UPCOMING EVENTS
April 24 – US Army Bowl 7:00 PM
$10 On Sale Now
May 7 – Marvel Universe Live 7:00 PM
$70, $45, $15 On Sale Now
May 8-10 – Marvel Universe Live
$70, $45, $30, $25 On Sale Now
May 26 – Eagles 8:00 PM
$177.50, $127.50, $77.50, $47.50 On Sale Now
June 2 – Theresa Caputo Live 7:30 PM
$89.75, $69.75, $49.75, $39.75 On Sale Now
August 27 - Florida Georgia Line 7:30 PM
$54.75, $34.75 On Sale Now
May 9 – Bakersfield Symphony 7:30 PM
$45, $35, $30, $20 On Sale Now
June 2-3 – Sesame Street Live
$30, $22, $15 On Sale Now
June 5 - Freestyle Explosion 7:30 PM
$40.50, $35.50, $30.50 On Sale Now
July 11 – Intocable 8:00 PM
$85, $70, $55, $45, $35, $25 On Sale Now
July 14 – Dancing With The Stars Live 8:00 PM
$74, $48, $34 On Sale Now
July 28 – Juanes 7:30 PM
$73.50, $48, $38, $28 On Sale Now
April 24 - Beatles vs Stones 8:00 PM
$15 On Sale Now
May 9 – Trace Adkins 8:00 PM
$55, $39, $25 On Sale Now
May 22 - Average White Band 8:00 PM
$15 On Sale Now
September 18 - Firefall 8:00 PM
$15 On Sale Now
October 2 - Hotel California 8:00 PM
$15 On Sale Now
www.rabobankarena.com - www.bhnamphitheatre.com